NS2-DH01-P0ZEN-740009 - ITP For Crane & Hoist Installation - REV.D
NS2-DH01-P0ZEN-740009 - ITP For Crane & Hoist Installation - REV.D
NS2-DH01-P0ZEN-740009 - ITP For Crane & Hoist Installation - REV.D
Owner's Engineer
Contractor
Sub-Supplier
LILAMA CORPORATION
Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW)
Title
TITLE: INSPECTION AND TEST PLAN FOR CRANE & HOIST INSTALLATION
Applicable Specification or Participation by Sampling
No Description of Inspection and Test Acceptance Criteria Record Format Remark
Procedure Sub-Con Contractor Owner frequency
2 Erection
Construction Drawing
2.1 Elavation Check ISO 12488-1 Table 2 Inspection Report For Elevation Check (Form #1) H W RW -
ISO 12488-1
Construction Drawing
2.3 Span Check ISO 12488-1 Table 2 Inspection Report For Span Check (Form #3) H W RW -
ISO 12488-1
2.4 Fit-up Inspection (If any) AWS D1.1 Refer to AWS D1.1 Fig 5.3 Inspection Report For Fit-Up (Form #4) H W W 100%
Crack: No
Undercut: Max 1 mm for T<25mm
2.5 Welding Visual Inspection (If any) AWS D1.1 Max 2 mm for T≥ 25mm Inspection Report For Welding Visual (Form #5) H W W 100%
Reinforcement: 0 ~3 mm for T≤ 25mm
0~ 5 mm for 25< T≤ 50 mm
2.6 Inspection for Trolley Bar Construction Drawing Construction Drawing Inspection Report For Trolley Bar (Form #5-1) H W W 100% D
NDE Procedure No.: NS2-QE03-P0ZEN- - MT or PT
NDE Procedure No.: NS2-QE03-P0ZEN-040010
2.7 NDE (If any) 040010 - NDE Report H W R 100% Butt
Para PTC.NS2.MT.01, PTC.NS2.PT.01
Para. PTC.NS2.MT.01, PTC.NS2.PT.01 welding
Dynamic load test 110% of rated load (Except QTKĐ 001:2008/BLĐTBXH Inspection Report For Dynamic Load Test (Form Load Testing shall be witnessed by
2.8 Refer to Section 4.3.2 – TCVN 4244:2005 H W W 100%
Chain Block) TCVN 4244:2005 #6) Local Authorized Third Party
Static load test 125% of rated load (Except Chain QTKĐ 001:2008/BLĐTBXH Load Testing shall be witnessed by
2.9 Refer to Section 4.3.2 – TCVN 4244:2005 Inspection Report For Static Load Test (Form #6) H W W 100%
Block) TCVN 4244:2005 Local Authorized Third Party
4 Final Inspection
4.1 Final Inspection & Walk down Approved Construction Drawing Approved Construction Drawing - Punch List Report (Form #8) H W W 100%
Abbreviation : S: Surveillance R: Report Review RW: Random Witness Inspection W: Witness Inspection H: Hold Inspection
INSPECTION AND TEST PLAN FOR ITP. NS2-DH01-P0ZEN-740009
CRANE & HOIST INSTALLATION Rev. D
CONTENTS
Building/Structure Unit
ISO 12488-1
Tolerance of height related to opposite measuring points at right angles at each point of travelling track
Class Class 1 Class 2 Crane Type
E Result
Point no. Remarks
Design Actual Deviation Accept Reject
Signature
Full Name
Date
Building/Structure Unit
ISO 12488-1
Tolerance of straightness related to test length of 2000 mm at each point of height of crane rail ( c )
C c Result
Point no. Remarks
Design Actual Deviation Design Actual Deviation Accept Reject
Signature
Full Name
Date
ITP No.NS2-DH01-P0ZEN-740009 (2)
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor
Building/Structure Unit
ISO 12488-1
Tolerance of span S of the crane rails related to rail centre at each point of travelling track
Class Class 1 Class 2 Crane Type
±3 ±5 Applicable
Tolerance valid for all spans S≤16 m valid for all spans S≤16 m Class
+A= Smax-S
-A=Smin-S ±10 ±15
valid for all spans S>16 m valid for all spans S>16 m
A Result
Point no. Remarks
Design Actual Deviation Accept Reject
Signature
Full Name
Date
Construction Drawing/
Inspection Item Accept Reject Remarks
Code & Standard
Example sketches
Signature
Full Name
Date
ITP No.NS2-DH01-P0ZEN-740009 (4)
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor
- Crack No
0~ 3 mm for T≤ 25mm
- Reinforcement
0~ 5 mm for 25< T≤ 50 mm
<Remarks & Comments>
Signature
Full Name
Date
ITP No.NS2-DH01-P0ZEN-740009 (5)
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor
Building/Structure Unit
Signature
Full Name
Date
ITP No.NS2-DH01-P0ZEN-740009 (5-1)
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor
Inspection Report for Dynamic/Static Load Test
Report No. Sub-Contractor LILAMA
Building/Structure Unit
Test specification :
Result
Description (Dynamic/Static
No Item No. Test date Remark
Load Test)
Accept Reject
Signature
Full Name
Date
Building/Structure Unit
Construction Drawing /
Inspection Item Accept Reject Remarks
Code & Standard
1) Document
Outdoor:
Outside: 240µm (1st:80µm; 2nd:110µm; 3rd:50µm)
3.1 Exterior Coating Inspection
Indoor: □ □
Outside: 160µm (1st: 80µm; 2nd:80µm)
Exterior
DFT checking Remarks
1st 2nd 3rd
Actual result 3
Note: The actual DFT not less than requirement mentioned 3.1 above
<Remarks/Comments>
Signature
Full Name
Date
Building/Structure Unit
Notes :
Category A Comment that commissioning can proceed only after closure of this comment
Category B Comment that commissioning can proceed even if comment still not closed
<Remarks & Comments>
Signature
Full Name
Date
ITP No.NS2-DH01-P0ZEN-740009 (8)