PART I : GENERAL
A. GENERAL REQUIREMENTS
Work of this section as shown or specified, shall be in accordance with the requirements of the whole set of contract
documents.
B. SCOPE OF WORK
This section covers provision and installation of potable water pump system inclusive water filter and purifier, pressure
tank system and pump electric panel and installation.
1. Section included:
a. Provision of system drawings based on system provided.
b. Provision of all equipment, tools, supporting material and equipment.
c. Installation of system by skillful workmanship.
d. Commissioning and testing of entire potable water pump system.
2. Section related: Section C1: Electrical and Section C3: Plumbing
C. REFERENCES
D. SYSTEM REQUIREMENTS
1. Collect potable water from deep well by potable water collection tank (existing) through water filter and purifier with
capacity 2 liters per second. Water supply from deep well will be controlled by sufficient floating valve.
2. Distribution pump will pump the water from collection tank for distribution with sufficient pressure and capacity
through 1,000 liters pressure tank. It will have 2 potable that are the pump is brand-new pump. Both pump will be
jointed and working together that controlled by pressure switches and level control in collection tank.
3. The potable water pumps are able to working automatically and manually.
4. The pipe installation shall have by pass pipe connections.
5. The maximum pump capacity should have 7.5 to 8 liters per second on 40 M head because it will supply the water
to 4 units fire hydrant also.
E. SUBMITTALS
F. WARRANTY
Following contract agreement and manufacture’s warranty. Contractor must submit warranty card on final handling over.
PART II : PRODUCT
A. MANUFACTURER’S
Acceptable manufacturers: product of “ GRUNDFOS”, “EBARA” of equal approved for the pump.
A water filter and water purifier acceptable manufacturers is product of “CUNO” or equal approved and the pressure
tank acceptable manufacturers is locally product with pressure test certification and approved.
1. Using for 1st pump and working together with the 2nd pump.
2. The pump specified is Grundfos product type CR8-40 and CR16-50 (in phase 2) or equal approved.
1. Acceptable product of water filter and purifier is “Cuno” with capacity 2 liters per second.
2. The type of potable water filter and purifier accordance to the potable water existing condition.
3. It should be able to filtering the water, softening the water and reduce the un_mutual bacteria content accordance
to purifier water regulation.
1. Capacity of water pressure tank shall not less than 1,000 liters.
2. Made by steel plate with appropriate thickness to carry the water pressures test up to 15 Kg/M 2. It must be coated
by powdered coating or other finishes anti corrosive and approved.
3. The water pressure tank should have pressure switches, pressure gauge and membrane.
1. The electrical pump panel must be able to operated by automatically and manual operation.
2. It is able to control by pressures switches and level control.
3. It must have motor protector device from failure on one phase; rivers back rotation of phase, over load and over
heated.
4. It must be able to working on star and delta if required by pump motor.
A. EXAMINATION
Examine support system and adjacent installation for condition that would adversely affect to execution. Do not proceed
until unsatisfactory conditions are corrected. Beginning of execution will constitute acceptance of existing condition.
B. PREPARATION
Conditions unit as required by fabricator, prepare all material and equipment, work shop drawing for guidance and other
supporting material or tools.
C. INSTALLATION
D. CLEANING
E. PROTECTION
Protect the installation from damage during construction period so that it will be without any indication of use or
damaged at time of acceptance.
Commissioning and testing accordance to all system requirements has to perform. Site supervisor will provide checklist
on commissioning and testing requirements.
===============