STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Group Disclaimer
This document is issued for the party which commissioned it and for specific purposes connected with the above-captioned
project only. It should not be relied upon by any other party or used for any other purpose.We accept no responsibility for the
consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any
error or omission which is due to an error or omission in data supplied to us by other parties.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
TABLE OF CONTENTS
1. INTRODUCTION
2. SCOPE
4. REFERENCE DOCUMENTS
6. SEISMIC LOADS
7. WIND LOADS
8. LOAD CASES
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1. INTRODUCTION
This report contains Piping Stress Analysis performed for Pipeline from Jetty end to Pig Receiving station.
This document contains input parameters, code requirements, acceptance criteria, supports, environmental factors to
perform stress analysis of the said piping system. It provides the results of the analysis and comments on the same.
1. To ensure that the static & occasional stresses in the piping systems are within the permissible limits
defined by the applicable codes /standards, to check that piping deflections and slopes are within the
limits allowed or prescribed by the applicable codes and standards OR good engineering practices.
2. SCOPE
The scope of this document is to calculate the stresses, displacements, forces and moments acting on the
piping under various conditions/cases (e.g. sustained, expansion, operating and occasional cases) due to the
combined effect of internal pressure, maximum differential temperature, bending and external loads as applicable.
These calculations or analysis is performed on following lines.
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
IS-1893 (Part 1 & Part 4) Indian Standard: Criteria for Earthquake Resistant Design
of Structures
4. REFERENCE DOCUMENTS
SL NO DOCUMENT NO DESCRIPTION
20160521085523
3 SURVEY REPORT & SOIL DATA
Milennium Global Surveyors
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
2. The Design input parameters are referred from the reference documents as specified in system description.
4. The standard Guide / Limit stop gap is 3 mm. As per requirement of stress analysis, if there is any change in
Guide/Limit stop gap, the same is highlighted in Caesar snap at respective nodes.
8. Design Life
Stress Analysis shall be carried out for 25 years of design life (f=0.95).
9. Software used
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Operating Temperature -
Insulation thk. NA
Insulation density NA
Coefficient of friction
Steel on PTFE 0.1
Steel on Steel 0.3
Steel on Concrete 0.45
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
6) SEISMIC LOADS
The seismic analysis has been carried out as a Static Equivalent Method. The maximum acceleration has been
considered with 5% damping in the analysis in terms of gravitational acceleration as 0.21 g in Horizontal
direction.
Seismic zone have been considered in accordance with IS-1893 Part 4 as follows:
Category of structure for Importance factor = 2 Category Importance factor I = 1.75 %Damping: 5%
Damping Multiplication Factor = 1 Type of soil site = medium soil site Sa / g based on type of soil = 2.5
Response Reduction factor R = 12.0
7) WIND LOADS
N/A
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8) LOAD CASES
P1 = Design Pressure
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Table of Contents
LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS ................................................................................. 12
INPUT LISTING ........................................................................................................................................................... 13
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1 (HYD) WW+HP
2 (OPE) W+T1+P1
3 (SUS) W+P1
4 (OPE) W+T1+P1+U1
5 (OPE) W+T1+P1-U1
6 (OPE) W+T1+P1+U2
7 (OPE) W+T1+P1-U2
8 (OCC) L8=L4-L3
9 (OCC) L9=L5-L3
10 (OCC) L10=L6-L3
11 (OCC) L11=L7-L3
12 (OCC) L12=L3+L8
13 (OCC) L13=L3+L9
14 (OCC) L14=L3+L10
15 (OCC) L15=L3+L11
16 (EXP) L16=L2-L3
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PIPE DATA
-----------------------------------------------------------------------------
-----------------------------------------------------------------------------
From 10 To 30 DX= 4,950.946 mm. DZ= -698.665 mm.
B31.4 (2006) Sy= 241,311 KPa
Dia= 273.050 mm. Wall= 9.271 mm. Cor= 3.2000 mm.
GENERAL
T1= 38 C P1= 16.9300 bars PHyd= 25.3950 bars Mat= (305)API-5L B
E= 203,390,704 KPa EH1= 202,685,024 KPa EH2= 203,390,704 KPa
EH3= 203,390,704 KPa EH4= 203,390,704 KPa EH5= 203,390,704 KPa
EH6= 203,390,704 KPa EH7= 203,390,704 KPa EH8= 203,390,704 KPa
EH9= 203,390,704 KPa v = .292 Pipe Den= .0078334 kg./cu.cm.
Fluid Den= .0010000 kg./cu.cm. Insul Thk= .000 mm.
RESTRAINTS
Node 10 ANC
Node 30 +Y Mu = .30
UNIFORM LOAD
Vector1 in G-s X1 Dir = .21 g's Y1 Dir = .00 g's Z1 Dir = .00 g's
Vector2 in G-s X2 Dir = .00 g's Y2 Dir = .00 g's Z2 Dir = .21 g's
Vector3 in G-s X3 Dir = .00 g's Y3 Dir = .00 g's Z3 Dir = .00 g's
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 30 To 50 TP-1 DX= 2,029.054 mm. DZ= -286.335 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 88.943 Angle/Node @1= 44.47 49
Angle/Node @2= .00 48
-----------------------------------------------------------------------------
From 50 To 70 DX= 473.936 mm. DZ= 2,962.327 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 70 +Y Mu = .30
-----------------------------------------------------------------------------
From 70 To 90 DX= 789.894 mm. DZ= 4,937.213 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 90 +Y Mu = .30
-----------------------------------------------------------------------------
From 90 To 110 TP-2 DX= 317.169 mm. DZ= 1,982.460 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 90.355 Angle/Node @1= 45.18 109
Angle/Node @2= .00 108
-----------------------------------------------------------------------------
From 110 To 130 DX= 1,972.888 mm. DZ= -328.194 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 130 +Y Mu = .30
-----------------------------------------------------------------------------
From 130 To 150 DX= 5,425.447 mm. DZ= -902.535 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 150 +Y Mu = .30
-----------------------------------------------------------------------------
From 150 To 170 DX= 4,761.635 mm. DZ= -791.684 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 170 +Y Mu = .30
Node 170 Guide
-----------------------------------------------------------------------------
From 170 To 190 DX= 5,869.428 mm. DZ= -975.868 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 190 +Y Mu = .30
-----------------------------------------------------------------------------
From 190 To 210 DX= 5,966.035 mm. DZ= -992.334 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 210 +Y Mu = .30
Node 210 Guide
-----------------------------------------------------------------------------
From 210 To 230 DX= 5,861.471 mm. DZ= -974.946 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 230 +Y Mu = .30
-----------------------------------------------------------------------------
From 230 To 250 DX= 5,942.000 mm. DZ= -975.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 250 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 250 Guide
-----------------------------------------------------------------------------
From 250 To 270 DX= 5,854.000 mm. DZ= -974.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 270 +Y Mu = .30
-----------------------------------------------------------------------------
From 270 To 290 DX= 2,938.000 mm. DZ= -489.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 290 +Y Mu = .30
Node 290 Guide
-----------------------------------------------------------------------------
From 290 To 310 DX= 5,994.000 mm. DZ= -997.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 310 +Y Mu = .30
-----------------------------------------------------------------------------
From 310 To 330 DX= 5,985.000 mm. DZ= -995.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 330 +Y Mu = .30
Node 330 Guide
-----------------------------------------------------------------------------
From 330 To 350 DX= 5,927.000 mm. DZ= -986.000 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 350 +Y Mu = .30
-----------------------------------------------------------------------------
From 350 To 370 DX= 5,883.864 mm. DZ= -978.641 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 370 +Y Mu = .30
Node 370 Guide
-----------------------------------------------------------------------------
From 370 To 390 DX= 6,046.921 mm. DZ= -1,005.805 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 390 +Y Mu = .30
-----------------------------------------------------------------------------
From 390 To 410 DX= 2,939.671 mm. DZ= -488.602 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 410 +Y Mu = .30
Node 410 Guide
-----------------------------------------------------------------------------
From 410 To 430 DX= 5,916.688 mm. DZ= -984.284 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 430 +Y Mu = .30
-----------------------------------------------------------------------------
From 430 To 450 DX= 5,903.000 mm. DZ= -982.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 450 +Y Mu = .30
Node 450 Guide
-----------------------------------------------------------------------------
From 450 To 470 DX= 5,839.854 mm. DZ= -970.827 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 470 +Y Mu = .30
-----------------------------------------------------------------------------
From 470 To 490 DX= 5,901.729 mm. DZ= -981.281 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 490 +Y Mu = .30
Node 490 Guide
-----------------------------------------------------------------------------
From 490 To 510 DX= 5,945.299 mm. DZ= -989.015 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 510 +Y Mu = .30
-----------------------------------------------------------------------------
From 510 To 530 DX= 4,932.221 mm. DZ= -820.487 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 530 +Y Mu = .30
-----------------------------------------------------------------------------
From 530 To 550 TP-3 DX= 1,954.888 mm. DZ= -325.200 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 90.246 Angle/Node @1= 45.12 549
Angle/Node @2= .00 548
-----------------------------------------------------------------------------
From 550 To 570 TP-4 DX= -382.000 mm. DZ= -2,237.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 381.000 mm. (LONG) Bend Angle= 90.558 Angle/Node @1= 45.28 569
Angle/Node @2= .00 568
-----------------------------------------------------------------------------
From 570 To 590 DX= 986.988 mm. DY= -1,497.706 mm. DZ= -150.769 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 590 To 591 DX= 542.777 mm. DY= -823.638 mm. DZ= -82.913 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 590 X2 K= 963 N./cm. Yield K= 1 N./cm. Yield Force= 2,561 N.
Dir Vec= .5483 -.8321 -.0838
Node 590 X2 K= 137,688 N./cm. Yield K= 1 N./cm.
Yield Force= 366,187 N. Dir Vec= .1510 .0000 .9885
Node 590 X2 K= 137,688 N./cm. Yield K= 1 N./cm.
Yield Force= 366,187 N. Dir Vec= .8225 .5547 -.1256
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 591 To 592 DX= 209.555 mm. DY= -317.990 mm. DZ= -32.011 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 591 X2 K= 1,692 N./cm. Yield K= 1 N./cm. Yield Force= 4,499 N.
Dir Vec= .5483 -.8321 -.0838
Node 591 X2 K= 241,857 N./cm. Yield K= 1 N./cm.
Yield Force= 643,229 N. Dir Vec= .1510 .0000 .9885
Node 591 X2 K= 241,857 N./cm. Yield K= 1 N./cm.
Yield Force= 643,229 N. Dir Vec= .8225 .5547 -.1256
-----------------------------------------------------------------------------
From 592 To 610 DX= 666.138 mm. DY= -360.667 mm. DZ= -101.985 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 592 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= .8715 -.4719 -.1334
Node 592 X2 K= 208,337 N./cm. Yield K= 1 N./cm.
Yield Force= 554,083 N. Dir Vec= .1513 .0000 .9885
Node 592 X2 K= 208,337 N./cm. Yield K= 1 N./cm.
Yield Force= 554,083 N. Dir Vec= .4664 .8817 -.0714
-----------------------------------------------------------------------------
From 610 To 611 DX= 1,297.728 mm. DY= .000 mm. DZ= -198.927 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 610 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= .9885 .0000 -.1515
Node 610 X2 K= 233,627 N./cm. Yield K= 1 N./cm.
Yield Force= 621,342 N. Dir Vec= .1515 .0000 .9885
Node 610 Y2 K= 233,627 N./cm. Yield K= 1 N./cm.
Yield Force= 621,342 N.
-----------------------------------------------------------------------------
From 611 To 612 DX= 919.968 mm. DY= .000 mm. DZ= -141.020 mm.
RESTRAINTS
Node 611 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9885 .0000 -.1515
Node 611 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .1515 .0000 .9885
Node 611 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 612 To 613 DX= 919.968 mm. DY= .000 mm. DZ= -141.020 mm.
RESTRAINTS
Node 612 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9885 .0000 -.1515
Node 612 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .1515 .0000 .9885
Node 612 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 613 To 614 DX= 1,379.952 mm. DY= .000 mm. DZ= -211.531 mm.
RESTRAINTS
Node 613 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= .9885 .0000 -.1515
Node 613 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= .1515 .0000 .9885
Node 613 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 614 To 615 DX= 1,130.368 mm. DY= .000 mm. DZ= -173.272 mm.
RESTRAINTS
Node 614 X2 K= 2,471 N./cm. Yield K= 1 N./cm. Yield Force= 6,572 N.
Dir Vec= .9885 .0000 -.1515
Node 614 X2 K= 353,253 N./cm. Yield K= 1 N./cm.
Yield Force= 939,493 N. Dir Vec= .1515 .0000 .9885
Node 614 Y2 K= 353,253 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 939,493 N.
-----------------------------------------------------------------------------
From 615 To 616 DX= 1,379.952 mm. DY= .000 mm. DZ= -211.531 mm.
RESTRAINTS
Node 615 X2 K= 2,471 N./cm. Yield K= 1 N./cm. Yield Force= 6,572 N.
Dir Vec= .9885 .0000 -.1515
Node 615 X2 K= 353,253 N./cm. Yield K= 1 N./cm.
Yield Force= 939,493 N. Dir Vec= .1515 .0000 .9885
Node 615 Y2 K= 353,253 N./cm. Yield K= 1 N./cm.
Yield Force= 939,493 N.
-----------------------------------------------------------------------------
From 616 To 617 DX= 919.968 mm. DY= .000 mm. DZ= -141.020 mm.
RESTRAINTS
Node 616 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= .9885 .0000 -.1515
Node 616 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= .1515 .0000 .9885
Node 616 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 617 To 618 DX= 919.968 mm. DY= .000 mm. DZ= -141.020 mm.
RESTRAINTS
Node 617 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9885 .0000 -.1515
Node 617 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .1515 .0000 .9885
Node 617 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 618 To 619 DX= 919.968 mm. DY= .000 mm. DZ= -141.020 mm.
RESTRAINTS
Node 618 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9885 .0000 -.1515
Node 618 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .1515 .0000 .9885
Node 618 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 619 To 620 DX= 377.760 mm. DY= .000 mm. DZ= -57.906 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 619 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= .9885 .0000 -.1515
Node 619 X2 K= 233,627 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 621,342 N. Dir Vec= .1515 .0000 .9885
Node 619 Y2 K= 233,627 N./cm. Yield K= 1 N./cm.
Yield Force= 621,342 N.
-----------------------------------------------------------------------------
From 620 To 630 DX= 666.138 mm. DY= 360.667 mm. DZ= -101.985 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 620 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= .8715 .4719 -.1334
Node 620 X2 K= 208,337 N./cm. Yield K= 1 N./cm.
Yield Force= 554,083 N. Dir Vec= .1513 .0000 .9885
Node 620 X2 K= 208,337 N./cm. Yield K= 1 N./cm.
