Flare System Libre
Flare System Libre
Flare System Libre
Calcgory - A l
Fl:lrc S ~ s c c ~ n s
Modulc No.
TES-TS-P-014
Rcliancc I~iduslricsLi~~iilcd
P;~ial&?;la$?Tnitiilig S!.stcn~
I
INDEX
'
1-
TRE.
B3'3K
ACC
DsTE
NO. .. ..
.. ...
..
..
..
Rcliancc lndustncs L I I ~ I I I C ~
Patalgaflgil T n ~ n l n gSys~cm
Cntcgon. A1
Flnrc Svs~crns
Modulc No.
TES-TS-P-(114
Preprcd
b\. : h.1. G.
Rev : 00
, '
.f';'*'
{
/.
00
LZ
Calcgoy - A l
Flarc Systems
1.0
INTRODUCTION
I
1.1
Mod~llcNo.
TES-TS-P-014
iI
I
What is flarir~g?
1.2
I
In general, proper planning and layout of process plants require that special
consideration be given to the design of vanous safety facil~ties to prevent
catastrophic equipment failure. These facilities are designed to prevent
overpressure and to provide for safe disposal of dischuged vapors and liquids.
Portions of these facilities are also used as an operational tool for safe disposal of
hydrocarbons - particularly during start-up and shutdown phases
Standard pressure relieving devices most often used are safety and relief valt~es,
rupture disks, pressure control valves and equipment blowdown valves. Direct
discharge of waste or excess vapors to atmosphere is unacceptable either 1
Xon hazardot~svapors such as low pressure steam are c;i;ally discharged di:ec;ly
to the atmosphere ir: contrast, hydrocarbon vapors that are dischar~edon a
continuous or intermittent basis can not be directly discharged to the atmosphere
and should be disposed ofthrough a closed system, and burnt in a flare.
I
hlodnlc No.
Rclial~ccIndustries Li~ilitcd
Palnlg:injg 1'r;tioing S\slclll
Carcgop A l
Flarc Svstcllis
TES-TS-P-014
There are basically two types of flare systcm ~larncly,Elevated FI:~rcs & \I.(:ro~~nct
Flrrrs.
In an clevnted flare sys~enl,cotnbustion rcactlons are carried out : ~ tthe top of a
pipe or stack w!iere thc bt~rnerand igniter arc located Rclicving gascs are sent
throuzh an elevated stack from a closed collection systcm and Lmrned c!T at the
top The flame generated is open in this casc E 2 the flarcs of PX and LAB
I
plants at RIL - PG
A sround flare is also similarly cquipped except that the combustion takes place at
The type that uses a water spray to disperse the combustion gases
The venturi type that depends on the kinetic energy available in the waste
gases to inspirate and mix the proper amount of air with the gases
Multi Jet ground flares where the fiow of the waste gas is distributed
through many,srna!l burners
* I
2
3
4
5
However, a disadvantage of the ground flares is that they must be well isolated
from the remainder of the plant and process lines, thus requiring considerable
space and Ions interconnecting piping. Concentrations of toxic gases are relatively
high because of corr.!x;;ti~n t3kiog place at ground le:re! A :*a:er spray can be a
possible solution, but it is often avoided because of
I
1.
7
-.
Prcprcd bv : h.1. G. M a w
Re\ : 00
I Rc~ic\vcdby : A. M. H n t a n g d i I
( D;ltc : 301011')X
-
-.
.
. .:
..
I Page : 4 of 66
Rcfi:!~icclr~d~~sfrics
1.ini1tcd
P:lfnlg~T~li~!ir~~:
Svsfcrn
I
potential water darna~eto ~n~trumcntatlon
Category A1
Flare S\.stcms
hlodul~'No.
I'ES-1's-1'-01.1
In contrast, an Elevated flare requires less gdund arca Becatlse o!. its high
elevation, it can be locatcd within a process arca or on the periphery of tlic plant
site, since radiation effects and ground level concentrations of pollutants can bc
maintained within allowable limits P~pingcosts tend to bc lower duc to snlaller
and shorter pipe runs Also the distance between the point of discharge from
safety valves and the flare stack is less than that in the case of ground flares
A problem with elevated flares is that initial iand operating costs are high.
Maintenance is also difficult a d tedious. The visibility of the flame is the most
serious disadvantage and sometimes causes objections from local community.
These systems also require more steam to produce a smokeless flare. Afinal
disadvantage is that noise levels are relatively high.
There are situations when a ground flare is used in conjunction with a second
conventional flare, which may be an elevated system. The ground flare is designed
to handle the normal flaring requirement. In the event of major failure, excess flow
is automatically diverted by a seal to a second flare. Since, the possibility of a
major failure is rather remote, it may not conflict with pollution or local site
regulations.
i
I
Prcprcd b: : M. G.Mamc
Rcv : 00
1 Rc\ic!vcd
-__ !&- .
b?. : A. M. Hattangadi
. ?,),,>l;<,Q
--._,
C:ncgon - A I
FI:lrc Svstclils
-~
Rcli;~ilccI~ldt~s~rics
Lill~ilcd
PJI:I~~IIILXI
l'r:1111i11gSVSICIII
Module No.
TES-TS - ~ - O l 4
Pressure - relieving headers that convey discharges from safety valvcs and
pressure control valves in the process unit to the flare.
Knock out ( KO ) drum located before the flare stack in order to separate
any condensate or liquid from the relieving vapors (it is hazardous to bum
liquid droplets)
I
Flare stack consisting of riser structure, Molecular seal and burner tip
The relieving gases from safety relief valves and pressure control valvts are
collected in a horizontal or vertical hock-out drum through a flare main teader.
A n y condensate canied out alongwith the gases is knocked down here. A
constant liquid level is maint'ained in the boot'drum. The liquid is pumped to a
slop tank or is reused in oil recovery facilities. Jf required, steam is used for
winterizing to prevent freezing. The gas from the KO drum is then sent t o an
elevated flare stack. At the bottom of the 'stack, normally a liquid seal is
maintained. Alternately another seal may be located between the KO drum and the
flare stack. A positive water seal is maintained by controlling the le\rel. In cold
countries, the water seal is also provided with steam for winterizing.
I
The stack is comprised of a riser section, molecular seal and burner tip.
I
1.
R~serstructure
!
This normally consists of two o r more sections. The flare header enters at the
bottom section, which can also serve as a flare stack knock cut drum where any
condensate carried over from the main knock out drum is colle(:ted.
This is welded to the riser section. It provides a seal against entrance of air into
the flare stack and minimizes the possibility of a explosive mixture forming in the
Prcpclrcd bv : M. G. M3n.c
RCV : OO
.\
I Dare : 30/01198-~
.-. .
'!
.. . -
t,*
C : I I C ~-OA1~
Ilcli;tncc I~tduscncsLiltlitcdi
l'larc Svncrtts
P~I:II~:IIIEL
7r~111ing
SvsIc~n
Modllle No. :
TES-TS-P-OII'
flare system More infornlatcon on a niolccular steal is givcn in one of tile cbming
chapters Uriclly, it rescmblcs a bubble cap and creates a seal by usidg the
buoyancy of tile pursc gas to create a Lone where tlle pressure is greatek than
a!niosplienc pressure
Tlic t u r ~ c tip
r 15 sealed to the molecular seal outlet .r\cccssories on the burner tip
include about three or fo~crgas pilots, a similar number of pilot gaslair mixture
asseniblies, and steam supply nozzles for steam injection
I
At the top of the burner tip, pilot burners, whichare autoniatically lighted from a
remote place through the igniter line, are positioned The steam connection is also
provided for smokeless flares and a purge gas connection is provided for
maintaining an air free system and to prevent flash back by maintaining pressire at
the molecular seal higher than the atmospheric pressure. This arrangement
prevents air from re-entering the stack from ambient surroundings
In the next few chapters, we shall go through the flare system design guidelines,
,;
Prcprcd h : M. G.h43ne
--
,-Kc* :OC
Cnrcgory - A l
I;l:~rcSvslcnls
3.2
Modulc No.
TES-TS-P-014
Each prcssurc rclief valve shohd bc individually analyzed for any probable causes
of over pressure due to operational failures and plant fire.
Tlie valvc should be sized for the case that will require the maximum relieving rate.
If a fire condition is controllins, two separate safety valves, one for fire condition
and tlic other for operationai failure, may be provided since the fire situation'is less
likely to occur.
