TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
The requisite information asked vide Chief Engineer Design (NTDC) letter
referred at Sr. No. 2 above may please be supplied to the office of Chief Engineer Design
(NTDC) WAPDA House, Lahore in order to proceed in the matter.
No.____________/SM(P&D)DMP(T&G)/BG-I Dated______/12/2004
Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
It has been mentioned in para-11 of the above cited subject Proforma that most of
the material shall be procured from local market, hence F.E. component shall not be required.
In this regard it is submitted that emphasis shall be made to procure all the equipment /
material from local firms, however, the equipment like 132 kV C.Bs, 132 kV Isolators,
Transmission line and Grid Station hardware, transmission line C.Ts and TRF C.TS, if not
available from local market shall have to be imported for which F.E component shall be
required.
No.____________/SM(P&D)DM(T&G)/PC-1 Dated______/11/2004
T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
III-REMINIDER
The requisite information is still awaited from your end. You are once again
advised to send the same without further loss of time.
Info: 1. Manger Easten Circle LESCO with reference to his letter No. 5245 dated
10-7-2004.
2. Master file.
No.____________/ Dated______/7/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
(1) In this regard, it is submitted that, as per findings of joint visit by NTDC and
LESCO Engineers at 66 kV EMCO Grid Station on 30-4-2004:
(i) The 3rd 66/11 kV 10/13 MVA Power Transformer can be added in the
switch yard and a 9-meter wide 11 kV switch room can be constructed to
accommodate 11 kV panels for this transformer.
(2) As far as loading position of 66 kV system feeding the EMCO grid station is
concerned, it is submitted that the loading conditions of 66 kV Attabad-Emco transmission line
and 40 MVA 132/66 kV Power Transformer at Attaabad Grid Station (feeding EMCO) were
analyzed for the months of 5/2003 to 4/2004 by allowing 80% loading of 3x10/13 MVA
Power Transformers at EMCO and it was found that expected loading of 66 kV Attabad-
EMCO transmission lines comes out 102.6% and the same for 40 MVA, 132/66 kV power
transformer at Attabad Grid station comes out to 81%.
(1) In this regard, it is submitted that, as per findings of joint visit by NTDC and
LESCO Engineers at 66 kV EMCO Grid Station on 30-4-2004:
(i) The 3rd 66/11 kV 10/13 MVA Power Transformer can be added in the
switch yard and a 9-meter wide 11 kV switch room can be constructed to
accommodate 11 kV panels for this transformer.
(2) As far as loading position of 66 kV system feeding the EMCO grid station is
concerned, it is submitted that the loading conditions of 66 kV Attabad-Emco transmission line
and 40 MVA 132/66 kV Power Transformer at Attaabad Grid Station (feeding EMCO) were
analyzed for the months of 5/2003 to 4/2004 by allowing 80% loading of 3x10/13 MVA
Power Transformers at EMCO and it was found that expected loading of 66 kV Attabad-
EMCO transmission lines comes out 102.6% and the same for 40 MVA, 132/66 kV power
transformer at Attabad Grid station comes out to 81%.
iii) 3rd 10/13 MVA, 66/11 kV Power Transformer may kindly be added at 66 kV
EMCO grid station with the condition that loading of 3x10/13 MVA power
transformers be restricted to 60 %, to avoid damaging of power transformer due
to over loading / jerky furnace load and to keep the 66 kV feeding system within
permissible limit.
2. The PHA staff created hindrance during soil investigation and eventually the transfer of
said land was withdrawn on 1-1-2001 by Secretary (Colonies Department) Government
of Punjab.
3. The matter was taken up with B.O.R. Punjab to reconsider the decision and allow
construction of the grid station but the request was regretted on 13-2-2002.
4. Efforts were made to find some alternate piece of land but in vain as suitable land of
required size was not available in the vicinity.
5. The matter was taken up with the Governor of Punjab who visited the site of proposed
grid station on 4-8-2002 and was briefed by Chief Engineer (GSC) NTDC WAPDA.
He, in turn, instructed the District Government Lahore and PHA to conduct Survey in
order to find out alternate site.
6. The matter was again taken up by Chairman WAPDA with Governor of Punjab and
accordingly Governor of Punjab directed the concerned Department to hand over the
site to LESCO for the construction of proposed 132 kV Sheranwala Gate grid station.
The temporary possession, however, was taken but the documentation for the transfer of
land in the name of LESCO could not be completed.