Yield Force= 554,083 N. Dir Vec= -.4664 .8817 .0714
-----------------------------------------------------------------------------
From 630 To 649 DX= 374.654 mm. DY= 568.519 mm. DZ= -57.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 630 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,485 N.
Dir Vec= .5483 .8321 -.0838
Node 630 X2 K= 241,089 N./cm. Yield K= 1 N./cm.
Yield Force= 641,189 N. Dir Vec= .1510 .0000 .9885
Node 630 X2 K= 241,089 N./cm. Yield K= 1 N./cm.
Yield Force= 641,189 N. Dir Vec= -.8225 .5547 .1256
-----------------------------------------------------------------------------
From 649 To 650 DX= 374.654 mm. DY= 568.519 mm. DZ= -57.231 mm.
RESTRAINTS
Node 650 X2 K= 958 N./cm. Yield K= 1 N./cm. Yield Force= 2,547 N.
Dir Vec= .5483 .8321 -.0838
Node 650 X2 K= 136,921 N./cm. Yield K= 1 N./cm.
Yield Force= 364,147 N. Dir Vec= .1510 .0000 .9885
Node 650 X2 K= 136,921 N./cm. Yield K= 1 N./cm.
Yield Force= 364,147 N. Dir Vec= -.8225 .5547 .1256
-----------------------------------------------------------------------------
From 650 To 670 DX= 990.012 mm. DY= 1,502.294 mm. DZ= -151.231 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.311 Angle/Node @1= 28.16 669
Angle/Node @2= .00 668
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 670 To 690 DX= 2,965.597 mm. DZ= -453.028 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 690 +Y Mu = .30
-----------------------------------------------------------------------------
From 690 To 710 TP-5 DX= 2,662.385 mm. DZ= -406.709 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 79.569 Angle/Node @1= 39.78 709
Angle/Node @2= .00 708
-----------------------------------------------------------------------------
From 710 To 730 DX= 1,382.133 mm. DZ= 3,987.555 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 730 +Y Mu = .30
-----------------------------------------------------------------------------
From 730 To 750 DX= 1,964.981 mm. DZ= 5,669.114 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 750 +Y Mu = .30
Node 750 Guide
-----------------------------------------------------------------------------
From 750 To 770 DX= 1,964.981 mm. DZ= 5,669.114 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 770 +Y Mu = .30
-----------------------------------------------------------------------------
From 770 To 790 DX= 1,964.981 mm. DZ= 5,669.114 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 790 +Y Mu = .30
Node 790 Guide
-----------------------------------------------------------------------------
From 790 To 810 TP-6 DX= 1,748.833 mm. DZ= 5,045.511 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 16.991 Angle/Node @1= 8.50 809
Angle/Node @2= .00 808
-----------------------------------------------------------------------------
From 810 To 830 DX= 589.301 mm. DZ= 807.913 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 830 +Y Mu = .30
-----------------------------------------------------------------------------
From 830 To 850 DX= 2,946.507 mm. DZ= 4,039.566 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 850 +Y Mu = .30
-----------------------------------------------------------------------------
From 850 To 870 TP-7 DX= 1,875.993 mm. DZ= 2,571.926 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 20.048 Angle/Node @1= 10.02 869
Angle/Node @2= .00 868
-----------------------------------------------------------------------------
From 870 To 890 DX= 593.000 mm. DZ= 2,060.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 890 +Y Mu = .30
-----------------------------------------------------------------------------
From 890 To 910 DX= 1,630.737 mm. DZ= 5,664.956 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 910 +Y Mu = .30
Node 910 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 910 To 930 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 930 +Y Mu = .30
-----------------------------------------------------------------------------
From 930 To 950 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 950 +Y Mu = .30
Node 950 Guide
-----------------------------------------------------------------------------
From 950 To 970 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 970 +Y Mu = .30
-----------------------------------------------------------------------------
From 970 To 990 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 990 +Y Mu = .30
Node 990 Guide
-----------------------------------------------------------------------------
From 990 To 1010 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1010 +Y Mu = .30
-----------------------------------------------------------------------------
From 1010 To 1030 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1030 +Y Mu = .30
Node 1030 Guide
-----------------------------------------------------------------------------
From 1030 To 1050 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1050 +Y Mu = .30
-----------------------------------------------------------------------------
From 1050 To 1070 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1070 +Y Mu = .30
Node 1070 Guide
-----------------------------------------------------------------------------
From 1070 To 1090 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1090 +Y Mu = .30
-----------------------------------------------------------------------------
From 1090 To 1110 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1110 +Y Mu = .30
Node 1110 Guide
-----------------------------------------------------------------------------
From 1110 To 1130 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1130 +Y Mu = .30
-----------------------------------------------------------------------------
From 1130 To 1150 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1150 +Y Mu = .30
Node 1150 Guide
-----------------------------------------------------------------------------
From 1150 To 1170 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1170 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 1170 To 1190 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1190 +Y Mu = .30
Node 1190 Guide
-----------------------------------------------------------------------------
From 1190 To 1210 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1210 +Y Mu = .30
-----------------------------------------------------------------------------
From 1210 To 1230 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1230 +Y Mu = .30
Node 1230 Guide
-----------------------------------------------------------------------------
From 1230 To 1250 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1250 +Y Mu = .30
-----------------------------------------------------------------------------
From 1250 To 1270 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1270 +Y Mu = .30
Node 1270 Guide
-----------------------------------------------------------------------------
From 1270 To 1290 DX= 1,659.783 mm. DZ= 5,765.858 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1290 +Y Mu = .30
-----------------------------------------------------------------------------
From 1290 To 1310 TP-8 DX= 850.915 mm. DZ= 2,955.963 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 4.962 Angle/Node @1= 2.48 1309
Angle/Node @2= .00 1308
-----------------------------------------------------------------------------
From 1310 To 1330 DX= 1,076.158 mm. DZ= 2,800.336 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1330 +Y Mu = .30
Node 1330 Guide
-----------------------------------------------------------------------------
From 1330 To 1350 DX= 1,793.597 mm. DZ= 4,667.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1350 +Y Mu = .30
-----------------------------------------------------------------------------
From 1350 To 1370 DX= 994.684 mm. DZ= 2,588.328 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.099 Angle/Node @1= 28.05
1369 Angle/Node @2= .00 1368
-----------------------------------------------------------------------------
From 1370 To 1390 DX= 360.143 mm. DY= -1,494.003 mm. DZ= 937.151 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 1390 To 1391 DX= 200.567 mm. DY= -832.025 mm. DZ= 521.909 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1390 X2 K= 975 N./cm. Yield K= 1 N./cm. Yield Force= 2,594 N.
Dir Vec= .2001 -.8300 .5206
Node 1390 X2 K= 139,435 N./cm. Yield K= 1 N./cm.
Yield Force= 370,833 N. Dir Vec= -.9334 .0000 .3587
Node 1390 X2 K= 139,435 N./cm. Yield K= 1 N./cm.
Yield Force= 370,833 N. Dir Vec= .2977 .5578 .7748
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 1391 To 1392 DX= 76.165 mm. DY= -315.960 mm. DZ= 198.194 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.049
RESTRAINTS
Node 1391 X2 K= 1,701 N./cm. Yield K= 1 N./cm. Yield Force= 4,524 N.
Dir Vec= .2001 -.8300 .5206
Node 1391 X2 K= 243,211 N./cm. Yield K= 1 N./cm.
Yield Force= 646,832 N. Dir Vec= -.9334 .0000 .3587
Node 1391 X2 K= 243,211 N./cm. Yield K= 1 N./cm.
Yield Force= 646,832 N. Dir Vec= .2977 .5578 .7748
-----------------------------------------------------------------------------
From 1392 To 1410 DX= 241.014 mm. DY= -358.012 mm. DZ= 627.210 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.049
RESTRAINTS
Node 1392 X2 K= 1,452 N./cm. Yield K= 1 N./cm. Yield Force= 3,861 N.
Dir Vec= .3166 -.4702 .8238
Node 1392 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,998 N. Dir Vec= -.9335 .0000 .3587
Node 1392 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,998 N. Dir Vec= .1687 .8825 .4389
-----------------------------------------------------------------------------
From 1410 To 1411 DX= 470.368 mm. DY= .000 mm. DZ= 1,224.130 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1410 X2 K= 1,631 N./cm. Yield K= 1 N./cm. Yield Force= 4,339 N.
Dir Vec= .3587 .0000 .9335
Node 1410 X2 K= 233,235 N./cm. Yield K= 1 N./cm.
Yield Force= 620,299 N. Dir Vec= -.9335 .0000 .3587
Node 1410 Y2 K= 233,235 N./cm. Yield K= 1 N./cm.
Yield Force= 620,299 N.
-----------------------------------------------------------------------------
From 1411 To 1412 DX= 442.123 mm. DY= .000 mm. DZ= 1,150.622 mm.
RESTRAINTS
Node 1411 X2 K= 2,105 N./cm. Yield K= 1 N./cm. Yield Force= 5,598 N.
Dir Vec= .3587 .0000 .9335
Node 1411 X2 K= 300,913 N./cm. Yield K= 1 N./cm.
Yield Force= 800,292 N. Dir Vec= -.9335 .0000 .3587
Node 1411 Y2 K= 300,913 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 800,292 N.
-----------------------------------------------------------------------------
From 1412 To 1413 DX= 333.828 mm. DY= .000 mm. DZ= 868.785 mm.
RESTRAINTS
Node 1412 X2 K= 2,105 N./cm. Yield K= 1 N./cm. Yield Force= 5,598 N.
Dir Vec= .3587 .0000 .9335
Node 1412 X2 K= 300,913 N./cm. Yield K= 1 N./cm.
Yield Force= 800,292 N. Dir Vec= -.9335 .0000 .3587
Node 1412 Y2 K= 300,913 N./cm. Yield K= 1 N./cm.
Yield Force= 800,292 N.
-----------------------------------------------------------------------------
From 1413 To 1414 DX= 136.540 mm. DY= .000 mm. DZ= 355.345 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.049
RESTRAINTS
Node 1413 X2 K= 1,631 N./cm. Yield K= 1 N./cm. Yield Force= 4,339 N.
Dir Vec= .3587 .0000 .9335
Node 1413 X2 K= 233,235 N./cm. Yield K= 1 N./cm.
Yield Force= 620,299 N. Dir Vec= -.9335 .0000 .3587
Node 1413 Y2 K= 233,235 N./cm. Yield K= 1 N./cm.
Yield Force= 620,299 N.
-----------------------------------------------------------------------------
From 1414 To 1430 DX= 241.014 mm. DY= 358.012 mm. DZ= 627.210 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.049
RESTRAINTS
Node 1414 X2 K= 1,452 N./cm. Yield K= 1 N./cm. Yield Force= 3,861 N.
Dir Vec= .3166 .4702 .8238
Node 1414 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,998 N. Dir Vec= -.9335 .0000 .3587
Node 1414 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,998 N. Dir Vec= -.1687 .8825 -.4389
-----------------------------------------------------------------------------
From 1430 To 1449 DX= 136.921 mm. DY= 567.996 mm. DZ= 356.290 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1430 X2 K= 1,687 N./cm. Yield K= 1 N./cm. Yield Force= 4,487 N.
Dir Vec= .2001 .8300 .5206
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 1430 X2 K= 241,201 N./cm. Yield K= 1 N./cm.
Yield Force= 641,486 N. Dir Vec= -.9334 .0000 .3587
Node 1430 X2 K= 241,201 N./cm. Yield K= 1 N./cm.
Yield Force= 641,486 N. Dir Vec= -.2977 .5578 -.7748
-----------------------------------------------------------------------------
From 1449 To 1450 DX= 136.921 mm. DY= 567.996 mm. DZ= 356.290 mm.
RESTRAINTS
Node 1450 X2 K= 961 N./cm. Yield K= 1 N./cm. Yield Force= 2,556 N.
Dir Vec= .2001 .8300 .5206
Node 1450 X2 K= 137,425 N./cm. Yield K= 1 N./cm.
Yield Force= 365,487 N. Dir Vec= -.9334 .0000 .3587
Node 1450 X2 K= 137,425 N./cm. Yield K= 1 N./cm.
Yield Force= 365,487 N. Dir Vec= -.2977 .5578 -.7748
-----------------------------------------------------------------------------
From 1450 To 1470 DX= 363.035 mm. DY= 1,505.997 mm. DZ= 944.675 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.099 Angle/Node @1= 28.05
1469 Angle/Node @2= .00 1468
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 1470 To 1490 DX= 1,793.353 mm. DZ= 4,667.321 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1490 +Y Mu = .30
-----------------------------------------------------------------------------
From 1490 To 1510 DX= 2,152.023 mm. DZ= 5,600.785 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 1510 +Y Mu = .30
Node 1510 Guide
-----------------------------------------------------------------------------
From 1510 To 1530 TP-9 DX= 1,420.336 mm. DZ= 3,696.518 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.287 Angle/Node @1= 1.14 1529
Angle/Node @2= .00 1528
-----------------------------------------------------------------------------
From 1530 To 1550 DX= 834.465 mm. DZ= 2,460.865 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1550 +Y Mu = .30
-----------------------------------------------------------------------------
From 1550 To 1570 DX= 2,119.000 mm. DZ= 6,249.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1570 +Y Mu = .30
Node 1570 Guide
-----------------------------------------------------------------------------
From 1570 To 1590 DX= 2,119.000 mm. DZ= 6,249.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1590 +Y Mu = .30
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 1590 To 1610 DX= 1,682.741 mm. DZ= 4,962.458 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1610 +Y Mu = .30
Node 1610 Guide
-----------------------------------------------------------------------------
From 1610 To 1630 DX= 526.659 mm. DZ= 1,553.136 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 1630 To 1650 DX= 872.199 mm. DZ= 2,572.145 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 47.851 Angle/Node @1= 23.93
1649 Angle/Node @2= .00 1648
-----------------------------------------------------------------------------
From 1650 To 1670 DX= 426.054 mm. DY= -1,482.785 mm. DZ= 1,272.724 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 1670 To 1671 DX= 291.910 mm. DY= -1,015.928 mm. DZ= 872.005 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1670 X2 K= 1,333 N./cm. Yield K= 1 N./cm. Yield Force= 3,546 N.
Dir Vec= .2130 -.7414 .6364
Node 1670 X2 K= 190,602 N./cm. Yield K= 1 N./cm.
Yield Force= 506,915 N. Dir Vec= -.9483 .0000 .3174
Node 1670 X2 K= 190,602 N./cm. Yield K= 1 N./cm.
Yield Force= 506,915 N. Dir Vec= .2353 .6711 .7030
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 1671 To 1672 DX= 68.785 mm. DY= -239.392 mm. DZ= 205.478 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.925
RESTRAINTS
Node 1671 X2 K= 1,952 N./cm. Yield K= 1 N./cm. Yield Force= 5,192 N.
