Approach length
Span Arrangement (c/c of exp) 2x 15 3.50 x 2 = 7.00m 16.5
Total length of bridge 30 0.020 m exp gap each side 30.04
No. of Long. Girders 3
No. of Cross Girders 3
Superstructure Details
Deck Width 8.45 Spacing between Girders= 2.5
Carriageway Width 7.50 Cantilever 1.725
Thickness of deck slab 0.210
Total Depth of Superstructure 1.500
Longitudinal Girder
Length of End Portion 1.000
Length of Tapered Portion 1.500
Length of Mid Portion 9.4
Cross Girder
Length of Cross Girder 5.000 Area of Cross Girder 0.2655
Page 1 of 31
Depth/
Sl. SDB MORD Length Width
Item Description Unit Nos Height Quantity
No. Sl. No. Ref No. (m) (m)
(m)
FOUNDATION
1 11.1 300 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specifications Clause
305.1 including setting out, construction of
shoring and bracing, removal of stumps and
other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable
material.
I. Ordinary Soil
i) Upto 3m depth
Abutment Cum 2 9.70 9.00 3.15 549.99
Pier Cum 1 9.50 9.50 3.15 284.29
ii) 3m to 6m depth
Page 2 of 31
6 12.22 Providing steel liner 10 mm thick for curbs and
6mm thick for steining of wells including
fabricating and setting out as per detailed
drawing
i Abutment or Pier Location t 8.50 0.00 0.15 0.00
Sub-Total = t 0.00
SUBSTRUCTURE
5 13.5 1500, R.C.C. grade M-35 in Substructure complete as
(H) 1700 & per Dwg & Tech Specification
(MoRT 2100
&H) A For Abutments (A1 & A2)
From 5m upto 10m height
(a) Dirt Wall cum 2 8.45 0.3 1.909 9.679
(b) Bracket
(i) Bracket rectangle portion cum 2 7.55 0.30 0.18 0.815
(ii) Bracket triangle portion cum 2 7.55 0.30 0.12 0.272
(c) Pedestals
i) On Edges cum 4 0.70 0.70 0.05 0.098
4x 4 ii) At Centre cum 2 0.70 0.70 0.109 0.107
Sub-Total = cum 10.97
Upto 5m height
(d) Abutment Cap
i) 1st Rect. portion cum 2 1.24 8.700 0.40 8.630
iii) Triangular portion cum 2 1.02 8.70 0.40 3.550
(e) Abutment Shaft cum 2 8.70 1.00 3.287 57.194
Sub-Total = cum 69.37
B For Piers
From 5m upto 10m height
(a) Pedestals
i) On Edges cum 4 0.70 0.70 0.05 0.098
ii) At Centre cum 2 0.70 0.70 0.109 0.107
Sub-Total = cum 0.20
Upto 5m height
(b) Pier Cap
i) 1st Rect. portion cum 1 6.00 2.00 0.80 9.600
iii) Trepozoidal portion cum 1 3.90 2.00 0.80 3.120
(c) Pier Shaft (Rounded) cum 1 2.02 2.79 5.64
Sub-Total = cum 18.36
Page 3 of 31
9 13.16 Supplying, fitting and fixing in position true to
(MoRT line and level POT-PTFE bearing consisting of a
&H) metal piston supported by a disc or unreinforced
elastomer confined within a metal cylinder,
sealing rings, dust seals, PTFE surface sliding
against stainless steel mating surface,
completre assembly to be of cast
steel/fabricated structural steel, metal and
elastomer elements to be as per IRC: 83 part-I &
II respectively and other parts conforming to BS:
5400, section 9.1 & 9.2 and clause 2006 of
MoRTH Specifications complete asper drawing
and approved technical specifications.
Nos 0 - - - - 0
Page 4 of 31
SUPERSTRUCTURE
11 13.1 800 Providing and laying reinforced cement concrete
in superstructure complete as per drawing and
technical specifications Clauses 800, 1205.4
and 1205.5.