7. Demarcation was given at site on 10-1-2004 by the Patwari and Tehsildar concerned but
Tehsildar (Najul) refused to sign the papers of possession/demarcation in the light of
contents of the Secretary (Colonies Department) Government of Punjab Lahore, letter
No. 2785-2001/2273-C.S. (1) dated 1-10-2001 and D.O. (Revenue) Lahore letter No.
Nazul/69-c/192 dated 18-9-2001 issued for non-construction of the grid station.
8. It is pertinent to mention here that, 132 kV grid station near Sheranwala Gate was
proposed to provide the continuous supply to walled City of Lahore and area around it.
Moreover, this grid station will have to provide relief to already overloaded 132 kV
Bhatti Gate, Fort and Badami Bagh Grid Stations.
(Cont’ on Page 2)
(2)
9. The matter has delay to a such extent that if this grid station is not constructed within
next few months, then it is apprehended that LESCO will not be able to avoid forced
load shedding in walled City of Lahore and area around it.
10. Foregoing in view, it is requested that Secretary (Colonies Department)-I and District
Officer (Revenue) may kindly be advised to issue necessary amendment in the orders,
mentioned in para-7 above, so that possession formalities could be completed and
construction activities of 132 kV grid station Sheranwala Gate, Lahore could be started
without further delay.
Info: 1. Mian Muhammad Aamer, District Nazim, City Distt. Govt. Lahore.
2. PSO to Governor of Punjab, Lahore.
3. The Secretary (Colonies Department)-I Govt. of Punjab, Lahore.
4. The Chief Executive Officer (NTDC) 414-WAPDA House, Lahore.
5. The GM (Operation) WAPDA, WAPDA House, Lahore.
6. The District Officer(Revenue) Government of Punjab, Lahore.
7. The G.M (GSC) NTDC,413-WAPDA House, Lahore.
8. The Chief Engineer Construction (North) 220/132 kV System NTDC, Lahore.
9. The Project Director GSC NTDC,Lahore.
10. Sr. Manager O&M (T&G), LESCO H/Q Lahore.
11. Manager, GSO Circle LESCO, Lahore.
12. Deputy Manager (Op.) Data Darbar Divn. LESCO Lahore to pursue the matter.
13. Master file.
T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
You are advised to make hectic efforts for selection / pinpointing of the
appropriate / suitable location for newly proposed Grid Station for further submission to
Purchase Committee.
No.____________/SM(P&D)/DMP(T&G)/PC-1 Dated______/6/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
Reference: 1. Telephonic discussion of the undersigned with Mr. Saleem Imtiaz, Dir.
Planning (STG) on 3-4-2004.
3. GM (Op.) WAPDA letter No. 9988-99/GMO/CEHQ/4-DISCO dated 21-
07-2003.
1. Through the letter referred at Sr. No.2 above, a programme was worked out in
coordination with Distribution Companies to achieve the target for loss reduction by
converting 33 kV and 66 kV grid stations and transmission lines into 132 kV.
2. For this purpose, the under mentioned LESCO grid stations were selected being a
th
part of 6 STG:-
i) 66 kV Emco
ii) 66 kV U.I.S
iii) 66 kV Hujra
4. It is intimated that not a single LESCO grid station has been included in the
above-mentioned list.
2. In view of the loading situation explained above and growing industrial load
demand of the area, it is requested that extension with one No. 10/13 MVA Power Transformer
may please be carried out at 132 kV Grid Station, Attabad to avoid any untoward situation due
to over loading and to meet with the g rowing future load requirement.
Reference: Ministry of Water & Power Fax Message No. 56 dated 4-3-2004, endorsed vide
your office Endst. No. Nil dated 20-3-2004.
No.____________/ Dated____/4/2004
Hamid
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
1. The list of PC-I (STG, DOP, ELR, RE), those have been submitted to Ministry of
Water & Power, Government of Pakistan for processing to obtain the approval of
CDWP/ECNEC, were sent to your good office vide this office letter referred at Sr. No. 1
above.
2. In order to know the latest progress of the PC-Is, Chief Planning & Development
Division, Government of Pakistan has already been requested vide this office letter No. 13013-
14 dated 25-3-2004 with copy to your office as well.
3. Moreover, the matter was also discussed on telephone with Mr. Ashfaque
Mahmood, Deputy Chief Planning & Development Division, Islamabad on 27-3-2004 to know
the latest status of subject PC-Is in respect of LESCO, who informed that all the PC-Is are
under process in P&D Division Government of Pakistan for obtaining the approval of
CDWP/ECNEC.
No.____________/ Dated____/4/2004
Hamid
To,
The Secretary,
WAPDA Employees Cooperative Housing Society,
Lahore.