Dir Vec= .2130 -.7414 .6364
Node 1671 X2 K= 279,120 N./cm. Yield K= 1 N./cm.
Yield Force= 742,332 N. Dir Vec= -.9483 .0000 .3174
Node 1671 X2 K= 279,120 N./cm. Yield K= 1 N./cm.
Yield Force= 742,332 N. Dir Vec= .2353 .6711 .7030
-----------------------------------------------------------------------------
From 1672 To 1690 DX= 187.378 mm. DY= -261.895 mm. DZ= 559.773 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.925
RESTRAINTS
Node 1672 X2 K= 1,238 N./cm. Yield K= 1 N./cm. Yield Force= 3,293 N.
Dir Vec= .2902 -.4055 .8668
Node 1672 X2 K= 177,035 N./cm. Yield K= 1 N./cm.
Yield Force= 470,833 N. Dir Vec= -.9483 .0000 .3174
Node 1672 X2 K= 177,035 N./cm. Yield K= 1 N./cm.
Yield Force= 470,833 N. Dir Vec= .1287 .9141 .3846
-----------------------------------------------------------------------------
From 1690 To 1691 DX= 397.919 mm. DY= .000 mm. DZ= 1,188.779 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1690 X2 K= 1,525 N./cm. Yield K= 1 N./cm. Yield Force= 4,055 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Dir Vec= .3174 .0000 .9483
Node 1690 X2 K= 217,976 N./cm. Yield K= 1 N./cm.
Yield Force= 579,716 N. Dir Vec= -.9483 .0000 .3174
Node 1690 Y2 K= 217,976 N./cm. Yield K= 1 N./cm.
Yield Force= 579,716 N.
-----------------------------------------------------------------------------
From 1691 To 1692 DX= 295.426 mm. DY= .000 mm. DZ= 882.583 mm.
RESTRAINTS
Node 1691 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .3174 .0000 .9483
Node 1691 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9483 .0000 .3174
Node 1691 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 1692 To 1693 DX= 449.731 mm. DY= .000 mm. DZ= 1,343.569 mm.
RESTRAINTS
Node 1692 X2 K= 2,284 N./cm. Yield K= 1 N./cm. Yield Force= 6,074 N.
Dir Vec= .3174 .0000 .9483
Node 1692 X2 K= 326,534 N./cm. Yield K= 1 N./cm.
Yield Force= 868,433 N. Dir Vec= -.9483 .0000 .3174
Node 1692 Y2 K= 326,534 N./cm. Yield K= 1 N./cm.
Yield Force= 868,433 N.
-----------------------------------------------------------------------------
From 1693 To 1694 DX= 295.426 mm. DY= .000 mm. DZ= 882.583 mm.
RESTRAINTS
Node 1693 X2 K= 2,284 N./cm. Yield K= 1 N./cm. Yield Force= 6,074 N.
Dir Vec= .3174 .0000 .9483
Node 1693 X2 K= 326,534 N./cm. Yield K= 1 N./cm.
Yield Force= 868,433 N. Dir Vec= -.9483 .0000 .3174
Node 1693 Y2 K= 326,534 N./cm. Yield K= 1 N./cm.
Yield Force= 868,433 N.
-----------------------------------------------------------------------------
From 1694 To 1695 DX= 295.426 mm. DY= .000 mm. DZ= 882.583 mm.
RESTRAINTS
Node 1694 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .3174 .0000 .9483
Node 1694 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9483 .0000 .3174
Node 1694 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 1695 To 1696 DX= 121.796 mm. DY= .000 mm. DZ= 363.864 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.264
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 1695 X2 K= 1,637 N./cm. Yield K= 1 N./cm. Yield Force= 4,354 N.
Dir Vec= .3174 .0000 .9483
Node 1695 X2 K= 234,029 N./cm. Yield K= 1 N./cm.
Yield Force= 622,410 N. Dir Vec= -.9483 .0000 .3174
Node 1695 Y2 K= 234,029 N./cm. Yield K= 1 N./cm.
Yield Force= 622,410 N.
-----------------------------------------------------------------------------
From 1696 To 1710 DX= 210.958 mm. DY= 363.378 mm. DZ= 642.167 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.264
RESTRAINTS
Node 1696 X2 K= 1,463 N./cm. Yield K= 1 N./cm. Yield Force= 3,891 N.
Dir Vec= .2749 .4735 .8368
Node 1696 X2 K= 209,141 N./cm. Yield K= 1 N./cm.
Yield Force= 556,220 N. Dir Vec= -.9500 .0000 .3121
Node 1696 X2 K= 209,141 N./cm. Yield K= 1 N./cm.
Yield Force= 556,220 N. Dir Vec= -.1478 .8808 -.4499
-----------------------------------------------------------------------------
From 1710 To 1729 DX= 117.556 mm. DY= 587.778 mm. DZ= 370.496 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 1710 X2 K= 1,729 N./cm. Yield K= 1 N./cm. Yield Force= 4,599 N.
Dir Vec= .1668 .8341 .5258
Node 1710 X2 K= 247,233 N./cm. Yield K= 1 N./cm.
Yield Force= 657,528 N. Dir Vec= -.9532 .0000 .3024
Node 1710 X2 K= 247,233 N./cm. Yield K= 1 N./cm.
Yield Force= 657,528 N. Dir Vec= -.2523 .5516 -.7950
-----------------------------------------------------------------------------
From 1729 To 1730 DX= 117.556 mm. DY= 587.778 mm. DZ= 370.496 mm.
RESTRAINTS
Node 1730 X2 K= 998 N./cm. Yield K= 1 N./cm. Yield Force= 2,654 N.
Dir Vec= .1668 .8341 .5258
Node 1730 X2 K= 142,663 N./cm. Yield K= 1 N./cm.
Yield Force= 379,418 N. Dir Vec= -.9532 .0000 .3024
Node 1730 X2 K= 142,663 N./cm. Yield K= 1 N./cm.
Yield Force= 379,418 N. Dir Vec= -.2523 .5516 -.7950
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 1730 To 1750 DX= 292.214 mm. DY= 1,461.068 mm. DZ= 920.960 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.528 Angle/Node @1= 28.26
1749 Angle/Node @2= .00 1748
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 1750 To 1770 DX= 634.338 mm. DZ= 1,896.738 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 1770 To 1790 DX= 1,027.311 mm. DZ= 3,071.767 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1790 +Y Mu = .30
Node 1790 Guide
-----------------------------------------------------------------------------
From 1790 To 1810 DX= 1,903.015 mm. DZ= 5,690.214 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1810 +Y Mu = .30
-----------------------------------------------------------------------------
From 1810 To 1830 TP-10 DX= 1,815.477 mm. DZ= 5,429.519 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 85.962 Angle/Node @1= 42.98
1829 Angle/Node @2= .00 1828
-----------------------------------------------------------------------------
From 1830 To 1850 DX= 1,999.671 mm. DZ= -515.309 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1850 +Y Mu = .30
-----------------------------------------------------------------------------
From 1850 To 1870 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1870 +Y Mu = .30
-----------------------------------------------------------------------------
From 1870 To 1890 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1890 +Y Mu = .30
Node 1890 Guide
-----------------------------------------------------------------------------
From 1890 To 1910 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1910 +Y Mu = .30
-----------------------------------------------------------------------------
From 1910 To 1930 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1930 +Y Mu = .30
Node 1930 Guide
-----------------------------------------------------------------------------
From 1930 To 1950 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1950 +Y Mu = .30
-----------------------------------------------------------------------------
From 1950 To 1970 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1970 +Y Mu = .30
Node 1970 Guide
-----------------------------------------------------------------------------
From 1970 To 1990 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 1990 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 1990 To 2010 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2010 +Y Mu = .30
Node 2010 Guide
-----------------------------------------------------------------------------
From 2010 To 2030 DX= 5,809.992 mm. DZ= -1,497.998 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2030 +Y Mu = .30
-----------------------------------------------------------------------------
From 2030 To 2050 DX= 5,693.595 mm. DZ= -1,468.800 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2050 +Y Mu = .30
-----------------------------------------------------------------------------
From 2050 To 2070 TP-11 DX= 5,258.829 mm. DZ= -1,356.642 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 62.598 Angle/Node @1= 31.30
2069 Angle/Node @2= .00 2068
-----------------------------------------------------------------------------
From 2070 To 2090 DX= 1,067.860 mm. DZ= 1,191.501 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2090 +Y Mu = .30
-----------------------------------------------------------------------------
From 2090 To 2110 DX= 3,176.216 mm. DZ= 3,543.972 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 2110 To 2130 DX= 1,054.263 mm. DZ= 1,188.886 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2130 +Y Mu = .30
Node 2130 Guide Gap= 5.000 mm.
-----------------------------------------------------------------------------
From 2130 To 2150 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2150 +Y Mu = .30
-----------------------------------------------------------------------------
From 2150 To 2170 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 2170 +Y Mu = .30
Node 2170 Guide
-----------------------------------------------------------------------------
From 2170 To 2190 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2190 +Y Mu = .30
-----------------------------------------------------------------------------
From 2190 To 2210 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2210 +Y Mu = .30
Node 2210 Guide
-----------------------------------------------------------------------------
From 2210 To 2230 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2230 +Y Mu = .30
-----------------------------------------------------------------------------
From 2230 To 2250 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2250 +Y Mu = .30
Node 2250 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 2250 To 2270 DX= 2,799.205 mm. DZ= 3,156.646 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2270 +Y Mu = .30
-----------------------------------------------------------------------------
From 2270 To 2290 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2290 +Y Mu = .30
Node 2290 Guide
-----------------------------------------------------------------------------
From 2290 To 2310 DX= 4,555.426 mm. DZ= 5,137.125 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2310 +Y Mu = .30
-----------------------------------------------------------------------------
From 2310 To 2330 DX= 4,164.639 mm. DZ= 4,696.437 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2330 +Y Mu = .30
Node 2330 Guide Gap= 5.000 mm.
-----------------------------------------------------------------------------
From 2330 To 2340 DX= 3,980.856 mm. DZ= 4,489.186 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2340 +Y Mu = .30
-----------------------------------------------------------------------------
From 2340 To 2350 TP-12 DX= 2,842.995 mm. DZ= 3,206.027 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 82.069 Angle/Node @1= 41.03
2349 Angle/Node @2= .00 2348
-----------------------------------------------------------------------------
From 2350 To 2370 DX= -1,100.892 mm. DZ= 1,288.822 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2370 +Y Mu = .30
-----------------------------------------------------------------------------
From 2370 To 2390 DX= -4,171.698 mm. DZ= 4,883.837 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2390 +Y Mu = .30
-----------------------------------------------------------------------------
From 2390 To 2410 DX= -3,896.928 mm. DZ= 4,562.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 2410 +Y Mu = .30
Node 2410 Guide
-----------------------------------------------------------------------------
From 2410 To 2530 DX= -3,896.928 mm. DZ= 4,562.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2530 +Y Mu = .30
Node 2530 Guide
-----------------------------------------------------------------------------
From 2530 To 2550 DX= -3,896.928 mm. DZ= 4,562.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2550 +Y Mu = .30
-----------------------------------------------------------------------------
From 2550 To 2570 DX= -3,896.928 mm. DZ= 4,562.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2570 +Y Mu = .30
Node 2570 Guide
-----------------------------------------------------------------------------
From 2570 To 2590 DX= -3,896.928 mm. DZ= 4,562.231 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2590 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 2590 To 2610 DX= -1,298.976 mm. DZ= 1,520.744 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 2610 To 2630 DX= -1,948.464 mm. DZ= 2,281.115 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 2630 To 2650 DX= -1,355.482 mm. DZ= 1,586.896 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.431 Angle/Node @1= 28.22
2649 Angle/Node @2= .00 2648
-----------------------------------------------------------------------------
From 2650 To 2670 DX= -643.407 mm. DY= -1,499.784 mm. DZ= 759.391 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 2670 To 2671 DX= -351.314 mm. DY= -818.914 mm. DZ= 414.643 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 2670 X2 K= 956 N./cm. Yield K= 1 N./cm. Yield Force= 2,543 N.
Dir Vec= -.3574 -.8332 .4219
Node 2670 X2 K= 136,708 N./cm. Yield K= 1 N./cm.
Yield Force= 363,582 N. Dir Vec= -.7630 .0000 -.6464
Node 2670 X2 K= 136,708 N./cm. Yield K= 1 N./cm.
Yield Force= 363,582 N. Dir Vec= -.5386 .5530 .6357
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 2671 To 2672 DX= -136.909 mm. DY= -319.134 mm. DZ= 161.588 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.215
RESTRAINTS
Node 2671 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,485 N.
Dir Vec= -.3574 -.8332 .4219
Node 2671 X2 K= 241,098 N./cm. Yield K= 1 N./cm.
Yield Force= 641,212 N. Dir Vec= -.7630 .0000 -.6464
Node 2671 X2 K= 241,098 N./cm. Yield K= 1 N./cm.
Yield Force= 641,212 N. Dir Vec= -.5386 .5530 .6357
-----------------------------------------------------------------------------
From 2672 To 2690 DX= -436.254 mm. DY= -362.168 mm. DZ= 515.095 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.215
RESTRAINTS
Node 2672 X2 K= 1,460 N./cm. Yield K= 1 N./cm. Yield Force= 3,884 N.
Dir Vec= -.5695 -.4728 .6724
Node 2672 X2 K= 208,779 N./cm. Yield K= 1 N./cm.
Yield Force= 555,259 N. Dir Vec= -.7631 .0000 -.6463
Node 2672 X2 K= 208,779 N./cm. Yield K= 1 N./cm.
Yield Force= 555,259 N. Dir Vec= -.3056 .8812 .3608
-----------------------------------------------------------------------------
From 2690 To 2691 DX= -612.199 mm. DY= .000 mm. DZ= 722.993 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 2690 X2 K= 1,279 N./cm. Yield K= 1 N./cm. Yield Force= 3,402 N.
Dir Vec= -.6462 .0000 .7632
Node 2690 X2 K= 182,889 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 486,401 N. Dir Vec= -.7632 .0000 -.6462
Node 2690 Y2 K= 182,889 N./cm. Yield K= 1 N./cm.
Yield Force= 486,401 N.
-----------------------------------------------------------------------------
From 2691 To 2692 DX= -247.509 mm. DY= .000 mm. DZ= 292.303 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.215
RESTRAINTS
Node 2691 X2 K= 1,279 N./cm. Yield K= 1 N./cm. Yield Force= 3,402 N.
Dir Vec= -.6462 .0000 .7632
Node 2691 X2 K= 182,889 N./cm. Yield K= 1 N./cm.
Yield Force= 486,401 N. Dir Vec= -.7632 .0000 -.6462
Node 2691 Y2 K= 182,889 N./cm. Yield K= 1 N./cm.
