SUMMARY OF COST

(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Sr. No. Particulars Amount % of Cost


1 Bill No. 1: Site clearance and Dismantling 28557224 0.169
2 Bill No. 2 : Earth Work 3013304557 17.884

3 Bill No. 3 : Grannular Sub Base Courses and Base Courses ( Non- Bituminous ) 2906982667 17.253

4 Bill No. 4 : Bituminous Courses 1886977044 11.199


5 Bill No. 5 : Box Culverts 855691135 5.079
6A Bill No. 6A : Minor Bridges 2539690380 15.073
6B Bil No. 6B : Major Bridges 0 0.000
6C Bill No. 6C : VUP/LVU/PUP 894848789 5.311
6D Bill No. 6D : ROB 583115060 3.461
6E Bill No. 6E : Flyover and NH & SH Crossing 740986705 4.398
6F Bill No. 6F : Interchange and Junctions 420708594 2.497

6G Bill No. 6G : Retaining Wall 245725711 1.458

7 Bill No. 7 : Drainage & Protective Works 883248263 5.242

8 Bill No. 8 : Traffic signs, Road markings and other road appurtunences 776998233 4.611
9 Bill No. 9: Toll Plaza 460442606 2.733
10 Bill No. 10: Approach to Wayside Amenities & Toilet block 97318883 0.578
11 Bill No. 11 : Enviormental Cost (Civil Works) 110420061 0.655
12 Bill No. 12 : Miscellaneous Works 214728500 1.274
13 Bill No. 13 : Additional Service Cost & Median Opening 0.000
14 Bill No. 14 : ATMS for Access Controlled Expressway 189525964 1.125
Civil Cost 16849270377 100.00
GST @ 12% 2021912445
Total Civil Cost (a) 18871182822

Contingency @ 2.8 (b) 528393119


Total (a+b) 19399575941

Total Amount of Bought out Items 26544062


Net Total excluding Bought out items 19373031879
c) Agency Charges 1 % 193730319

d) Quality Control charges @ 1 % 193730319


e) Road Safety Audit charges @ 0.5% 96865159

f) Supervision 2 % 387460638
g) Maintenance Cost for 5 years @ 7% 1356112232

h) Escalation for First Year (2.5% x 25%) 121081449

i) Escalation for Second Year (7.5% x 55%) 799137565


j) Escalation for Third Year (12.5% x 20%) 484325797

Labour Cess - 1% 188711828


Total Project Cost (a+b+c+d+e+f+g+h+i+j) 23220731246

Utility Shifting & EMP Cost

utility shifting - Ls 450 cr for 8 packages 534337371


Land Acquisation cost 8149695685

Enviormental Cost (Non Civil works)


Grand Total 31904764301.8
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No. 1: Site clearance and Dismantling

Item
Description Unit No Length Breadth Depth Total Quantity Rate(Rs) Amount(Rs)
No.
Cutting of trees including cutting of trunks, branches and
removal of stumps including stacking of serviceable material
1.01
within a lead of 100 meters and earth filling in the
depression/Pit as per Technical clause 201
(a) Girth 300 mm to 600 mm No 1666 226.00 376,516
(b) Girth 600 mm to 900 mm No 3054 414.00 1,264,356
(c ) Girth 900 mm to 1800 mm No 790 789.00 623,310
(d) above 1800 mm Girth No 270 1482.00 400,140
Total 2,664,322

Clearing and grubbing road land including uprooting rank


vegetation, grass, bushes, shrubs, saplings and trees girth up
to 300 mm, removal of stumps of trees cut earlier and
1.02 disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, up to a lead of 1000 metres
including removal and disposal of top organic soil not
exceeding 150 mm in thickness
Hec
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2560 120 30.72
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 5160 120 61.92
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 4485 120 53.82
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 8220 120 98.64
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 8675 120 104.10
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 8220 120 98.64
TCS-C ( 6 lane Expressway without SR) 1370 120 16.44
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 510 120 6.12
TCS-E ( 4 lane Expressway without SR) 1060 90 9.54
Total Quantity 479.94
Start Junction Nos 1 17.00
Junction islands Slip Road Nos 1 260 350 9.10
Toll plaza Nos 1 120 60 0.72
Total Quantity 26.82
Net Quantity 506.76 51095.00 25,892,902
Total Amount 28,557,224
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No. 2 : Earth Work

Item
Description Unit No Length Breadth Depth Total Quantity Rate (Rs) Amount (Rs)
No.
2.01 Earth work in excavation necessary for construction of road way in
all types of soils and complete as per Technical Specification
Clause No.301.

a)Ordinary and soft Soils (material to be used in embankments)


-
Cu.m.
Quantities as per MX software 43035 49 2,108,723
Total 2,108,723
2.02 Construction of embankment with approved material from borrow
pits with all leads and lifts complete as per drawings and Technical
Specification Clause No. 301 & 305.
Cu.m.
Main Carriageway Quantities as per MX software 9099162
Service Road Quantities as per MX software 655780
Deduct the Quantity Reused in itm no 2.03 -30125 2,602,827,849
Deduct the Quantity Reused in itm no 2.04 -30000
Net Quantity 9785067 266
Total 2,602,827,849
2.03 Construction of embankment with suitable material obtained from
roadway and drainage excavation with all leads and lifts complete
as per drawings and Technical Specification Clause Nos. 301 & 305
(with an average distance of transport of 50 m)
Cu.m.
New 6 Lane Expressway Used 70 % of Item no 2.01 30125 109 3,283,584
Total 3,283,584
2.04 Embankment Construction with Flyash/Pond ash available
from coal or lignite burning Thermal Plants as waste
material.
Construction of embankment with Flyash conforming to table 1 of
IRC: SP: 58 - 2001 obtained from coal or lignite burning thermal
power stations as waste material, spread and compacted in layer
of 200mm thickness each at OMC, all as specified in IRC: SP: 58-
2001 and as per approved plans

Quantity As per Annexure - 2 Cum 1 30000 30000 123 3,690,000


Carriage Cost as Per Annexure - 2 Cum 1 30000 30000 268.80 8,064,000
Total 11,754,000
2.05 Construction of Sub grade & earthen / un paved shoulders
satisfying the requirements of minimum 8% CBR value as
indicated in the drawings and specification with approved material
with all leads & lifts all complete as per Technical Specification
Clause No 305. Cu.m.
Main carriageway - Sub Grade
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 41.46 0.500 53069
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 41.46 0.500 106967
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 41.46 0.500 92974
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 41.46 0.500 170401
Bill No. 2 : Earth Work

Item
Description Unit No Length Breadth Depth Total Quantity Rate (Rs) Amount (Rs)
No.
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 41.46 0.500 179833
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 41.46 0.500 170401
TCS-C ( 6 lane Expressway without SR) 1 1370 41.46 0.500 28400
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 41.46 0.500 10572
TCS-E ( 4 /6 lane Expressway without SR) 1 450 41.46 0.500 9329
TCS-E ( 4 lane Expressway without SR) 1 610 41.46 0.500 12645
Deduct Structure Length -1 1205 41.46 0.500 (24,984)
Deduction for toll plaza -1 1230 41.46 0.500 (25,498)
Total Quantity 784108 308 241,505,296
Bill No. 2 : Earth Work

Item
Description Unit No Length Breadth Depth Total Quantity Rate (Rs) Amount (Rs)
No.
Service Road - Sub Grade
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 11.80 0.500 15104
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 11.80 0.500 30444
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 11.80 0.500 52923
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 10.30 0.500 42333
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 10.30 0.500 44676
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 10.30 0.500 84666
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 22.10 0.500 5635
Total Quantity 275782 308 84,940,779
Main carriageway - Earthen Shoulder
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2 2560 2.40 0.415 5100
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 2 5160 2.40 0.415 10279
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 2.40 0.415 8934
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 2 8220 2.40 0.415 16374
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 2 8675 2.40 0.415 17281
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 2.40 0.415 16374
TCS-C ( 6 lane Expressway without SR) 2 1370 2.40 0.415 2729
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 2 510 2.40 0.415 1016
TCS-E ( 4 /6 lane Expressway without SR) 2 450 2.15 0.415 803
TCS-E ( 4 lane Expressway without SR) 2 610 1.90 0.415 962
Deduct Structure Length -2 1205 2.40 0.415 (2,401)
Deduction for toll plaza -2 1230 2.40 0.415 (2,450)
Deduction for WMM overlap Section -2 37825 0.25 0.250 (4,728)
Total Quantity 70272 308 21,643,892
Main carriageway - Earthen Shoulder Median Side
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2 2560 2.00 0.415 4250
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 2 5160 2.00 0.415 8566
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 2.00 0.415 7445
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 2 8220 2.00 0.415 13645
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 2 8675 2.00 0.415 14401
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 2.00 0.415 13645
TCS-C ( 6 lane Expressway without SR) 2 1370 2.00 0.415 2274
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 2 510 2.00 0.415 847
Deduct Structure Length -2 1205 2.00 0.415 (2,001)
Deduction for toll plaza -2 1230 2.00 0.415 (2,042)
Deduction for WMM overlap Section -2 36255 0.25 0.250 (4,532)
Total Quantity 56498 308 17,401,297
Bill No. 2 : Earth Work

Item
Description Unit No Length Breadth Depth Total Quantity Rate (Rs) Amount (Rs)
No.
Service Road - - Earthen Shoulder
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2 2560 1.30 0.300 1997
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 2 5160 1.30 0.300 4025
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 4 4485 1.30 0.300 6997
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 2 8220 2.18 0.300 10727
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 2 8675 2.18 0.300 11321
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 4 8220 2.18 0.300 21454
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 4 510 2.18 0.300 1331
Deduction for WMM overlap Section(Service road one side) -2 24615 0.225 0.225 (2,492)
Deduction for WMM overlap Section(Service road two side) -4 12705 0.225 0.225 (2,573)
Total Quantity 52786 308 16,258,225

Total 381,749,489
2.06 Turfing with sods of embankment slopes, verge, earthen shoulders
and other locations all complete as per Technical Specification
Clause 307. Sq.m.
Considered in Bill No 7 35 -

Total -
2.07 Earthwork in filling of median / island area with selected earth
complete as per Technical Specification Clause 407 with all leads
and lifts. Cu.m.
Main carriageway - Selected Earth in Median
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2 2560 1.75 0.300 2688
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 2 5160 1.75 0.300 5418
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 1.75 0.300 4709
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 2 8220 1.75 0.300 8631
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 2 8675 1.75 0.300 9109
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 1.75 0.300 8631
TCS-C ( 6 lane Expressway without SR) 2 1370 1.75 0.300 1439
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 2 510 1.75 0.300 535
Deduct Structure Length -2 1205 1.75 0.300 (1,265)
Deduction for toll plaza -2 1230 1.75 0.300 (1,292)
Total Quantity 38603 300 11,580,912
Total 11,580,912

Total Amount 3,013,304,557


(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No. 3 : Grannular Sub Base Courses and Base Courses (Non- Bituminous)

Item
Description Unit No. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.

Granular Sub-Base with Close Graded Material (Table:- 400-


1)
Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage
3.01
of mixed Material to work site, spreading in uniform layers
with motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density,
complete as per clause 401
Cu.m.
Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 40.06 0.200 20,510.72
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 40.06 0.200 41,341.92
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 40.06 0.200 35,933.82
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 40.06 0.200 65,858.64
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 40.06 0.200 69,504.10
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 40.06 0.200 65,858.64
TCS-C ( 6 lane Expressway without SR) 1 1370 40.06 0.200 10,976.44
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 40.06 0.200 4,086.12
TCS-E ( 4 /6 lane Expressway without SR) 1 450 35.31 0.200 3,177.90
TCS-E ( 4 lane Expressway without SR) 1 610 30.56 0.200 3,728.32
Deduct Structure Length -1 1205 40.06 0.200 (9,656.06)
Deduction for toll plaza -1 1230 40.06 0.200 (9,854.76)
Total Quantity 301,465.80 3,869 1,166,371,171
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 10.50 0.150 4,032.00
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 10.50 0.150 8,127.00
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 10.50 0.150 14,127.75
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 9.00 0.150 11,097.00
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 9.00 0.150 11,711.25
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 9.00 0.150 22,194.00
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 19.50 0.150 1,491.75
Total Quantity 72,780.75 3,869 281,588,722
Total 1,447,959,893
Bill No. 3 : Grannular Sub Base Courses and Base Courses (Non- Bituminous)

Item
Description Unit No. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix
3.02
plant carriage of mixed Material by tipper to site, laying in
uniform layers with paver in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density.
Cu.m.
Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 31.00 0.250 19,840.00
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 31.00 0.250 39,990.00
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 31.00 0.250 34,758.75
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 31.00 0.250 63,705.00
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 31.00 0.250 67,231.25
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 31.00 0.250 63,705.00
TCS-C ( 6 lane Expressway without SR) 1 1370 31.00 0.250 10,617.50
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 31.00 0.250 3,952.50
TCS-E ( 4 /6 lane Expressway without SR) 1 450 28.75 0.250 3,234.38
TCS-E ( 4 lane Expressway without SR) 1 610 26.50 0.250 4,041.25
Deduct Structure Length -1 1205 31.00 0.250 (9,340.30)
Deduction for toll plaza -1 1230 31.00 0.250 (9,532.50)
Total Quantity 292,202.83 4,133 1,207,674,276
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.45 0.225 4,291.20
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.45 0.225 8,649.45
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.45 0.225 15,035.96
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 4.20 0.225 7,767.90
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 4.20 0.225 8,197.88
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 4.20 0.225 15,535.80
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 11.65 0.225 1,336.84
Total Quantity 60,815.03 4,133 251,348,498
Total 1,459,022,774
Total Amount 2,906,982,667
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No. 4 : Bituminous Courses

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount(Rs)
No.