II
Guidelines for determining individual relieving rates are illustrated with an eiample
1
of a column Consider a fractionating column where different causes of overpressure day be
I
analyzed as follows :
cooling waterfailure
The cooling water typically, used as the cold utility in the overhead condenser may
stop because of power failure or some other operational problem. Under this
situation, overhead vapor will not condense in the condenser and because of the
vapor accumulation, the pressure will rise. The reflux can still be maintained for
about 10 minutes because of the holding capacity of the accumulator. The
relieving capacity of the pressure relief valve will also be the normal vapor rate to
the conienser. Vaporization rates may need correction here also.
3
, ,..
..
refl~x
f~iltrre
This may be ass:ciz:e~ with rhe rnalhnction of rkflux control valve, pump failure,
or any other operational problem. In this case, the overhead condenser becomes
flooded with condensate. ~ s result
a of this, overhead vapor can not condense and
pressure starts buildingup. Once the pressure reaChes to the set pressure of PRV,
Prepared bv : M. G.Manc
I Rexiewcd by : A. M. Haltangadi ( Approved by : Dr. H. V. Ddctor
Rev : 00
I ! Pzqe: 9 of 66
-I Datc :30101198
.
--
Catcgor).
- Al
Piarc Svsrc~lls
Module No
TES-TS-P-014
tlic relief occurs The vaporization rate, here as well, can get affected by rise in
pressure
I
If the reboiler controller n1alfu"ctions for any reason, the rate of vaporization nlay
incrcasc If the vaporization rate exceeds the rate of condensation, the pressure
will build up in this case, the relieving rate should be the difference between the
~iiasimunirate of overhcad vapor and the maximum rate of condensation of the
condenser. In thc absence of data, the relieving ratc may be assumed to be the
nomial vapor load to the condenser.
I
The column can also get subjedted to high pressuk, if the reboiler is an exchanger.
carrying the hot utility ( like steam ) at higher pressure than the column bottoms
pressure and the exchanger tube leaks
For relief load.^ drrc to fire
:
I
The surface area of a vessel exposed to fire, and which is effective in generating
vapor, is that area wetted by its internal liquid level up to a maximum height
limitation of 25 B above giade, which is the normal practice based upon the flame
length. "GRADE"is defined as any horizontal solid surface on which liquid could
accun~ulatei.e. roofs, solid piatform etc. I h e contents under variable level
conditions would ordinarily be taken at the average inventory L.in,uid f i l l vessels,
horizontal or vertical (such as clay treaters), operate with no vapor space, and the
wetted surface in such cases would be the total vessel area within a height of 25
feet above grade. It should be noted tha:, in such a vessel, at the start of a fire the
opening of the pressure relief may be due to thermal expansion of the liquid.
However, the PRV should be sized based upon the vapor generated at the relief
pressure and the boiling point corresponding to that pressure.
I
The wetted surface should be calculated using the high liquid level or 50% of the
total vessel surface, whichever greater, since 50% is the normal liquid level in
these vcssels.
KO Drums usuaily cperec nith only a small amou"t of liquid at the bottom of :lie
drum. If the normal liquid level is not known, the level at the high level alarm
should be used to estimate the wetted surface.
Prclwrcd by : M. G. Manc
I Rc\ic\red bv : A. h!. Harlnngad!
_(
Date : 30/OI/9X
I
--. .
-
Rev : 00
!
I
Carcgory Al
Flare SVS~CIIIS
hlodulc No.
TES-TS-P-014
/racliorialirtg coltmrrn
Here the liquid level is independent of oper&ion, and therefore the rnaxinium
liquid level should bc used for determining the wettcd surface. The wetted
surfaces of spheres and spheroids are calculated as the area of the bottom half of
the vessel or up to a height of 25 ft. which ever $ives the greater surface area.
Ifeat absorbed bv ve&v
Where suitable drainage is provided to preclude an accumulation of flammable
liquids directly under vessel, the total heat input rate to the vessel may be
computed as follows :
Where,
Q = Total heat absorbed in B T U h
A = Wetted surface in sq.A.
F = Environment factor
This equation is recommended by the API, RP-520
Using the appropriate value of the wetted surface and the value of factor F
tabulated for different thickness of insulation, the heat input may be calculated :
~
I
-. ; Da!r
: .?0/01!98
.(
Cnlcgon A1
I-'l:~rcS\.S!CIIIS
--
Rcli;~nccI~~dustrics
Li1111rcd
I % t : ~ l p n gI ' c ~ i ~ ~ S\\tcn~
ing
hlcxlulc No.
TES-TS P-014
I
I
These values are based on the wcttcd surfitcc iipto tl~enornial liquid level.
provided tlic insulation is fire proofed. Ifinsirlatiol~is not fire proofed, the vesscl
i
should be assumed as bare.
i
Vapor generated for it fluid below critical point (i e at relieving rempera!\lre and
pressure) tlic rate of vapor released 1s -
where,
it
BTUilb
I
No credit is normally taken for the sensible heat capacity of the fluid in the tank
For 2 fluid zbove the critical point, i.e wlien pressure relief conditions are near or
above the critical point, the rate of vapor discharge depends upon the rate at which
the fluid will expand as a result of the heat input. The latent heat & vaporization
at or near the critical point is almost zero in this case.
l
a:
More information on the relief rate calculation is available in API 520 and in the
training module on the relief valves
3.3
I
I
. -
a<
,
.'
Prcprcd bv : M. G. Mawc
'
"
After relieving loads of individual PRVs have been calculated, a detailed study is
required to determine how these relieving situations are related to each other. The
simultaneous occurrence of two or more contingencies (known as double
jeopardy) is so unlikely that this situation is not usually considered as a basis for
determining the maximum system loads. In determining the maximum load ri.nrn a, .
single contingency, all directly related continsenhies that influence the load must
be conjitlered. For example, in a plant where a single boiler or source of steam is
generation, a failure of steam
used for both, process drives i n d electric
source (a sinzle contingency) 'can cause simult'ancous loss of power (directly
.,. .
.-
RCV:00
1
.
/Pare:
-- - -.-- 17 of
66
--
Catcgory - A1
Flnrc S ~ s t c t ~ ~ s
Rcliai~ccIndustries Linrilcd
P;~mlg:~n~g
Training ~!s'icnl
Xlodulc No.
TES-TS-P-014
Since, double jeopardy is not usually considered, the niasirnun~load can be based
up on any one of the following continsencies.
I!
For the fire case, a cause of fire is normally lochized. The who!e plant is divided
into different fire zones. The flare load is generally calculated based up on one or
two related zones. However, it is not unusual to consider the total load
I
Another consideration is that the time delay relative to the discharge of individual
valves caused by the same and related contingencies should be properly studied
while determining the maximum load. A similar line of reasoning will in some
cases apply to a tire affecting several vessels where product composition and
p:es:urc vaii iyideiy.
"
The method of calculating the time element relaid to each pressure relief valve is
refereed to as 'TRANSIENT L O N ANALYSIS'. This is based upon the non
steady state condition in the flare system of a plant during emergency situations.
This calculation is tedious but with simplified assumptions, it provides an estimate
of the relative time delays of the individual valves:
,I
Rclt:~t~cc
It~dr~slr~cs
Li~~iilCd
Modulc No.
TES-TS-P-014
The pressure level of the flare header depends on the type of pressure relief valves
used to protect the equipment and the pressure levels of the equipment connected
to the flare system. In the conventional type of PRV, the performance depends on
the back pressure. A maximum back pressure of 10% of the maximum allowable
working pressure is a limit f o r the conventional type of PRV. For the nonconventional valves like balanced bellow type, piston type or pilot operated type,
the maximum allowable back pressure may be taken as high as 40-50% of thc
valve set pressure.
4.1
Plot plan layout study - From the plot plan layout. the no. of safety valves in
different process areas, the set pressures of safety valves, individual relieving loads
of safety valves, relieving temperature of vapors, the nature of vapors (i.e. whether
corrosive, condensable or dry etc.) are recorded. I
A single subheader in each process area is drawn up, connecting area PRVs or
depressurising valves.
The sub headers are then connected to give a single main flare header based upon
shortest routing
The equivalent length of the main flare header is then calculated from the flare
stack to the last safety valve, taking in to consideration the straight length of the
pipe and approximat
Prcp~rcdb\. : M. G.M a n c
Calcgon - A l
F1:lrc Svs!cnis
P;ii:ll;;~ilg:~
Modulc No.
TES-TS-P-014
I
the flare stack is [lot known by that time, it may be assunled to be 500 R. from t l ~ c
1
last piece of equiptilent.