Yield Force= 486,401 N.
-----------------------------------------------------------------------------
From 2692 To 2710 DX= -436.254 mm. DY= 362.168 mm. DZ= 515.095 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.215
RESTRAINTS
Node 2692 X2 K= 1,460 N./cm. Yield K= 1 N./cm. Yield Force= 3,884 N.
Dir Vec= -.5695 .4728 .6724
Node 2692 X2 K= 208,779 N./cm. Yield K= 1 N./cm.
Yield Force= 555,259 N. Dir Vec= -.7631 .0000 -.6463
Node 2692 X2 K= 208,779 N./cm. Yield K= 1 N./cm.
Yield Force= 555,259 N. Dir Vec= .3056 .8812 -.3608
-----------------------------------------------------------------------------
From 2710 To 2729 DX= -244.019 mm. DY= 568.808 mm. DZ= 288.007 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 2710 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,484 N.
Dir Vec= -.3574 .8332 .4219
Node 2710 X2 K= 241,026 N./cm. Yield K= 1 N./cm.
Yield Force= 641,020 N. Dir Vec= -.7630 .0000 -.6464
Node 2710 X2 K= 241,026 N./cm. Yield K= 1 N./cm.
Yield Force= 641,020 N. Dir Vec= .5386 .5530 -.6357
-----------------------------------------------------------------------------
From 2729 To 2730 DX= -244.019 mm. DY= 568.808 mm. DZ= 288.007 mm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 2730 X2 K= 956 N./cm. Yield K= 1 N./cm. Yield Force= 2,542 N.
Dir Vec= -.3574 .8332 .4219
Node 2730 X2 K= 136,636 N./cm. Yield K= 1 N./cm.
Yield Force= 363,391 N. Dir Vec= -.7630 .0000 -.6464
Node 2730 X2 K= 136,636 N./cm. Yield K= 1 N./cm.
Yield Force= 363,391 N. Dir Vec= .5386 .5530 -.6357
-----------------------------------------------------------------------------
From 2730 To 2750 DX= -643.593 mm. DY= 1,500.216 mm. DZ= 759.609 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.430 Angle/Node @1= 28.22
2749 Angle/Node @2= .00 2748
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 2750 To 2770 DX= -1,287.919 mm. DZ= 1,530.119 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 2770 To 2790 DX= -2,575.838 mm. DZ= 3,060.239 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2790 +Y Mu = .30
Node 2790 Guide
-----------------------------------------------------------------------------
From 2790 To 2930 DX= -3,863.757 mm. DZ= 4,590.358 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2930 +Y Mu = .30
-----------------------------------------------------------------------------
From 2930 To 2950 DX= -3,863.757 mm. DZ= 4,590.358 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2950 +Y Mu = .30
Node 2950 Guide
-----------------------------------------------------------------------------
From 2950 To 2970 DX= -3,863.757 mm. DZ= 4,590.358 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2970 +Y Mu = .30
-----------------------------------------------------------------------------
From 2970 To 2990 DX= -3,863.757 mm. DZ= 4,590.358 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 2990 +Y Mu = .30
Node 2990 Guide
-----------------------------------------------------------------------------
From 2990 To 3010 DX= -3,863.757 mm. DZ= 4,590.358 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3010 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 3010 To 3030 DX= -3,638.371 mm. DZ= 4,322.587 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3030 +Y Mu = .30
-----------------------------------------------------------------------------
From 3030 To 3040 TP-13 DX= -1,114.050 mm. DZ= 1,323.553 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 43.884 Angle/Node @1= 21.94
3039 Angle/Node @2= .00 3038
-----------------------------------------------------------------------------
From 3040 To 3050 DX= -3,952.027 mm. DZ= 417.324 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3050 +Y Mu = .30
-----------------------------------------------------------------------------
From 3050 To 3060 DX= -5,966.825 mm. DZ= 630.082 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3060 +Y Mu = .30
-----------------------------------------------------------------------------
From 3060 To 3070 DX= -5,966.825 mm. DZ= 630.082 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3070 +Y Mu = .30
-----------------------------------------------------------------------------
From 3070 To 3090 TP-14 DX= -5,608.815 mm. DZ= 592.277 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 45.088 Angle/Node @1= 22.54
3089 Angle/Node @2= .00 3088
-----------------------------------------------------------------------------
From 3090 To 3110 DX= -1,229.000 mm. DZ= 1,524.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3110 +Y Mu = .30
-----------------------------------------------------------------------------
From 3110 To 3130 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3130 +Y Mu = .30
Node 3130 Guide Gap= 5.000 mm.
-----------------------------------------------------------------------------
From 3130 To 3150 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3150 +Y Mu = .30
-----------------------------------------------------------------------------
From 3150 To 3170 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3170 +Y Mu = .30
Node 3170 Guide
-----------------------------------------------------------------------------
From 3170 To 3190 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3190 +Y Mu = .30
-----------------------------------------------------------------------------
From 3190 To 3210 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3210 +Y Mu = .30
Node 3210 Guide
-----------------------------------------------------------------------------
From 3210 To 3230 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3230 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 3230 To 3250 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3250 +Y Mu = .30
Node 3250 Guide
-----------------------------------------------------------------------------
From 3250 To 3270 DX= -3,766.455 mm. DZ= 4,670.527 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3270 +Y Mu = .30
-----------------------------------------------------------------------------
From 3270 To 3290 DX= -1,725.664 mm. DZ= 2,139.880 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 3290 To 3310 DX= -2,030.000 mm. DZ= 2,539.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3310 +Y Mu = .30
Node 3310 Guide
-----------------------------------------------------------------------------
From 3310 To 3320 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3320 +Y Mu = .30
-----------------------------------------------------------------------------
From 3320 To 3323 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3323 +Y Mu = .30
Node 3323 Guide
-----------------------------------------------------------------------------
From 3323 To 3326 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3326 +Y Mu = .30
-----------------------------------------------------------------------------
From 3326 To 3329 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3329 +Y Mu = .30
Node 3329 Guide
-----------------------------------------------------------------------------
From 3329 To 3332 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 3332 +Y Mu = .30
-----------------------------------------------------------------------------
From 3332 To 3335 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3335 +Y Mu = .30
Node 3335 Guide
-----------------------------------------------------------------------------
From 3335 To 3338 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3338 +Y Mu = .30
-----------------------------------------------------------------------------
From 3338 To 3341 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3341 +Y Mu = .30
Node 3341 Guide
-----------------------------------------------------------------------------
From 3341 To 3344 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3344 +Y Mu = .30
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 3344 To 3350 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3350 +Y Mu = .30
Node 3350 Guide
-----------------------------------------------------------------------------
From 3350 To 3370 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3370 +Y Mu = .30
-----------------------------------------------------------------------------
From 3370 To 3390 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3390 +Y Mu = .30
Node 3390 Guide
-----------------------------------------------------------------------------
From 3390 To 3410 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3410 +Y Mu = .30
-----------------------------------------------------------------------------
From 3410 To 3430 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3430 +Y Mu = .30
Node 3430 Guide
-----------------------------------------------------------------------------
From 3430 To 3450 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3450 +Y Mu = .30
-----------------------------------------------------------------------------
From 3450 To 3470 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3470 +Y Mu = .30
Node 3470 Guide
-----------------------------------------------------------------------------
From 3470 To 3490 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3490 +Y Mu = .30
-----------------------------------------------------------------------------
From 3490 To 3510 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3510 +Y Mu = .30
Node 3510 Guide
-----------------------------------------------------------------------------
From 3510 To 3530 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3530 +Y Mu = .30
-----------------------------------------------------------------------------
From 3530 To 3550 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3550 +Y Mu = .30
Node 3550 Guide
-----------------------------------------------------------------------------
From 3550 To 3570 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3570 +Y Mu = .30
-----------------------------------------------------------------------------
From 3570 To 3590 DX= -3,746.820 mm. DZ= 4,686.293 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3590 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 3590 To 3610 DX= -1,876.532 mm. DZ= 2,347.052 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.310 Angle/Node @1= 28.15
3609 Angle/Node @2= .00 3608
-----------------------------------------------------------------------------
From 3610 To 3630 DX= -623.508 mm. DY= -1,497.691 mm. DZ= 779.846 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 3630 To 3631 DX= -342.906 mm. DY= -823.673 mm. DZ= 428.886 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 3630 X2 K= 963 N./cm. Yield K= 1 N./cm. Yield Force= 2,562 N.
Dir Vec= -.3464 -.8321 .4332
Node 3630 X2 K= 137,695 N./cm. Yield K= 1 N./cm.
Yield Force= 366,206 N. Dir Vec= -.7810 .0000 -.6245
Node 3630 X2 K= 137,695 N./cm. Yield K= 1 N./cm.
Yield Force= 366,206 N. Dir Vec= -.5196 .5547 .6499
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 3631 To 3632 DX= -132.380 mm. DY= -317.981 mm. DZ= 165.572 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 3631 X2 K= 1,692 N./cm. Yield K= 1 N./cm. Yield Force= 4,499 N.
Dir Vec= -.3464 -.8321 .4332
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 3631 X2 K= 241,862 N./cm. Yield K= 1 N./cm.
Yield Force= 643,244 N. Dir Vec= -.7810 .0000 -.6245
Node 3631 X2 K= 241,862 N./cm. Yield K= 1 N./cm.
Yield Force= 643,244 N. Dir Vec= -.5196 .5547 .6499
-----------------------------------------------------------------------------
From 3632 To 3650 DX= -420.825 mm. DY= -360.656 mm. DZ= 526.342 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 3632 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= -.5506 -.4719 .6886
Node 3632 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.7810 .0000 -.6245
Node 3632 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.2947 .8817 .3685
-----------------------------------------------------------------------------
From 3650 To 3651 DX= -819.854 mm. DY= .000 mm. DZ= 1,025.423 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 3650 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= -.6245 .0000 .7810
Node 3650 X2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N. Dir Vec= -.7810 .0000 -.6245
Node 3650 Y2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N.
-----------------------------------------------------------------------------
From 3651 To 3652 DX= -581.203 mm. DY= .000 mm. DZ= 726.933 mm.
RESTRAINTS
Node 3651 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.6245 .0000 .7810
Node 3651 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.7810 .0000 -.6245
Node 3651 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 3652 To 3653 DX= -605.005 mm. DY= .000 mm. DZ= 756.703 mm.
RESTRAINTS
Node 3652 X2 K= 1,848 N./cm. Yield K= 1 N./cm. Yield Force= 4,915 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Dir Vec= -.6245 .0000 .7810
Node 3652 X2 K= 264,218 N./cm. Yield K= 1 N./cm.
Yield Force= 702,700 N. Dir Vec= -.7810 .0000 -.6245
Node 3652 Y2 K= 264,218 N./cm. Yield K= 1 N./cm.
Yield Force= 702,700 N.
-----------------------------------------------------------------------------
From 3653 To 3654 DX= -581.203 mm. DY= .000 mm. DZ= 726.933 mm.
RESTRAINTS
Node 3653 X2 K= 1,848 N./cm. Yield K= 1 N./cm. Yield Force= 4,915 N.
Dir Vec= -.6245 .0000 .7810
Node 3653 X2 K= 264,218 N./cm. Yield K= 1 N./cm.
Yield Force= 702,700 N. Dir Vec= -.7810 .0000 -.6245
Node 3653 Y2 K= 264,218 N./cm. Yield K= 1 N./cm.
Yield Force= 702,700 N.
-----------------------------------------------------------------------------
From 3654 To 3655 DX= -581.203 mm. DY= .000 mm. DZ= 726.933 mm.
RESTRAINTS
Node 3654 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.6245 .0000 .7810
Node 3654 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.7810 .0000 -.6245
Node 3654 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 3655 To 3656 DX= -196.593 mm. DY= .000 mm. DZ= 245.886 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.343
RESTRAINTS
Node 3655 X2 K= 1,510 N./cm. Yield K= 1 N./cm. Yield Force= 4,015 N.
Dir Vec= -.6245 .0000 .7810
Node 3655 X2 K= 215,822 N./cm. Yield K= 1 N./cm.
Yield Force= 573,989 N. Dir Vec= -.7810 .0000 -.6245
Node 3655 Y2 K= 215,822 N./cm. Yield K= 1 N./cm.
Yield Force= 573,989 N.
-----------------------------------------------------------------------------
From 3656 To 3670 DX= -361.003 mm. DY= 249.483 mm. DZ= 451.521 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.343
RESTRAINTS
Node 3656 X2 K= 1,208 N./cm. Yield K= 1 N./cm. Yield Force= 3,213 N.
Dir Vec= -.5734 .3962 .7171
Node 3656 X2 K= 172,728 N./cm. Yield K= 1 N./cm.
Yield Force= 459,379 N. Dir Vec= -.7810 .0000 -.6245
Node 3656 X2 K= 172,728 N./cm. Yield K= 1 N./cm.
Yield Force= 459,379 N. Dir Vec= .2474 .9181 -.3095
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 3670 To 3689 DX= -290.683 mm. DY= 493.725 mm. DZ= 363.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 3670 X2 K= 1,618 N./cm. Yield K= 1 N./cm. Yield Force= 4,304 N.
Dir Vec= -.4284 .7276 .5358
Node 3670 X2 K= 231,344 N./cm. Yield K= 1 N./cm.
Yield Force= 615,270 N. Dir Vec= -.7810 .0000 -.6245
Node 3670 X2 K= 231,344 N./cm. Yield K= 1 N./cm.
Yield Force= 615,270 N. Dir Vec= .4544 .6860 -.5683
-----------------------------------------------------------------------------
From 3689 To 3690 DX= -290.683 mm. DY= 493.725 mm. DZ= 363.569 mm.
RESTRAINTS
Node 3690 X2 K= 1,014 N./cm. Yield K= 1 N./cm. Yield Force= 2,697 N.
Dir Vec= -.4284 .7276 .5358
Node 3690 X2 K= 144,980 N./cm. Yield K= 1 N./cm.
Yield Force= 385,580 N. Dir Vec= -.7810 .0000 -.6245
Node 3690 X2 K= 144,980 N./cm. Yield K= 1 N./cm.
