AIA Drawings
AIA Drawings
AIA Drawings
01 02 03 04 05 06 07 08 09 10 10
Sheet
A
STAIR STO
UP
000 003
BARISTA
002
LEVEL PLANS
ELEV MECH
UP 001 008
GROUND
30'-0"
CAFE/EXHIBIT
004
M JAN W
005 006 007
Checked
B
FH
MG/ES
Drawn
UP
FRANK HARMON
488 S (300) gross SF = 2 people
PLAN cafe + exhibit
12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 8'-0" 2 1/8" = 1'-0"
1/8"=1'-0"
Scale
A
08 12 08
Date
DN
STAIR STAIR
000 100
Job No.
0801
ELEV CHAS
001 104
NORTH CAROLINA
30'-0"
105
STO
WAKE COUNTY
LOBBY RECEPTION MULTIPURPOSE
101 102 103
106 107
PREP ELEC
B
DN
Headquarters Building
AIA North Carolina
3,389 gross SF = 298 people
2,006 A (7) net SF = 287 people
894 B (100) gross SF = 9 people
344 S (300) gross SF = 2 people
PLAN lobby + multi-purpose
12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 8'-0" 1 1/8" = 1'-0"
A202
01 02 03 04 05 06 07 08 09 10 11
Sheet
IT
A
COPY
AIA NC + TENANT
207
STAIR STAIR
000 100
AIA OFFICE
213
LEVEL PLANS
ELEV MECH M W
001 204 205 206
30'-0"
CON
214
Checked
B
FH
BALCONY
MG/ES
Drawn
DN 202
FRANK HARMON
188 S (300) gross SF = 1 person
PLAN aia
12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 8'-0" 2 1/8" = 1'-0"
1/8"=1'-0"
Scale
A
08 12 08
Date
STAIR STAIR
000 100
Job No.
0801
ELEV MECH M W
001 204 205 206
NORTH CAROLINA
30'-0"
WAKE COUNTY
301 302
TENANT 1 TENANT 2
1,300 SF 1,024 SF
B
DN
Headquarters Building
AIA North Carolina
3,726 gross SF = 39 people
0 A net SF = 0 people
3,738 B (100) gross SF = 38 people
107 S (300) gross SF = 1 person
PLAN tenant
12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 8'-0" 2 1/8" = 1'-0"
AIA
323'-0"
333'-0"
347'-0"
358'-6"
TENANT
374'-7 3/4"
CAFE + EXHIBIT
LOBBY + MULTI-PURPOSE
TOP OF CONSTRUCTION
4
A
B
AIA North Carolina WAKE COUNTY Job No. Date Scale FRANK HARMON ARCHITECT Drawn Checked SECTION Sheet
3
2
B
A
4
TOP OF CONSTRUCTION
TENANT
CAFE + EXHIBIT
374'-7 3/4"
LOBBY + MULTI-PURPOSE
323'-0"
333'-0"
AIA
347'-0"
358'-6"
AIA North Carolina WAKE COUNTY Job No. Date Scale FRANK HARMON ARCHITECT Drawn Checked SECTION Sheet
Sheet
374'-7 3/4"
TOP OF CONSTRUCTION
358'-6" 6.2
TENANT
ELEVATIONS
7.3 8.1 7.2
347'-0"
AIA
4.1
Checked
333'-0"
LOBBY + MULTI-PURPOSE
FH
7.2 3.1
MG/ES
Drawn
323'-0"
CAFE + EXHIBIT
4.1 STONE
FRANK HARMON
6.1 CLEAR FINISH PLYWOOD
6.2 SHIP LAP WOOD SIDING
1/8"=1'-0"
8.2 404.5.1 SINGLE PANE GLASS BARRIER
Scale
9.1 PAINTED DRYWALL
11 10 09 08 07 06 05 04 03 02 01
08 12 08
9.2 CERAMIC TILE
Date
374'-7 3/4"
TOP OF CONSTRUCTION
Job No.
0801
7.1
NORTH CAROLINA
WAKE COUNTY
358'-6"
TENANT
347'-0"
AIA
Headquarters Building
AIA North Carolina
333'-0"
6.3 8.1
LOBBY + MULTI-PURPOSE
323'-0"
CAFE + EXHIBIT
ELEVATION north
1 1/8" = 1'-0"
A302
B A
Sheet
374'-7 3/4"
TOP OF CONSTRUCTION
8.1
358'-6"
TENANT
ELEVATIONS
7.2 6.2 8.1
347'-0"
AIA
6.3
Checked
333'-0"
LOBBY + MULTI-PURPOSE
3.1 7.2
FH
MG/ES
Drawn
323'-0"
CAFE + EXHIBIT
4.1 STONE
FRANK HARMON
6.1 CLEAR FINISH PLYWOOD
6.2 SHIP LAP WOOD SIDING
1/8"=1'-0"
8.2 404.5.1 SINGLE PANE GLASS BARRIER
Scale
9.1 PAINTED DRYWALL
08 12 08
9.2 CERAMIC TILE
01 02 03 04 05 06 07 08 09 10 11
Date
374'-7 3/4"
TOP OF CONSTRUCTION
Job No.