Providing and laying bituminous primer coat over prepared


surface of grannular base with bituminous emulsion
4.01 Sqm
complete as per Technical Specifications Clause No 502.
(Table 500-1)

Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 30.00 76800
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 30.00 154800
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 30.00 134550
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 30.00 246600
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 30.00 260250
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 30.00 246600
TCS-C ( 6 lane Expressway without SR) 1 1370 30.00 41100
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 30.00 15300
TCS-E ( 4 /6 lane Expressway without SR) 1 450 30.00 13500
TCS-E ( 4 lane Expressway without SR) 1 610 30.00 18300
Deduct Structure Length -1 1205 30.00 (36,156)
Deduction for toll plaza -1 1230 30.00 (36,900)
Total Quantity 1134744 22.00 24,964,368
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.00 17920
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.00 36120
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.00 62790
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 3.75 30825
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 3.75 32531
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 3.75 61650
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 10.75 5482
Total Quantity 247319 22.00 5,441,013
Total 30,405,381

Providing and laying Tack coat over granular surface with


4.02 bituminous emulsion all complete as per Technical Sqm 0
Specifications Clause 503.(Table 500-2) @ 2.5 kg /10 sq.m.

Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 30.00 76800
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 30.00 154800
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 30.00 134550
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 30.00 246600
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 30.00 260250
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 30.00 246600
Bill No. 4 : Bituminous Courses

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount(Rs)
No.
TCS-C ( 6 lane Expressway without SR) 1 1370 30.00 41100
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 30.00 15300
Bill No. 4 : Bituminous Courses

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount(Rs)
No.
TCS-E ( 4 /6 lane Expressway without SR) 1 450 30.00 13500
TCS-E ( 4 lane Expressway without SR) 1 610 30.00 18300
Deduct Structure Length -1 1205 30.00 (36,156)
Deduction for toll plaza -1 1230 30.00 (36,900)
Total Quantity 1134744 8.00 9,077,952
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.00 17920
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.00 36120
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.00 62790
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 3.75 30825
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 3.75 32531
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 3.75 61650
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 10.75 5482
Total Quantity 247319 8.00 1,978,550
Total 11,056,502

Providing and laying Tack coat over bituminous courses with


4.03 Bituminous emulsion all complete as per Technical Sqm
Specifications Clause 503.(Table 500-2) @ 2.0 kg/10 sq.m.

Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 30.00 76800
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 30.00 154800
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 30.00 134550
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 30.00 246600
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 30.00 260250
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 30.00 246600
TCS-C ( 6 lane Expressway without SR) 1 1370 30.00 41100
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 30.00 15300
TCS-E ( 4 /6 lane Expressway without SR) 1 450 30.00 13500
TCS-E ( 4 lane Expressway without SR) 1 610 30.00 18300
Deduct Structure Length -1 1205 30.00 (36,156)
Deduction for toll plaza -1 1230 30.00 (36,900)
Total Quantity 1134744 8.00
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.00 17920
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.00 36120
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.00 62790
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 3.75 30825
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 3.75 32531
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 3.75 61650
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 10.75 5482
Total Quantity 247319 8.00
Total -
Bill No. 4 : Bituminous Courses

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount(Rs)
No.

Dense Graded Bituminous Macadam


Providing and laying dense graded bituminous macadam
with 100-120 TPH batch type HMP producing an average
output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder (VG-40)
@ 4.0 to 4.5 per cent by weight of total mix and filler,
4.03 transporting the hot mix to work site, laying with a Cu.m.
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired
compaction as per MoRTH specification clause No. 507
complete in all respects.
Grading - I 40 mm (Nominal Size)

Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 30.00 0.115 8832
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 30.00 0.115 17802
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 30.00 0.115 15473
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 30.00 0.115 28359
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 30.00 0.115 29929
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 30.00 0.115 28359
TCS-C ( 6 lane Expressway without SR) 1 1370 30.00 0.115 4727
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 30.00 0.115 1760
TCS-E ( 4 /6 lane Expressway without SR) 1 450 30.00 0.115 1553
TCS-E ( 4 lane Expressway without SR) 1 610 30.00 0.115 2105
Deduct Structure Length -1 1205 30.00 0.115 (4,158)
Deduction for toll plaza -1 1230 30.00 0.115 (4,244)
Total Quantity 130496 8,787.00 1,146,664,486
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.00 0.050 896
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.00 0.050 1806
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.00 0.050 3140
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 3.75 0.050 1541
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 3.75 0.050 1627
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 3.75 0.050 3083
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 10.75 0.050 274
Total Quantity 12366 8,787.00 108,659,493
Total 1,255,323,979
Bill No. 4 : Bituminous Courses

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount(Rs)
No.

Bituminous Concrete with CRMB/PMB


Providing and laying bituminous concrete with 100-120 TPH
batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder (CRMB/PMB) @
5.4 to 5.6 per cent of mix and filler, transporting the hot
4.04 Cu.m.
mix to work site, laying with a hydrostatic paver finisher
with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects
Grading - I-19 mm (Nominal Size)

Main carriageway
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 30.00 0.050 3840
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 30.00 0.050 7740
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 1 4485 30.00 0.050 6728
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 30.00 0.050 12330
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 30.00 0.050 13013
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 1 8220 30.00 0.050 12330
TCS-C ( 6 lane Expressway without SR) 1 1370 30.00 0.050 2055
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 30.00 0.050 765
TCS-E ( 4 /6 lane Expressway without SR) 1 450 30.00 0.050 675
TCS-E ( 4 lane Expressway without SR) 1 610 30.00 0.050 915
Deduct Structure Length -1 1205 30.00 0.050 (1,808)
Deduction for toll plaza -1 1230 30.00 0.050 (1,845)
Total Quantity 56737 9,380.00 532,194,936.00
Service Road
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 1 2560 7.00 0.025 448
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 1 5160 7.00 0.025 903
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 2 4485 7.00 0.025 1570
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 1 8220 3.75 0.025 771
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 1 8675 3.75 0.025 813
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 2 8220 3.75 0.025 1541
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 1 510 10.75 0.025 137
Total Quantity 6183 9,380.00 57,996,246.88
Total 590,191,183
Total Amount 1,886,977,044
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

6 G. Toe wall

Item
Description Unit Quantity Rate(Rs) Amount(Rs)
No.
Earthwork in excavation for all types of soil for road
side drains and retaining walls to the requied line and
1 cum 6563.25 53.00 347,852
grade complete as per drawing and Technical
Specification Clause 309
Providing Plain Cement Concrete M15 in foundation, of
drain,brest wall and retainingwall including cost of all
2 materials, labour, mixing transportation, placing, cum 341 6,651.0 2,266,993
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Providing Plain Cement Concrete M20 in foundation, of
drain,brest wall and retainingwall including cost of all
3 materials, labour, mixing transportation, placing, cum 2532 7138 18,074,652
vibration,curing etc as per Technical Specification
Sections 1400, 1700
HYSD bar reinforcement complete as per drawing and
4 MT 177 45229 8,016,936
Technical Specification clause no 1600. for 9,03a
Providing and fixing weep holes as per drawing and Technical
5 No. 2215 107.00 237,005
Specifications Clause 2706

Total 28,943,439
Toe wall on SR

Earthwork in excavation for all types of soil for road


side drains and retaining walls to the requied line and
1 cum 53530 53.00 2,837,090
grade complete as per drawing and Technical
Specification Clause 309
Providing Plain Cement Concrete M15 in foundation, of
drain,brest wall and retainingwall including cost of all
2 materials, labour, mixing transportation, placing, cum 1751 6,651.0 11,645,236
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Providing Plain Cement Concrete M20 in foundation, of
drain,brest wall and retainingwall including cost of all
3 materials, labour, mixing transportation, placing, cum 19457 7138 138,885,721
vibration,curing etc as per Technical Specification
Sections 1400, 1700
HYSD bar reinforcement complete as per drawing and
4 MT 1362 45229 61,602,180
Technical Specification clause no 1600. for 9,03a
Providing and fixing weep holes as per drawing and Technical
5 No. 16935 107.00 1,812,045
Specifications Clause 2706
Total 216,782,272
Total Cost of Toe wall 245,725,711
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
Earthwork in excavation for all types of soil for road
side drains and retaining walls to the requied line and
7.01
grade complete as per drawing and Technical
Specification Clause 309
a)Ordinary and soft Soils (material to be used in
0 ###
embankments)
Covered Drain on Toll Plaza Cu.m. 2 1230.00 2.20 1.10 5953.20 0.00
Lined Drain Cu.m. 1 48921.40 1.20 1.10 64576.25 0.00
Total 70529 104.00 7335062.59
Providing Plain Cement Concrete M10 in foundation, of
drain,brest wall and retainingwall including cost of all
7.02 materials, labour, mixing transportation, placing, cum ###
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Covered Drain on Toll Plaza 2 1230.00 2.20 0.10 541.20 0.00
Edge Drain on Shoulder - Base Err:509 Err:509
Lined Drain - Toe 5870.57 0.00
Median Drain 2059.20 0.00
Chutes 2286.77 0.00
Outlet Chambers in median 14.50
Total Err:509 5963.00 Err:509

Providing Plain Cement Concrete M15 in foundation, of


drain,brest wall and retainingwall including cost of all
7.03 materials, labour, mixing transportation, placing, cum
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Edge Drain on Shoulder Err:509
Chutes 24697
Outlet Chambers in median 9
Total Err:509 6651.00 Err:509

Providing Reinforced Cement Concrete M15 in


foundation, of drain,brest wall and retainingwall
7.04 including cost of all materials, labour, mixing
transportation, placing, vibration,curing etc as per
Technical Specification Sections 1400, 1700
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
RCC M 15 grade Cum ###
Covered Drain on Toll Plaza
RCC Raft 2 1230 2 0.15 738
RCC Wall 4 1230 1 0.15 738
RCC Top Slab 2 1230 2 0.15 738
Total 2214 6651.00 14725314.00
Lined Drain
RCC Raft 2 48921 1.0 0.15 14676
RCC Wall 2 48921 0.15 0.9 12475
Total 27151 6651.00 180583808.43
Median drain
RCC Raft 1 17160 1.0 0.2 2574
RCC Wall 2 17160 0.2 0.9 4376
Total 6950 6651.00 46223119.80
HYSD bar reinforcement complete as per drawing and
7.05 Mt ###
Technical Specification clause no 1600. for 9,03a
Covered Drain on Toll Plaza 2214 60kg/cum 133
Lined Drain 27151 60kg/cum 1629
Median Drain 6950 60kg/cum 417
Toe Wall for Chute Drains 1505 60kg/cum 90
Outlet Chambers in median 42 60kg/cum 3
Total 2272 45229.00 102746096.04

Supplying and fixing of cast iron grating of size in


7.06 covered drain and for entry of water as per Technical No ###
Specification Clause 309.
Covered Drain on Toll Plaza - 400mm x 150mm @20m c/c 2 1230 15mc/c 164 333.00 54612.00
Outlet Chambers in median Grating of 700 x 300 2 58 116 832.50 96570.00

Providing and fixing weep holes as per drawing and


7.07 No ###
Technical Specifications Clause 2706
Covered Drain on Toll Plaza 2 1230 2mc/c 1230
Total 1230 107.00 131610.00
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
Turfing with sods of embankment slopes, verge, earthen
7.08 shoulders and other locations all complete as per Technical Sqm
Specification Clause 307.
Total Length with Height up to 3 mt 1 Err:509 5.44 Err:509 Err:509
Total Length with Height from 3 mt to 4.5 mt 1 Err:509 8.52 Err:509 Err:509
Total Length with Height from 4.5 mt to 6 mt 1 Err:509 11.82 Err:509 Err:509
Deduction For Chute Sections
Total Length with Height up to 3 mt 145 -1.7 5.44 -1342
Total Length with Height from 3 mt to 4.5 mt 866 -1.7 8.52 -12542
Total Length with Height from 4.5 mt to 6 mt 992 -1.7 11.82 -19929
Total Err:509 35 Err:509
Providing Boulder Pitching/Geocell for Embk Ht more than 6
7.09 Cum
Mt
Total Length with Height More than 6 mt 1 Err:509 16.82 0.30 Err:509
Deduction for Chute Area 1537 -1.7 16.82 0.30 -13181
Total Err:509 3370.00 Err:509

Providing and laying Filter material underneath pitching in


7.10
slopes complete as per drawing and Technical specification
Chute 15550
below Boulder Pitching for 6 mt Ht Embk 1 Err:509 16.82 0.20 Err:509
Deduction for Chute Area 1537 -1.7 16.82 0.20 -8787
Total Err:509 4248.00 Err:509
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe of
7.11 embankment complete as per drawing and Technical
specifications
Chute 21953 3370.00 73981591.45

Plain/Reinforced Cement Concrete in Open Foundation


7.12
complete as per Drawing and Technical Specifications.
RCC M-20 - Toe Wall for Chute Drains 1505 7315.00 11005417.50
Outlet Chambers in median 42 7315.00 305474.40

Construction of dry rubble flooring at cross drainage works


7.13 for relatively less important works.
Chute 3009 3672.00 11049048.00
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
Construction of unlined surface drains of average cross
sectional area 0.40 sqm in soil to specified lines, grades,
7.14 1 27148.20 27148 64.54 1752064.58
levels and dimensions to the requirement of clause 301 and
309.

Providing 600 mm dia NP4 pipes across pavement from


median chamber to chute at 500m interval for crossing of
7.15 drainage water from median drain as per Drawing and
Lm 1 2033.70 2034 7360.00 14968025.02
Technical specification Section. 2900

Stone Masonry Work in Cement Mortar 1:3 in Foundation


7.16 complete as per Drawing and Technical Specifications.