Yield Force= 385,580 N. Dir Vec= .4544 .6860 -.5683
-----------------------------------------------------------------------------
From 3690 To 3710 DX= -952.340 mm. DY= 1,617.547 mm. DZ= 1,191.129 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 46.686 Angle/Node @1= 23.34
3709 Angle/Node @2= .00 3708
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 3710 To 3730 DX= -1,873.410 mm. DZ= 2,343.146 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3730 +Y Mu = .30
-----------------------------------------------------------------------------
From 3730 To 3750 DX= -3,749.942 mm. DZ= 4,690.198 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3750 +Y Mu = .30
Node 3750 Guide
-----------------------------------------------------------------------------
From 3750 To 3770 DX= -2,314.286 mm. DZ= 2,894.567 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3770 +Y Mu = .30
-----------------------------------------------------------------------------
From 3770 To 3790 DX= -3,749.942 mm. DZ= 4,690.198 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3790 +Y Mu = .30
Node 3790 Guide
-----------------------------------------------------------------------------
From 3790 To 3810 DX= -2,138.185 mm. DZ= 2,674.311 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 3810 To 3830 DX= -1,567.000 mm. DZ= 2,050.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3830 +Y Mu = .30
-----------------------------------------------------------------------------
From 3830 To 3850 DX= -3,643.751 mm. DZ= 4,766.873 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3850 +Y Mu = .30
Node 3850 Guide
-----------------------------------------------------------------------------
From 3850 To 3870 DX= -3,643.751 mm. DZ= 4,766.873 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3870 +Y Mu = .30
-----------------------------------------------------------------------------
From 3870 To 3890 DX= -3,643.751 mm. DZ= 4,766.873 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3890 +Y Mu = .30
Node 3890 Guide
-----------------------------------------------------------------------------
From 3890 To 3910 DX= -2,666.011 mm. DZ= 3,487.762 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 3910 To 3930 DX= -940.000 mm. DZ= 1,309.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3930 +Y Mu = .30
-----------------------------------------------------------------------------
From 3930 To 3950 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3950 +Y Mu = .30
Node 3950 Guide
Node 3950 LIM
-----------------------------------------------------------------------------
From 3950 To 3952 DX= -3,499.745 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3952 +Y Mu = .30
-----------------------------------------------------------------------------
From 3952 To 3968 DX= -3,499.745 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 3968 +Y Mu = .30
Node 3968 Guide
-----------------------------------------------------------------------------
From 3968 To 3970 DX= -3,499.745 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3970 +Y Mu = .30
-----------------------------------------------------------------------------
From 3970 To 3990 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 3990 +Y Mu = .30
Node 3990 Guide
-----------------------------------------------------------------------------
From 3990 To 4010 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4010 +Y Mu = .30
-----------------------------------------------------------------------------
From 4010 To 4030 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4030 +Y Mu = .30
Node 4030 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 4030 To 4050 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4050 +Y Mu = .30
-----------------------------------------------------------------------------
From 4050 To 4070 DX= -3,499.744 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4070 +Y Mu = .30
Node 4070 Guide Gap= 3.000 mm.
-----------------------------------------------------------------------------
From 4070 To 4080 TP-15 DX= -2,321.497 mm. DZ= 3,232.809 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 4080 To 4090 DX= -1,178.247 mm. DZ= 1,640.772 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4090 +Y Mu = .30
-----------------------------------------------------------------------------
From 4090 To 4110 DX= -3,943.045 mm. DZ= 5,490.901 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.310 Angle/Node @1= 28.15
4109 Angle/Node @2= .00 4108
-----------------------------------------------------------------------------
From 4110 To 4130 DX= -679.458 mm. DY= -1,747.306 mm. DZ= 946.182 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 4130 To 4131 DX= -223.228 mm. DY= -574.057 mm. DZ= 310.857 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4130 X2 K= 671 N./cm. Yield K= 1 N./cm. Yield Force= 1,785 N.
Dir Vec= -.3236 -.8321 .4506
Node 4130 X2 K= 95,966 N./cm. Yield K= 1 N./cm.
Yield Force= 255,227 N. Dir Vec= -.8123 .0000 -.5833
Node 4130 X2 K= 95,966 N./cm. Yield K= 1 N./cm.
Yield Force= 255,227 N. Dir Vec= -.4853 .5547 .6758
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 4131 To 4132 DX= -123.650 mm. DY= -317.981 mm. DZ= 172.190 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4131 X2 K= 1,400 N./cm. Yield K= 1 N./cm. Yield Force= 3,723 N.
Dir Vec= -.3236 -.8321 .4506
Node 4131 X2 K= 200,133 N./cm. Yield K= 1 N./cm.
Yield Force= 532,264 N. Dir Vec= -.8123 .0000 -.5833
Node 4131 X2 K= 200,133 N./cm. Yield K= 1 N./cm.
Yield Force= 532,264 N. Dir Vec= -.4853 .5547 .6758
-----------------------------------------------------------------------------
From 4132 To 4150 DX= -393.075 mm. DY= -360.656 mm. DZ= 547.378 mm.
BEND at "TO" end
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4132 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= -.5143 -.4719 .7162
Node 4132 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.8123 .0000 -.5833
Node 4132 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.2752 .8817 .3833
-----------------------------------------------------------------------------
From 4150 To 4151 DX= -765.791 mm. DY= .000 mm. DZ= 1,066.404 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4150 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= -.5833 .0000 .8123
Node 4150 X2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N. Dir Vec= -.8123 .0000 -.5833
Node 4150 Y2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N.
-----------------------------------------------------------------------------
From 4151 To 4152 DX= -542.877 mm. DY= .000 mm. DZ= 755.985 mm.
RESTRAINTS
Node 4151 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.5833 .0000 .8123
Node 4151 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8123 .0000 -.5833
Node 4151 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4152 To 4153 DX= -542.877 mm. DY= .000 mm. DZ= 755.985 mm.
RESTRAINTS
Node 4152 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.5833 .0000 .8123
Node 4152 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8123 .0000 -.5833
Node 4152 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4153 To 4154 DX= -814.315 mm. DY= .000 mm. DZ= 1,133.977 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 4153 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= -.5833 .0000 .8123
Node 4153 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8123 .0000 -.5833
Node 4153 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 4154 To 4155 DX= -4,990.831 mm. DY= .000 mm. DZ= 6,949.997 mm.
RESTRAINTS
Node 4154 X2 K= 9,683 N./cm. Yield K= 1 N./cm.
Yield Force= 25,753 N. Dir Vec= -.5833 .0000 .8123
Node 4154 X2 K= 1,384,335 N./cm. Yield K= 1 N./cm.
Yield Force= 3,681,704 N. Dir Vec= -.8123 .0000 -.5833
Node 4154 Y2 K= 1,384,335 N./cm. Yield K= 1 N./cm.
Yield Force= 3,681,704 N.
-----------------------------------------------------------------------------
From 4155 To 4156 DX= -814.315 mm. DY= .000 mm. DZ= 1,133.977 mm.
RESTRAINTS
Node 4155 X2 K= 9,683 N./cm. Yield K= 1 N./cm.
Yield Force= 25,753 N. Dir Vec= -.5833 .0000 .8123
Node 4155 X2 K= 1,384,335 N./cm. Yield K= 1 N./cm.
Yield Force= 3,681,704 N. Dir Vec= -.8123 .0000 -.5833
Node 4155 Y2 K= 1,384,335 N./cm. Yield K= 1 N./cm.
Yield Force= 3,681,704 N.
-----------------------------------------------------------------------------
From 4156 To 4157 DX= -542.877 mm. DY= .000 mm. DZ= 755.985 mm.
RESTRAINTS
Node 4156 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= -.5833 .0000 .8123
Node 4156 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8123 .0000 -.5833
Node 4156 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 4157 To 4158 DX= -542.877 mm. DY= .000 mm. DZ= 755.985 mm.
RESTRAINTS
Node 4157 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.5833 .0000 .8123
Node 4157 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8123 .0000 -.5833
Node 4157 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4158 To 4159 DX= -542.877 mm. DY= .000 mm. DZ= 755.985 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 4158 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.5833 .0000 .8123
Node 4158 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8123 .0000 -.5833
Node 4158 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4159 To 4160 DX= -222.914 mm. DY= .000 mm. DZ= 310.419 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4159 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= -.5833 .0000 .8123
Node 4159 X2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N. Dir Vec= -.8123 .0000 -.5833
Node 4159 Y2 K= 233,625 N./cm. Yield K= 1 N./cm.
Yield Force= 621,337 N.
-----------------------------------------------------------------------------
From 4160 To 4170 DX= -393.075 mm. DY= 360.656 mm. DZ= 547.378 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4160 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= -.5143 .4719 .7162
Node 4160 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.8123 .0000 -.5833
Node 4160 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= .2752 .8817 -.3833
-----------------------------------------------------------------------------
From 4170 To 4190 DX= -442.148 mm. DY= 1,137.035 mm. DZ= 615.714 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4170 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,485 N.
Dir Vec= -.3236 .8321 .4506
Node 4170 X2 K= 241,090 N./cm. Yield K= 1 N./cm.
Yield Force= 641,190 N. Dir Vec= -.8123 .0000 -.5833
Node 4170 X2 K= 241,090 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 641,190 N. Dir Vec= .4853 .5547 -.6758
-----------------------------------------------------------------------------
From 4190 To 4191 DX= -320.294 mm. DY= 823.672 mm. DZ= 446.026 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4190 X2 K= 1,921 N./cm. Yield K= 1 N./cm. Yield Force= 5,109 N.
Dir Vec= -.3236 .8321 .4506
Node 4190 X2 K= 274,618 N./cm. Yield K= 1 N./cm.
Yield Force= 730,359 N. Dir Vec= -.8123 .0000 -.5833
Node 4190 X2 K= 274,618 N./cm. Yield K= 1 N./cm.
Yield Force= 730,359 N. Dir Vec= .4853 .5547 -.6758
-----------------------------------------------------------------------------
From 4191 To 4192 DX= -123.650 mm. DY= 317.981 mm. DZ= 172.190 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4191 X2 K= 1,692 N./cm. Yield K= 1 N./cm. Yield Force= 4,499 N.
Dir Vec= -.3236 .8321 .4506
Node 4191 X2 K= 241,862 N./cm. Yield K= 1 N./cm.
Yield Force= 643,244 N. Dir Vec= -.8123 .0000 -.5833
Node 4191 X2 K= 241,862 N./cm. Yield K= 1 N./cm.
Yield Force= 643,244 N. Dir Vec= .4853 .5547 -.6758
-----------------------------------------------------------------------------
From 4192 To 4210 DX= -393.075 mm. DY= 360.656 mm. DZ= 547.378 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 4192 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= -.5143 .4719 .7162
Node 4192 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= -.8123 .0000 -.5833
Node 4192 X2 K= 208,334 N./cm. Yield K= 1 N./cm.
Yield Force= 554,074 N. Dir Vec= .2752 .8817 -.3833
-----------------------------------------------------------------------------
From 4210 To 4230 DX= -871.755 mm. DY= .000 mm. DZ= 1,213.965 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4210 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,816 N.
Dir Vec= -.5833 .0000 .8123
Node 4210 X2 K= 258,894 N./cm. Yield K= 1 N./cm.
Yield Force= 688,541 N. Dir Vec= -.8123 .0000 -.5833
Node 4210 Y2 K= 258,894 N./cm. Yield K= 1 N./cm.
Yield Force= 688,541 N.
-----------------------------------------------------------------------------
From 4230 To 4250 DX= -3,499.745 mm. DY= .000 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4230 X2 K= 6,920 N./cm. Yield K= 1 N./cm.
Yield Force= 18,404 N. Dir Vec= -.5833 .0000 .8123
Node 4230 X2 K= 989,300 N./cm. Yield K= 1 N./cm.
Yield Force= 2,631,090 N. Dir Vec= -.8123 .0000 -.5833
Node 4230 Y2 K= 989,300 N./cm. Yield K= 1 N./cm.
Yield Force= 2,631,090 N.
-----------------------------------------------------------------------------
From 4250 To 4270 DX= -3,499.745 mm. DY= .000 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4250 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5833 .0000 .8123
Node 4250 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.8123 .0000 -.5833
Node 4250 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4270 To 4290 DX= -3,499.745 mm. DY= .000 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4270 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5833 .0000 .8123
Node 4270 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.8123 .0000 -.5833
Node 4270 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4290 To 4310 DX= -3,499.745 mm. DY= .000 mm. DZ= 4,873.581 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4290 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5833 .0000 .8123
Node 4290 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.8123 .0000 -.5833
Node 4290 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4310 To 4330 TP-16 DX= -2,779.380 mm. DY= .000 mm.
DZ= 3,870.435 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4310 X2 K= 10,474 N./cm. Yield K= 1 N./cm.
Yield Force= 27,855 N. Dir Vec= -.5833 .0000 .8123
Node 4310 X2 K= 1,497,364 N./cm. Yield K= 1 N./cm.
Yield Force= 3,982,308 N. Dir Vec= -.8123 .0000 -.5833
Node 4310 Y2 K= 1,497,364 N./cm. Yield K= 1 N./cm.
Yield Force= 3,982,308 N.
-----------------------------------------------------------------------------
From 4330 To 4350 DX= -579.819 mm. DY= .000 mm. DZ= 814.745 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4330 X2 K= 5,609 N./cm. Yield K= 1 N./cm.
Yield Force= 14,917 N. Dir Vec= -.5798 .0000 .8147
Node 4330 X2 K= 801,886 N./cm. Yield K= 1 N./cm.
Yield Force= 2,132,653 N. Dir Vec= -.8147 .0000 -.5798
Node 4330 Y2 K= 801,886 N./cm. Yield K= 1 N./cm.
Yield Force= 2,132,653 N.
-----------------------------------------------------------------------------
From 4350 To 4370 DX= -3,478.913 mm. DY= .000 mm. DZ= 4,888.473 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4350 X2 K= 6,811 N./cm. Yield K= 1 N./cm.
Yield Force= 18,113 N. Dir Vec= -.5798 .0000 .8147
Node 4350 X2 K= 973,669 N./cm. Yield K= 1 N./cm.
Yield Force= 2,589,517 N. Dir Vec= -.8147 .0000 -.5798
Node 4350 Y2 K= 973,669 N./cm. Yield K= 1 N./cm.
Yield Force= 2,589,517 N.
-----------------------------------------------------------------------------
From 4370 To 4390 DX= -3,478.913 mm. DY= .000 mm. DZ= 4,888.473 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4370 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5798 .0000 .8147
Node 4370 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.8147 .0000 -.5798
Node 4370 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4390 To 4410 DX= -3,478.913 mm. DY= .000 mm. DZ= 4,888.473 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4390 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5798 .0000 .8147
Node 4390 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.8147 .0000 -.5798
Node 4390 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4410 To 4430 DX= -3,478.913 mm. DY= .000 mm. DZ= 4,888.473 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4410 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.5798 .0000 .8147
Node 4410 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.8147 .0000 -.5798
Node 4410 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 4430 To 4450 DX= -2,899.094 mm. DY= .000 mm. DZ= 4,073.727 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4430 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= -.5798 .0000 .8147
Node 4430 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.8147 .0000 -.5798
Node 4430 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
From 4450 To 4451 TP-17 DX= -122.749 mm. DY= .000 mm. DZ= 172.483 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4450 X2 K= 5,071 N./cm. Yield K= 1 N./cm.