0801
7.1
NORTH CAROLINA
WAKE COUNTY
358'-6"
TENANT
347'-0"
AIA
5.1
Headquarters Building
AIA North Carolina
4.1
333'-0"
LOBBY + MULTI-PURPOSE
CISTERN
323'-0"
CAFE + EXHIBIT
ELEVATION south
1 1/8" = 1'-0"
A501
C A
Sheet
5
A205
VERTICAL DETAILS
6" RIGID INSULATION TWO LAYERS OF 1 1/2" RIGID INSULATION
WITH 5/8" NAILER ON TOP SURFACE
1
MESH FOR SPRAY 11 4"
INSULATION SEE STRUCTURAL DWGS B
Checked
1/2" TS 3x3
SEE STRUCT DWGS, S17 WRAP WINDOW OPENING HEAD, SILL
FH
AND JAMBS WITH FLEXIBLE FLASHING
Drawn
MG
11" DIAMETER GUTTER SLIP CONNECTION WINDOW BEYOND B
TO ALLOW FOR ROOF DEFLECTION
12
A601
1'-4"
ALUMINUM STOREFRONT
1"=1'-0"
Scale
ALUMINUM SILL
04 06 09
5/8" GYP BD
AIR SPACE
Date
STEEL CONNECTOR PLATE
BUILDING PAPER SEE STRUCT DRAWINGS
WOOD BASE METAL ROOFING SYSTEM BEYOND
1/2" FIRE RETARDANT
SHEATHING OPERABLE WINDOW
Job No.
4 1/2" CONC SLAB ON METAL DECK
0801
A
4 1/2" CONCRETE SLAB ON
6" METAL STUDS 16" OC METAL DECK
BATT INSULATION
5 3/8"
1 1/2"
5/8" GYP BD
STEEL CONNECTOR PLATE
SEE STRUCT DRAWINGS
NORTH WALL
3 SOUTH WALL 1 1" = 1'-0"
1" = 1'-0" BID DOCUMENTS
A502
C A
Sheet
1'-4" 5 3/8"
VERTICAL DETAILS
SILL
FLASHING
A B
Checked
4 1/2" CONC. SLAB ON METAL DECK
4 1/2" CONC. SLAB ON METAL DECK
FH
ELEV = 347'-6" ELEV = 359'-0"
Drawn
DOMESTIC WATER
MG
ACOUSTIC TREATMENT 1 1/2" RIGID INSULATION
SEE STRUCTURAL DWGS ALT 11
FLASHING
ROLLER SHADE BY OWNER
EXPANDED METAL CEILING CURTAIN TRACK
ALT 05 BY OWNER
1"=1'-0"
Scale
6"
3/8"x1 3/4" STEEL BAR
04 06 09
1 1/2" METAL FRAMING HAT CHANNEL @ 24" O.C.
Date
5/8" GYP BOARD
Job No.
PRECAST CONCRETE PAVERS HVAC GRILL BETWEEN COLUMNS HVAC GRILL BETWEEN COLUMNS
0801
2"
6" CONCRETE SLAB 6" CONCRETE SLAB
ELEV = 333'-6"
DAMPROOFING
RIGID INSULATION
PIER BEYOND -
SEE STRUCTURAL
1'-0"
Sheet
8" OUTSIDE EDGE
OF RAKE BEAM
2
A205
VERTICAL DETAILS
MESH FOR SPRAY INSULATION
2
12
MESH FOR SPRAY INSULATION
CEMENTITIOUS PANEL
ON 1 1/2" HAT CHANNELS
Checked
CEMENTITIOUS PANEL ON 1 1/2" 5/8" GYP BD ON TS 3 1/2"x 3 1/2"
5/8" GYP BD CEILING @ 24" O.C.
HAT CHANNEL @ 24" OC
FH
STOREFRONT
Drawn
MG
6 NOT USED
ALUMINUM SILL ALUM SILL
1x4 PT
1x4 PT
3'-0"
A
WOOD BASE
1"=1'-0"
1" RIGID INSULATION
1" RIGID INSULATION
Scale
STEEL TUBE - SEE STRUCTURAL DWGS
EAST WALL@ 3rd level
8 1" = 1'-0"
2'-9"
SEE STRUCTURAL DWGS
04 06 09
6"x6" POCKET FOR LIGHTING
Date
1'-4"
Job No.