Stone Masonry - Toe Wall for Pitching for Embk ht > 6m Cum 1 Err:509 0.60 0.60 Err:509 5861.00 Err:509

Total Err:509
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
Earthwork in excavation for all types of soil for road
side drains and retaining walls to the requied line and
7.01
grade complete as per drawing and Technical
Specification Clause 309
a)Ordinary and soft Soils (material to be used in
0
embankments)
Covered Drain on Toll Plaza Cum 2 1230.00 2.20 1.25 6765.00 0.00
Lined Drain Cum 1 48921.40 1.20 1.10 64576.25 0.00
Total 71341 53.00 3781086.14
Providing Plain Cement Concrete M10 in foundation, of
drain,brest wall and retainingwall including cost of all
7.02 materials, labour, mixing transportation, placing,
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Covered Drain on Toll Plaza Cum 2 1230.00 2.20 0.10 541.20 0.00
Lined Drain - Toe Cum 5870.57 0.00
Median Drain Cum 2059.20 0.00
Chutes Cum 2286.77 0.00
Outlet Chambers in median Cum 14.50
Total 10772 5963.00 64234856.74

Providing Plain Cement Concrete M15 in foundation, of


drain,brest wall and retaining wall including cost of all
7.03 materials,labour, mixing transportation, placing, cum
vibration,curing etc as per Technical Specification
Sections 1400, 1700
Chutes 24697
Outlet Chambers in median 9
Total 24706 6651.00 164318537.44

Providing Reinforced Cement Concrete M15 in


foundation, of drain,brest wall and retainingwall
7.04 including cost of all materials, labour, mixing
transportation, placing, vibration,curing etc as per
Technical Specification Sections 1400, 1700
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
RCC M 15 grade Cum
Covered Drain on Toll Plaza
RCC Raft 2 1230 2 0.15 738
RCC Wall 4 1230 1 0.15 738
RCC Top Slab 2 1230 2 0.15 738
Total 2214 6651.00 14725314.00
Lined Drain
RCC Raft 2 48921 1.0 0.15 14676
RCC Wall 2 48921 0.15 0.85 12475
Total 27151 6651.00 180583808.43
Median drain
RCC Raft 1 17160 1.0 0.15 2574
RCC Wall 2 17160 0.15 0.85 4376
Total 6950 6651.00 46223119.80
HYSD bar reinforcement complete as per drawing and
7.05 Mt
Technical Specification clause no 1600. for 9,03a
Covered Drain on Toll Plaza 2214 60kg/cum 133
Lined Drain 27151 60kg/cum 1629
Median Drain 6950 60kg/cum 417
Toe Wall for Chute Drains 1505 60kg/cum 90
Outlet Chambers in median 42 60kg/cum 3
Total 2272 45229.00 102746096.04
Supplying and fixing of cast iron grating of size in
7.06 covered drain and for entry of water as per Technical No
Specification Clause 309.
Covered Drain on Toll Plaza - 400mm x 150mm @20m c/c 2 1230 15mc/c 164 333.00 54612.00
Outlet Chambers in median Grating of 700 x 300 2 58 116 832.50 96570.00

Providing and fixing weep holes as per drawing and


7.07 No
Technical Specifications Clause 2706
Covered Drain on Toll Plaza 2 1230 2mc/c 1230
Total 1230 107.00 131610.00
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.
Turfing with sods of embankment slopes, verge, earthen
7.08 shoulders and other locations all complete as per Technical Sqm
Specification Clause 307.
Total Length with Height up to 3 mt 1 2885 5.44 15708 0.00
Total Length with Height from 3 mt to 4.5 mt 1 17305 8.52 147429 0.00
Total Length with Height from 4.5 mt to 6 mt 1 19820 11.82 234225 0.00
Deduction For Chute Sections
Total Length with Height up to 3 mt 145 -1.7 5.44 -1342
Total Length with Height from 3 mt to 4.5 mt 866 -1.7 8.52 -12542
Total Length with Height from 4.5 mt to 6 mt 992 -1.7 11.82 -19929
In service road portion 2 5418.5 5 54185
Total 417733 35 14620669.34
Providing Geocell for slope protection of Embankment Ht
7.09
more than 6 Mt complete, spreding, filling and turfing etc

Total Length with Height More than 6 mt Sqm 1 30730 16.82 516732
Deduction for Chute Area Sqm 1537 -1.7 16.82 -43937
Total 472796 180.00 85103196.64

Providing and laying Filter material underneath pitching in


7.10 slopes complete as per drawing and Technical specification
Chute Cum 15550
below Boulder Pitching for 6 mt Ht Embk 0 30730 16.82 0.20 0
Deduction for Chute Area Cum 1537 -1.7 16.82 0.20 -8787
Total 6763 4248.00 28728095.10
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe of
7.11 embankment complete as per drawing and Technical
specifications
Chute 21953 3370.00 73981591.45

Plain/Reinforced Cement Concrete in Open Foundation


7.12
complete as per Drawing and Technical Specifications.
RCC M-20 - Toe Wall for Chute Drains 1505 7315.00 11005417.50
Outlet Chambers in median 42 7315.00 305474.40

Construction of dry rubble flooring at cross drainage works


7.13 for relatively less important works.
Chute 3009 3672.00 11049048.00
Bill No: 7 DRAINAGE AND PROTECTIVE WORKS

Item
Description Unit No. Length Breadth Depth Quantity Rate (Rs) Amount (Rs)
No.

Construction of unlined surface drains of average cross


sectional area 0.40 sqm in soil to specified lines, grades,
7.14 Lm 1 27148.20 27148 64.54 1752064.58
levels and dimensions to the requirement of clause 301 and
309.

Providing 900 mm dia NP4 pipes across pavement from


median chamber to chute at 500m interval for crossing of
7.15 drainage water from median drain as per Drawing and
Lm 1 2033.70 2034 7360.00 14968025.02
Technical specification Section. 2900

Stone Masonry Work in Cement Mortar 1:3 in Foundation


7.16 complete as per Drawing and Technical Specifications.

Stone Masonry - Toe Wall for Pitching for Embk ht > 6m Cum 1 30730 0.60 0.60 11063 5861.00 64839070.80

Total 883,248,263
Package - 1
-0.27 40.2 40.47

Net Length 35403 Excluding Structure & Toll Plaza

Up to 3 Mt 3 to 4.5 Mt 4.5 to 6 above 6 Mt


Ht Ht Mt Ht Ht
Slope Length 1375 9010 9870 15115
Left
carriageway No of Chute Drains 69 451 494 756
Average Height of Chutes 2.49 3.79 5.3 7.63
Slope Length 1510 8295 9950 15615
Right
carriageway No of Chute Drains 76 415 498 781
Average Height of Chutes 2.38 3.83 5.27 7.41

Sn Description Nos Length Width Thickness


Chute Drain
Average Ht
1 Filter media Below Base Of Embk
Up to 3 mt Ht 2.435 145 5.44 1.7 0.2
Up to 4.5 mt Ht 3.81 866 8.52 1.7 0.2
Up to 6 mt Ht 5.285 992 11.82 1.7 0.2
Up to 6 mt to 9 MtHt 7.52 1537 16.82 1.7 0.2
Total
2 PCC - M10 - Bed Concrete
Up to 3 mt Ht 145 5.44 0.5 0.1
Up to 4.5 mt Ht 866 8.52 0.5 0.1
Up to 6 mt Ht 992 11.82 0.5 0.1
Up to 6 mt to 9 MtHt 1537 16.82 0.5 0.1
Total
3.a PCC - M15 - Embeded Concrete Base Slab
Up to 3 mt Ht 145 5.44 0.5 0.1
Up to 4.5 mt Ht 866 8.52 0.5 0.1
Up to 6 mt Ht 992 11.82 0.5 0.1
Up to 6 mt to 9 MtHt 1537 16.82 0.5 0.1

3.b PCC - M 15 Side Wall


Up to 3 mt Ht 145 5.44 0.2 0.2
Up to 4.5 mt Ht 866 8.52 0.2 0.2
Up to 6 mt Ht 992 11.82 0.2 0.2
Up to 6 mt to 9 MtHt 1537 16.82 0.2 0.2
Total
4 Boulder Pitching
Up to 3 mt Ht 145 5.44 1.2 0.4
Up to 4.5 mt Ht 866 8.52 1.2 0.4
Up to 6 mt Ht 992 11.82 1.2 0.4
Up to 6 mt to 9 MtHt 1537 16.82 1.2 0.4
Sn Description Nos Length Width Thickness
Total
Sn Description Nos Length Width Thickness
5 Toe Wall - RCC M-20 For Dissipation chamber
Up to 3 mt Ht 145 1.7 0.25 1
Up to 4.5 mt Ht 866 1.7 0.25 1
Up to 6 mt Ht 992 1.7 0.25 1
Up to 6 mt to 9 MtHt 1537 1.7 0.25 1
Total
6 Dry Rubble Masonry
Up to 3 mt Ht 145 1.7 1 0.5
Up to 4.5 mt Ht 866 1.7 1 0.5
Up to 6 mt Ht 992 1.7 1 0.5
Up to 6 mt to 9 MtHt 1537 1.7 1 0.5
Total

Lined Drain Length 54185


Deduction of Structure Length & Toll Plaza 5263.60
Net Drain Length 48921.40

Sn Description Nos Length Width Thickness


Qty of Toe Drain

1 PCC - M10 Base 1 48921.40 1.2 0.1

2 PCC - M15
Bottom Slab 1 48921.4 1 0.15
Side wall 2 48921.4 0.15 0.85

Total
Median Drain
Sn Description Nos Length Width Thickness
Qty of Median Drain

1 PCC - M10 Base 1 17160 1.2 0.1

2 PCC - M15
Bottom Slab 1 17160 1 0.15
Side wall 2 17160 0.15 0.85

Total
Sn Description Nos Length Width Thickness
Outlet Chambers in median drains connected to chutes

1 PCC - M10 Base 1 58 1.5 0.1


Below Pipe 1 58 1 0.1
Total
2 PCC-M15 Embeded concrete below pipe
1 58 0.8 0.1
1 58 0.8 0.3
Deduction for -1 58 0.57 0.3
Total
3 RCC M-20 Base 1 58 1.3 0.15
Side Walls 2 58 0.15 1
Cover 58 1.5 1.5 0.1
Total
4 Reinforcement Chamber @ 60 Kg / Cum Total
5 Grating 500 X 300 - Both sides Total
6 Laying of Pipes - 900 mm dia 58 35.06

Unlined Drain
Sn Description Nos Length Width Thickness

Unlined Drain 1 27148.2


Quantity

268
2508
3986
8787
15550

39
369
586
1292
2287

395
3689
5862
12923

32
295
469
1034
24697

379
3541
5627
12406
Quantity
21953
Quantity

62
368
422
653
1505

123
736
843
1306
3009

Quantity

5871

7338
12475

19813

Quantity

2059

2574
4376

6950
Quantity

9
6
15

5
14
-10
9
11.31
17.40
13.05
42
2.5
116.0
2033.7

Quantity

27148
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 8 Traffic signs, Road markings and other road appurtunences

Item
Description Unit Nos. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.
Providing Plain Cement Concrete of M20 grade for
Mountable Kerbs & Kerb and Channel Drain including form
8.01 work , machinery, labour , material and all leads and lifts
etc. complete as per drawing and Technical Specification
Sections 408 1500, 1700
a) Mountable Kerb LM 2 35403 70806 281.00 19,896,486

b) Kerb and Channel Drain LM 2 35403 70806 946.00 66,982,476

Supplying and fixing at site retro-reflectorised type sign


boards/ signs made of encapsulated lense type of reflective
sheeting fixed over aluminum sheeting 2.0 mm thick
8.02
complete including vertical pipes / angles / posts etc., all
complete as per drawing and Technical Specification Clause
801

a) Informatory signs

(i) Advance direction, (size 1200 x 700 mm) including


No. 83 12905.76 1071178.08
lettering

(ii) Advance direction, (size 3600 x 1800 mm) including


No. 40 99558.72 3982348.80
lettering
(iii) Advance direction, (size 2400 x 1800 mm) including
No. 20 66372.48 1327449.60
lettering
(iv) Advance direction, (size 1200 x 1800 mm) including
No. 8 33186.24 265489.92
lettering
(v) Toll Plaza Information, (size 4500 x 2400 mm)
No. 2 165931.20 331862.40
including lettering

(vi) NH & SH Route Markers ( size 450 mm x 600 mm ) No. 35 3602.00 126070.00

(vii) Facility Information signs (800 mm x 600 mm) No. 64 5065.00 324160.00

(viii) Cautionary/ Warning signs (1200 mm Eq. triangle) No. 36 7510.00 270360.00

(ix)Stop Sign - Octoganal (1200 mm) No. 64 10032.00 642048.00

(x)Prohibitory Signs & Circular (1200 mm) No. 246 9600.00 2361600.00
Bill No: 8 Traffic signs, Road markings and other road appurtunences

Item
Description Unit Nos. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.
Supply and fixing overhead sign complete as shown in
8.03 drawings, as per Technical Specification Clause 802, and as
directed by the Engineer.

a) Overhead sign - Gantry Type No. 7 600000 4200000


b) Cantilever type overhead sign No. 25 310000 7750000

Pavement marking with hot applied thermoplastic


compound materials for road markings with surface
application of glass beads at specified rate complete as per
8.04
drawing or directed by the Engineer and Technical
Specification Clause 803 for 2.5 mm thickness of marking
and consisting of:

a) Lane, Centre line, Edge and other marking along strips Sq.m 47758 799.00 38,158,802

(b) Diagonal and Chevron marking Sq.m 2100 799.00 1677900.0

(c) STOP, Stop Lines, Pedestrian marking, etc. Sq.m 3200 799.00 2556800.0
d) Directional arrows on entry & exit No. 1680 799.00 1342320.0

Providing and fixing Reinforced Cement Concrete M15-


Grade Stones including excavation, foundation concrete
8.05
and reinfrocement , inscriptions etc., all complete as per
drawing and Technical Specification Clause No.804.

a) Boundary Stones No. 2 41 10 820 924.00 757680


b) 5th km Marker No. 2 8 16 5239.00 83824
c) Distance Marker - Single Digit No. 2 9 18 3017.00 54306
d) Distance Marker - Double Digit No. 2 33 66 3665.00 241890
e) Distance Marker - Three Digit No. 2 4313.00
f) 100 Mt Marker No. 2 41 9 738 3017.00 2226546
Providing and fixing guard posts as per drawing and
8.06 No.
directed by the engineer
Bill No: 8 Traffic signs, Road markings and other road appurtunences

Item
Description Unit Nos. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.
Providing and fixing retro-reflectorised road indicators
8.07 complete as per drawing and Technical Specification Clause
805
a) Cluster of Red Reflector No. 250 131.00 32750
b) One way hazard marker No. 200 3602.00 720400
c) Two way hazard marker No. 0
d) Object hazard marker No. 250 3602.00 900500
f) Raised pavement marker ( Road studs / cat eyes) No. 7259 131.00 950929
g) Raised pavement marker (Solar Studs) No. 1419 1600.00 2270400
h) Chevron 900 x 750 mm No. 145 6423.00 931335
8.08 LED Traffic Beacons No. 84 6000 504000

8.09 Movable crash barrier ( New Jercy type) on Approaches L.M.

VUP/PUP Approaches with staggered SR 0


Providing and erecting " W " metal beam crash barrier
8.10 complete as per drawing and as approved by Engineer and
Technical Specification Clause 810

i) Single face L.M.