1. It is submitted that I want to construct my house at the subjected plot for which I
have already submitted the submission drawings to LDA for approval through your good office
letter No. CE/41K1/206 dated 19-3-2004, which is under process (copy enclosed.).
2. It is, therefore, requested to kindly get installed water supply connection at the
earliest.
3. It is further added that I have already paid all the dues outstanding including
maintenance of the plot and late construction charges (copy of the receipt is attached).
Yours truly,
2. This grid station is feeding important domestic / commercial consumers and load
is growing rapidly.
No.____________/ Dated____/3/2004
Hamid
RECONNECTION OF AYAZ TEXTILE MILLS LTD.
1. M/s Ayaz Textile Mills Ltd. became WAPDA / LESCO consumer on 24-3-1992 with
sanctioned load 1066 kW under tariff B-3. The consumer was being fed through 11 kV
independent Ayaz feeder 9.69 KM long.
5. The RCO was effected on 5-9-2002 under Incentive Package for Industries after
recovering 25% down payment of arrears Rs. 23,70,067/- and allowing 12 installments
of remaining amount.
7. The consumer paid the defaulting amount of Rs. 8,36,025/- upto January 2004.
8. In January 2004, the consumer requested for reconnection and installments of arrears
worth Rs. 16,71,751/-.
9. Chief Executive LESCO had allowed to pay down payment Rs. 6,63,591/- and
remaining in 3-installemtns on 15-1-2004 for reconnection.
10. The AM (CS) City Divn. Kasur has issued the D.N. / Bills to consumer for reconnection
as follows:-
11. Since the consumer had already availed the facility of Incentive Package for Industries
during 9/2002, so he is entitled to avail this facility again as per policy in vogue.
Reference: 1. Manager GSO Circle LESCO letter No. 10674-83 dated 22-12-03.
2. Deputy Manager Property Management Cell LESCO letter No.
5906-10 dated 28-1-2004.
1. The matter regarding the transfer of land in the name of LESCO was forwarded
to you by Deputy Manager Property Management Cell vide letter at Reference-2 above.
2. You are advised to take up the matter with Lahore Cantonment Board /
Authorities for the transfer of land of 132 kV Lahore Cantonment Grid Station in the name of
LESCO and intimate the latest status / outcome without further delay.
No.____________/ Dated____/3/2004
Hamid
MATTER WAS DISCUSSED WITH MR. SULTANS, SSO,
INCHARGE 132 KV ATTABAD GRID STATION ON 3-4-2004
1. 1280-Amp. Maximum load of T-1 (20/26 MVA) Power Transformer has been recorded
in 10/2003. The matter was got investigated from Grid Station Staff, who intimated that
due to damage of Power Transformer at 132 kV Grid Station ICI (Public), the load of 11
kV New Rupali feeder (Approximately 120-Amp.) emanating from ICI (Public) Grid
Station was shifted on 21-10-2003 to this Power Transformer, in emergency. The actual
maximum load of this power Transformer is about 1170-Amps.
2. 1300-Amps. Load was recorded in 3/2003 when the load of 11 kV Flaying Paper
increased rapidly. In order to avoid tripping due to over loading at T-2, the 11 kV Flying
Paper feeder (300-Amps.) was shifted to T”-1 Power Transformer at spare panel of
Sunshine Factory (closed). By this arrangement load of T-2 came down to around 1200-
Amps.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]
2. This grid station is feeding important domestic / commercial consumers and load
is growing rapidly.
3. No.____________/ Dated____/3/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: [email protected]
DA / As above
GM / Technical Director
( Muhammad Saleem )
Info: 1. Section Officer (Gencos), Ministry for Water Power, Government of Pakistan,
Islamabad with reference to his office letter No. GPII 15(35)/2013 dated 27-2-
2013 alongwith a copy of above referred letter of CE (Development) PMU
LESCO
3. Master file.
No._____________/ Dated______/2/2013
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
DA / As above
No._______________/ Dated______/2/2013
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
Extension of load from 2553 kW to 3353 kW of M/s Shadman Cotton Mills Ltd.
was approved vide this office letter No. 10782-91/DRW/SKP/555 dated 4-4-2013 subject to
energization / commissioning of 40 MVA / addition of 3 rd MVA 20/26 MVA Power
Transformer at 132 kV Warburton grid station.
Latest status in this regard may please be intimated to this office in order to
proceed further in the matter.
No._______________/DRW/SKP/555 Dated______/9/2014
Hamid /T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
Info: 1. Chief Engineer (Development) PMU LESCO to let this office know about latest
stats of work as already requested vide this office letter No. 3080 dated 9-9-2014.