0801
FLASHING
STOREFRONT
WEST WALL @ 3rd level
2 1" = 1'-0"
5/8" GYP BD CEILING
ALTERNATE 05
2x8 RIPPED
SEE STRUCTURAL DWGS
FLASHING
1/2" ANCHOR BOLTS
24" OC STAGGERED 2" A
STOREFRONT
2x6 PT 3'-6"
ELEV = 333'-6"
CAVITY DRAINAGE FABRIC 1" RIGID INSULATION
9
A440
Sheet
5
A205
VERTICAL DETAILS
6" RIGID INSULATION TWO LAYERS OF 1 1/2" RIGID INSULATION
WITH 5/8" NAILER ON TOP SURFACE
1
MESH FOR SPRAY 11 4"
INSULATION SEE STRUCTURAL DWGS B
Checked
1/2" TS 3x3
SEE STRUCT DWGS, S17 WRAP WINDOW OPENING HEAD, SILL
FH
AND JAMBS WITH FLEXIBLE FLASHING
Drawn
MG
11" DIAMETER GUTTER SLIP CONNECTION WINDOW BEYOND B
TO ALLOW FOR ROOF DEFLECTION
12
A601
1'-4"
ALUMINUM STOREFRONT
1"=1'-0"
Scale
ALUMINUM SILL
04 06 09
5/8" GYP BD
AIR SPACE
Date
STEEL CONNECTOR PLATE
BUILDING PAPER SEE STRUCT DRAWINGS
WOOD BASE METAL ROOFING SYSTEM BEYOND
1/2" FIRE RETARDANT
SHEATHING OPERABLE WINDOW
Job No.
4 1/2" CONC SLAB ON METAL DECK
0801
A
4 1/2" CONCRETE SLAB ON
6" METAL STUDS 16" OC METAL DECK
BATT INSULATION
5 3/8"
1 1/2"
5/8" GYP BD
STEEL CONNECTOR PLATE
SEE STRUCT DRAWINGS
NORTH WALL
3 SOUTH WALL 1 1" = 1'-0"
1" = 1'-0" BID DOCUMENTS
A502
C A
Sheet
1'-4" 5 3/8"
VERTICAL DETAILS
SILL
FLASHING
A B
Checked
4 1/2" CONC. SLAB ON METAL DECK
4 1/2" CONC. SLAB ON METAL DECK
FH
ELEV = 347'-6" ELEV = 359'-0"
Drawn
DOMESTIC WATER
MG
ACOUSTIC TREATMENT 1 1/2" RIGID INSULATION
SEE STRUCTURAL DWGS ALT 11
FLASHING
ROLLER SHADE BY OWNER
EXPANDED METAL CEILING CURTAIN TRACK
ALT 05 BY OWNER
1"=1'-0"
Scale
6"
3/8"x1 3/4" STEEL BAR
04 06 09
1 1/2" METAL FRAMING HAT CHANNEL @ 24" O.C.
Date
5/8" GYP BOARD
Job No.
PRECAST CONCRETE PAVERS HVAC GRILL BETWEEN COLUMNS HVAC GRILL BETWEEN COLUMNS
0801
2"
6" CONCRETE SLAB 6" CONCRETE SLAB
ELEV = 333'-6"
DAMPROOFING
RIGID INSULATION
PIER BEYOND -
SEE STRUCTURAL
1'-0"
Sheet
8" OUTSIDE EDGE
OF RAKE BEAM
2
A205
VERTICAL DETAILS
MESH FOR SPRAY INSULATION
2
12
MESH FOR SPRAY INSULATION
CEMENTITIOUS PANEL
ON 1 1/2" HAT CHANNELS
Checked
CEMENTITIOUS PANEL ON 1 1/2" 5/8" GYP BD ON TS 3 1/2"x 3 1/2"
5/8" GYP BD CEILING @ 24" O.C.
HAT CHANNEL @ 24" OC
FH
STOREFRONT
Drawn
MG
6 NOT USED
ALUMINUM SILL ALUM SILL
1x4 PT
1x4 PT
3'-0"
A
WOOD BASE
1"=1'-0"
1" RIGID INSULATION
1" RIGID INSULATION
Scale
STEEL TUBE - SEE STRUCTURAL DWGS
EAST WALL@ 3rd level
8 1" = 1'-0"
2'-9"
SEE STRUCTURAL DWGS
04 06 09
6"x6" POCKET FOR LIGHTING
Date
1'-4"
Job No.
0801
FLASHING
STOREFRONT
WEST WALL @ 3rd level
2 1" = 1'-0"
5/8" GYP BD CEILING
ALTERNATE 05
2x8 RIPPED
SEE STRUCTURAL DWGS
FLASHING
1/2" ANCHOR BOLTS
24" OC STAGGERED 2" A
STOREFRONT
2x6 PT 3'-6"
ELEV = 333'-6"
CAVITY DRAINAGE FABRIC 1" RIGID INSULATION
9
A440