!
5
A trial estimate is nladc for determining the dianlctcr of the flare header bascd up
on tile m u , rclievin!: flare load and considerins thc back pressurc limitation of
10% for couventional valves and 40% for balarlccd type valves. Note, however, a
single main header in many cases, may be too large to be economically fcasiblc.
I
The second trial is rcquircd for two main flare headers, one collecting thc Low
Pressure (LP) flares (usually 5 to I0 psig) and ttiL other collecting relatively High
Pressure (HP) flares (usually 15 to 20 Psig) Th? two hcadcrs are connected to
their individual KO drums Thc vapor lines koin the KO drums are combined into
single header connected to the flare stack.
Maximum simultaneous load in each header must be calculated separately and the
pressure drop must also be computed for the entire length of the pipe including
combined len!:th from the KO drum to the stack 1
The load in a subheader used for the line sizing: need not be same as the load
whicn is utilized for designing the main header or the flare stack.
The next consideration is the cost of constructio" materisls This determines the
final no. of flare headers. Vapors that normally require expensive materials may be
listed as a
b
Of the thrce, corrosive vapors are usually piped up in a separate header quite up to
the flare stack since such lines are very small and if combined with other streams
may run the risk of corroding the much larger and more expensive pipelines.
For a high temperature system, separate sub header may be run up to the point
where the temperature drops down to the allowable limit of a less expensive
material. It may then be connected to the main flare header. A heat loss
calculation is needed in order to properly evaluate this. As a rule of thumb, a heat
loss of 10 BTUlhrtfI2 may be assumed for a quicic estimate for bare pipe.
Consideration should also be given to the need for expansion joints. Main flare
headers may be as large as 36 t o 42" in diameter for a largc capacity plant.
.A flare sub header carrying very low temperature vapors (temperature ranglng
from 50 deg.F and below) may similarly be combined into a single low temperature
flare header and pipe all the way up to the flare stack. Again, since the atmosphere
Modulc No.
TES-TS-P-OIJ
C:~tcgon A l
Flare Systc~iis
alier running a certain distance by themselves may be safely conibined either. with
the low pressure mail{ flare header or the HP main flare header depending upon
this @rating pressure.
\Yet flare and Dry llarc : Some tinies, relatively hot vapors carrying condensates
may be separated from the d j cold vapors. They do not run as separate headers
but either L,P or HP flare headers tnay be associated with any one of them. Thus a
wet flare header inay be in fact the LP header and !he dry flare header may bc thc
1
I-IP flare or vice versa.
I
After thc total no of flare headers has been estabhshed, it may be necessary to
recheck the vapor load in individual headers since introduction of a separate
header may allow subtraction of the flow quantity from earlier header to which it
was added initially.
II
For Example :
A typical coal gasification plant usually has -
I
HP wet flare header
HP dry flare header
An H2S header containing vapor which has more than 5% H2S
I
4.2
Once the relief load is established and the maximum allowable back pressure has
been defined, line sizing is reduced t o standard flow calculations.
I
The flare lines ca11-y the vapors which are comp$sible in nature. The flare lines
are also normally long and not fully insulated. Hence, the flow can not be adiabatic
flow. Hence, the flare headers are typically sized based upon isothermal
compressible flow. This also gives more conservative design.
The back pn ssure developed at the downstreamof any PRV connected to the
same header thould not exceed the allowable limit for that type of PRV
Prcparcd bv : M.G.M;?M
Rev : 00
#
- .-
To avoid the sonic velccity and related noisi proklem, the velocity in the header is
limited t o 0 6 Mach
1
I Date : 30101i.i;
.
.-
I )
h g r : 16 or L.;
I .-
.- 1
Cnlcgoty - A l
Fhrc S?slcnis
Modulc No.
TES-TS-P-014
4fL
+ Z Ki
Line resistance, N =
D
where,
.approximate pressure at base of flare stack (varies slightly with type of seal used)
is taken as 2 psig This is based on 0.5 psi pressure drop at tip, 0.5 psi pressure
I
--
.L
--- 1 P y - .
Dale : 30/01/98
.
----. . ..
-u----
17 ?f 6 5
Cnrcgon. - A t
Flnrc Svsccnis
Rcli:ll~ccIndustries Lin~itcd
Modulc No.
P~I~I&II~&I
Training S!.slcn~
TES-TS-P-01-I
drop dt niolecular seal and I psi pressure drop due to flow through the stack
I
height
0'(
As a tirst trial, inside pipe diameter is calculated based on 0 6 Mach ( 60% of the
sonic velocity ) corresponding to pressurc & temperature a! ~ S afPI!: sack, i e
2 psis and temp = To ( as it is assumed to be isothermal flow )
*(
* (I<T/M) O '
where,
Vs = Sonic velocity, Wsec
'
T = temperature, Rankine
M = molecular weight
The vapor density, p ( Iblft3 ), at pressure P (corresponding flare base i e 2+14 7
= 16.7 psia ) and temp T ( Rankine ) with a molecular weight ofM, is given as
Now,
Knowing all other values, the pipe inside diameter ( di ) is calculated. Knowing di,
the Reyno!ds no. and friction factor can be calculated. Assuming a straight length
'of pipe for L = 500, line resistance N is calculated. G is calculated based on the
di. Gci is calculated based on downstream pressure & is called Gc2 GIGc2
evaluated & P 2 P 1 determined from Fig.3 since P2 is known, PI can be calculated
Pressure at inlet o f K O drum is taken as P l i 0 . 5 psi
4
From the KO drum, indicated flare headers can b'e sized similarly. Based on a
Mach no. of 0.6 & density corresponding to (PI + 0.5) psia, trial diameter can be
estimated. The pressure at every intersection between sub header & main header to
be calculated with downstream pressure being (PI + 0.5) psia Knowing the
pressure at the icterscc:;oo of the sub header & main header, the pressure at the
intersection of sub header & dischargepipe of the safety vaive is computed. The
process continues till discharge pipes and subheaders of all PRVs are sized.
i
Rclint~ccl~ldustricsLin~ilcd
htalgnnga Training Svslcnl
Category Al
Flan: Svstcn~s
Modulc No.
TES-TS-P-014
Tlie sum of all pressure losses starting from flare stack up to the safety valve
yields the total back pressure This back pressure niust be lower than the ninu
back pressure allowed in the system &. corresponding to the lowest set pressure of
the safety valve
Tlie rnmimum flare load of a system is 1,000.000 Soiiir of vapor Tlie prcssurc z:
!iie base of the flare stack is 2 psig, the average MW of vapor is 50 and temp is
200 F. The distance from the dnrm to stack is 500 ft The line has two 90 degree
weldins elbows and an orifice with Ki factor of 0 2 The total pressure drop at thc
knock out drum is 0.5 psi. Determine pressure at inlet of the knockout drum. Also,
given are
Solution :
=(MtP)/(R*T)
I
=
0.84
I ( orifice Ki is 0.2 )
Re)
.
I
4fL
Line resistance, N
= -----
~-
Prepared b?. : M. G . M a n ~
Rev : 00
+ ZKi
i
I
-J
!
I
,,..:
Po will be replaced by downstream pressure, i.e. 2 + 14.7 = 16.7 psia and figure 3
will be used
Gci = Gc2
= 12 6
This is a very high pressure drop. Typically, it should not exceed 3 psi Hence, a
larger pipe diameter is required
I
The above procedure is repeated for higher diameter pipes. It can be seen that,
when pipe ID is 41.25" (corresponding to standard OD of 42"),
N=3.1
G lGc2 = 0.49
..
I,
P2/P1 = 0.87
I
PI = 19.2
and the pressure drop ( PI - P2 ) is 2.5 psi, which is acceptable.
~
Prclwrcd bv : M. G. M a n e
Rev : 00
~. .
\I.
Dmur
-
1
I
Cntcgon - A l
Flare Svstcms
Rcli:iricc Indos~ricsL~riiitcd
I ' : I ~ ~ ~ : 'Tr:~i~ii~ig
I I ~ ~ ; I S\SICIII
hlodulc No.
TES-TS-P-014
Prcparcd br : M. G. Manpc
Rev : 00
d - - -
LP.-~ G O ~ - -66
(.:~fcgon A I
Fl:trc S~srcnis
5.0
Rclt:ll~ccI~lduslncsLi~iiilcd
I ? ~ f n l $ i t ~ gTrmning S\.sfcm
hlodulc No.