Both Edge on Shoulder including over structures 2 39410 78820

Both sides of Median 2 35403 70806

Slip Road 8 300 2400

152026 3135.00 476601510.00

8.11 Road Delineators


Bill No: 8 Traffic signs, Road markings and other road appurtunences

Item
Description Unit Nos. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No.
Supplying and installation of delineators (road way
indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm
wide strips, fitted with 80 x 100 mm rectangular or 75 mm
dia circular reflectorised panels at the top, buried or
pressed into the ground and conforming toIRC-79 and the
drawings.

Expressway - Both Side Median Edge @ 50 Mt Interval 2 788 1576 1280.00 2017792.00

Providing and fixing 2.5 metres high GI barbed wire fencing


8.12 with 3.2 m RCC M-25 posts of 110 mm x 110 mm placed L.M.
every 3 metres center to center
ROW Edge 2 40470 80940
Additional at Junctions 2 500 1000
81940 789.00 64650660
8.13 Providing Lighted Bollard Nos 25 2800 70000

8.14 LED Traffic Light Blinker Nos 15048 0

8.15 Providing Anti Glare on Median and Bridges and Overpasses

At horizontal curves Lm. 1 17160 4121 70716360

Total Amount 776,998,233


Pavement Marking

Start Km -0.27
End Km 40.20

Length 40.47 Km
40470 Mt 0

Sn Description Side Nos Length Width Area Remarks


Main Carriageway
1 Edge Marking LHS 2 40470 0.2 16188
2 Edge Marking RHS 2 40470 0.2 16188
3 Lane Marking Centre - LHS 2 13490 0.2 5396
4 Lane Marking Centre - RHS 2 13490 0.2 5396
Service Road
Service Road 7 Mt Width (Edge
Marking) 768
5 LHS 2 2560 0.15
Service Road 7 Mt Width (Edge
Marking) 1548
6 RHS 2 5160 0.15
Service Road 7 mt Both Side
(Edge Marking) 2691
7 Both side 4 4485 0.15

Sub Total 45484


Add for Miscellaneous Work 2274
Total 47758

Raised pavement marker (Solar Studs)


1 Horizontal Curves Spacing
> 1000 Mt Radius 9 2 0 0
1000 to 2000 Mt Radius 18 2 10595 1178
2000 to 3000 Mt Radius 27 2 4010 298
2 Vertical Grade > 2% 18 2 0 0
All Major/Minor, ROB and all
structures, Interchanges,
3 Flyovers
Structure 9 2 843.64 188
Approaches 18 2 369.00 41
All entry/exit slip roads/ ramps
and its acceleration/
4 deceleration lanes
Both side of Ramp & Loop 9 2 4380 974
Edge lin of Acce n Dece lanes 9 2 2000 445
Cat Eye 7259
Solar 1419
Abstract of Quantity

Sn Description Type Size Unit Exp SR Total


A Mandatory / Regulatory Sign
1 Stop Sign Octoganal 1200 mm Ht Nos 42 22 64
2 Give Way Triangular 1200 mm Ht Nos 8 8
3 Prohibitory/Regulation Signs 0
No Entry Circular 1200 mm Dia Nos 32 32
One Way Circular 1200 mm Dia Nos 16 16
Bus / Truck etc Prohibited Circular 1200 mm Dia Nos 6 6
Right / Left Turn Prohibited Circular 1200 mm Dia Nos 16 16
U Turn Prohibited Circular 1200 mm Dia Nos 8 8
Overtaking Prohibited Circular 1200 mm Dia Nos 20 20
Horn Prohibited Circular 1200 mm Dia Nos 8 8
4 Compulsory/Operational Direction 0
No Parking / No Standing Circular 1200 mm Dia Nos 42 42
Speed Limit Circular 1200 mm Dia Nos 16 16
Height Limit Circular 1200 mm Dia Nos 16 16
Axle Weight Limit Circular 1200 mm Dia Nos 16 20 36
Restriction End Circular 1200 mm Dia Nos 22 22
Keep Left Circular 1200 mm Dia Nos 8 8
0
B Cautionary and Warning Sign 0
Curve Sign Triangular 1200 mm Nos 24 24
Narrow Bridge Triangular 1200 mm Nos 0
Gap In Median Triangular 1200 mm Nos 4 4
Merging & demerging Triangular 1200 mm Nos 25
Pedestrian Crossing Triangular 1200 mm Nos 0
Cross Road Triangular 1200 mm Nos 0
T and Y Junction Triangular 1200 mm Nos 0
0
C Informatory Sign Boards 0
1 Direction and Place Identification Rectangular 1200 x 700 Nos 40 40
Advance Direction Rectangular 3600 x 1800 Nos 40 40
Advance Direction Rectangular 2400 x 1800 Nos 20 20
Reassurance Sign Rectangular 1200 x 700 Nos 25 25
Truck Laybye Rectangular 1200 x 700 Nos 4 4
Toll Plaza Rectangular 1200 x 700 Nos 8 8
Toll Booth Ahead Rectangular 1800 x 1200 Nos 8 8
Toll Gate Rectangular 4500 x 2400 Nos 2 2
Weigh Bridge Rectangular 1200 x 700 Nos 4 4
Bus Stop Rectangular 1200 x 700 Nos 2 2
2 Facility Information 0
Eating, Resting, First Aid etc Rectangular 800 x 600 Nos 24 24
Filling Stations Rectangular 800 x 600 Nos 16 16
U-Turn, Median Opening Rectangular 800 x 600 Nos 4 4
Hospital Rectangular 800 x 600 Nos 4 4
Police Station Rectangular 800 x 600 Nos 4 4
Airport, Railway Station, Bus stop Rectangular 800 x 600 Nos 0
Exp Start and End Point Rectangular 800 x 600 Nos 4 4
3 Parking Signs Rectangular 800 x 600 Nos 8 8
4 Route Marker Other Sign Boards 600 x 450 Nos 35 35
5 Flood Gauge Nos - 0
0
D Other Signages 0
1 Road Way Indicator 1 m Height Nos 0
2 Chevron on Curves 750 x 900 Nos 145 145
3 Hazard Marker 300 x 900 Nos 200 200
4 Object Marker 300 x 900 Nos 250 250
5 LED Traffic Beacons Nos 84 84
6 Lighted Bollard Nos 4 4
7 Overhead Sign (Cantilever) Nos 25 25
8 Overhead Sign - Gantry Nos 7 7
10 Solar Blinker
Octoganal 1200 mm Ht 64
Triangular 1200 mm Ht 36 0
Circular 1200 mm Dia 246
1200 x 700 83
3600 x 1800 40
2400 x 1800 20
1800 x 1200 8
4500 x 2400 2
800 x 600 64
600 x 450 35
300 x 900 450
750 x 900 145
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 9 Toll Plaza

Item CODE
Description Unit Quantity Rate(Rs) Amount(Rs)
No.

Providing Toll Booth buildings including arrangement of electric supply


, all electrical items like fans , lights , socket receptacles , and
complete wiring , with requisite earthing , providing fire alarm and
9.01 9.01 fighting system like smoke detector , electric hooter multizone Nos. 16.00 150000 2,400,000
control & repeater panel with battery back-up , cabling and CO2 hand
extinguisher,etc, all complete as per drawing and Technical
Specifications

9.02 9.02 Roof over toll plaza Sq.m 4675.00 10000 46,750,000

9.03 9.03 Operation & Office building at toll plaza Sq.m 300.00 22500 6,750,000

9.04 9.04 Administrative block and control Centre Sq.m 300.00 22500 6,750,000

9.05 9.05 Maintenance Base camp & Workshop Sq.m 450.00 8000 3,600,000

9.06 9.06 Pavement marking Sq.m 2822.40 799 2,255,098

Providing Plain Cement Concrete of M20 grade for Kerbs including


form work , machinery, labour , material and all leads and lifts etc.
9.07 9.07 LM 2460.00 431 1,060,260
complete as per drawing and Technical Specification Sections 408
1500, 1700

Painting of Road Kerbs in alternate bands of 500 mm wide in white


9.08 9.08 Sq.m. 1230.00 79 97,170
and Black as per drawing and Technical Specification
Providing 150 mm thick DLC (M15) for toll plaza as per Technical
9.09 9.09 cum 11425.88 5103 58,306,240
Specification Clause 601.
Providing 300 mm thick PQC for toll plaza as per Technical
9.10 9.10 cum 21328.30 7191 153,371,805
Specification Clause 602.

Providing generator room as shown on drawings including arrangement


9.11 9.11 for electric supply, all electric items with necessary earthing as per No. 1.00 250000 250,000
additional Technical Specification and as directed by the Engineer.

Providing and laying 38 mm thick precast cement concrete chequered


tiles of grade M-20 in cement mortar 1:3 over 25 mm thick cement
concrete M-15 grade and 150 mm thick granular sub-base for
9.12 9.12 sq.m. 2460.00 800 1,968,000
constructing footpath / paved seperator / passenger platform / paved
part of islands / medians etc. in junction as well as in other areas as
per drawing and Tech. Specificaitons Clause 409.

9.13 9.13a Providing Digital Pit less weigh bridge 120 Tonne capacity No. 2.00 1085040 2,170,080
9.13b Weigh-in-Motion System No. 14.00 548640 7,680,960

Providing , installing and commisioning electrically operated barrier


9.14 gates/boom complete as per drawing and Technical Specifications -
shown on drawing.
9.14a a) For 3.2 & 3.5 m wide toll lane No. 14.00 57600 806,400
9.14b b) For 4.5 m wide toll lane No. 2.00 64800 129,600

Providing and fixing 2.5 metres high GI barbed wire fencing with 3.2 m
9.15 9.15 RCC M-25 posts of 110 mm x 110 mm placed every 3 metres center to m 2460 789.10 1,941,194
center
9.16 9.16 M-15 grade concrete in approaches of Channelizers cum -

Clearing and grubbing of road land including uprooting rank


vegetation, grass, brush shrubs, saplings and trees of girth upto 300
9.17 9.17 Hec 0.00 -
mm, removal of stumps, disposal of unserviceable material and
stacking of serviceable material upto 100 meters from road boundary

Construction of embankment with approved material from borrow pits


9.18 9.18 with all leads and lifts complete as per drawings and Technical Cum 282396.50 266 75,117,469
Specification Clause No. 301 & 305.

Construction of Sub grade satisfying the requirements of minimum 8%


CBR value as indicated in the drawings and specification with
9.19 9.19 cum 38468.75 308 11,848,375
approved material with all leads & lifts all complete as per Technical
Specification Clause No 305.
Bill No: 9 Toll Plaza

Item CODE
Description Unit Quantity Rate(Rs) Amount(Rs)
No.
Constructing Grannular Sub-base complete as per Technical
9.20 9.20 Cu.m. 11540.63 3869 44,650,678
Specification Clause No 401. Grading-I, Table 400-2.
Bill No: 9 Toll Plaza

Item CODE
Description Unit Quantity Rate(Rs) Amount(Rs)
No.
9.21 Toll Plaza Equipments -
9.21a Automatic Vehicle Counters and Classifiers Nos. 16.00 273863 4,381,805
9.21b Contactless Smart card system with installation Nos. 8.00 30870 246,960
9.21c Integrated toll management Software Nos. 16.00 28800 460,800
Toll collector, Computers, printer, Cash box including installations
9.21d Nos. 16.00 56700 907,200
complete
9.21e Video Camera in all lanes of Checkpost Nos. 16.00 55056 880,900
9.21f Video Camera monitoring at Checkpost Nos. 16.00 117369 1,877,898
9.22 9.22 Box Tunnel of 2.1m x 2.5m size at toll plaza m 100.00 41580 4,158,000
9.23 9.23 Canopy lighting Nos. 36.00 12400 446,400

Providing and fixing of retro- reflectorised informatory sign as per


IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed
9.24 9.24 over aluminium sheeting, as per approved drawing and and all Nos. 6.00 89677 538,062
complete as per Technical specifications and as directed by the
Engineer-in-charge.

Providing and fixing of retro- reflectorised informatory sign as per


IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed
9.25 9.25 over aluminium sheeting, as per approved drawing and and all Nos. 4.00 160000 640,000
complete as per Technical specifications and as directed by the
Engineer-in-charge. (Size - 4.9 x 1.9 m)

Providing and erecting overhead signs with a corrosion resistant 2mm


thick aluminium alloy sheet reflectorised with high intensity retro-
reflective sheeting of encapsulated lense type with vertical and
lateral clearance given in clause 802.2 and 802.3 and installed as per
9.26 9.26 clause 802.7 over a designed support system of aluminium alloy or Nos. 2.00 600000.00 1,200,000
galvanised steel trestles and trusses of sections and type as per
structural design requirements and approved plans and and all
complete as per Technical specifications and as directed by the
Engineer-in-charge.

Providing and erecting gantry mounted variable message sign board


electronically operated capable of flashing the desired message over a
designed support system of aluminium alloy or galvanised steel,
9.27 9.27 Nos. 2.00 157500 315,000
erected as per approved design and drawings and with lateral
clearance, all complete as per Technical specifications and as
directed by the Engineer-in-charge.