RCC M-35
i) Longitudinal Girder cum Area Length
(a) End Uniform Section cum 12 0.94 1.000 11.280
(b) Tappered Section cum 12 0.765 1.500 13.770
(c) Mid Uniform Section cum 6 0.59 9.4 33.382
ii) Cross Girder cum
(a) End Cross Girder cum 4 0.2655 5.000 5.310
(b) Intermediate Cross Girder cum 2 0.2655 5.000 2.655
iii) Deck Slab cum 2 2.0394 15 61.182
Sub-Total = cum 127.58
Page 5 of 31
PROTECTION WORK
Page 6 of 31
Detailed Estimate for Construction of 2 x 3.855 m x 1.50 m R.C.C Culvert
Name of Work Construction of Road from Marotolia to Barkrakocha road
SL.
No. DESCRIPTION QTY UNIT RATE AMOUNT
2x2.6x7.5x0.30 = 11.700
Total = 317.074 m3
2x10.71x0.725x0.60 = 9.318 m3
2x10.71x0.525x0.60 = 6.747 m3
1xpi/4x(1.652+0.752)/2x2.375 = 3.065 m3
2x10.71x3.00x0.15 = 9.639 m3
2x7.5x5.325x0.425 = 33.947 m3
1x7.5x10x0.075 = 11.250 m3
2x10.71x3.00x0.15 = 9.639 m3
Sides of abutment
4x5.30x0.60 = 12.720 m4
4x(2.025+0.60)/2x3.0 = 15.750 m5
Ordinary Soil
Sub-Total = m 75.35
Sub-Total = t 17.32
5
Providing and laying PCC M15 in Flooring Cum 1 4.40 8.45 0.15 1.27
Ordinary Soil
SUBSTRUCTURE
7
R.C.C. grade M-35 in Substructure complete
as per Dwg & Tech Specification
Abutment Cap
i) 1st Portion Cum 2 8.45 0.40 0.30 2.03
For Piers
Cum
Pier Shaft Cum 1 8.45 1.58 1.28 10.77
Ordinary Soil
9 Providing weepholes in brick masonry/stone
masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC
pipe extending through the full width of the
structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and
technical specification Clauses 614, 709,
1204.3.7
Ordinary Soil
SUPERSTRUCTURE
12 Providing and laying reinforced cement
concrete in superstructure complete as per
drawing and technical specifications Clauses
800, 1205.4 and 1205.5.
RCC M-35
Deck Slab Cum 2 8.45 3.00 0.30 15.21
Sub-Total = Cum 15.21
CEMENT PLASTER
Ordinary Soil
#REF!
Abstract
Remark FILL CUT Total
#REF! 563.01 110.67 673.68
#REF! 401.41 408.45 809.86
#REF!
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item
D No. RETAINING WALL
47 Excavation for structures in ordinary
soil (Earth work in excavation of
foundation of structures as per
drawing and technical specification,
12.1 (I) including setting out, construction of
B shoring and bracing, removal of
stumps and other deleterious matter,
dressing of sides and bottom and
bockfilling with approved material)
Mechanical means
#REF!
6 m Height Retaining Wall cum 2 10.8 6.1 2.1 138.35 276.7
#REF!
6 m Height Retaining Wall cum 2 10.8 6.1 2.1 138.35 276.7
4 m Height Retaining Wall cum 2 10.8 3.80 2.1 86.18 172.4
Total 0.0
#REF!
#REF!
Total 0.0
#REF!
6 m Height Retaining Wall
#REF!
6 m Height Retaining Wall
Total 0.0
#REF!
Total 0.0
51 12.40 Supplying , fitting and placing un- tonne Foundation 14.39 0.0
coated HYSD bar reinforcement in
foundation complete as per drawing
and technical specifications
52 13.6 Supplying , fitting and placing HYSD tonne Substructure 14.31 0.0
bar reinforcement in sub-structure
complete as per drawing and technical
specifications
53 15.5 Providing and laying Filter material
#REF!