TES-TS-P-014
KO drums are either florizontal or venical They are also available in a variety of
contiprations and arrangements which include I
Horizontal drum with vapor enterins at one end of the vessel & exiting at the top
of the opposite end (no internal baming)
Horizontal drum with vapor entering at each end on the horizontal axis & a central
outlet.
Horizontal drum with vapor entering in the center & exiiing at the two ends on the
horizontal axis.
Vertical drum with vapor entering at the top on a certain diameter & provided
with a baffle so that the flow is directed downward. Out!et noule is located at the
top of the vertical axis.
5.
I
!
('
(
.
!
Selection of the drum arrang;ment depends o" economics. When large liquid
volume storage is required & the vapor flow is high, normally a horizontal drum is
more economical.
Split entrylexit reduces size of the drum for large flows. As a rule of thumb, when
drum diameter exceeds 12 feet, split flow arrangement is normally economical.
I
e
a
KO drums are usually sized by a trial & error mahod Liquid particles can drop
out when the vapor velocity traveling through the drum is sufficiently low In other
words, the drum must be of sufficient diameter tc, effect the desired liquid - vapor
separation.
C:ltc~on- A l
I:l:~rc Sisccl~ls
2.
I
I
Ilcli:~nccIndttstncs Lir~~ifcd
Modulc No.
TES-TS-P-014
P:I~~~J$IIIGI
Tr3111ingSvstc111
I
.!.llc residence time 01. [he vapor shollld be eci"al to or Sreater than the time
required for a liquid droplet t o travel the available ve~iicalheight at dropout
velocity of the liquid particle.
Sulticient volume should be provided for the liquid accurnulatio~~
in the knockout
drr11>1.
!
i
Where,
W=
p~ =
p, =
M=
T=
P=
D=
I
!
i
The min. L.4) ratio recommended for a split flow horizontal drum is 2.5 for proper
separation of liquid particles From vapors.
'1
PL
PG
C:~tcgon- A l
Fl:~rcS~srctiis
Modnlc No.
Rcli~ttcclndusrrics Lin~itcd
P i ~ ~ a I g aTr;iiliing
~ i g ~ Syslcm
TES-TS-P-014
approsinlation.
5.2
Sral svqtcnl
1,iquid seals are further classified as seal drums and seal pipes In the former, a
liquid seal is used in a seal drum located between the KO drum & flare stack Seal
drums can be horizontal or vertical. the selection mainly depends on the availability
of space F~gure4 shows a horizontal and a vertical seal drum Instead of a drum,
sometimes, a piping seal is used as a seal leg located at the bottom of the stack.
I
This is often an integral part of the stack.
A seal drum maintains a seal of several inches on the inlet flare header, preferably
6 inches. More is the height of the seal, more is the back pressure
~ i o exceeding
t
Sealing liquid is usually water with a continuous flow, the ovefflow goins to the
I
sewer.
I
I
The height of the vapor space above the liquid ~kvelin a vertical drum should be
app.2-3 times the diameter (d) to provide disengaging space for entrained seal
liquid
I
If 2 horizontal iiquid xi! vessel is used, a minimum dimension of 5 A between
Itquid level & top ofthe drum is recommended
I
I
PrclxlrcC by : M. G.hlanc
Rev : 00 . -.--- -
1 Dare : 30/01/0X
..
-
I
-.
Modulc No.
TES-TS-P-014
Rcliaricc l~lduslricsLitaitcd
Pnl3lp:lngn T n i ~ i i Systcn~
~~g
C31cgory A l
Flnrc S!stcols
Seal pipes (Fig 5) located at the base of stack are cheaper than drums. llowever
they can cxpericnce pulsation of the gas flow to the flare under very low flow
condit~ons Also during a large gas release, the water seal may be blown out of the
I
top to the flare stack
I
G1rrdc.1it1c.s
for s r z i scal
~ ~ legs
1
Slope of the inlet line 1s designed to provide a volume of water below the normal
sealing water level equivalent to inlet pipe volume of 10 A.
Depth of water seal should not exceed 12" to &event gas pulsation
Normal overflow is taken off the bottom of the seal through a seal leg height of
which is equivalent to about 175% of the pressure at the base of the stack durins
maximum vapor release so that gas release at the base of flare is prevented.
Gas seals
A more recent gas seal type of device that has been developed to prevent flash
backs in the flare system is 'Molecular' type seal. It uses a purge gas of molecular
weight of 28 or less ( like N2, CH4 or natural gas ). Because or" the buoyancy of
the purge gas, it creates a zone having pressure greater than the atmospheric
pressure. The molecular Seal is located at the top of the flare stack immediately
below the burner tip, the ambient air can not enter the stack because of this high
pressure. (Figure-6). The recommended purge velocity through the molecular seal
is about 0.1 Wsec. If a molecular seal is not used, the recommended velocity is 1
Wsec, thereby increasing the purge gas requirement.
5.3
Flare burners
The flare burner is located at the tip of the flare stack. The top secticn is normally
about 12 A long & is called the flare burner tip. The burner diameter is sized on a
velocity basis. The flame blowout can occur when the exit velocity of the vapor
exceeds 20-30% of the sonic velocity.
I
I
W=360O*p~*&*V
a'
a'
.
1
Prcparcd by : M. G. Man.c
Rcv : 00
I Rc\~c~vcd
by : A. M. Hatlangadi I Approved b!.
I Date : 30/01/98
-
! Pap::
: Dr. H. V.
: 25 nf 66
Doctor
Rcliancc I~idus~r~cs
Lit~~ilcd
k131gnt?p~
Tr.ltaitlg S?.slc111
Cntcgo:01? A1
Flnrc S~slcms
Modulc KO
TES-TS-P-014
-j
where,
C\' =
p,, =
V =
Ac =
---------10 73 T
v = I 15
(g K R T / ~ ~ ) "
d2
M = molecular weight
P = absolute pressure ofvapor = 14.7 psia
T temperature, .P
-K=m=
CV
d = diameter of flare tip, inches
Col~lbiningthe above equations and substituting values for g, K, R & P; we obtain,
If based on the maximum rate, the diameter map be too large. In such case, the
normal flow is used to anive at value of d and velocity for the maximum flow is
1
kept at maximum 40% of the sonic velocity.
~-
5.4
Example
.~
The flare normal load is 800,000 I b h whereas hax load is 1,000,000 Ibhr. The
vapor temperature is 300 degree F and molecular wt. i s 50. What should be
!
diameter of the burner tip ?
) Revic~vcdbv : A. XI. H:ittangadi I Appro~cdt?\. : Dr. 14. V. Doctor
Prcprcd b?. : M. G.Mane
Re\. : (xi
- -.--..
-.
:>...+&30/01/9?- -.
Rclinncc Ind~~strics
Li~iiitcd
C;llcgon A l
Flare S!.slcms
Hence, d
Modulc No.
TES-TS-P-014
P;~tnl&lngT r ~ i n i nSvstc111
~
* ( 760/5O)"*i).5
800.000
1370
47.7 i.c. 4S inch.
MP
----------
Vapor density, p~ -;
1073 T
= 50*14.7/(10.73*760)
= 0.09 Iblft3
Max Velocity
= W/( 3600* n
* p~ *d214 )
= 1C00,000*4/(3600*0.09*3.14*(48/12)*(48/12))
= 246 ftlsec
= (g KRT/M)O.*
Sonic velocity, V,
Thus, the maximum velocity is 25.8 % of the sonic velocity, which is less than the
max limit of 40%. Hence, the diameter of br~mertip should be 48".
5.5
The location of flare, is a safety related issue. The flare stack is generally located
on the downwind of normally prevailing winds & remote from operating & traffic
zones.
In India, as per Petroleum Rules, 1976 ( page 49, point 169 ), no flare shall be
situated nearer than 90 meters to any tank, still, pump-house o r any faeiiily
for the refining, cracking, r c f r i blending, storage for handling of
petroleum o r liquefied pctrolel~m gases o t l ~ e rthan knock-oot drum and
condensate recovery pump attnchcd to such flare.
Prcp~rcd : M.G.M3n.c
Rcs : 00
..
. ~..
. -.
-.
Calcgoq A 1
I;I:lrc Svsrcrns
5.6
I?t~:tlgang:~
'I.~:IIIII%
Svs~c~ii
.\lodulc No.
TES-TS-r-014
I
IIci~Iitof the flare stack depend%upon -
-*
'!
>.
