Etihad Rail Network: Jebel Ali Branch Contract C0306 (Package C Dubai) Structures - Drawing List
Etihad Rail Network: Jebel Ali Branch Contract C0306 (Package C Dubai) Structures - Drawing List
Etihad Rail Network: Jebel Ali Branch Contract C0306 (Package C Dubai) Structures - Drawing List
A A
B
DRAWING TITLE DRAWING NO. REV. NO. B
GENERAL
AC
LIST OF DRAWINGS - STRUCTURES - SUBSTRUCTURE 01 OF 01 C0306 - S02 - ECB - DG - 30005 AC
UNDERBRIDGE AT CH: 1+971 - PIER DETAILS - CONCRETE 01 OF 02 C0306 - JBL - ECB - DG - 31258 AC
UNDERBRIDGE AT CH: 1+971 - PIER DETAILS - CONCRETE 02 OF 02 C0306 - JBL - ECB - DG - 31259 AC
D D
UNDERBRIDGE AT CH: 1+971 - ABUTMENT DETAILS - REINFORCEMENT 01 OF 01 C0306 - JBL - ECB - DG - 31274 AB
AC
UNDERBRIDGE AT CH: 1+971 - PIER DETAILS - REINFORCEMENT 01 OF 02 C0306 - JBL - ECB - DG - 31276 AC
FILENAME :\\CORP.PBWAN.NET\AE\PROJECTS\37463520-ETIHAD RAIL - STAGE 2BC\05-DWGS\1-WIP\1-WIP T&I\3-WIP BRIDGES\2-WIP PLOT SHEETS\03-DCP3-DETAILED DESIGN\STAGE 2C\4-JBL ZONE-0 (0+000 TO 3+0000)\UB 1+971\C0306-S02-ECB-DG-30005-AC.DWG
UNDERBRIDGE AT CH: 1+971 - PIER DETAILS - REINFORCEMENT 02 OF 02 C0306 - JBL - ECB - DG - 31277 AC
UNDERBRIDGE AT CH: 1+971 - PILE DETAILS - REINFORCEMENT 01 OF 01 C0306 - JBL - ECB - DG - 31279 AB
AC
UNDERBRIDGE AT CH: 1+971 - CONSTRUCTION STAGE SEQUENCE 01 OF 01 C0306 - JBL - ECB - DG - 31292 AB
E E
F F
G G
H H
C0306-JBL-EVF-DG-30000 : 30026
C0306-JBL-ERA-DG-30000 : 30024
RAIL
C0306-UAE-ERA-DG-30003
C0306-JBL-EUT-DG-30207 : 30208
TELECOM
K C0306-JBL-EUT-DG-30250 : 30251 K
TIMESTAMP : 11/8/2020 1:38:54 PM
L L
LEGEND NOTES KEY PLAN CONTRACTOR'S JOINT VENTURE : SUB-CONSULTANT : PROJECT DRAWING TITLE
REV DATE DESCRIPTION Drwn Chkd Appr
ETIHAD RAIL NETWORK ETIHAD RAIL STAGE 2 PROJECT C0306-PACKAGE 2C - ZONE 4
JEBEL ALI BRANCH
AA 21/05/2020 ISSUED FOR REVIEW FF RC DI
USER NAME : Farooque, Faizan