Yield Force= 13,486 N. Dir Vec= -.5798 .0000 .8147
Node 4450 X2 K= 724,925 N./cm. Yield K= 1 N./cm.
Yield Force= 1,927,970 N. Dir Vec= -.8147 .0000 -.5798
Node 4450 Y2 K= 724,925 N./cm. Yield K= 1 N./cm.
Yield Force= 1,927,970 N.
-----------------------------------------------------------------------------
From 4451 To 4452 DX= -32.512 mm. DY= .000 mm. DZ= 45.685 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 4.214
RESTRAINTS
Node 4451 X2 K= 315 N./cm. Yield K= 1 N./cm. Yield Force= 838 N.
Dir Vec= -.5798 .0000 .8147
Node 4451 X2 K= 45,039 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 119,783 N. Dir Vec= -.8147 .0000 -.5798
Node 4451 Y2 K= 45,039 N./cm. Yield K= 1 N./cm.
Yield Force= 119,783 N.
-----------------------------------------------------------------------------
From 4452 To 4470 DX= -58.134 mm. DY= .000 mm. DZ= 95.902 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 4.214
RESTRAINTS
Node 4452 X2 K= 218 N./cm. Yield K= 1 N./cm. Yield Force= 580 N.
Dir Vec= -.5184 .0000 .8552
Node 4452 X2 K= 31,184 N./cm. Yield K= 1 N./cm.
Yield Force= 82,935 N. Dir Vec= -.8552 .0000 -.5184
Node 4452 Y2 K= 31,184 N./cm. Yield K= 1 N./cm.
Yield Force= 82,935 N.
-----------------------------------------------------------------------------
From 4470 To 4471 DX= -448.133 mm. DY= .000 mm. DZ= 879.163 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4470 X2 K= 1,015 N./cm. Yield K= 1 N./cm. Yield Force= 2,698 N.
Dir Vec= -.4541 .0000 .8909
Node 4470 X2 K= 145,050 N./cm. Yield K= 1 N./cm.
Yield Force= 385,768 N. Dir Vec= -.8909 .0000 -.4541
Node 4470 Y2 K= 145,050 N./cm. Yield K= 1 N./cm.
Yield Force= 385,768 N.
-----------------------------------------------------------------------------
From 4471 To 4472 DX= -422.668 mm. DY= .000 mm. DZ= 829.205 mm.
RESTRAINTS
Node 4471 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4541 .0000 .8909
Node 4471 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8909 .0000 -.4541
Node 4471 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4472 To 4473 DX= -422.668 mm. DY= .000 mm. DZ= 829.205 mm.
RESTRAINTS
Node 4472 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4541 .0000 .8909
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 4472 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8909 .0000 -.4541
Node 4472 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4473 To 4474 DX= -702.999 mm. DY= .000 mm. DZ= 1,379.168 mm.
RESTRAINTS
Node 4473 X2 K= 2,412 N./cm. Yield K= 1 N./cm. Yield Force= 6,414 N.
Dir Vec= -.4541 .0000 .8909
Node 4473 X2 K= 344,778 N./cm. Yield K= 1 N./cm.
Yield Force= 916,954 N. Dir Vec= -.8909 .0000 -.4541
Node 4473 Y2 K= 344,778 N./cm. Yield K= 1 N./cm.
Yield Force= 916,954 N.
-----------------------------------------------------------------------------
From 4474 To 4490 DX= -702.999 mm. DY= .000 mm. DZ= 1,379.168 mm.
RESTRAINTS
Node 4474 X2 K= 3,012 N./cm. Yield K= 1 N./cm. Yield Force= 8,011 N.
Dir Vec= -.4541 .0000 .8909
Node 4474 X2 K= 430,640 N./cm. Yield K= 1 N./cm.
Yield Force= 1,145,308 N. Dir Vec= -.8909 .0000 -.4541
Node 4474 Y2 K= 430,640 N./cm. Yield K= 1 N./cm.
Yield Force= 1,145,308 N.
-----------------------------------------------------------------------------
From 4490 To 4510 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4490 X2 K= 7,344 N./cm. Yield K= 1 N./cm.
Yield Force= 19,532 N. Dir Vec= -.4541 .0000 .8909
Node 4490 X2 K= 1,049,955 N./cm. Yield K= 1 N./cm.
Yield Force= 2,792,405 N. Dir Vec= -.8909 .0000 -.4541
Node 4490 Y2 K= 1,049,955 N./cm. Yield K= 1 N./cm.
Yield Force= 2,792,405 N.
-----------------------------------------------------------------------------
From 4510 To 4530 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4510 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4510 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4510 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4530 To 4550 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4530 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4530 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4530 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4550 To 4570 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4550 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4550 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4550 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 4570 To 4590 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4570 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4570 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4570 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4590 To 4610 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4590 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4590 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4590 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4610 To 4630 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 4610 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4610 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4610 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4630 To 4650 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4630 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4630 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4630 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4650 To 4670 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4650 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4650 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4650 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4670 To 4690 DX= -2,725.000 mm. DY= .000 mm. DZ= 5,346.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4670 X2 K= 11,676 N./cm. Yield K= 1 N./cm.
Yield Force= 31,053 N. Dir Vec= -.4541 .0000 .8909
Node 4670 X2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N. Dir Vec= -.8909 .0000 -.4541
Node 4670 Y2 K= 1,669,270 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,502 N.
-----------------------------------------------------------------------------
From 4690 To 4691 TP-18 DX= -654.821 mm. DY= .000 mm. DZ= 1,284.651 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4690 X2 K= 7,241 N./cm. Yield K= 1 N./cm.
Yield Force= 19,258 N. Dir Vec= -.4541 .0000 .8909
Node 4690 X2 K= 1,035,199 N./cm. Yield K= 1 N./cm.
Yield Force= 2,753,160 N. Dir Vec= -.8909 .0000 -.4541
Node 4690 Y2 K= 1,035,199 N./cm. Yield K= 1 N./cm.
Yield Force= 2,753,160 N.
-----------------------------------------------------------------------------
From 4691 To 4692 DX= -422.668 mm. DY= .000 mm. DZ= 829.205 mm.
RESTRAINTS
Node 4691 X2 K= 2,308 N./cm. Yield K= 1 N./cm. Yield Force= 6,139 N.
Dir Vec= -.4541 .0000 .8909
Node 4691 X2 K= 330,022 N./cm. Yield K= 1 N./cm.
Yield Force= 877,709 N. Dir Vec= -.8909 .0000 -.4541
Node 4691 Y2 K= 330,022 N./cm. Yield K= 1 N./cm.
Yield Force= 877,709 N.
-----------------------------------------------------------------------------
From 4692 To 4693 DX= -422.668 mm. DY= .000 mm. DZ= 829.205 mm.
RESTRAINTS
Node 4692 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4541 .0000 .8909
Node 4692 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8909 .0000 -.4541
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 4692 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4693 To 4694 DX= -422.668 mm. DY= .000 mm. DZ= 829.205 mm.
RESTRAINTS
Node 4693 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4541 .0000 .8909
Node 4693 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8909 .0000 -.4541
Node 4693 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4694 To 4695 DX= -8.841 mm. DY= .000 mm. DZ= 17.345 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 1.464
RESTRAINTS
Node 4694 X2 K= 943 N./cm. Yield K= 1 N./cm. Yield Force= 2,509 N.
Dir Vec= -.4541 .0000 .8909
Node 4694 X2 K= 134,874 N./cm. Yield K= 1 N./cm.
Yield Force= 358,703 N. Dir Vec= -.8909 .0000 -.4541
Node 4694 Y2 K= 134,874 N./cm. Yield K= 1 N./cm.
Yield Force= 358,703 N.
-----------------------------------------------------------------------------
From 4695 To 4710 DX= -18.563 mm. DY= .000 mm. DZ= 34.227 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 1.464
RESTRAINTS
Node 4695 X2 K= 76 N./cm. Yield K= 1 N./cm. Yield Force= 201 N.
Dir Vec= -.4767 .0000 .8790
Node 4695 X2 K= 10,831 N./cm. Yield K= 1 N./cm.
Yield Force= 28,806 N. Dir Vec= -.8790 .0000 -.4767
Node 4695 Y2 K= 10,831 N./cm. Yield K= 1 N./cm.
Yield Force= 28,806 N.
-----------------------------------------------------------------------------
From 4710 To 4711 DX= -474.184 mm. DY= .000 mm. DZ= 823.408 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4710 X2 K= 943 N./cm. Yield K= 1 N./cm. Yield Force= 2,509 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Dir Vec= -.4990 .0000 .8666
Node 4710 X2 K= 134,874 N./cm. Yield K= 1 N./cm.
Yield Force= 358,703 N. Dir Vec= -.8666 .0000 -.4990
Node 4710 Y2 K= 134,874 N./cm. Yield K= 1 N./cm.
Yield Force= 358,703 N.
-----------------------------------------------------------------------------
From 4711 To 4730 DX= -514.185 mm. DY= .000 mm. DZ= 892.869 mm.
RESTRAINTS
Node 4711 X2 K= 1,908 N./cm. Yield K= 1 N./cm. Yield Force= 5,074 N.
Dir Vec= -.4990 .0000 .8666
Node 4711 X2 K= 272,774 N./cm. Yield K= 1 N./cm.
Yield Force= 725,455 N. Dir Vec= -.8666 .0000 -.4990
Node 4711 Y2 K= 272,774 N./cm. Yield K= 1 N./cm.
Yield Force= 725,455 N.
-----------------------------------------------------------------------------
From 4730 To 4750 DX= -2,994.265 mm. DY= .000 mm. DZ= 5,199.459 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4730 X2 K= 6,840 N./cm. Yield K= 1 N./cm.
Yield Force= 18,192 N. Dir Vec= -.4990 .0000 .8666
Node 4730 X2 K= 977,889 N./cm. Yield K= 1 N./cm.
Yield Force= 2,600,741 N. Dir Vec= -.8666 .0000 -.4990
Node 4730 Y2 K= 977,889 N./cm. Yield K= 1 N./cm.
Yield Force= 2,600,741 N.
-----------------------------------------------------------------------------
From 4750 To 4751 DX= -552.353 mm. DY= .000 mm. DZ= 959.146 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4750 X2 K= 6,914 N./cm. Yield K= 1 N./cm.
Yield Force= 18,389 N. Dir Vec= -.4990 .0000 .8666
Node 4750 X2 K= 988,527 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 2,629,034 N. Dir Vec= -.8666 .0000 -.4990
Node 4750 Y2 K= 988,527 N./cm. Yield K= 1 N./cm.
Yield Force= 2,629,034 N.
-----------------------------------------------------------------------------
From 4751 To 4752 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4751 X2 K= 1,982 N./cm. Yield K= 1 N./cm. Yield Force= 5,272 N.
Dir Vec= -.4990 .0000 .8666
Node 4751 X2 K= 283,412 N./cm. Yield K= 1 N./cm.
Yield Force= 753,748 N. Dir Vec= -.8666 .0000 -.4990
Node 4751 Y2 K= 283,412 N./cm. Yield K= 1 N./cm.
Yield Force= 753,748 N.
-----------------------------------------------------------------------------
From 4752 To 4753 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4752 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4990 .0000 .8666
Node 4752 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8666 .0000 -.4990
Node 4752 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4753 To 4754 DX= -222.612 mm. DY= .000 mm. DZ= 386.560 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 32.630
RESTRAINTS
Node 4753 X2 K= 1,750 N./cm. Yield K= 1 N./cm. Yield Force= 4,654 N.
Dir Vec= -.4990 .0000 .8666
Node 4753 X2 K= 250,181 N./cm. Yield K= 1 N./cm.
Yield Force= 665,367 N. Dir Vec= -.8666 .0000 -.4990
Node 4753 Y2 K= 250,181 N./cm. Yield K= 1 N./cm.
Yield Force= 665,367 N.
-----------------------------------------------------------------------------
From 4754 To 4770 DX= -374.956 mm. DY= -481.055 mm. DZ= 651.101 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 32.630
RESTRAINTS
Node 4754 X2 K= 1,689 N./cm. Yield K= 1 N./cm. Yield Force= 4,492 N.
Dir Vec= -.4203 -.5392 .7298
Node 4754 X2 K= 241,445 N./cm. Yield K= 1 N./cm.
Yield Force= 642,134 N. Dir Vec= -.8666 .0000 -.4990
Node 4754 X2 K= 241,445 N./cm. Yield K= 1 N./cm.
Yield Force= 642,134 N. Dir Vec= -.2691 .8422 .4673
-----------------------------------------------------------------------------
From 4770 To 4790 DX= -223.544 mm. DY= -972.083 mm. DZ= 388.179 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4770 X2 K= 1,452 N./cm. Yield K= 1 N./cm. Yield Force= 3,861 N.
Dir Vec= -.2089 -.9082 .3627
Node 4770 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,996 N. Dir Vec= -.8666 .0000 -.4990
Node 4770 X2 K= 207,553 N./cm. Yield K= 1 N./cm.
Yield Force= 551,996 N. Dir Vec= -.4532 .4185 .7870
-----------------------------------------------------------------------------
From 4790 To 4791 DX= -151.932 mm. DY= -660.675 mm. DZ= 263.825 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4790 X2 K= 1,315 N./cm. Yield K= 1 N./cm. Yield Force= 3,498 N.
Dir Vec= -.2089 -.9082 .3627
Node 4790 X2 K= 188,015 N./cm. Yield K= 1 N./cm.
Yield Force= 500,035 N. Dir Vec= -.8666 .0000 -.4990
Node 4790 X2 K= 188,015 N./cm. Yield K= 1 N./cm.
Yield Force= 500,035 N. Dir Vec= -.4532 .4185 .7870
-----------------------------------------------------------------------------
From 4791 To 4792 DX= -93.166 mm. DY= -405.132 mm. DZ= 161.780 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 32.630
RESTRAINTS
Node 4791 X2 K= 1,552 N./cm. Yield K= 1 N./cm. Yield Force= 4,128 N.
Dir Vec= -.2089 -.9082 .3627
Node 4791 X2 K= 221,907 N./cm. Yield K= 1 N./cm.
Yield Force= 590,172 N. Dir Vec= -.8666 .0000 -.4990
Node 4791 X2 K= 221,907 N./cm. Yield K= 1 N./cm.
Yield Force= 590,172 N. Dir Vec= -.4532 .4185 .7870
-----------------------------------------------------------------------------
From 4792 To 4810 DX= -374.956 mm. DY= -481.055 mm. DZ= 651.101 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 32.630
RESTRAINTS
Node 4792 X2 K= 1,689 N./cm. Yield K= 1 N./cm. Yield Force= 4,492 N.
Dir Vec= -.4203 -.5392 .7298
Node 4792 X2 K= 241,445 N./cm. Yield K= 1 N./cm.
Yield Force= 642,134 N. Dir Vec= -.8666 .0000 -.4990
Node 4792 X2 K= 241,445 N./cm. Yield K= 1 N./cm.