Note that the Reynolds number is based on stack diameter. Each of these criteria
refers to the gas state before combustion at the exit from the stack tip. The
Reynolds number of 3,000 applies to the Peak Loci Curve, the Reynolds number
of 5,000 applies to the Valley Loci Curve, and the Blow off Mach number applies
to the limit of Valley Loci Curve. The blow off point is reached when the velocity
of gas leaving the stack causes the flame to separate from tip, at which point the
flzne becomes unstable.
I
. __
-. . .. I
For max. stack discharge, a mach number of 0.2 is recommended. From Fig.8
then, corresponding LID ratio is 118.' From the stack diameter D, the flame length
L can be determined. Thus.~,
Picprcd h : M. G.M3n.c
Rc\. : 00
..
~- -.
Cnlcgor\.- A 1
I.'l;~rcS\SICI~IS
h l d o l c No.
Rcil:l~rrcI11du5trics1.i11iilcd
I';II;I~~:IIIC:I 'Tr:r~tri~ig
SVSICIII
TES-TS-P-014
l'lle tliernial radiation and escape timc car1 bc cstinrated from tlic data in table-'.
Valucs arc based on cspcrir~~cn:al
data on tlic tllrcsllold limit of pzirl to the human
generated by a flame.
body as a functiori of the radiatior~illtctisity in ~TUll~lrIR2,
A silfe level of heat radiatiot~intensity for unlimitcti time esposurc has been found
ta bc 440 BTUnlrlttZ. I t is apparent that a time interval with varying radiation
intensity must be allowed, to per~ilita I1unia1l to escape fro111a sl~ddcrllyreleased
irltense heat source. The varyins radiation intensity results from an irldividual
increasilig his distance from tlie source of heat.
Assume a person is at the base of a flare stack when heat is suddenly relea'sed.
The average individual reaction time is between 3 and 5 seconds. Hence, during
this short reaction time interval, the full radiated heat intensity will be absorbed
Then follows another short interval (20 IUsec is normally assumed to be the
average escape velocity of a man) during which continually decreasing amounts of
heat will be absorbed until safe distance is reached (heat intensity for a safe
location is 440 BTU/Hr/sq.fl.)
Where, t,
= t,
+ t.
Prcrwrcd Sr : M. G . Marvc
Rcv : 00
( D3tc : 30101/98
I Page : 29 of 66
C:;lcgon - A i
FI:irc SYSICIIIS
I?cli;ll~ccInd~~strics
Li~~lifcd
P:I~~~~:IIII$J
? ' r : ~ i l ~ i ~Svgcnl
~fi
Modulc No.
TES-TS-P-014
\v11ere.
(I
f
',
(2
S
Gas
I-iydrocarbons
Propane
Methane
04
0 33
0.2
A relationship between f and the net calorific value of a gas can be used in tlle
absence of data -
Where hc = net heat value of a gas (LHV) in BTUIscf (60 deg.F, 14.7 psia)
where,
>
The formula for the stack height is first derived. Refening to Fig.10, we have -
x ~ = x , ~ a+n d~X m
~=
[H(H+L)]"
I
I
-.
Where,
X , = distance (ft) of the punt of maximum intensity from grade
H =-stack l!eigh:, ft L = flame length in 2 = i 18 L, as per equation 1
Hence,
x2=H ( H + L) + y2
Prepared b~ : M.G.M3mc
Rcv : 09
--
---------------- ( 111
Pzgc : 3 0 ci 66
---J
*f
Cntcgo:or?.
- Al
Modi~lcNO.
TES-TS.P-014
Rcli:~ticcIndustries Limited
Palal~lngnTmi~~inl:
S\stc~n
0-
I Icnce. from cqilations I1 and L i l . and ror tnau radiation density (qtl ) at flare basc
~vllerc5-0,
I let~ce,!t is derived as -
0
0 s { [ ~ ' + ( ~ I r ; q \ l ) ] ~ -------(IV)
'-~~
el
If=
(1,
a'
ct
9
fQ
X = (----------) I R
4 n 440
i,e,
x2=fQ/5530
* I
and we note that y = radial distance from the base oithe stack = [ x~-H(H+L)]"
Allowing for the speed of escapc ( 20 ftfsec) we have y = 20 te = [ x2- H(H+L)]
*
I
The above analysis must be extended to accountfor the more prevalent case of
wind circulation in the vicinity of the flare. For those sections where wind
intensity is unknown, it is suggested that an average 20 mph wind be assumed in
all directions, which results in increasing the safe circular boundary by the resulting
tilt of the flame (Figure 11). he flame tilt and its effect on the safety boundary
I
increase may be determined as follows :
Uw = wind velocity
C = flare exit vcloci~
el
----- ( V )
This defines the safety boundary, corresponding to quiescent ambient air. Thus,
the stack height H,the limiting heat radiation q ~and
, the radial distance, y can be
evaluated with a trial and error procedure, by assuming a value of te.
In
Prcprcd h : M. G. Mawc
Rev : 00
**
C:ltcgon. - A l
I;I:lrc S.VSICII~S
Palalg;111g:1Trniliilig Sysic~n
i l l
Modolc No
TES-TS-P-OIJ
------ ( V! )
*
0
0
I
1'
d
6
!
i
For high flaring rates, ilie stack height calculation previously described leads to a
very tall stack. Part of the reason for this conservative estimate is that
calculations arc based up on tile thermal effect on bare skin. If proper cloth in^ is
provided to personnel before entering the flare stack area and proper sllielding is
installed at the stack or at the equipment to reduce the radiation effects, the
required stack height can be gieatly reduced. However, there is a tradeoff in that
the safe boundary limit must be increased.
I
Since heat load of the flare, the flame length, an; the safe radiation intensity (440
BTU/hr/sq A) remain the same, decreasing the stack height leads to an increase in
the safety radius Another important consideration is the type of support provided
for the stack In general, the higher the stack the greater the structural support
costs
An alternative method of stack sizing is based on the allowable limit for radiation
intensity. For operating personnel the allowable intensity is 1500 BTU/hr/sq.fi. ,
and for equipment it is 3000 BTUihr/sq.ft.
The 1500 UTU/hr/sq.tl criterion is established From the following basis. In
emergency releases, an operation time of 3 to 5 sec. may be assumed. Perhaps 5 to
10 sec. more would elapse before an individual could escape the area via an
average velocity of 20 Wsec. This would result in a total exposure period ranging
from 8 to 15 sec. only. The time to pain threshold corresponding to 1500
BTU1hrtsq.A. is 16 sec. before the individual cduld escape to a safe place. The
effect of radiation on equipment is shown in figure-12. The temperature of metal
equipment increases with exposure time and higher the radiation heat intensity, the
greater the temp. Curve 1 in 'fiSure 13 shows the theoretical equilibrium temps.
for metal equipment, based on view factor of 0.5 . The actual temp. on surfaces
facing the flame the flame will be between curves 1 62 2.
The teapiraiure or'the vebscls Lontniriing iicjxid br flowing vapors iilay be lower
becausc of cooling effcz:~. Curve-2 applies to materials having a low heat
conduciivity coefficient e.g. wood. In this cask, equilibrium temperatures are
reached within a shorter time as compared with metal objects. Dehydration of
Cntcgory A l
~ 1 3 r cS!.SICIIIS
Modutc No.
ES-TS-P-014
a:ound SO0 deg .F, corresponding to heat intensities of 1300, 3000 and 4000
BTUAlrIsq A respectively This meanc that wooden structures and vegetation
exposed to heat intensities of 3000 to 4000 BTUltirlsq tt. and higher may catch
fire and bum Paint on equipment also may also be damaged
Therefore, it is recommended that equipment located in this area be protected by
proper heat shielding or emergency water sprays.
The following steps outline caiculations by the alternate method :
I
1
From equation 11, the radial distance from the flame at Q = 1500 RTUlhrlsq.ft. is
calculated.
rigtlle-14 illustrates the different heat intensity loci that should be examined
The flare normal load is 800,000 lbhr whereas max load is 1,000,000 I b h . The
vapor temperature is 300 degree F and molecular wt. is 50 Stack diameter is 48"
Average wind velocity is 20 mph and net heating value is 1500 BTUlscf )
Calculate the stack height and the safe boundary.
Sollrtiot, :
'"
Radiation intensity,
4 nx2
f~
Prcplrcd bv : M.
Rcv : 00
G.Mawc
1 Rcvicwcd by : A. M. Haltangadi I I
( Datc : 30/01/98
---
.- -.-
.; .p..--.