Supplying and fixing at site retro-reflectorised STOP sign boards/


signs made of encapsulated lense type of reflective sheeting fixed
9.28 9.28 over aluminum sheeting 2.0 mm thick complete including vertical Nos. 16.00 12906 206,492
pipes / angles / posts etc., all complete as per drawing and Technical
Specification Clause 801

Providing guard rails using MS tubular pipes of 100mm dia.with one


9.29 9.29 coat of red oxide Primer and two coats of enamel painting etc.- for toll -
booths and bull nosing
Straight portion Metre 320.00 600 192,000
Curved portion Metre 64.00 600 38,400
9.30 9.30 Plantation and Landscaping LS 1.00 367500 367,500
9.31 9.31 Maintenance Area and Workshop Sqm 600.00 1260 756,000

9.32 9.32 Providing and Installation of Power Sub Station including Generator Nos. 1 1,134,000 1,134,000

9.33 9.33 Estalishing of Laboratory for testing of Road Construction Materials LS 1 1,080,000 1,080,000

9.34 9.34 Providing and Installation of Fuel Storage Tank (30 KL) Nos. 1 0 -
9.35 9.35 Removal Barriers at Toll Plaza Mt 100 1,600 160,000
0.00
Bill No: 9 Toll Plaza

Item CODE
Description Unit Quantity Rate(Rs) Amount(Rs)
No.
Toll Arrangement at Slip Road

Providing Toll Booth buildings including arrangement of electric supply ,


all electrical items like fans , lights , socket receptacles , and complete
wiring , with requisite earthing , providing fire alarm and fighting system
9.36 9.36 No 4 150,000 600,000
like smoke detector , electric hooter multizone control & repeater panel
with battery back-up , cabling and CO2 hand extinguisher,etc, all
complete as per drawing and Technical Specifications

Toll collector, Computers, printer, Cash box including installations


9.37 9.37 No 4 56,700 226,800
complete
9.38 9.38 Video Camera in all lanes of Checkpost No 4 55,056 220,225
9.39 9.39 Video Camera monitoring at Checkpost No 4 117,369 469,475
Providing , installing and commisioning electrically operated barrier
9.40 9.40 gates/boom complete as per drawing and Technical Specifications No 4 57,600 230,400
shown on drawing.
Building construction of (Manager, Cashier, traffic Aid, Medical Aid,
9.41 9.41 Sqm 180 22,500 4,050,000
Rest room and Toilet block
9.42 9.42 Providing Digital Pit less weigh bridge 60 Tonne capacity No. 4.00 708480 2,833,920

9.43 9.43 Providing Digital Pit less weigh bridge 120 Tonne capacity No. 1.00 1085040 1,085,040

9.44 9.44 Weigh-in-Motion System No. 4.00 504000 2,016,000


9.45 9.45 Landscaping Ls 1 100,000 100,000
Providing and Installation of Power Sub Station including Generator Nos. 1 720,000 720,000

Total Amount 460,442,606


Calculation for Area of Toll Plaza
Location Design Ch. Start Km End Km Length
Toll Plaza 1 Ch. 9.000 1230.00

Total Length 1230.00

Tapered Length including Toll Plaza 1230.00 m


Width at starting pt of Tapered 38.00 m
Width at Toll plaza 85.00 m
Length at toll Plaza 55.00 m
Avg width 61.50 m
Total area 76937.50 sqm
Deduct for carriageway sqm
Net area 76937.50 sqm
deduct for median 17.00 765.00
Deduct Existing Rigid Pavement Area 0.00
Rigid Pavement area 76172.50 sqm
Flexible pavement area sqm
Nos of Lane 16.00 Nos 16.00
Rigid Pavement Calculation
Net area 76172.50 sqm
Nos of Toll Plaza 1.00
CnG Ha Considered in Bill No 1
Embankment 282396.50 cum
Subgrade 500 mm thick 38468.75 cum
GSB 150 mm thick 11540.63 cum
DLC 150 mm thick 11425.88 cum
PQC 280 mm thick 21328.30 cum

Covered Drain
2460 m
Pavement Marking in Toll Plaza

a)Transverse Line in Straight Portion


Nos of Transverse Marking 8
Marking Per Nos 8
Total Nos of Trasverse Marking 64
Length of Marking 12.5
Width of Marking 0.3
Area 240 Sqm

b)Transverse Line in Tappered Portion


Nos of Transverse Marking 8
Marking Per Nos 8
Total Nos of Trasverse Marking 64
Average Length of Marking 48.75
Width of Marking 0.3
Area 936 Sqm

Total Pavement Marking in One Side 1176


Total for Both Side 2352
Add 20 % for Chevron Marking 470.4
Total Quantity 2822.4 Sqm
Covered Drain
2460 m
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 10 Wayside Amenities & Toilet Block

Item
Description Unit Quantity Rate(Rs) Amount(Rs)
No.
Wayside Amenities

Development of Way side amenity area (60,000 sqm proposed


10.01 sqm 60000 532 31,920,000
for Development & 40,000 sqm Future Development
Development Area - 60,000 SQM
Building Component - Construction of Shopping area,
Restaurant, Hotel, Dhabha, Fuel station, Contro centre etc, bye
10.02 sqm 5000 23500 117,500,000
or any other place as per drawing and additional Technical
Specification and as directed by the Engineer.
-
Digging and construction of bore well as per Technical
10.03 No. 5 100000 500,000
Specification complete
Construction of passenger shelter at pick-up bus stop as per
10.04 drawing and additional Technical Specification and as directed No. 2 0 -
by the Engineer.
Construction of parking facility, electrification, plumbing, water
supply, sewerage disposal system and street illumination
10.05 complete as per Technical Specification. Sqm 20000 1500 30,000,000

Development of Children Play Area, Seating area, Lawn, Palm


10.06 Sqm 25000 500 12,500,000
court etc
10.07 Approach road to Wayside Amenities 79,268,270

Total 271,688,270
Toilet block

Building Component for construction of Toilet block with all the


10.08 facilities including plumbing, electrification, water supply, Sqm 300 17200 5,160,000
sewerage disposal etc
Construction of parking facility, electrification, street illumination
10.09 Sqm 300 2000.00 600,000
complete as per Technical Specification.
Digging and construction of bore well as per Technical
10.10 No. 1 100000 100,000
Specification complete
10.11 Rain Water harvesting arrangement No. 2 378301 756,602

10.12 Approach road to Toilet Block 14,677,863

Total 21,294,464

Total bill no - 10 292,982,734


(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No. 10 - Approach to Wayside Amenities Area 30000

Item
Description Unit No Length Bredth Depth Quantity Rate(Rs) Amount(Rs)
No.
Construction of embankment with approved material from borrow
1 pits with all leads and lifts complete as per drawings and Technical cum 1.0 30000.0 4.40 132000 266.00 35,112,000
Specification Clause No. 301 & 305.
Construction of Sub grade & earthen / un paved shoulders
satisfying the requirements of minimum 8% CBR value as
2 indicated in the drawings and specification with approved material cum 1.0 30000.0 0.50 15000 308.00 4,620,000
with all leads & lifts all complete as per Technical Specification
Clause No 305.

Granular Sub-Base with Close Graded Material (Table:- 400-1)


Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage of
3 cum 1.0 1500.0 11.1 0.200 3318 3869.00 12,837,342
mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause 401

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
4 the Material with water at OMC in mechanical mix plant carriage of cum 1.0 1500.0 7.00 0.25 2625 4133.00 10,849,125
mixed Material by tipper to site, laying in uniform layers with paver
in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.

Providing and laying bituminous primer coat over prepared surface


5 of grannular base with bituminous emulsion complete as per cum 1.0 1500.0 7.00 10500 22.00 231,000
Technical Specifications Clause No 502.(Table 500-1)
Providing and laying Tack coat over granular surface with
6 bituminous emulsion all complete as per Technical Specifications cum 1.0 1500.0 7.00 10500 8.00 84,000
Clause 503.(Table 500-2) @ 2.5 kg /10 sq.m.

Dense Graded Bituminous Macadam


Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder (VG-40) @ 4.0 to 4.5 per cent by
7 weight of total mix and filler, transporting the hot mix to work site, cum 1.0 1500.0 7.00 0.115 1208 8787.00 10,610,303
laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as
per MoRTH specification clause No. 507 complete in all respects.
Grading - I 40 mm (Nominal Size)

Bituminous Concrete with CRMB/PMB


Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed
with bituminous binder (CRMB/PMB) @ 5.4 to 5.6 per cent of mix
8 and filler, transporting the hot mix to work site, laying with a cum 1.0 1500.0 7.00 0.05 525 9380.00 4,924,500
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects
Grading - I-19 mm (Nominal Size)

Total 79,268,270
Bill No. 10 - Approach to Toilet Block Area 1500
Item
Description Unit No Length Bredth Depth Quantity Rate(Rs) Amount(Rs)
No.
Construction of embankment with approved material from borrow
1 pits with all leads and lifts complete as per drawings and Technical cum 1.0 1500.0 4.40 6600 266.00 1,755,600
Specification Clause No. 301 & 305.
Construction of Sub grade & earthen / un paved shoulders
satisfying the requirements of minimum 8% CBR value as
2 indicated in the drawings and specification with approved material cum 1.0 1500.0 0.50 750 308.00 231,000
with all leads & lifts all complete as per Technical Specification
Clause No 305.

Granular Sub-Base with Close Graded Material (Table:- 400-1)


Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage of
3 cum 1.0 500.0 9.8 0.20 980 3869.00 3,791,620
mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause 401

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
4 the Material with water at OMC in mechanical mix plant carriage of cum 1.0 500.0 7.00 0.25 875 4133.00 3,616,375
mixed Material by tipper to site, laying in uniform layers with paver
in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.

Providing and laying bituminous primer coat over prepared surface


5 of grannular base with bituminous emulsion complete as per cum 1.0 500.0 7.00 3500 22.00 77,000
Technical Specifications Clause No 502.(Table 500-1)
Providing and laying Tack coat over granular surface with
6 bituminous emulsion all complete as per Technical Specifications cum 1.0 500.0 7.00 3500 8.00 28,000
Clause 503.(Table 500-2) @ 2.5 kg /10 sq.m.

Dense Graded Bituminous Macadam


Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder (VG-40) @ 4.0 to 4.5 per cent by
7 weight of total mix and filler, transporting the hot mix to work site, cum 1.0 500.0 7.00 0.12 403 8787.00 3,536,768
laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as
per MoRTH specification clause No. 507 complete in all respects.
Grading - I 40 mm (Nominal Size)

Bituminous Concrete with CRMB/PMB


Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed
with bituminous binder (CRMB/PMB) @ 5.4 to 5.6 per cent of mix
8 and filler, transporting the hot mix to work site, laying with a cum 1.0 500.0 7.00 0.05 175 9380.00 1,641,500
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects
Grading - I-19 mm (Nominal Size)

Total 14,677,863
Bill No. 13 -Median Opening Cost No 5.0
Item Bredth/A
Description Unit No Length Depth Quantity Rate(Rs) Amount(Rs)
No. rea
Construction of Sub grade & earthen / un paved shoulders
satisfying the requirements of minimum 8% CBR value as
1 indicated in the drawings and specification with approved material cum 5.0 247.5 0.50 619 308.00 190,575
with all leads & lifts all complete as per Technical Specification
Clause No 305.

Granular Sub-Base with Close Graded Material (Table:- 400-1)


Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage of
2 cum 5.0 247.5 0.15 186 3869.00 718,183
mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause 401

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
3 the Material with water at OMC in mechanical mix plant carriage of cum 5.0 247.5 0.3 309 4133.00 1,278,647
mixed Material by tipper to site, laying in uniform layers with paver
in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.

Providing and laying bituminous primer coat over prepared surface


4 of grannular base with bituminous emulsion complete as per cum 5.0 247.5 0 22.00 -
Technical Specifications Clause No 502.(Table 500-1)
Providing and laying Tack coat over granular surface with
5 bituminous emulsion all complete as per Technical Specifications cum 5.0 247.5 0 8.00 -
Clause 503.(Table 500-2) @ 2.5 kg /10 sq.m.

Dense Graded Bituminous Macadam


Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder (VG-40) @ 4.0 to 4.5 per cent by
6 weight of total mix and filler, transporting the hot mix to work site, cum 5.0 247.5 0.05 62 8787.00 543,696
laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as
per MoRTH specification clause No. 507 complete in all respects.
Grading - I 40 mm (Nominal Size)

Bituminous Concrete with CRMB/PMB


Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed
with bituminous binder (CRMB/PMB) @ 5.4 to 5.6 per cent of mix
7 and filler, transporting the hot mix to work site, laying with a cum 5.0 247.5 0.025 31 9380.00 290,194
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects
Grading - I-19 mm (Nominal Size)

Providing Plain Cement Concrete of M20 grade for Kerbs


including form work , machinery, labour , material and all leads
8 Lm 128 946.00 121,088
and lifts etc. complete as per drawing and Technical Specification
Sections 408 1500, 1700
Providing Plain Cement Concrete M15 in foundation, of
drain,brest wall and retainingwall including cost of all
9 materials, labour, mixing transportation, placing, cum 8 6651.00 55,868
vibration,curing etc as per Technical Specification Sections
1400, 1700
100 mm Dia Ms Pipe (Removable) @ 1.5 mt C/C of 1.2 mt
10 Lm 42.0 1.5 63 1500.00 94,500
ht
11 Barrier Post - Steel Lm 80 1000.00 80,000

Total 3,372,751
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 11 Environmental cost

Total cost (INR)


Item No. Component Description Unit Quantity Unit cost (INR)
Detail Cost
1 MITIGATION / ENHANCEMENT COST 
1.2 Construction Stage
Half brick circular tree guard as per design provided by the
1.2.1 engineer and complete in all respect as per MoRT&H Standard No. 2000 778.40 1,556,800.00
Data book for analysis of rates.
Horticulture
Bamboo tree guard as per design provided by the engineer and
1.2.2 complete in all respect as per MoRT&H Standard Data book for No. 4000 250.00 1,000,000.00
analysis of rates.