#REF!
BILLS OF QUANTITIES
#REF!
STEEL CALCULATION
Foundation Sub-Structure
#REF!
0.30
5.00 6.00
0.40
1.00 0.60
5.30
Typical Diagram of Retaining Wall
SL. Spacing
Bar Marked as Dia (mm)
No. (mm)
0.30
3.00 4.00
0.40
1.00 0.60
3.00
Typical Diagram of Retaining Wall
SL. Spacing
Bar Marked as Dia (mm)
No. (mm)
1 a 10 200 10T @ 200mm c/c
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (Kg) (Kg)
B Bottom
Foundation a 10 200 3800 1000 75 4225 450 4.68 6 0.62 17.31 Longitudinal
L Heel
B Bottom
Foundation c 16 125 2300 1000 75 2725 450 3.18 8 1.58 40.14 Longitudinal
L in Toe
B B Bottom
Foundation b 10 200 1000 3800 75 1000 450 1.90 20 0.62 23.46 Transverse
L Heel
B B Bottom
Foundation d 10 150 1000 2300 75 1000 450 1.90 17 0.62 19.94 Transverse
L Toe
Heel Top
Foundation e 16 125 3827 1000 75 4252 450 4.70 8 1.58 59.44
Longitudinal
Toe Top
Foundation g 10 200 2352 1000 75 2777 450 3.23 6 0.62 11.95
Longitudinal
B B
Heel Top
Foundation d 10 150 1000 3827 75 1000 450 1.90 27 0.62 31.67
Transeverse
L
B B
Toe Top
Foundation b 10 200 1000 2352 75 1000 450 1.90 13 0.62 15.25
Transeverse
L
Abutment
k B B Shaft Earth
Shaft -earth 16 125 6000 1000 75 5850 650 6.50 8 1.58 82.17
L Face,
face
Vertical
Abutment
L-
B B Shaft Water
Shaft remote 16 125 6000 1000 75 5850 650 6.50 8 1.58 82.17
L Face,
face
Vertical
Abutment
B B Shaft Earth
Shaft m 10 150 1000 5000 75 850 400 1.25 34 0.62 26.23
L Face,
Transverse
Abutment
B B Shaft Water
Shaft n 10 150 1000 5000 75 850 400 1.25 34 0.62 26.23
L Face,
Transverse
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (Kg) (Kg)
B Bottom
Foundation a 10 200 2000 1000 75 2425 450 2.88 6 0.62 10.65 Longitudinal
L Heel
B Bottom
Foundation c 16 125 1500 1000 75 1925 450 2.38 8 1.58 30.02 Longitudinal
L in Toe
B B Bottom
Foundation b 10 200 1000 2000 75 1000 450 1.90 11 0.62 12.90 Transverse
L Heel
B B Bottom
Foundation d 10 150 1000 1500 75 1000 450 1.90 11 0.62 12.90 Transverse
L Toe
Heel Top
Foundation e 16 125 2052 1000 75 2477 450 2.93 8 1.58 37.01
Longitudinal
Toe Top
Foundation g 10 200 1577 1000 75 2002 450 2.45 6 0.62 9.08
Longitudinal
B B
Heel Top
Foundation d 10 150 1000 2052 75 1000 450 1.90 15 0.62 17.59
Transeverse
L
B B
Toe Top
Foundation b 10 200 1000 1577 75 1000 450 1.90 9 0.62 10.56
Transeverse
L
k B B Abutment
RE wall -earth 16 125 4000 1000 75 3850 650 4.50 8 1.58 56.89 Shaft Earth
face L Face, Vertical
L- Abutment
RE wall remote 16 125 4000 1000 75 B B 3850 650 4.50 8 1.58 56.89 Shaft Water
face L Face, Vertical
Abutment
B B Shaft Earth
RE wall m 10 150 1000 3000.00 75 850 250 1.10 20 0.62 13.58
L Face,
Transverse
Abutment
B B Shaft Water
RE wall n 10 150 1000 3000 75 850 250 1.10 20 0.62 13.58
L Face,
Transverse
#REF!