,..33ofl-5
440
= 0.258
* 1 1370 S 10"/ (3
:: X' )
-- 410
is s n k intensity \salus
0 5 ( [ I.'
( 1Q/ rt ']\I
1 "'- L
Hence, H = 1 19 6 li = 120 R
This is the shortest possible stack hc~ght,but is not a practical height as it assumes
te = 0
a(
oi
0'.
*
@(
-----ix
per equation ( V )
1,
a((
In
Now, let us calculate the wind effect on the safe bcundary around the flare stack
1
--
ARer the stack height has been established from radiation intens~ty\,slues, thc
maximum permissible ground level concentration of toxic gases in the event of a
flame blow out should be evaluated Table 3 represents toxicological threshold
limit as allowed by the environmental protection agency (EPA)
Estimated ground level concentrations should be based on the emergency
condition of flame blowout. The calculation is normally done for a range of
c!imatological conditions at the plant site.
For a rough estimate, the following empirical formula may be used
3697 VM Dz
Cmax =
---------------pH2DY
Where,
Cmax = Concentration at grade in ppm (volume)
V = Specific volume of toxic gas, cu ft per lb
M = Weight discharge of pollutant component in tons per day
Dz = Vertical difision coefficient
I
I
p= Air velocity at grade, mph
H = Stack height, A.
Dy- Horizontal diffusion Coefficient
Xmax = Distance from stack to the point of maximum concentration, fl
N = Environmental factor
The following values are taken from API manual
: 35
..- .J. .papc
- -. .~
CT
Doctor
-+--
1 ; ~
.l'herc arc generally thrcc typcs of'llarc stack supports . Guyed type, i>crricb ant1
sclr supporttng
A s a rousli y i d c to thc cco~~omics
of'tl~csc rl~rcctypcs of flare structures, the
comparative costs for material al?d lal;cr 's fi~:>c!i~n:
zf s:;i:k hcight are tnbul;~tcd
as r o l l o ~ s-
Least expensive
ivfost expensive
Derrick type
Self supporting
Guyed
Derrick type
Guyed
Self supporting
Self supporting
Guyed
Derrick
Derrick
(Self supporting
Guyed)*
Guyed
Derrick
Self
supporting
Installation Labor
Least expensive
Most expensive
-,.."
Gv-rrerl
Derrick
Self
Supporting
Pilot burners
To ensure ignition of flare gases, continuous pilots with a means of remote ignition
are reconunended for all flares. Generally the pilot system consists of three
components - a continuous pilot, an ONJOFF pilot and an igniter. The most
commonly used type of igniter is the flame front propagation type which utilizes a
spark from a remote location to ignite a flammable mixture. The ONIOFF type is
used only to ensure ignition of the continuous pilot. Pilot igniter controls are
located near the base of elevated flares and atleast 100 ft. awa: from ground flares.
The number uf piiot systems required per flare is largely a function of the wind
conditions. A minimum of tivo pilot systems is recommended while nonnally three
pilot systems are used. They are uniformly placed around the top of the flare.
PrcpareC by : M. G. M a n c
RCV : 00
I
Calcgon - A1
Flnrc S~sfcms
Modulc No.
TES-TS-P-014
Rcliann: l~rdusrricsLi~~lited
P;~I:~lglog:~
Trilling Svslcnl
ill
figu~c-15. Tile
flares.
Tile pilo! is piped to the top of the flare stack via a 2" venturi burner. Nozzles are
pr-ovidcd at the end of tllc pipe. In some designs, nozzles are hooded and shbuld
the flatnc blow out, the heat ofthe nozzle will ilnmediately rei~niteit.
I
I
In tlie pilot igniter system, tlie gas pipe is connected to a 3" venturi type burner-,
~vhicliis located at the bot:om of the stack. The fuel gas flows througi~a nozzle to
inspiratc air to for111 a combustible mixture. The isniter with spark gap is located
approx. 3 f above the burncr. When the igniter button is pushed, tlie resulting
spark ignites the gas air niisture. The flame front generated travels up the pipe at
the top of the flare and ignites the gas from the pilot nozzles.
by : M. G. Marvc
.
+
Pagc
.-.
: 37 of 66
Catcgoq A1
FIarc Svstcms
6.0
6.1
Mod~ilcNo.
TES-TS-P-014
hlaterial of construction
Up to - 20 deg.F
Up to - 50 deg.F
&
l
&
Bottom section
Structural members,
hardware and bolting
6.2
--
! Dnrc : 3011111OX
?.s J : .:h
_
A'.
.
4
&'
Catcgory - A I
Flnrc Syslcms
---~
~~
~~~
Mod~tlcNo
TES-TS-P-014
.
!
0'
*(
I
a'
2.
I -
Among these methods, the addition of stearn isimost commonly used to produce a
smokeless flare for economy and superior perfohance. In steam addition, the raw
gas is preheated before it enters the combustion zone of the flare. If the
temperature is high enough, cracking of the hydrocarbons may occur. This
produces free hydrogen and carbon. When the cracked hydrocarbons travel to the
combustion zone, hydrogen reacts much faster than carbon. Unless the carbon
particles are burned away, they cool down and form smoke. Consequently, in
order to prevent smoke, either the hydrogen atom concentration must be decreased
to ensure uniform burning of both hydrogen and carbon or enough oxygen must be
provided for complete combustion.
There arc several theories which try to explain the chemistry of smokeless flares,
using steam. One of them assumes that the steam separates the hydrocarbon
mo!ecules, thereby ~ilinimizing polymerization reactions and forms oxygen
compounds that bum at reduced rate and temperature, so as to prevent cracking.
*(
Another theory, claims that steam reacts with carbon particles forming CO, C02
and H2,thereby removing the carbon which forms smoke after cooling. Following
reactions are expected to take place as per this theory,
where,
Catcgor).- A l
Flan: Svstctns
Rcli~ncclndustrics Lir~~ilcd
Patnlgtng:~Tninitlg S! stctil
Modulc No.
TES-TS-P-014
It may be observed From this that the highertlie mol. wt., the hi~Jrcr the rcquired
steam. This may be associated with the tlicory tl~atthe liiglicr t l ~ cr~iol.wt, rllc
lower the ratio of steam to C02 after combt;stion, resulting in a greater tendcncy
I
to smoke.
Since, steam consumption is rather high ( about 0.464 ib/lb of hydrocarbons with
mol. wt.50 ), it is too expensive io provide for s~nokelessburning for tile mas.
flare load. Normally, 20% of tile mas. flare load is designed ibr smokeless
burning. This is well supported by the fact that massive failure is very larc and in
90% of occurrences, smokeless flares are produced.
6.3
Fuel requirement
I
Fuel gas supply to the pilots and igniters must have high reliability. Since, normal
plant fuel sources may be upset or lost in the plant upsets, it is desirable to provide
a backup system connected to the most reliable aiternate he1 source with provision
for automatic cut in on low pressure. The flare he1 system should be carefully
checked to ensure that hydrates are not present to cause problems. Because of
small iines, long exposed runs and large vertical rises up the stack, use of liquid
b o c k out poi is frequently warranted to remove condensates that may have
collected in the fuel line especially during winter. It is a good practice to provide a
!ow pressure alarm on fuel supply after the last regulator, which will warn the
operator.
I
6.4
Normal purging is used continuously and admitted to the flare system at the end of
each sub header and at the bottom of the molecular seal at the flare stack. When
the molecular seal is used, it is that purge volume which will create a velocity of
0.1 ft Isec. at thi flare tip. When a molecular seal is not provided, the exit velocity
is 1 A fsec. The purge co!un:e Lzpend~upon the wind velocity ai thc flare
elevation. These velocity criteri- s!r i w e d on a wind velocity of i5 mph and vary
as the square of the wind velocity.
P T C P ~h,E:~
M. G.Mamc
Rm:W
!
( Resicwed by : A. M. H a t u n p d i
] Dale : 30/01/98
1 Approved
: Dr. H. V.
Doctor
Noise poll~ltion
Noise pollution from flares has for too Ion? been a n inconvcnicnce, acceltted in
pctrocllemical plants as an inevitable byproduct of flarin~process. I t has been
established that major individual source of noise from tlare is usually at the flare
tip itself. This is especially true when the flare tip is of the type used for sn~okclcss
flaring of hydrocarbon gases utilizing steam injection.
Basically noise is created because of two reascns, steam energy losses at the high
pressure steam injectors and unsteadiness in the combustion process.