Compensatory Re-plantation to offset the loss of trees due to


widening of the project corridor in accordance to the relevant
1.2.1 forest laws (Minimum of 2 trees planted for every tree cut) No. 11560 777.00 8,982,120.00
including Plantation and maintenance at locations & as per
directions of the forest department or administrative department
Horticulture
Planting of flowering, shade, medicinal, ornamental & fruit
1.2.3 bearing trees in suitable area @ 1000 numbers per Km. (2 row No. 40470 777.00 31,445,190.00
@ 4 mt C/C on each side)
Planting of ornamental, medicinal & flowering plants and shrubs
1.2.5 in the central verge / median for the entire duration of the No. 26953 150.00 4,042,953.00
contract period @ 666 numbers per Km
Planting and Maintaining of Flowering Plants and Shrubs 200
plants and 800 shrubs in two rows in one km length of road in Km 42 31,054.00 1,304,268.00
Median
Cost of transport & distribution of cooking fuel to construction
1.2.11 Flora Months
workers to prevent indiscriminate felling of trees
Providing Oil Interceptors as per design and drawing at vehicle
1.2.3 Soil parking areas and as per directions of the Environmental Nos. 2 27,000.00 54,000.00
Specialist / Environmental Engineer of the Engineer.
Total cost (INR)
Item No. Component Description Unit Quantity Unit cost (INR)
Detail Cost

Dust Management with sprinkling of water, covers for vehicles


1.2.4 Air Km 42 10,000.00 420,000.00
transporting construction material
Silt Fencing around soil stockpiled near water bodies and at
1.2.6 m 200 750.00 150,000.00
areas identified by the engineer.
Rainwater Harvesting Structures complete in all respect and
1.2.7 confirming to the relevant specifications as directed by the Nos. 162 378,300.81 61,284,730.41
Engineer and as per drawing approved by Engineer.
Water Quality
Water harvesting structures for storage of water especailly
during summer and also for the use of local populace at
1.2.8 locations identified by the engineer and as per directions and No.
drawings approved by the Environmental Specialist /
Environmental Engineer of the Engineer.
Disposal of Sewage and other wastes in the construction yard
Solid Waste
1.2.17 and labour camps as per directions of the Environmental Month 36 5,000.00 180,000.00
Disposal
Specialist / Environmental Engineer of the Engineer.
TOTAL MITIGATION / ENHANCEMENT COST 110,420,061.41
TOTAL COST 110,420,061.41
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)
Environmental Cost - Non Civil
Total cost (INR)
Item No. Component Description Unit Quantity Unit cost (INR)
Detail Cost
2 MONITORING COST
2.1 Construction Stage 
Sampling and monitoring ambient Air Quality and gaseous
pollutants as per CPCB Standard Procedures at locations
including approved hot mix plant locations, sensitive area and
No. of
2.1.1 Air chainages as per direction by Environmental Specialist / 680 3,850.00 2,618,000.00
Samples
Environmental Engineer of the Engineer for thrice a year for
three years & Analysis charges for NO2, SO2, PM2.5, PM10, Pb,
CO and NOx

Collection of grab samples of water quality at locations identified


by the engineer for 3 years at the end of summer / before start of
monsoon and Analysis of water quality for pH, Turbidity, total
solids, turbidity COD, BOD, DO, Chlorides, Hardness, Oil &
No. of
2.1.4 Water Grease, TSS, TDS, Total Coliform, Iron, Fluorides, Nitrates, E. 20 5,500.00 110,000.00
Samples
coli, Total coliform and faecal coliform as specified in "Standard
Methods for Examination of Water and Wastewater" published
by WEF, AWWA and APHA as per direction of Environmental
Specialist / Environmental Engineer of the Engineer

Monitoring Noise level at Equipment Yards, Sensitive area and


Settlements using hand held noise meters at locations and
2.1.5 Noise chainages identified by the Engineer) as per directions of Nos. 30 1,100.00 33,000.00
Environmental Specialist / Environmental Engineer of the
Engineer for thrice a year for three years
Transportation Transportation cost for monitoring of noise, air and water during
2.1.6 L.S. - 50,000.00 50,000.00
Cost construction period for 3 years
2.2 Operation Stage 
Sampling and monitoring ambient Air Quality and gaseous
pollutants as per CPCB Standard Procedures at locations and at
chainages identified by the Engineer including sensitive area and No. of
2.2.1 Air 290 3,850.00 1,116,500.00
chainages as per direction by Environmental Specialist / Samples
Environmental Engineer of the Engineer & Analysis charges for
NO2, SO2, PM2.5, PM10, O3 and CO
Environmental Cost - Non Civil
Total cost (INR)
Item No. Component Description Unit Quantity Unit cost (INR)
Detail Cost

Collection of grab samples of water quality at locations and


chainages identified by the engineer at the end of summer /
before start of monsoon as per direction of Environmental
Specialist / Environmental Engineer of the Engineer & Analysis
of water quality for pH, Turbidity, total solids, COD, BOD, DO,
No. of
2.2.4 Water Chlorides, Hardness, Oil & Grease, TSS, TDS, Total Coliform, 12 5,500.00 66,000.00
Samples
Iron, Fluorides, Nitrates, E. coli, Total coliform and faecal
coliform etc. as specified in "Standard Methods for Examination
of Water and Wastewater" published by WEF, AWWA and APHA
as per direction of Environmental Specialist / Environmental
Engineer of the Engineer and as per MoEF rate list.

Monitoring Noise level at Sensitive area and Settlements using


hand held noise meters at locations and chainages identified by
2.2.6 Noise the Engineer) identified by the Engineer and as per directions of Nos. 12 1,700.00 20,400.00
Environmental Specialist / Environmental Engineer of the
Engineer
Transportation Transportation cost for monitoring of noise, air and water during
2.2.7 L.S. - 100,000.00 100,000.00
Cost operation period
TOTAL MONITORING COST 4,113,900.00
3 MISCELLANEOUS COST
3.1 Training Training L.S. - 48,000.00 48,000.00

Holding meetings for policy planning and subsequent review


Advocacy and
3.2 meetings with Revenue Department, Forest Department, local Year 4 11,000.00 44,000.00
Policy Making
representatives, NGOs, etc. regarding development controls.

Administrative
Maintenance of vehicle with the Environment Cell, Data
3.3 Charges including Months 36 40,000.00 1,440,000.00
processing, administrative support, stationery etc.
logistics
Miscellaneous
3.4 Digital Camera for the Environment Cell No. 1 10,000.00 10,000.00
Items
TOTAL MISCELLANEOUS COST 1,542,000.00
TOTAL COST 5,655,900.00
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)

Bill No: 12 MISCELLANEOUS WORKS

Item
Description Unit Nos. Length Breadth Depth Quantity Rate(Rs) Amount(Rs)
No. ###
12.01 Providing and laying chequered tiles 25mm thick precast
cement concrete chequered tiles of grade M20 in ordinary
grey cement with out chips in CM 1:3 over 50 mm thick
cement concrete M10 grade and 150 mm thick Grannular
Sub base including pointing of tiles with neat cement as per
drawing and Technical Specification Clause 409.

Sq.m.
On Cross Roads of VUP/PUP 758.00 -
12.02 Providing min 900 mm dia NP4 pipes across the ###
road(including catchpits on both sides) at 2000m interval
for crossing of Utilities as per Drawing and Technical
specification Section. 2900

40.656 Km length & @ 2km LM 22 120 2640 7360.00 19,430,400

12.03 Construction of temporary diversion and providing traffic ###


safety and control where necessary and as per direction of
the Engineer including maintenance thereof complete as per L.M. 5000 22000.00 110,000,000
drawing and Technical Specification Clause 112

12.04 Providing lighting including excavation, pipes, cables for ###


erecting single arm street lighting with solar arrangement Nos

Total No. 602 74000 44,548,000


12.05 Providing lighting including excavation, pipes, cables for
erecting single arm street lighting with power supply and Nos
arrangement from generator
Total No. 18 78000 1,404,000
12.06 Mast lighting (with a high of 30 metres), with an arm
bracket length of 2 metres, and to comply with 30 lux, for Nos
Intersections, Flyovers including Generator
Total 8 1249200 9,993,600

Electic connection charges at major locations LS 20,000,000

Supply of Ambulance vechile with all emergency equipments Nos


1 3000000 3,000,000

12.07
Cost of Solar (Solar Farm + Evacuation + Distribution) @ Rs.
MW 0.65 40000000
5 Cr per MW

12.08 Landscaping on around interchanges Ls.


Turfing Sqm Area on interchange 20000 35 700,000
12.09 Beautification of interchanges Ls. 2 5,000,000
2500000
12.10 Artefacts Ls. 1
12.11 Medical Aid Post Nos 1 450000 450,000
12.12 Traffic Aid Post Nos 1 202500 202,500
12.13 Vehicle Rescue Post/Cranes

Total Amount 214,728,500


Item No 12.04

Total Qty in Nos No. of high Mast Total no.


@ 20 m Light @ 4 per of light
S.No Location Nos Length Side location Remarks
A Street Lighting
1 VUPs 5 13.0 4 8.00 40
2 LVUs 18 12.0 4 8.00 144
3 PUPs 5 8.0 4 8.00 40
4 Flyovers 3 80.0 4 18.00 54
5 Diamond Interchange with Flyovers 1 80.0 4 18.00 4 18
6 Trumpet Interchanges/slip roads with Flyovers 0 204.0 4 42.00 4 0
7 Major Bridges 0 100.0 4 22.00 0
8 Minor Bridges 21 20.0 4 8.00 168
9 ROB’s 2 100.0 4 22.00 44
10 Toll Plaza 1 1100.0 2 112.00 4 112
11 Wayside Amenities 0.0 1 8.00 4 0
12 Toilet Block 130.0 1 9.00 0 0
A Street Lighting with Power Line & Generator 18 0
B Street Lighting with Solar Panel 602
C High Mast Lamps 8
Total Nos of Street Light Single Arm with Solar arrangement 602
Total Nos of Street Light with Power supply 18
Total Nos of High Mast light (30 m height ) 8

Details of Electrical Connection/facility for different locations


1 Trumpet interchange at Lucknow and ROB 1 255 KW 8000000 8000000
2 Toll Plaza 1 280 KW 4000000 4000000
3 Flyovers 2 200 KW 2000000 4000000
4 Diamond Interchange with Flyovers 1 200 KW 2000000 2000000
5 ROB 1 200 KW 2000000 2000000
20000000
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist.
Barabanki) (Km -0.270 to Km 40.200)

Cross Section Schedule


From To LHS (m) RHS (m) Type of C/S Length (Km)
-0.270 -0.060 No N0 R 0.210
-0.060 0.550 No N0 E 0.610
0.550 1.000 No N0 E 0.450
1.000 1.510 No N0 C 0.510
1.510 5.395 7.00 7.00 A3 3.885
5.395 6.155 3.75 B1 0.760
6.155 6.550 3.75 3.75 B3 0.395
6.550 7.360 3.75 B1 0.810
7.360 8.400 3.75 3.75 B3 1.040
8.400 9.380 3.75 B2 0.980
9.380 9.780 7.00 A2 0.400 MB
9.780 9.950 3.75 B2 0.170
9.950 10.450 3.75 3.75 B3 0.500
10.450 11.570 3.75 B2 1.120
11.570 11.970 7.00 A2 0.400 MB
11.970 12.420 3.75 B2 0.450
12.420 13.550 3.75 3.75 B3 1.130
13.550 13.875 7.00 A2 0.325
13.875 14.430 3.75 B2 0.555
14.430 15.110 7.00 A2 0.680 MB - 2 Nos
15.110 15.150 3.75 B2 0.040
15.150 15.900 3.75 3.75 B3 0.750
15.900 16.450 3.75 B1 0.550
16.450 17.180 3.75 3.75 B3 0.730
17.180 17.375 3.75 B1 0.195
17.375 17.775 7.00 A1 0.400 MB
17.775 18.550 3.75 B1 0.775
18.550 19.225 3.75 B2 0.675
19.225 19.625 7.00 A2 0.400 MB
19.625 19.745 3.75 B2 0.120
19.745 20.665 3.75 3.75 B3 0.920
20.665 21.065 7.00 7.00 A3 0.400 MB
21.065 21.200 3.75 3.75 B3 0.135
21.200 21.465 3.75 B2 0.265
Cross Section Schedule
From To LHS (m) RHS (m) Type of C/S Length (Km)
21.465 21.865 7.00 A2 0.400 MB
21.865 22.540 3.75 B2 0.675
22.540 22.770 3.75 3.75 B3 0.230
22.770 23.265 3.75 B2 0.495
23.265 24.350 3.75 B1 1.085
24.350 24.750 7 A1 0.400 MB
24.750 25.830 3.75 B1 1.080
25.830 25.985 3.75 B2 0.155
25.985 26.385 7.00 A2 0.400 MB
26.385 26.655 3.75 B2 0.270
26.655 27.095 7 A2 0.440 MB
27.095 27.400 3.75 B1 0.305
27.400 27.800 7.00 A1 0.400 MB
27.800 28.785 3.75 B1 0.985
28.785 29.080 3.75 3.75 B3 0.295
29.080 29.905 3.75 B1 0.825
29.905 30.290 3.75 3.75 B3 0.385
30.290 30.700 3.75 B2 0.410
30.700 31.560 No No C 0.860
31.560 32.150 3.75 B2 0.590
32.150 32.550 3.75 3.75 B3 0.400
32.550 32.910 7.00 A2 0.360 MB
32.910 33.450 3.75 B2 0.540
33.450 33.650 7.00 A2 0.200
MB
33.650 33.850 7.00 7.00 A3 0.200
33.850 34.080 3.75 3.75 B3 0.230
34.080 34.110 3.75 B2 0.030
34.110 34.510 7.00 A2 0.400 MB
34.510 34.560 3.75 B2 0.050
34.560 34.990 3.75 3.75 B3 0.430
34.990 35.500 7.00 3.75 D 0.510
35.500 36.860 7.00 A1 1.360
36.860 37.325 3.75 B2 0.465
37.325 38.080 7.00 A2 0.755 MB
38.080 38.700 3.75 B2 0.620
38.700 39.550 3.75 B1 0.850
39.550 40.200 3.75 3.75 B3 0.650
Cross Section Schedule
From To LHS (m) RHS (m) Type of C/S Length (Km)
40.470
Cross Section Schedule
From To LHS (m) RHS (m) Type of C/S Length (Km)
TCS-A1 ( 6 lane Expressway with 7 Mt SR on LHS) 2.56 2560
TCS-A2 ( 6 lane Expressway with 7 Mt SR on RHS) 5.16 5160
TCS-A3 ( 6 lane Expressway with 7 Mt SR Both Side) 4.485 4485
TCS-B1 ( 6 lane Expressway with 3.75 Mt SR on LHS) 8.22 8220
TCS-B2 ( 6 lane Expressway with 3.75 Mt SR on RHS) 8.675 8675
TCS-B3 ( 6 lane Expressway with 3.75 Mt SR Both Side) 8.22 8220
TCS-C ( 6 lane Expressway without SR) 1.37 1370
TCS-D ( 6 lane Exp with 7 mt & 3.75 mt on either side ) 0.51 510
TCS-E ( 4 lane Expressway without SR) 1.06 1060
Ramps 0.21 210
40.470 40470