QUANTITY CALCULATION
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height L×B×H QTY
No. Item No.
D HUME PIPE CULVERT
Total 0.000
Supplying , fitting and placing un-coated HYSD bar
reinforcement in foundation complete as per drawing
60 12.40 and technical specifications tonne 2 Hume Pipe 0.126 0.000
###
#REF!
#REF!
SL. NH Sch.
DESCRIPTION No. Length Breadth Height L×B×H QTY
No. Item No.
62 Excavation for structures in ordinary
soil (Earth work in excavation of foundation
of structures as per drawing and technical
12.1 (I) A specification, including setting out,
(i) construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material) Mechanical means.
i) Curtain Wall (Type I) 1 7.4 2.45 2.65 48.04 48.04
ii) Curtain Wall (Type II) 1 7.4 2.1 2.15 33.41 33.41
iii) Apron 1 7.4 9 1.05 69.93 69.93
iv) Wing Wall
4 3.82 2.810 6.84 73.42 293.68
Total 0.00
63 12.8A Plain/Reinforced cement concrete in open
foundation complete as per drawing and
technical specification, (PCC Grade M15)
i) Box Culvert
1 3.6 8.45 0.15 4.56 4.56
#REF!
BOX CULVERT (2.00M x 2.00M)
SL. NH Sch.
DESCRIPTION UNIT QTY RATE AMOUNT
No. Item No.
62 Excavation for structures in Ordinary soil
(Earth work in excavation of foundation of
structures as per drawing and technical
12.1 (I) A specification, including setting out,
cum 0.00 63 0
(i) construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material) Mechanical means.
63 12.8A Plain/Reinforced cement concrete in open
foundation complete as per drawing and cum 0.00 3852 0
technical specification, (PCC Grade M15)
64 12.8 C Plain/Reinforced cement concrete in open
foundation complete as per drawing and
cum 0.00 4337 0
technical specification, (RCC Grade M 20
using Concrete Mixer)
65 14.10 PCC M-15 Grade Levelling Course below
Approach Slab complete as per drawing and cum 0.00 3706 0
Technical specification
66 14.11 Approach Slab (M30 Grade) including
reinforcement and formwork complete as per cum 0.00 7952 0
drawing and Technical specification.
67 14.7 Construction of railing of M30 grade in-situ
with 20mm nominal size aggregate, true to
line and grade, tolurence of vertical RCC post
not to exceed 1 in 500, centre to centre
spacing between vertical post not to exceed metre 0.00 1664 0
2000 mm, leaving adequate space between
vertical post for expansion, complete as per
approved drawings and technical
specificatoins.
68 13.8 Providing weep holes in Brick masonry/ Plain/
Reinforced concrete abutment, wing wall/
return wall with 100 mm dia AC pipe,
extending through the full width of the Each 0.00 128 0
structure with slope of 1V:20H towards
drawing face. Complete as per drawing and
technical specification.
69 14.9 Providing drainage spout complete as per
Each 0.00 885 0
drawing and technical specification
70 15.4A Providing and laying Pitching on slopes laid
over prepared filter media including boulder
apron laid dry in front of toe of embankment cum 0.00 1031 0
complete as per drawing and technical
specifications (Stone/Boulder)
71 15.5 Providing and laying Filter material under
pitching in slopes complete as per drawing
cum 0.00 1459 0
and technical specification
In Wing Wall
72 13.6 Supplying , fitting and placing HYSD bar
reinforcement in sub-structure complete as tonne 0.00 67721 0
per drawing and technical specifications
SUB TOTAL