Ground flares are normally quieter than elevated flares. This is probably due to the
fact that the flame contained inside a box is protected from wind effects and the
st~bi!iring effect of the hzat re-radiated from the refractory walls reduces the
random characteristics of combustion. The walls themselves will absorb some of
the sound energy.
Sophisticated design of flare tips have greatly reduced the noise pollution. In some
designs, combustion efficiency has been greatly increased by renixing of air with
gas before they are combusted. Steam is also premixed with air and gas before
gases leave the flare tip. Some of the turbulent noise energy is thus shielded by the
tip itself.
6.6
The major stress to which the discharge piping of a relief system is subjected, are
results of thermal strains from entry of cold or hot gases. Temperature
fluctuations are normally very wide. In majority of situations, it is usually possible
to maintain stress levels within allowable limits over the full temperature range by
providing an expansion joint or expansion with a cc!d G r hot spiing. Special
afterition :o stresses is rccommended where pipins constructed of carbon steel is
used for metal temps. as low as -50 deg. F.
I
Prcp:~rcdh : M. G. M3n.e
, Rcv : O;!
,;j
~-
FI:IIC S\SIL,III>
~-
I)csi;11 of' disch;lr;c pipin: requires careli~lanal!.sis of the possible thermal and
111ccl1;1nic;11
scrcsscs i~~iposcdon the pressure relief' \.alvcs. I'roper anchors,
s u i ~ l ~ l rand
t s l)~o\.ision
fi~rllevibility of (lischnryc pipins can prevent these stresses.
I
6.7
I ~ i ~ t c ~ ~ r n r n t anr~cl
t i o ncolitrols
Typical flarc system in?trurnentation and controls are as follo\\s -
Thermocouples are provided for the pilots with an alarm in the control room
The KO drum is level controlled in order t o maintain a constant level for providing
a seal and to prevent the pump from running dry. The KO drum pump, many a
times can cut in automatically at high level of KC drum. It also typically, has a
AUTO standby pump.
I
5.
A flare video monitor is provided in the control room which helps to observe
smokeless operation as well as to identify the abnormal releases in the flare
headers
?
1
Prcparcd 6 : M. C. M;IW
,CRrv
00
-:-
-_
-- I
bv : Dr. H. V. Doclor
Modulc No.
IT.S-TS-P-014
R C I I ~ ~ I I ICI CI ~ L I S I ~ I Li~~iitcd
CS
P : I I ~ ! ~ ; ITr:~i~ii~ig
I ~ ~ I Svstcrii
.l.l ~ cilarr
I
I
The flare KO drum pump should be checked for ease of operation and correct
rotation.
Eqvipment such as flare tip, molecular seal, flare front generator, water seal, flow
sensor and all associated piping should be given final check.
The flare system must be purged of air before the pilots are ignited, otherwise
there is danger of a severe explosion. After the flare system has been purged of
air (less than 2% 02), the pilots are lighted as follows :
Plant air and fiel gas lines up to flare front generator should be blown down to
remove any line condensate before gas or air is admitted.
Push the ignition button and check for a spark at the slght port
Open valves for the flare front generator to pilot No.] and fiel gas to all pilots.
n
upen
the gas supply to approx. I0 psig by observing the pressure gauges
Rcv : OO
-,.~.---
- I--.Pa=
---of 66
Tltc tot;ll flare svsrc~iicnri olily bc shutdown and isolated after all tlie process units
al-c shut dowri, drained of liydrocarbons, dcprcssuriscd and purged as necessary.
l'hcri llarc systcrl~is pirrgcd wit11 nitrogen before opcning up the KO drum,
rnolccular scal ctc. l i ~ rany rnaintenalicc.
Individual proccss units or pipes of equiprrtent cat) be isolated from operating flzlre
syslc~iialtcr tltcy arc shutdo\r,~iby closins block valvcs and installirig blinds, when
niaintenancc is rcquircd.
7.4
Normal operation
I
During the normal operation, the shift crew monitors the flare and ensures that it is
smokeless The flame length is monitored to identify abnormal releases in the flare
system In the normal operation, the amount of vapors flared can be monitored As
his is the material wasted, efforts are to be taken to minimize the normal load
I
.\liicli is flared.
I
The KO drum level and the flare header p u r s e a s minimum flow is ensured d u r i n ~
rhe normal operation. The operations crew also ensures that the seal liquid rate
1 and hence, the scal ) is maintained for the liquid seal system It is also checked
that thc pumpout pump ofthe KO dmrn is always available
Prcwrcd kw : M. G.M m e
.-Ilcv : VO
---.--
: 301!l I!')!
..
p,,~
. :! c: ;,;
9: :
Cnlcgo? - A l
Tl:lrc S~stcms
1,
8.0
Rclinncc 111dustricsLili~ilcd
Ptllal@ng Tni~iinp,Svslcnl
hlodulc No.
TES-TS-P-014
I n P a t a l ~ a ~complcs
l ~ ; ~ of IIIL, there arc t\vo flares - one each in PX and LAB
plants. Thc detailed information of both the flare systems is available with
rcspective plants. Hcre is a brief introduction to both flare systems.
@
01;
I
I
I ,
The flare i n the PX plant is designed to llandle maximum flow rate o r 500,000
kgllr of hydrocarbons. This load can arise whell there is plant wide elcctricity
failure. The normal operating flow in the flare design is 640 k ~ r The
. flare has a
molecu!ar scal, with height of 15 fl and diameter of 80". Minimum purge gas
required is 7.21: nm3Ihr. The riAer height is 305 A and the riser diameter is 42".
The flare tip is From 'John Zink' and is of 31OSS. There are 3 pilot burners and 21
steam jets. It uses LP ( 6 bar g ) steam for smokeless operation.
I
The system had a ZOOM control ( Zink Optically Operated Monitor ) for ensuring
the smokeless operation in the original design. This was supposed to monitor the
luminosity of flame by a remotely located detector and adjust the steam for
smokeless operation Rut i: i z not conaissicned 2s some of :h: critical
components of the control system are not available. Currently, the steam control to
the fiare is on 'manual'.
I
The stack has guyed rope type of support, but it has been found inadequate
Hence, the support is being changed t o Derrick type.
\
8.2
1
I'
Prcparcd h : M. G. Many
.a
Re;. : 29
4.~31~
: 32!Oli?J
I Pa<.* . .I! 6 . C 5
: _ I T 1 - 4 2 -
__,-.
..
I..
.-:
Caccgor) AI
Flnrc Srslcrns
Tnble - I
Rclr~ncclrlduslncs L~rn~lcd
Pnt:11p111pn
Tmlnlng Svslcm
hlodulc No
TES-TS-P-01.1
I
I
Catcgory A1
Flnrc S\stcrns
Tnble 2
htodulc No
TES-TS-1'-01.1
Radiation intensity
(BTU~KIA~)
I
I
cC
Prcplrcd
Rc\. : 00
---"
,'
h. : M. G. M3n.c
--PJ
C:ilcpry - A1
Flilrc S ~ s ~ c n l s
T r r l ~ l c3
- l'ltrrsl~old
- -.. ..
--
Acrnlcin
Arvlani#tre
Ammonia
h y l lcculr
h y l dcohul
hdmc
Arrinlc
R c l i ~ n c cIndos~ncsL i t l i t l c d
~ I J ! E ~ I I ~Tr3i111112
I
S~.,s\stctll
l i r ~ l i t si o r s o n ~ ctoxic
.
PPAf
203
10
5
I.m
0J
20
trrbon m u &
tvbar utnchl3tide
Gdarinc
aombrwcnc
Cs!cx!am
C d (all uorrm)
Cycloheunc
cyclokunol
cyc1ahewohcrme
C%~opmpur
Dianionc doh4
c-Dicblombcnrmc
1.1-Dichlomcr)luu
Dicthylunine
Dikoburyl ketone
Dlmcti,).Lnili~c
s t ~ b s t n ~ ~ c g:~scs
r s
:III~
vnpors
$1
I . , ~I.)
Elbyl bmmidc
Elhyl chloride
Ethyl r t h r i
Elhylrnc rhlomhydtin
Eth~lcncdtivninc
&-nc
&TIchlatidc
Bmmdc
Bulrdlrne
B u v l dcoh0I
Buvlunirr
G r w o 4'0,id~
G r b n &sulfide
h l d o l c No
TI:S-TS-P-o14
I
1.000
la,
5
5.m
20
la,
25
1
75
la,
5
Hydnune
Hydrogen vicnidc
Hvdmecn rdlidc
i'
,.