Total Structure length 1205.20


Total Toll Plaza length 1230.00
Total Length of RE Wall for structures 2631.80

Total Deduction Length for Pavement 2435.20


Total Deduction Length for Drainage & chute 5067.00
TCS_A1&A2 (2x3 Lane Expressway with Raised Median with Staggered Service
Road of 7 Mt Width Carriageway)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 15.00 15.00 30.00

DBM 115 mm 15.00 15.00 30.00

WMM 250 mm 15.50 15.50 31.00

GSB 200 mm 20.03 20.03 40.06

Subtotal 615 mm 0.00

Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46

Total 1115 mm 0.00

1.115 m 0.00

Selected Earth Shoulder 415 mm 2.42 2.42 4.83

Median Filling 415 mm 2.00 2.00 4.00


Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50

Carriageway discription

Carriageway m 11.250 11.250 22.50

Paved shoulder m 3.000 3.000 6.00

Edge strip m 0.750 0.750 1.50

Median width m 2.750 2.75 5.50

Earthen Shoulder m 2.000 2.000 4.00

Median Shoulder m 2.000 2.000 4.00


ROW 120.00

Service Road
BC 25 mm 3.50 3.50 7.00

DBM 50 mm 3.50 3.50 7.00

WMM 225 mm 3.73 3.73 7.45

GSB 150 mm 5.25 5.25 10.50

Subtotal 450 mm 0.00

Subgrade(Selected Earth) 500 mm 5.9 5.90 11.80

Total 950 mm 0.00

0.95 m 0.00

Embankment Top 6.4 6.40 12.80

Selected Earth Shoulder 300 mm 1.30 1.30 2.60

Carriageway discription 0.00


Carriageway m 3.50 3.500 7.00

Earthen Shoulder m 1.00 1.00 2.00


TCS_A3 (2x3 Lane Expressway with Raised Median with Both side Service Road of
7 Mt Width Carriageway)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 15.00 15.00 30.00

DBM 115 mm 15.00 15.00 30.00

WMM 250 mm 15.50 15.50 31.00

GSB 200 mm 20.03 20.03 40.06

Subtotal 615 mm 0.00

Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46

Total 1115 mm 0.00

1.115 m 0.00

Selected Earth Shoulder 415 mm 2.42 2.42 4.83

Median Filling 415 mm 2.00 2.00 4.00


Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50

Carriageway discription

Carriageway m 11.250 11.250 22.50

Paved shoulder m 3.000 3.000 6.00

Edge strip m 0.750 0.750 1.50

Median width m 2.750 2.75 5.50

Earthen Shoulder m 2.000 2.000 4.00

Median Filling m 2.000 2.000 4.00


ROW 120.00

Service Road One side Both Side

BC 25 mm 3.50 3.50 7.00 14.00

DBM 50 mm 3.50 3.50 7.00 14.00

WMM II 225 mm 3.73 3.73 7.45 14.90

GSB 150 mm 5.25 5.25 10.50 21.00

Subtotal 450 mm 0.00

Subgrade(Selected Earth) 500 mm 5.9 5.90 11.80 23.60

Total 950 mm 0.00

0.95 m 0.00

Embankment Top 6.4 6.40 12.80 25.60

Selected Earth Shoulder 300 mm 1.30 1.30 2.60 5.20

Carriageway discription 0.00


Carriageway m 3.50 3.50 7.00 14.00

Earthen Shoulder m 1.00 1.00 2.00 4.00


TCS_B1&B2 (2x3 Lane Expressway with Raised Median with Staggered Service
Road of 3.75 Mt Width Carriageway)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 15.00 15.00 30.00

DBM 115 mm 15.00 15.00 30.00

WMM 250 mm 15.50 15.50 31.00

GSB 200 mm 20.03 20.03 40.06

Subtotal 615 mm 0.00

Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46

Total 1115 mm 0.00

1.115 m 0.00

Selected Earth Shoulder 415 mm 2.42 2.42 4.83

Median Filling 415 mm 2.00 2.00 4.00


Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50

Carriageway discription

Carriageway m 11.250 11.250 22.50

Paved shoulder m 3.000 3.000 6.00

Edge strip m 0.750 0.750 1.50

Median width m 2.750 2.75 5.50

Earthen Shoulder m 2.000 2.000 4.00

Median Filling m 2.000 2.000 4.00


ROW 120.00

Service Road
BC 25 mm 1.875 1.875 3.75

DBM 50 mm 1.875 1.875 3.75

WMM II 225 mm 2.100 2.100 4.20

GSB 150 mm 4.5 4.500 9.00

Subtotal 450 mm 0.00

Subgrade(Selected Earth) 500 mm 5.15 5.150 10.30

Total 950 mm 0.00

0.95 m 0.00

Embankment Top 5.65 5.65 11.30

Selected Earth Shoulder 300 mm 2.175 2.18 4.35

Carriageway discription 0.00


Carriageway m 1.875 1.875 3.75

Earthen Shoulder m 1.875 1.875 3.75


TCS_B3 (2x3 Lane Expressway with Raised Median with Both side Service Road of
3.75 Mt Width Carriageway)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 15.00 15.00 30.00

DBM 115 mm 15.00 15.00 30.00

WMM 250 mm 15.50 15.50 31.00

GSB 200 mm 20.03 20.03 40.06

Subtotal 615 mm 0.00

Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46

Total 1115 mm 0.00

1.115 m 0.00

Selected Earth Shoulder 415 mm 2.42 2.42 4.83

Median Filling 415 mm 2.00 2.00 4.00


Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50

Carriageway discription

Carriageway m 11.250 11.250 22.50

Paved shoulder m 3.000 3.000 6.00

Edge strip m 0.750 0.750 1.50

Median width m 2.750 2.75 5.50

Earthen Shoulder m 2.000 2.000 4.00

Median Filling m 2.000 2.000 4.00


ROW 120.00

Service Road One side Both Side

BC 25 mm 1.875 1.875 3.75 7.50

DBM 50 mm 1.875 1.875 3.75 7.50

WMM 225 mm 2.100 2.100 4.20 8.40

GSB 150 mm 4.500 4.500 9.00 18.00

Subtotal 450 mm 0.00

Subgrade(Selected Earth) 500 mm 5.150 5.150 10.30 20.60

Total 950 mm 0.00

0.95 m 0.00

Embankment Top 5.65 5.65 11.30 22.60

Selected Earth Shoulder 300 mm 2.18 2.18 4.35 8.70

Carriageway discription 0.00


Carriageway m 1.875 1.875 3.75 7.50

Earthen Shoulder m 1.875 1.875 3.75 7.50


TCS_C (2x3 Lane Expressway with Raised Median without Service Road)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 15.00 15.00 30.00

DBM 115 mm 15.00 15.00 30.00

WMM 250 mm 15.50 15.50 31.00

GSB 200 mm 20.03 20.03 40.06

Subtotal 615 mm 0.00

Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46

Total 1115 mm 0.00

1.115 m 0.00

Selected Earth Shoulder 415 mm 2.42 2.42 4.83

Median Filling 415 mm 2.00 2.00 4.00

Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50

Carriageway discription

Carriageway m 11.250 11.250 22.50

Paved shoulder m 3.000 3.000 6.00

Edge strip m 0.750 0.750 1.50

Median width m 2.750 2.75 5.50

Earthen Shoulder m 2.000 2.000 4.00

Median Filling m 2.000 2.000 4.00


ROW 120.00
TCS_D (2x3 Lane Expressway with Raised Median with Service Road of 7 Mt &
3.75 Width Carriageway on either side )

Total
Width Width
Pavement Composition Thickness Unit Width
LHS (mt) RHS (mt)
(mt)
BC 50 mm 15.00 15.00 30.00
DBM 115 mm 15.00 15.00 30.00
WMM 250 mm 15.50 15.50 31.00
GSB 200 mm 20.03 20.03 40.06
Subtotal 615 mm
Subgrade(Selected Earth) 500 mm 20.73 20.73 41.46
Total 1115 mm 0.00
1.115 m 0.00
Selected Earth Shoulder 415 mm 2.42 2.42 4.83
Median Filling 415 mm 2.00 2.00 4.00
Median Filling with Agricultural soil 200 mm 1.75 1.75 3.50
Carriageway discription
Carriageway m 11.250 11.250 22.50
Paved shoulder m 3.000 3.000 6.00
Edge strip m 0.750 0.750 1.50
Median width m 2.750 2.75 5.50
Earthen Shoulder m 2.000 2.000 4.00
Median Filling m 2.000 2.000 4.00
ROW 120.00

Service Road 7 mt Width3.75 Width


BC 25 mm 7.00 3.75 10.75

DBM 50 mm 7.00 3.75 10.75

WMM 225 mm 7.45 4.20 11.65

GSB 150 mm 10.50 9.00 19.50


Subtotal 450 mm 0.00
Subgrade(Selected Earth) 500 mm 11.80 10.30 22.10
Total 950 mm 0.00 0.00

0.95 m 0.00 0.00


Embankment Top 12.80 11.30 24.10
Selected Earth Shoulder 300 mm 2.60 4.35 6.95
Carriageway discription 0.00
Carriageway m 7.00 3.750 10.75
Earthen Shoulder m 2.00 3.75 5.75
TCS_C (2x2 Lane Expressway with 4.5 mt Median without Service Road)

Width Width Total


Pavement Composition Thickness Unit
LHS RHS Width

BC 50 mm 11.25 11.25 22.50


DBM 115 mm 11.25 11.25 22.50
WMM 250 mm 13.25 13.25 26.50
GSB 200 mm 15.28 15.28 30.56
Subtotal 615 mm
Subgrade(Selected Earth) 500 mm 15.98 15.98 31.96
Total 1115 mm
1.115 m
Selected Earth Shoulder 415 mm 1.92 1.92 3.83

Carriageway discription
Carriageway m 7.500 7.500 15.00
Paved shoulder m 3.000 3.000 6.00
Edge strip m 0.750 0.750 1.50
Median width m 1.500 1.500 3.00
Earthen Shoulder m 1.500 1.500 3.00
Median Shoulder m 0.000 0.000 2.00
ROW 90.00
Sl. No. Chainage Propose Structure Span Arrangement (m) Structure Width
1 1+070 ROB 1 x 19.2 + 1 x 43.2 + 1 x 19.2 88.6
2 31+065 ROB 1 x 19.2 + 1 x 39.2 + 1 x 19.2 84.6
3 0+525 Flyover 2 x 30.0 x 5.5 67
4 3+245 Flyover 2 x 30.0 x 5.5 67
5 30+700 Flyover 2 x 30.0 x 5.5 67
6 36+860 Flyover 2 x 30.0 x 5.5 67
7 15+170 VUP 1 x 12.0 x 5.5 13.5
8 20+530 VUP 1 x 12.0 x 5.5 13.5
9 25+830 VUP 1 x 12.0 x 5.5 13.5
10 27+095 VUP 1 x 12.0 x 5.5 13.5
11 34+990 VUP 1 x 12.0 x 5.5 13.5
12 4+230 LVU 1 x 10.5 x 4.3 12
13 5+395 LVU 1 x 10.5 x 4.3 12
14 6+550 LVU 1 x 10.5 x 4.3 12
15 8+350 LVU 1 x 10.5 x 4.3 12
16 9+950 LVU 1 x 10.5 x 4.3 12
17 11+550 LVU 1 x 10.5 x 4.3 12
18 12+450 LVU 1 x 10.5 x 4.3 12
19 14+090 LVU 1 x 10.5 x 4.3 12
20 16+675 LVU 1 x 10.5 x 4.3 12
21 18+550 LVU 1 x 10.5 x 4.3 12
22 21+180 LVU 1 x 10.5 x 4.3 12
23 22+550 LVU 1 x 10.5 x 4.3 12
24 23+265 LVU 1 x 10.5 x 4.3 12
25 24+310 LVU 1 x 10.5 x 4.3 12
26 28+785 LVU 1 x 10.5 x 4.3 12
27 29+905 LVU 1 x 10.5 x 4.3 12
28 32+535 LVU 1 x 10.5 x 4.3 12
29 39+550 LVU 1 x 10.5 x 4.3 12
30 2+065 PUP 1 x 7.0 x 3.0 8
31 15+890 PUP 1 x 7.0 x 3.0 8
32 27+520 PUP 1 x 7.0 x 3.0 8
33 35+490 PUP 1 x 7.0 x 3.0 8
34 38+150 PUP 1 x 7.0 x 3.0 8
35 4+405 Minor Bridge 1 x 19.0 20.5
36 9+580 Minor Bridge 2 x 16.0 33.5
37 11+770 Minor Bridge 1 x 21.0 22.5
38 13+675 Minor Bridge 3 x 18.0 49.5
39 14+630 Minor Bridge 1 x 12.0 13.5
40 14+910 Minor Bridge 1 x 18.0 19.5
41 17+575 Minor Bridge 1 x 20.0 21.5
42 19+425 Minor Bridge 1 x 12.0 13.5
43 20+865 Minor Bridge 1 x 21.0 22.5
44 21+665 Minor Bridge 1 x 22.0 23.5
45 24+550 Minor Bridge 1 x 12.0 13.5
46 26+185 Minor Bridge 1 x 21.0 22.5
47 26+855 Minor Bridge 1 x 16.0 17.5
48 27+600 Minor Bridge 2 x 16.0 33.5
49 30+940 Minor Bridge 1 x 22.0 23.5
50 32+710 Minor Bridge 1 x 12.0 13.5
51 33+650 Minor Bridge 1 x 12.0 13.5
52 34+310 Minor Bridge 1 x 14.0 15.5
53 36+390 Minor Bridge 1 x 15.0 16.5
54 37+525 Minor Bridge 1 x 12.0 13.5
55 37+880 Minor Bridge 1 x 16.0 17.5
-0+060 295 Ramp Section
0+295 1+286 0+991 141.6
30470 31279 809 181.6

1205.2

295 295
495 495
555 555
755 805 84
800 42
853 803
1028 1028
1070 1070
1112 1112
1287 1287
RE Wall Skew Skew of Side
SPL 5
SPL 10 LHS
SPL Straight
400 21 LHS
SPL Straight
400 Straight
16 LHS
Straight
20 RHS
5 RHS
27 LHS
22 LHS
10 LHS
20 RHS
33 RHS
28 RHS
Straight
6 LHS
18 RHS
Straight
7 RHS
16 RHS
5 LHS
20 LHS
10 LHS
Straight
27 RHS
12 RHS
Straight
Straight
Straight
2 LHS
Straight
Straight
47 LHS
Straight
30 RHS
Straight
Straight
35 LHS
11 LHS
22 LHS
10 RHS
5 LHS
Straight
31 RHS
9 RHS
Straight
27 RHS
Straight
Straight
Straight
39 LHS
9 LHS
12 RHS
0+355
0+849
0+627