Yield Force= 642,134 N. Dir Vec= -.2691 .8422 .4673
-----------------------------------------------------------------------------
From 4810 To 4811 DX= -687.079 mm. DY= .000 mm. DZ= 1,193.095 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4810 X2 K= 1,750 N./cm. Yield K= 1 N./cm. Yield Force= 4,654 N.
Dir Vec= -.4990 .0000 .8666
Node 4810 X2 K= 250,181 N./cm. Yield K= 1 N./cm.
Yield Force= 665,367 N. Dir Vec= -.8666 .0000 -.4990
Node 4810 Y2 K= 250,181 N./cm. Yield K= 1 N./cm.
Yield Force= 665,367 N.
-----------------------------------------------------------------------------
From 4811 To 4812 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4811 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4990 .0000 .8666
Node 4811 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8666 .0000 -.4990
Node 4811 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4812 To 4813 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4812 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4990 .0000 .8666
Node 4812 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8666 .0000 -.4990
Node 4812 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 4813 To 4814 DX= -696.701 mm. DY= .000 mm. DZ= 1,209.802 mm.
RESTRAINTS
Node 4813 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= -.4990 .0000 .8666
Node 4813 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8666 .0000 -.4990
Node 4813 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 4814 To 4815 DX= -1,744.798 mm. DY= .000 mm. DZ= 3,029.794 mm.
RESTRAINTS
Node 4814 X2 K= 4,760 N./cm. Yield K= 1 N./cm.
Yield Force= 12,659 N. Dir Vec= -.4990 .0000 .8666
Node 4814 X2 K= 680,504 N./cm. Yield K= 1 N./cm.
Yield Force= 1,809,832 N. Dir Vec= -.8666 .0000 -.4990
Node 4814 Y2 K= 680,504 N./cm. Yield K= 1 N./cm.
Yield Force= 1,809,832 N.
-----------------------------------------------------------------------------
From 4815 To 4816 DX= -696.701 mm. DY= .000 mm. DZ= 1,209.802 mm.
RESTRAINTS
Node 4815 X2 K= 4,760 N./cm. Yield K= 1 N./cm.
Yield Force= 12,659 N. Dir Vec= -.4990 .0000 .8666
Node 4815 X2 K= 680,504 N./cm. Yield K= 1 N./cm.
Yield Force= 1,809,832 N. Dir Vec= -.8666 .0000 -.4990
Node 4815 Y2 K= 680,504 N./cm. Yield K= 1 N./cm.
Yield Force= 1,809,832 N.
-----------------------------------------------------------------------------
From 4816 To 4817 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4816 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= -.4990 .0000 .8666
Node 4816 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8666 .0000 -.4990
Node 4816 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 4817 To 4818 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4817 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4990 .0000 .8666
Node 4817 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8666 .0000 -.4990
Node 4817 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 4818 To 4819 DX= -464.467 mm. DY= .000 mm. DZ= 806.535 mm.
RESTRAINTS
Node 4818 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.4990 .0000 .8666
Node 4818 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8666 .0000 -.4990
Node 4818 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 4819 To 4820 DX= -190.703 mm. DY= .000 mm. DZ= 331.150 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 4819 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= -.4990 .0000 .8666
Node 4819 X2 K= 233,617 N./cm. Yield K= 1 N./cm.
Yield Force= 621,316 N. Dir Vec= -.8666 .0000 -.4990
Node 4819 Y2 K= 233,617 N./cm. Yield K= 1 N./cm.
Yield Force= 621,316 N.
-----------------------------------------------------------------------------
From 4820 To 4830 DX= -336.372 mm. DY= 360.602 mm. DZ= 583.892 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 4820 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,875 N.
Dir Vec= -.4401 .4718 .7640
Node 4820 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,033 N. Dir Vec= -.8665 .0000 -.4992
Node 4820 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,033 N. Dir Vec= .2355 .8817 -.4088
-----------------------------------------------------------------------------
From 4830 To 4849 DX= -189.313 mm. DY= 568.507 mm. DZ= 328.408 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 4830 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,485 N.
Dir Vec= -.2771 .8320 .4806
Node 4830 X2 K= 241,092 N./cm. Yield K= 1 N./cm.
Yield Force= 641,196 N. Dir Vec= -.8664 .0000 -.4994
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 4830 X2 K= 241,092 N./cm. Yield K= 1 N./cm.
Yield Force= 641,196 N. Dir Vec= .4155 .5548 -.7208
-----------------------------------------------------------------------------
From 4849 To 4850 DX= -189.313 mm. DY= 568.507 mm. DZ= 328.408 mm.
RESTRAINTS
Node 4850 X2 K= 958 N./cm. Yield K= 1 N./cm. Yield Force= 2,547 N.
Dir Vec= -.2771 .8320 .4806
Node 4850 X2 K= 136,933 N./cm. Yield K= 1 N./cm.
Yield Force= 364,180 N. Dir Vec= -.8664 .0000 -.4994
Node 4850 X2 K= 136,933 N./cm. Yield K= 1 N./cm.
Yield Force= 364,180 N. Dir Vec= .4155 .5548 -.7208
-----------------------------------------------------------------------------
From 4850 To 4870 DX= -558.476 mm. DY= 1,677.105 mm. DZ= 968.808 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 56.306 Angle/Node @1= 28.15
4869 Angle/Node @2= .00 4868
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 4870 To 4890 DX= -2,496.099 mm. DZ= 4,330.070 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4890 +Y
Node 4890 -Y
Node 4890 Guide Gap= 7.000 mm.
-----------------------------------------------------------------------------
From 4890 To 4910 TP-19 DX= -466.458 mm. DZ= 809.181 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Radius= 1,524.000 mm. (user) Bend Angle= 5.306 Angle/Node @1= 2.65 4909
Angle/Node @2= .00 4908
-----------------------------------------------------------------------------
From 4910 To 4930 DX= -2,085.834 mm. DZ= 4,544.169 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4930 +Y Mu = .30
Node 4930 Guide
Node 4930 -Y
-----------------------------------------------------------------------------
From 4930 To 4950 DX= -2,503.000 mm. DZ= 5,453.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4950 +Y Mu = .30
-----------------------------------------------------------------------------
From 4950 To 4970 DX= -2,502.993 mm. DZ= 5,452.983 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 4970 +Y Mu = .30
Node 4970 Guide
Node 4970 -Y
-----------------------------------------------------------------------------
From 4970 To 4990 DX= -1,668.662 mm. DZ= 3,635.322 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 4990 +Y Mu = .30
-----------------------------------------------------------------------------
From 4990 To 5010 DX= -2,085.827 mm. DZ= 4,544.153 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5010 +Y Mu = .30
Node 5010 Guide
-----------------------------------------------------------------------------
From 5010 To 5030 DX= -2,085.827 mm. DZ= 4,544.153 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5030 +Y Mu = .30
-----------------------------------------------------------------------------
From 5030 To 5050 TP-20 DX= -938.205 mm. DZ= 2,043.960 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 4.246 Angle/Node @1= 2.12 5049
Angle/Node @2= .00 5048
-----------------------------------------------------------------------------
From 5050 To 5070 DX= -1,039.000 mm. DZ= 1,882.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5070 +Y Mu = .30
Node 5070 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 5070 To 5090 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5090 +Y Mu = .30
-----------------------------------------------------------------------------
From 5090 To 5110 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5110 +Y Mu = .30
Node 5110 Guide
-----------------------------------------------------------------------------
From 5110 To 5130 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5130 +Y Mu = .30
-----------------------------------------------------------------------------
From 5130 To 5150 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5150 +Y Mu = .30
Node 5150 Guide
-----------------------------------------------------------------------------
From 5150 To 5170 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5170 +Y Mu = .30
-----------------------------------------------------------------------------
From 5170 To 5190 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5190 +Y Mu = .30
Node 5190 Guide
-----------------------------------------------------------------------------
From 5190 To 5210 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5210 +Y Mu = .30
-----------------------------------------------------------------------------
From 5210 To 5220 DX= -2,416.555 mm. DZ= 4,377.244 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5220 +Y Mu = .30
Node 5220 Guide
-----------------------------------------------------------------------------
From 5220 To 5225 DX= -966.622 mm. DZ= 1,750.897 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 5225 To 5250 DX= -1,933.244 mm. DZ= 3,501.795 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5250 +Y Mu = .30
-----------------------------------------------------------------------------
From 5250 To 5270 DX= -2,416.555 mm. DZ= 4,377.244 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5270 +Y Mu = .30
Node 5270 Guide
-----------------------------------------------------------------------------
From 5270 To 5290 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5290 +Y Mu = .30
-----------------------------------------------------------------------------
From 5290 To 5310 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5310 +Y Mu = .30
Node 5310 Guide
-----------------------------------------------------------------------------
From 5310 To 5330 DX= -2,899.866 mm. DZ= 5,252.692 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5330 +Y Mu = .30
-----------------------------------------------------------------------------
From 5330 To 5350 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5350 +Y Mu = .30
Node 5350 Guide
-----------------------------------------------------------------------------
From 5350 To 5370 DX= -2,899.866 mm. DZ= 5,252.692 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5370 +Y Mu = .30
-----------------------------------------------------------------------------
From 5370 To 5390 TP-21 DX= -1,473.132 mm. DZ= 2,668.368 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 11.962 Angle/Node @1= 5.98 5389
Angle/Node @2= .00 5388
-----------------------------------------------------------------------------
From 5390 To 5410 DX= -874.082 mm. DZ= 2,869.840 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5410 +Y Mu = .30
Node 5410 Guide Gap= 5.000 mm.
-----------------------------------------------------------------------------
From 5410 To 5430 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5430 +Y Mu = .30
-----------------------------------------------------------------------------
From 5430 To 5450 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5450 +Y Mu = .30
Node 5450 Guide
-----------------------------------------------------------------------------
From 5450 To 5470 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5470 +Y Mu = .30
-----------------------------------------------------------------------------
From 5470 To 5490 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 5490 +Y Mu = .30
Node 5490 Guide
-----------------------------------------------------------------------------
From 5490 To 5510 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5510 +Y Mu = .30
-----------------------------------------------------------------------------
From 5510 To 5530 DX= -1,747.721 mm. DZ= 5,738.227 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5530 +Y Mu = .30
Node 5530 Guide
-----------------------------------------------------------------------------
From 5530 To 5550 DX= -279.998 mm. DZ= 919.305 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .864 Angle/Node @1= .43 5549
Angle/Node @2= .00 5548
-----------------------------------------------------------------------------
From 5550 To 5570 DX= -1,395.000 mm. DZ= 4,841.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5570 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 5570 To 5590 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5590 +Y Mu = .30
Node 5590 Guide
-----------------------------------------------------------------------------
From 5590 To 5610 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5610 +Y Mu = .30
-----------------------------------------------------------------------------
From 5610 To 5630 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5630 +Y Mu = .30
Node 5630 Guide
-----------------------------------------------------------------------------
From 5630 To 5635 DX= -553.793 mm. DZ= 1,921.800 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 36.870 Angle/Node @1= 18.43
5634 Angle/Node @2= .00 5633
-----------------------------------------------------------------------------
From 5635 To 5640 DX= -553.793 mm. DY= -1,500.000 mm. DZ= 1,921.800 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 36.870 Angle/Node @1= 18.43
5639 Angle/Node @2= .00 5638
-----------------------------------------------------------------------------
From 5640 To 5650 DX= -553.793 mm. DZ= 1,921.800 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5650 +Y Mu = .30
Node 5650 -Y Mu = .30
Node 5650 Guide
-----------------------------------------------------------------------------
From 5650 To 5670 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5670 +Y Mu = .30
Node 5670 Guide
-----------------------------------------------------------------------------
From 5670 To 5690 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5690 +Y Mu = .30
-----------------------------------------------------------------------------
From 5690 To 5710 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5710 +Y Mu = .30
Node 5710 Guide
-----------------------------------------------------------------------------
From 5710 To 5730 DX= -1,661.378 mm. DZ= 5,765.399 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5730 +Y Mu = .30
-----------------------------------------------------------------------------
From 5730 To 5750 DX= -209.057 mm. DZ= 725.479 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 5750 To 5770 DX= -1,297.000 mm. DZ= 5,083.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5770 +Y Mu = .30
Node 5770 Guide
-----------------------------------------------------------------------------
From 5770 To 5790 DX= -1,483.454 mm. DZ= 5,813.722 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 5790 +Y Mu = .30
-----------------------------------------------------------------------------
From 5790 To 5810 DX= -1,483.454 mm. DZ= 5,813.722 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5810 +Y Mu = .30
Node 5810 Guide
-----------------------------------------------------------------------------
From 5810 To 5830 DX= -1,483.454 mm. DZ= 5,813.722 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5830 +Y Mu = .30
-----------------------------------------------------------------------------
From 5830 To 5850 DX= -1,151.655 mm. DZ= 4,513.386 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .529 Angle/Node @1= .26 5849
Angle/Node @2= .00 5848
-----------------------------------------------------------------------------
From 5850 To 5870 DX= -344.000 mm. DZ= 1,298.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5870 +Y Mu = .30
Node 5870 Guide
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 5870 To 5890 DX= -1,281.103 mm. DZ= 4,833.929 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5890 +Y Mu = .30
-----------------------------------------------------------------------------
From 5890 To 5895 DX= -512.358 mm. DZ= 1,933.259 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 5895 To 5920 DX= -1,024.716 mm. DZ= 3,866.517 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5920 +Y Mu = .30
Node 5920 Guide
-----------------------------------------------------------------------------
From 5920 To 5930 DX= -1,280.896 mm. DZ= 4,833.146 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5930 +Y Mu = .30
-----------------------------------------------------------------------------
From 5930 To 5950 DX= -1,537.075 mm. DZ= 5,799.776 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5950 +Y Mu = .30
Node 5950 Guide
-----------------------------------------------------------------------------
From 5950 To 5970 DX= -1,537.075 mm. DZ= 5,799.776 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5970 +Y Mu = .30
-----------------------------------------------------------------------------
From 5970 To 5990 DX= -1,359.000 mm. DZ= 5,844.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 5990 +Y Mu = .30