'>
403
la,
J!
la,
ux,
403
r..
i'
53
JO
i.
IW
23
I~ph0rm~
lropm~ylunine
M c t i v I oxidc
Methyl cam.
hbthyl r q l m c
Methyl dcohol
Methyl bmmidc
2-Melhonlethual
Mcthyl chloride
McthylqdohcMethylcyclaheuml
Mcthylryclohemns
Mcthyl fomu~e
Mcthyl m y 1 drohal
Doctor
. ~.
Catcgoy - A l
Flnrc Smlcn~s
I<cl~nnccInd!~slncsI.ln11tcd
P:~lnl,mnr~
Tninirig Svsccrn
hlodulc No.
TES-TS-P-014
FIGURES
Cnlcgon A l
1-inrc S!.s!cna
..
1.1g11rc2
I~cllilllccItld~~strics
L~n~~tcd
P:I~&:III?~
T r a i t ~ i S~SI
~ ~CcII
Modulc No.
TES-TS-P-014
- I'rrssl~rrdrop c!r:trt
( li!~o\rn t i p s t r r s l n conditions
- by Lnpple )
Prcrurrd bu : M. G h13n.e
RCY :
Cnlcgon - A l
Flnrc S~stcnis
Rcli;~nccInd~rslricsLinlrtcd
P:~tnlg:~np
Tr3111ing
S~slcm
Modulc No.
TES-TS-P-014
~ V E L3 O C I T
9Y RATIO.
a/aC2
',
FROM
a L o w o o w N DUV
-c'E
,
r-'
1.6"
LlOUlD
LEVEL
DRAIN
SEAL LIOUID
(A)
t.
.,
DLOWDOWN DRUM8
'
TO FLARE STACK
8 E A L LI(1UID
t--.----c
(B)
,
e
!a
a.
-I--
- ..
Calcgory - A l
1'larc Svstcms
hlodulc No.
ES-TS-P-014
Rcliaacc Induslr~cs1.1milcd
P n l n l p n p Training Syslcm
Prcpt~rcdbv : H.G.M;ln.c
Rcv : 00
I Rcviovcd bv : A. M. Hattangadi
1 D31c: 19/0l/OS
1 P3sc : 53
of 66
blodulc No.
TES-TS-P-014
!
Cxcgon
- Al
Flarc S~stcnls
r
\
c7
crtically
Rcli:tncc It~dusrncsLintllcd
P:~l:~lg.~n&!a
Trainill!: Svstcni
h,lodulc No.
TES-TS-P-01.1
e'
'
e I
C:!rcgon - A I
Fl:~rcS~lsrcn~s
Mcdulc No.
ITS-Ts-P-014
~:ll:ll!::ll~~~
Tr~iningSvsfcm
zoo
0 .02
.lo
.20
.24
.30
MACH N U M B E R
I b; : M. C.M2n.e
0 ~ 1 " ~
____
Carcgory - A!
Fhrc Svsrcnls
Modulc No.
TES-TSiP-013
>
C
LO
-zz a
C 0
b7
.
I
c< 3
+
s m
< 0
a o
.o
r
<
10
20
30
40
60
80
E S C A P E TIME. S E C .
Prcwred b~ : M. G.M a n r
Rcv : 00
1 D ~ I:C19/01/98
I Rlgc : 57
of 66
CJIC~A
Ol~
Flnrc Svstcnis
Rc1i:incc I~idustricsLimilcd
P:ihl!::~i~!..;irnillinr svsicm
hlodulc No.
TI-S - TS - I' - (114
Prcpllrcd h : M. G . M:tn.c
Rcv : 00
DOC~O~
C3rcgoq A 1
Fhrc S\.stcnis
Figure I 1
Modt~lcNo
TES-TS-1'-014
Prcparcd
RCV :00
by
:M
G.M3n.c
\'. Doctor
c3lcgon. - A l
FI:rrc S\~srcn~s
Rclinncc lnd~lstrlcs1.in11tcd
M@?:lc No.
l ' ; ~ t a l y t ~Tr:t~ni:l:
p
SYSICIII
TES-7.;-P-014
Prcp:~rcdh\ I . G . h1an.c
Rcv : 00
1 Rcvlcncd bv
'
A. M. Hallang:~di
1 D m : lYlOll98
( Appro~rdbv : Dr. H
( P3gc : 60 or
66
\'
Doctor
C;ltcgon A1
Flxc S~slems
Kcliancc Ind~~slncs
Ltnl~lcd
I'nlnl;nri~:~ Tr:~inin~:
Svsicrn
hlodtrlc No
TES-TS-P-01.1
1 Dnlc : 1910ll9X
I
1 P a y : 61
of 66
C:llegon - A 1
Flitrc SYS~CIIIS
-_
--................
.-- ........
.....
Modulc No.
ES-TS-P-014
-- - ..
..
3.
..............
..
i
:-:
:.BOUNDARY
FOR RADIANT
i HEAT INTENSITY
..~7
... ).
/-.. ..
=-Z.
/ ". ...........
..
,:\
(1500
a.
. BTU/HR/SO.FT.)
'-NORMALLY
FENCED
...
IN WITH
a.....
:
'
FOR PERSONNEL
BOUNDARY FOR
RADIANT HEAT INTENSITY
( 3 0 0 0 BTU/HR/SQ.FT.)
a
a
0 ~ 1 0 ~
I
Ca!cgon A l
Flnrc SIS~CIITS
I<ctinllccIrldustrics Linr~tcd
Tt~!lri~ig
SVSICIII
Modulc No.
TES-TS-P-014
Prcporcd h- : M G.~ 3 n r
Rev : 00
I.
>.
lnfonnation regarding statutory requirerncnt and LAB flare system has been
obtained from Mr. A. E. I'atil ( TS ) and Mr. U. D. Deshpande ( TS ).
I
I
rcprcd % : M. G.hlnnr
----1 D:!;c
: A::[;; 138
.
..
--I
Calcgory A l
Flnrc SVSICIIIS
Rcli:~t~cc
Industrin Liniilcd
P:~lnl&?ng.nTnini~ifiSvslcnl
Modulc No.
ES-TS-P-014
I
I'ollowin~ is a list of some of the questions which can be useful for validation of
training on this module.
I
I.
.3
Wliat are direrent types of flares? Wliat are tlie advantages and disadvanta~es
I
associated with then1 ?
*
3
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
What are the parameters which determine the flare stack height?
15.
Explain briefly how the flare stack height and safe boundary is arrived at
16.
How are the ground level concentrations determined in case of flame blow out ?
17.
\!'hat
18
19.
I Y . T-.
IA-.
20
21.
27.
23
Wliat are the inspection checks carried out on the flare stack
24
\\Illat are the things, operations crew shol~ldmonitor 111 tllc normal operation of the
flare 7
---. I Re\?c\vcd
- --- b\. : A M H;:Bnglfi
. .
.! c;=: . ,<.,,.-,,>"
.,..,-., ,.,
I.pp:o;.cC b\. : Dr :1
o i 65
I P~;;c : 66
b'.
1
Doc:::
F
l',\T/\L(;ANC;A
Topi;
TRAINING SYSI'ISRI
&Iodule No :TES-TS-P-O I 4
Flare Systems
: .IMC
C a t e e n r y t\l
Sr. N.J.
2
3
-.
-.I
Author
Rcquirclncnt orfl:~ring
11)pcsof narcs
Co~llpncnts of tltc
flare system
Detcrn~ini~lg vzpour
loads to be flare6
Dcsign of collection
thc
Resources
Available
Hrs #
Y .
Self Study
Quiz
Sclf study
Quiz
Sclf study
Sclf stndy
Quidproblem
solvinz
Quidproblem
solvins
MGM
Chapter 2.0
MGM
Chapter 3.0
MGM
Chapicr 4.0
MGM
Chaptcr 5.0
.~
dcsigt~ MGM
considentions
Flarc opcralio~~s
MGM
Flares at RIL PC
MGM
Chspter 6.0
Scll study
Quiz
Chaplcr 7.0
Cliaptcr 8.0
Y
Y
Sclf study
Self stud!.
Quiz
Quiz
1
(Total)
17
~.
~
Tr31'1Cr
~rs-i
?.lctl~od
Qtriz
Chap[cr I .O
.
Validation
Mclllod
Sclf s t ~ ~ d y
Learning
--
--
Site
.-
CONTENTS
YM
1
&!ion
~~~
--
I
(Total)
-~-~
~~
~