2631.8

30470 200
30670
30730
30920 190
MB
30960
65
31025
31105
31280 175
Remark
Railway Crossing
Railway Crossing
NH-731/NH-56 crossing (Trumpet Junction) Diamond Type
NH-24A crossing Junction with
NH-56 crossing Toll Booth
SH-13 crossing (Diamond Type Junction with Toll Booth) Four Loop
Ramp on 4
BT Road
nos. of Box
BT Road Culvert
BT Road (Size-1 x 3.0 x
BT Road 3.0)
BT Road
WBM Road
BT Road
BT Road
BT Road
BT Road
WBM Road
Cart Track
Cart Road
WBM Road
WBM Road

BT Road
WBM Road
WBM Road
WBM Road
WBM Road
WBM Road
WBM Road
Earthen Road
Earthen Road
Earthen Road
Earthen Road

Canal 1.5
River Stream
Nalla Bridge
Nalla
Nalla Bridge+Road
Nalla Bridge
Canal Bridge+Road
Canal Bridge+Road
Nalla Bridge
Canal Bridge+Road
Nala Bridge, (Nala to be trained from 24+360 to 24+555 RHS) Extra
ROW Provision
Nalla Bridge
Canal Bridge+ Road
Nalla Bridge
Canal Bridge+Road
Nala
Canal Bridge+Road
Canal Bridge+Road
Canal Bridge
Nala Bridge
Canal Bridge

31.025
Vertical
height from Structure
Chainage Propose Structure Span Arrangement Remark GL Width
0.525 FO 2 x 30.0 x 5.5 NH-56 crossing, Straight 8.646 60.00
1.070 ROB 1 x 19.2 + 1 x 37.2 + 1 x 19.2 Rail Line, Straight 9.848 90.00
1.480 Box Culvert 1 x 3.0 x 3.0
2.065 PUP 1 x 7.5 x 3.0 Earthen Road, Straight 3.996 7.50
2.575 Box Culvert 1 x 2.0 x 2.0
3.015 Box Culvert 1 x 2.0 x 2.0
3.245 FO 2 x 30.0 x 5.5 NH-24A crossing, Skew 21 8.646 60.00
3.530 Box Culvert 1 x 3.0 x 3.0
4.105 Box Culvert 1 x 2.0 x 2.0
4.230 LVU 1 x 10.5 x 4.3 WBM Road, Skew 21.5 4.746 10.50
4.405 Minor Bridge 1 x 16.0 Canal, Straight (Needs Canal Trai 39 16.00
5.125 Box Culvert 1 x 3.0 x 3.0
5.395 LVU 1 x 10.5 x 4.3 BT Road, Skew 9.752 4.746 10.50
5.695 Box Culvert 1 x 2.0 x 2.0
6.145 Box Culvert 1 x 3.0 x 3.0
6.550 LVU 1 x 10.5 x 4.3 BT Road, Skew 20 4.746 10.50
6.680 Box Culvert 1 x 3.0 x 3.0
7.060 Box Culvert 1 x 3.0 x 3.0
7.365 Box Culvert 1 x 2.0 x 2.0
7.940 Box Culvert 1 x 3.0 x 3.0
8.350 LVU 1 x 10.5 x 4.3 BT Road, Skew 33 4.746 10.50
8.730 Box Culvert 1 x 2.0 x 2.0
9.180 Box Culvert 1 x 3.0 x 3.0
9.580 Minor Bridge 2 x 16.0 River Stream, Straight 5.762 32.00
9.725 Box Culvert 1 x 2.0 x 2.0
9.950 LVU 1 x 10.5 x 4.3 BT Road, Skew 28.302 4.746 10.50
10.165 Box Culvert 1 x 3.0 x 3.0
10.695 Box Culvert 1 x 3.0 x 3.0
11.010 Box Culvert 1 x 2.0 x 2.0
11.565 LVU 1 x 10.5 x 4.3 WBM Road, Straight 4.746 10.50
11.770 Minor Bridge 1 x 18.0 Nalla Bridge, Skew 34.558 5.962 18.00
12.200 Box Culvert 1 x 3.0 x 3.0
12.450 LVU 1 x 10.5 x 3.5 Newly Added based on Discussion of UPIDA 10.50
12.850 Box Culvert 1 x 2.0 x 2.0
13.250 Box Culvert 1 x 3.0 x 3.0
13.675 Minor Bridge 3 x 18.0 Nalla, Straight 5.962 54.00
13.975 Box Culvert 1 x 3.0 x 3.0
14.380 Box Culvert 1 x 2.0 x 2.0
14.630 Minor Bridge 1 x 12.0 Nalla Bridge+Road (5.5m Ht.) 7.362 12.00
14.090 LVU 1 x 10.5 x 4.3 Cart Road, Skew 18 4.746 10.50

15.170 VUP 1 x 12.0 x 5.5 BT Road, Skew 16.341 6.746 12.00


15.550 Box Culvert 1 x 2.0 x 2.0
15.890 PUP 1 x 7.5 x 3.0 Earthen Road, Straight 3.996 7.50
15.930 Box Culvert 1 x 3.0 x 3.0
16.430 Box Culvert 1 x 2.0 x 2.0
16.675 LVU 1 x 10.5 x 4.3 WBM Road, Straight 4.746 10.50
17.150 Box Culvert 1 x 2.0 x 2.0
17.575 Minor Bridge 1 x 16.0 Canal Bridge+Road, Skew 10.513 7.762 16.00
17.920 Box Culvert 1 x 3.0 x 3.0
18.250 Box Culvert 1 x 2.0 x 2.0
18.550 LVU 1 x 10.5 x 4.3 WBM Road, Skew 7.2 4.746 10.50
19.150 Box Culvert 1 x 2.0 x 2.0
19.425 Minor Bridge 1 x 12.0 Canal Bridge+Road, Skew 22 7.362 12.00
19.745 Box Culvert 1 x 3.0 x 3.0
20.250 Box Culvert 1 x 2.0 x 2.0
20.530 VUP 1 x 12.0 x 5.5 BT Road, Straight 6.746 12.00
20.650 Box Culvert 1 x 2.0 x 2.0
20.865 Minor Bridge 1 x 21.0 Nalla Bridge, Skew 10 6.262 21.00
21.180 LVU 1 x 10.5 x 3.5 Change from Box to LVU by UPEIDA 10.50
21.665 Minor Bridge 1 x 16.0 Canal Bridge+Road, Skew 5 (5.5m 7.762 16.00
22.155 Box Culvert 1 x 2.0 x 2.0
22.550 LVU 1 x 10.5 x 4.3 BT Road, Skew 5.228 4.746 10.50
22.930 Box Culvert 1 x 2.0 x 2.0
23.265 LVU 1 x 10.5 x 4.3 WBM Road, Skew 19.571 4.746 10.50
23.630 Box Culvert 1 x 2.0 x 2.0
24.040 Box Culvert 1 x 3.0 x 3.0
24.310 LVU 1 x 10.5 x 4.3 WBM Road, Skew 10.368 4.746 10.50
24.550 Minor Bridge 1 x 12.0 Canal Bridge, Straight 7.362 12.00
24.905 Box Culvert 1 x 3.0 x 3.0
25.390 Box Culvert 1 x 2.0 x 2.0
25.830 VUP 1 x 12.0 x 5.5 BT Road, Skew 20.114 6.746 12.00
26.000 Box Culvert 1 x 2.0 x 2.0
Vertical
height from Structure
Chainage Propose Structure Span Arrangement Remark GL Width
26.185 Minor Bridge 1 x 21.0 Nalla Bridge, skew 31.062 21.00
26.480 Box Culvert 1 x 2.0 x 2.0
26.855 Minor Bridge 1 x 12.0 Canal Bridge+ Road, Skew 9.307 (5 7.362
27.095 VUP 1 x 12.0 x 5.5 BT Road, Skew 5.03 6.746 12.00
27.330 Box Culvert 1 x 2.0 x 2.0
27.520 PUP 1 x 7.5 x 3.0 Earthen Road, Skew 1.9761 3.996
27.600 Minor Bridge 2 x 16.0 Nalla Bridge, Straight 32.00
27.750 Box Culvert 1 x 3.0 x 3.0
28.500 Box Culvert 1 x 2.0 x 2.0
28.785 LVU 1 x 10.5 x 4.3 WBM Road, Straight 4.746 10.50
29.060 Box Culvert 1 x 2.0 x 2.0
29.510 Box Culvert 1 x 3.0 x 3.0
29.905 LVU 1 x 10.5 x 4.3 WBM Road, Skew 27.337 4.746 10.50
30.115 Box Culvert 1 x 2.0 x 2.0
30.500 Box Culvert 1 x 2.0 x 2.0
30.700 FO 2 x 30.0 x 5.5 NH-56 crossing, Straight 60.00
30.940 Minor Bridge 1 x 16.0 Canal Bridge+Road, skew 26.772 ( 7.762 16.00
31.065 ROB 1 x 19.2 + 1 x 31.2 + 1 x 19.2 Rail Line, Skew 9.2314 9.848 90.00
31.560 Box Culvert 1 x 3.0 x 3.0
32.145 Box Culvert 1 x 2.0 x 2.0
32.535 LVU 1 x 10.5 x 4.3 WBM Road, Skew 11.929 4.746 10.50
32.710 Minor Bridge 1 x 12.0
33.040 Box Culvert 1 x 3.0 x 3.0
33.650 Minor Bridge 1 x 12.0 Canal Bridge+Road, Straight 7.362 12.00
34.080 Box Culvert 1 x 2.0 x 2.0
34.310 Minor Bridge 1 x 12.0 Canal Bridge+Road, Straight (5.5m 7.362 12.00
34.580 Box Culvert 1 x 2.0 x 2.0
34.990 VUP 1 x 12.0 x 5.5 BT Road, Skew 26.87 6.746 12.00
35.170 Box Culvert 1 x 3.0 x 3.0
35.490 PUP 1 x 7.5 x 3.0 Earthen Rad,Straight 3.996
36.105 Box Culvert 1 x 2.0 x 2.0
36.390 Minor Bridge 1 x 12.0 39 12.00
36.620 Box Culvert 1 x 2.0 x 2.0
36.860 FO 2 x 30.0 x 5.5 SH-13 crossing, Straight 60.00
37.220 Box Culvert 1 x 2.0 x 2.0
37.525 Minor Bridge 1 x 12.0 Canal Bridge, Skew 9.201 7.362 12.00
37.720 Box Culvert 1 x 2.0 x 2.0
37.880 Minor Bridge 1 x 16.0 Canal Bridge, Skew 11.513 7.762 16.00
38.070 Box Culvert 1 x 3.0 x 3.0
38.150 PUP 1 x 7.5 x 3.0 Newly Added based on Discussion of UPIDA 7.50
38.700 Box Culvert 1 x 2.0 x 2.0
39.350 Box Culvert 1 x 3.0 x 3.0
39.550 LVU 1 x 10.5 x 4.3 WBM Road, Straight 4.746 10.50
40.175 Box Culvert 1 x 3.0 x 3.0
(Package-I): From Chand Sarai (Dist. Lucknow) to Sansara (Dist. Barabanki) (Km -0.270 to Km 40.200)
Bill No. 13 -Median Opening Cost No 2.0
Item Bredth/A
Description Unit No Length Depth Quantity Rate(Rs) Amount(Rs)
No. rea
Construction of Sub grade & earthen / un paved shoulders
satisfying the requirements of minimum 8% CBR value as
1 indicated in the drawings and specification with approved material cum 2.0 1012.5 0.50 1013 308.00 311,850
with all leads & lifts all complete as per Technical Specification
Clause No 305.

Granular Sub-Base with Close Graded Material (Table:- 400-1)


Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage of
2 cum 2.0 1012.5 0.15 304 3869.00 1,175,209
mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause 401

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
3 the Material with water at OMC in mechanical mix plant carriage of cum 2.0 1012.5 0.3 506 4133.00 2,092,331
mixed Material by tipper to site, laying in uniform layers with paver
in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.

Providing and laying bituminous primer coat over prepared surface


4 of grannular base with bituminous emulsion complete as per cum 2.0 1012.5 0 22.00 -
Technical Specifications Clause No 502.(Table 500-1)
Providing and laying Tack coat over granular surface with
5 bituminous emulsion all complete as per Technical Specifications cum 2.0 1012.5 0 8.00 -
Clause 503.(Table 500-2) @ 2.5 kg /10 sq.m.

Dense Graded Bituminous Macadam


Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder (VG-40) @ 4.0 to 4.5 per cent by
6 weight of total mix and filler, transporting the hot mix to work site, cum 2.0 1012.5 0.05 101 8787.00 889,684
laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as
per MoRTH specification clause No. 507 complete in all respects.
Grading - I 40 mm (Nominal Size)

Bituminous Concrete with CRMB/PMB


Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed
with bituminous binder (CRMB/PMB) @ 5.4 to 5.6 per cent of mix
7 and filler, transporting the hot mix to work site, laying with a cum 2.0 1012.5 0.025 51 9380.00 474,863
hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 509 complete in all respects
Grading - I-19 mm (Nominal Size)

Providing Plain Cement Concrete of M20 grade for Kerbs


including form work , machinery, labour , material and all leads
8 Lm 128 431.00 55,168
and lifts etc. complete as per drawing and Technical Specification
Sections 408 1500, 1700
Providing Plain Cement Concrete M15 in foundation, of
drain,brest wall and retainingwall including cost of all
9 materials, labour, mixing transportation, placing, cum 8 5963.00 50,089
vibration,curing etc as per Technical Specification Sections
1400, 1700
100 mm Dia Ms Pipe (Removable) @ 1.5 mt C/C of 1.2 mt
10 Lm 42.0 1.5 63 1500.00 94,500
ht
11 Barrier Post - Steel Lm 80 1000.00 80,000
Total 5,223,693