2. Master file.
No._______________/DRW/SKP/555 Dated______/10/2014
Hamid /T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
While processing Reconnection case of M/s Zaman Paper & Board Mills, it has
been observed that loading condition of existing 03 No. 20/26 MVA Power Transformers,
at 132 kV Bhikhi Grid Station has became critical as shown on the enclosed statement.
No.________________/ Dated______/10/2014
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
While processing Reconnection case of M/s Zaman Paper & Board Mills, it has
been observed that loading condition of existing 03 No. 20/26 MVA Power Transformers,
at 132 kV Bhikhi Grid Station has became critical as shown on the enclosed statement.
No.________________/ Dated______/10/2014
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
While processing the case of extension of load of M/s Hassan Limited, it has
been observed that loading condition of existing 02 No. 20/26 MVA Power Transformers,
at 132 kV Warburton Grid Station found critical.
Please let this office know whether any augmentation or addition of Power
Transformer at the above grid station has been proposed in near future plan or otherwise.
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
No.____________/DRW/129/LESCO Dated______/9/2015
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
FAX MESSAGE
No.____________/DRW/129/LESCO Dated______/10/2015
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
Reference: Chief Engineer (Development) LESCO letter No. 6894-99 / CE (Dev) / M (P&S)
/ 237 dated 20-12-2016 addressed to your with its copies to Additional Secy.
Ministry of Water & Power, Commissioner Lahore and others (copy enclosed for
ready reference).
As requested in the above refer letter, allocation and transfer of land for
extension at 132 kV Chah Miran Grid Station may please got made in order to meet the load
requirement of the area.
DA/As above
No._______________/DRW/11170/Ist Dated______/1/2017
Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
LESCO intends to acquire / purchase a piece of land from M/s EMCO Industries
Limited adjacent to 132 kV EMCO Grid Station for extension of existing switchyard in order
to accommodate the load of nearby Industrial Consumers.
In this regard LESCO taken up matter with M/s EMCO Industries Limited but
they are willing to give land on lease on market based prices. It is further added that the said
land is mortgaged by a Bank.
No._______________/DRW/411/Ist Dated______/4/2017
Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
DA / As above
No._______________/ Dated______/11/2017
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
DA / As above
No._______________/ Dated______/11/2017
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]
FAX MESSAGE
The Chief Executive Officer LESCO has directed to give time line / target date
for completion of augmentation work as mentioned above.
FAX MESSAGE
Hamid/T&G
INFORMATION REGARDING TRANSMISSION LINE
Type of conductor * Lynx (Mostly for remote and small grid station)
Used for 132 kV * Rail (Mostly in use) ACSR (Al. cond. Steel reinforced)
* Greely (Off and On)
For some more height than 132 kV pole, 220 kV poles types SPBM & SPBH are being
used (especially in Cities space constraints. Normally used heights and clearance.
Maximum height in route use without extensions 92-feet
(Otherwise extensions can be used)
3m, 6m etc.
Horizontal clearance (for safe point of view) Not less than 5m
Vehicle clearance Not less than 7.5m
Main Drawings (1) GLO (General layout) (2) S/Line (Connection Scheme)
Other Drawings (1) Foundation plan (Foundation of TRF, CTs, Gantries column etc.)
Standard In & Out Grid Station 32 Kanals (12 to 16 for grid station and
Within 48 meters Bus Bar remaining for Colony)
4 No. L/Bays 57m x 63m standard yard
4 No. T/Bays with 12 x 30m CHB
1 No. P.T. Bay
Due to critical loading condition of 132 kV EMCO grid station and in order to meet
with rapidly increasing load growth in the area, augmentation of existing 1x20/26 MVA Power
Transformer with 40 MVA Power Transformer was approved by the Chief Executive Officer LESCO
and you were advised to take immediate steps for execution of work on priority basis vide this office
letter No. 34836-41 dated 23-11-2017.
The matter has been discussed with Chief Executive Officer explicitly and it has been
decided that in order to resolve the matter and meet with the load requirement of the area 1 No. 40
MVA Power Transformer may immediately be allocated for above mentioned augmentation from
existing available stock and compliance be reported to this office within one week positively.
No._________________/ Dated______/04/2018
Hamid/T&G
FAX MESSAGE
Latest status of work and time line / target date to complete the work of
augmentation of existing 20/26 MVA with 40 MVA Power Transformer as well as addition of
20/26 MVA Power Transformer at 132 kV Boghiwal grid station may please be intimated to
this office.
Hamid/T&G