Node 5990 Guide
-----------------------------------------------------------------------------
From 5990 To 6010 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6010 +Y Mu = .30
-----------------------------------------------------------------------------
From 6010 To 6030 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 6030 +Y Mu = .30
Node 6030 Guide
-----------------------------------------------------------------------------
From 6030 To 6050 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6050 +Y Mu = .30
-----------------------------------------------------------------------------
From 6050 To 6070 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6070 +Y Mu = .30
Node 6070 Guide
-----------------------------------------------------------------------------
From 6070 To 6170 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6170 +Y Mu = .30
-----------------------------------------------------------------------------
From 6170 To 6190 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6190 +Y Mu = .30
Node 6190 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 6190 To 6210 DX= -1,359.015 mm. DZ= 5,844.064 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6210 +Y Mu = .30
-----------------------------------------------------------------------------
From 6210 To 6220 DX= -1,132.512 mm. DZ= 4,870.053 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6220 +Y Mu = .30
Node 6220 Guide
-----------------------------------------------------------------------------
From 6220 To 6225 DX= -453.005 mm. DZ= 1,948.021 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 6225 To 6250 DX= -906.010 mm. DZ= 3,896.042 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6250 +Y Mu = .30
-----------------------------------------------------------------------------
From 6250 To 6270 DX= -955.823 mm. DZ= 4,907.445 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6270 +Y Mu = .30
Node 6270 Guide
-----------------------------------------------------------------------------
From 6270 To 6290 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6290 +Y Mu = .30
-----------------------------------------------------------------------------
From 6290 To 6310 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6310 +Y Mu = .30
Node 6310 Guide
-----------------------------------------------------------------------------
From 6310 To 6330 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6330 +Y Mu = .30
-----------------------------------------------------------------------------
From 6330 To 6350 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6350 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 6350 Guide
-----------------------------------------------------------------------------
From 6350 To 6370 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6370 +Y Mu = .30
-----------------------------------------------------------------------------
From 6370 To 6390 DX= -1,147.065 mm. DZ= 5,889.333 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6390 +Y Mu = .30
Node 6390 Guide
-----------------------------------------------------------------------------
From 6390 To 6410 DX= -955.887 mm. DZ= 4,907.778 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 6410 To 6430 DX= -57.000 mm. DZ= 295.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6430 +Y Mu = .30
-----------------------------------------------------------------------------
From 6430 To 6450 DX= -1,082.873 mm. DZ= 5,604.342 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6450 +Y Mu = .30
Node 6450 Guide
-----------------------------------------------------------------------------
From 6450 To 6470 DX= -1,052.899 mm. DZ= 5,449.211 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6470 +Y Mu = .30
-----------------------------------------------------------------------------
From 6470 To 6490 TP-22 DX= -119.898 mm. DZ= 620.523 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 5.275 Angle/Node @1= 2.64 6489
Angle/Node @2= .00 6488
-----------------------------------------------------------------------------
From 6490 To 6510 DX= -559.235 mm. DZ= 5,641.660 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6510 +Y Mu = .30
Node 6510 Guide
-----------------------------------------------------------------------------
From 6510 To 6530 DX= -431.000 mm. DZ= 4,348.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6530 +Y Mu = .30
-----------------------------------------------------------------------------
From 6530 To 6550 DX= -591.856 mm. DZ= 5,970.738 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6550 +Y Mu = .30
Node 6550 Guide
-----------------------------------------------------------------------------
From 6550 To 6570 TP-23 DX= -352.154 mm. DZ= 3,552.589 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.243 Angle/Node @1= 1.12 6569
Angle/Node @2= .00 6568
-----------------------------------------------------------------------------
From 6570 To 6590 DX= -145.000 mm. DZ= 2,428.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6590 +Y Mu = .30
Node 6590 Guide
-----------------------------------------------------------------------------
From 6590 To 6610 DX= -357.682 mm. DZ= 5,989.329 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 6610 +Y Mu = .30
-----------------------------------------------------------------------------
From 6610 To 6630 DX= -178.960 mm. DZ= 2,996.661 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.731 Angle/Node @1= 1.37 6629
Angle/Node @2= .00 6628
-----------------------------------------------------------------------------
From 6630 To 6640 DX= -36.000 mm. DZ= 3,003.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6640 +Y Mu = .30
Node 6640 Guide
-----------------------------------------------------------------------------
From 6640 To 6645 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6645 +Y Mu = .30
-----------------------------------------------------------------------------
From 6645 To 6650 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6650 +Y Mu = .30
Node 6650 Guide
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 6650 To 6655 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6655 +Y Mu = .30
-----------------------------------------------------------------------------
From 6655 To 6660 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6660 +Y Mu = .30
Node 6660 Guide
-----------------------------------------------------------------------------
From 6660 To 6665 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6665 +Y Mu = .30
-----------------------------------------------------------------------------
From 6665 To 6670 DX= -71.923 mm. DZ= 5,999.569 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6670 +Y Mu = .30
-----------------------------------------------------------------------------
From 6670 To 6690 DX= -73.000 mm. DZ= 6,032.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6690 +Y Mu = .30
Node 6690 Guide
-----------------------------------------------------------------------------
From 6690 To 6700 DX= -54.456 mm. DZ= 4,499.670 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6700 +Y Mu = .30
-----------------------------------------------------------------------------
From 6700 To 6710 TP-24 DX= -23.210 mm. DZ= 1,917.860 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 4.127 Angle/Node @1= 2.06 6709
Angle/Node @2= .00 6708
-----------------------------------------------------------------------------
From 6710 To 6730 DX= 180.000 mm. DZ= 3,000.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6730 +Y Mu = .30
-----------------------------------------------------------------------------
From 6730 To 6810 DX= 514.936 mm. DZ= 5,977.863 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .263 Angle/Node @1= .13 6809
Angle/Node @2= .00 6808
RESTRAINTS
Node 6810 +Y Mu = .30
-----------------------------------------------------------------------------
From 6810 To 6830 DX= 545.000 mm. DZ= 6,004.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.147 Angle/Node @1= 1.07 6829
Angle/Node @2= .00 6828
RESTRAINTS
Node 6830 +Y Mu = .30
Node 6830 Guide
-----------------------------------------------------------------------------
From 6830 To 6850 DX= 770.000 mm. DZ= 5,983.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.166 Angle/Node @1= 1.08 6849
Angle/Node @2= .00 6848
RESTRAINTS
Node 6850 +Y Mu = .30
-----------------------------------------------------------------------------
From 6850 To 6870 DX= 996.000 mm. DZ= 5,952.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.142 Angle/Node @1= 1.07 6869
Angle/Node @2= .00 6868
RESTRAINTS
Node 6870 +Y Mu = .30
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 6870 Guide
-----------------------------------------------------------------------------
From 6870 To 6890 DX= 1,195.000 mm. DZ= 5,800.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.187 Angle/Node @1= 1.09 6889
Angle/Node @2= .00 6888
RESTRAINTS
Node 6890 +Y Mu = .30
-----------------------------------------------------------------------------
From 6890 To 6910 DX= 1,443.000 mm. DZ= 5,862.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.167 Angle/Node @1= 1.08 6909
Angle/Node @2= .00 6908
RESTRAINTS
Node 6910 +Y Mu = .30
Node 6910 Guide
-----------------------------------------------------------------------------
From 6910 To 6930 DX= 1,665.000 mm. DZ= 5,808.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.190 Angle/Node @1= 1.09 6929
Angle/Node @2= .00 6928
RESTRAINTS
Node 6930 +Y Mu = .30
-----------------------------------------------------------------------------
From 6930 To 6950 DX= 1,884.000 mm. DZ= 5,735.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 2.107 Angle/Node @1= 1.05 6949
Angle/Node @2= .00 6948
RESTRAINTS
Node 6950 +Y Mu = .30
Node 2130 Guide
-----------------------------------------------------------------------------
From 6950 To 6970 DX= 2,084.000 mm. DZ= 5,636.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 1.107 Angle/Node @1= .55 6969
Angle/Node @2= .00 6968
RESTRAINTS
Node 6970 +Y Mu = .30
Node 6970 Guide
-----------------------------------------------------------------------------
From 6970 To 6990 DX= 2,193.000 mm. DZ= 5,596.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 6990 +Y Mu = .30
-----------------------------------------------------------------------------
From 6990 To 7010 DX= 2,193.000 mm. DZ= 5,596.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7010 +Y Mu = .30
Node 7010 Guide
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 7010 To 7030 DX= 2,193.000 mm. DZ= 5,596.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7030 +Y Mu = .30
-----------------------------------------------------------------------------
From 7030 To 7040 DX= 1,641.914 mm. DZ= 4,189.763 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7040 +Y Mu = .30
-----------------------------------------------------------------------------
From 7040 To 7050 TP-25 DX= 551.086 mm. DZ= 1,406.237 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 10.136 Angle/Node @1= 5.07 7049
Angle/Node @2= .00 7048
-----------------------------------------------------------------------------
From 7050 To 7070 DX= 2,615.115 mm. DZ= 4,261.593 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7070 +Y Mu = .30
-----------------------------------------------------------------------------
From 7070 To 7090 DX= 2,327.309 mm. DZ= 3,792.584 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 60.939 Angle/Node @1= 30.47
7089 Angle/Node @2= .00 7088
-----------------------------------------------------------------------------
From 7090 To 7100 DX= 447.245 mm. DY= -1,485.863 mm. DZ= 694.393 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 7100 To 7101 RC-8 DX= 219.906 mm. DY= -730.586 mm. DZ= 341.427 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7100 X2 K= 813 N./cm. Yield K= 1 N./cm. Yield Force= 2,163 N.
Dir Vec= .2631 -.8740 .4085
Node 7100 X2 K= 116,266 N./cm. Yield K= 1 N./cm.
Yield Force= 309,216 N. Dir Vec= -.8407 .0000 .5415
Node 7100 X2 K= 116,266 N./cm. Yield K= 1 N./cm.
Yield Force= 309,216 N. Dir Vec= .4733 .4859 .7348
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 7101 To 7102 DX= 109.180 mm. DY= -362.724 mm. DZ= 169.513 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 30.466
RESTRAINTS
Node 7101 X2 K= 1,602 N./cm. Yield K= 1 N./cm. Yield Force= 4,260 N.
Dir Vec= .2631 -.8740 .4085
Node 7101 X2 K= 228,982 N./cm. Yield K= 1 N./cm.
Yield Force= 608,990 N. Dir Vec= -.8407 .0000 .5415
Node 7101 X2 K= 228,982 N./cm. Yield K= 1 N./cm.
Yield Force= 608,990 N. Dir Vec= .4733 .4859 .7348
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 7102 To 7110 DX= 387.380 mm. DY= -420.827 mm. DZ= 601.447 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 30.466
RESTRAINTS
Node 7102 X2 K= 1,577 N./cm. Yield K= 1 N./cm. Yield Force= 4,194 N.
Dir Vec= .4667 -.5070 .7246
Node 7102 X2 K= 225,432 N./cm. Yield K= 1 N./cm.
Yield Force= 599,547 N. Dir Vec= -.8407 .0000 .5415
Node 7102 X2 K= 225,432 N./cm. Yield K= 1 N./cm.
Yield Force= 599,547 N. Dir Vec= .2745 .8619 .4263
-----------------------------------------------------------------------------
From 7110 To 7111 DX= 728.683 mm. DY= .000 mm. DZ= 1,131.355 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7110 X2 K= 1,694 N./cm. Yield K= 1 N./cm. Yield Force= 4,505 N.
Dir Vec= .5415 .0000 .8407
Node 7110 X2 K= 242,174 N./cm. Yield K= 1 N./cm.
Yield Force= 644,073 N. Dir Vec= -.8407 .0000 .5415
Node 7110 Y2 K= 242,174 N./cm. Yield K= 1 N./cm.
Yield Force= 644,073 N.
-----------------------------------------------------------------------------
From 7111 To 7112 DX= 503.967 mm. DY= .000 mm. DZ= 782.461 mm.
RESTRAINTS
Node 7111 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .5415 .0000 .8407
Node 7111 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8407 .0000 .5415
Node 7111 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7112 To 7113 DX= 503.967 mm. DY= .000 mm. DZ= 782.461 mm.
RESTRAINTS
Node 7112 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .5415 .0000 .8407
Node 7112 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8407 .0000 .5415
Node 7112 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7113 To 7114 DX= 755.951 mm. DY= .000 mm. DZ= 1,173.692 mm.
RESTRAINTS
Node 7113 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= .5415 .0000 .8407
Node 7113 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8407 .0000 .5415
Node 7113 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 7114 To 7115 DX= 3,033.170 mm. DY= .000 mm. DZ= 4,709.307 mm.
RESTRAINTS
Node 7114 X2 K= 6,808 N./cm. Yield K= 1 N./cm.
Yield Force= 18,107 N. Dir Vec= .5415 .0000 .8407
Node 7114 X2 K= 973,342 N./cm. Yield K= 1 N./cm.
Yield Force= 2,588,648 N. Dir Vec= -.8407 .0000 .5415
Node 7114 Y2 K= 973,342 N./cm. Yield K= 1 N./cm.
Yield Force= 2,588,648 N.
-----------------------------------------------------------------------------
From 7115 To 7116 DX= 755.951 mm. DY= .000 mm. DZ= 1,173.692 mm.
RESTRAINTS
Node 7115 X2 K= 6,808 N./cm. Yield K= 1 N./cm.
Yield Force= 18,107 N. Dir Vec= .5415 .0000 .8407
Node 7115 X2 K= 973,342 N./cm. Yield K= 1 N./cm.
Yield Force= 2,588,648 N. Dir Vec= -.8407 .0000 .5415
Node 7115 Y2 K= 973,342 N./cm. Yield K= 1 N./cm.
Yield Force= 2,588,648 N.
-----------------------------------------------------------------------------
From 7116 To 7117 DX= 503.967 mm. DY= .000 mm. DZ= 782.461 mm.
RESTRAINTS
Node 7116 X2 K= 2,264 N./cm. Yield K= 1 N./cm. Yield Force= 6,021 N.
Dir Vec= .5415 .0000 .8407
Node 7116 X2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N. Dir Vec= -.8407 .0000 .5415
Node 7116 Y2 K= 323,645 N./cm. Yield K= 1 N./cm.
Yield Force= 860,750 N.
-----------------------------------------------------------------------------
From 7117 To 7118 DX= 503.967 mm. DY= .000 mm. DZ= 782.461 mm.
RESTRAINTS
Node 7117 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .5415 .0000 .8407
Node 7117 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8407 .0000 .5415
Node 7117 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7118 To 7119 DX= 503.967 mm. DY= .000 mm. DZ= 782.461 mm.
RESTRAINTS
Node 7118 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .5415 .0000 .8407
Node 7118 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.8407 .0000 .5415
Node 7118 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7119 To 7120 DX= 191.028 mm. DY= .000 mm. DZ= 296.591 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 26.067
RESTRAINTS
Node 7119 X2 K= 1,580 N./cm. Yield K= 1 N./cm. Yield Force= 4,202 N.
Dir Vec= .5415 .0000 .8407
Node 7119 X2 K= 225,901 N./cm. Yield K= 1 N./cm.
Yield Force= 600,795 N. Dir Vec= -.8407 .0000 .5415
Node 7119 Y2 K= 225,901 N./cm. Yield K= 1 N./cm.
Yield Force= 600,795 N.
-----------------------------------------------------------------------------
From 7120 To 7130 DX= 343.190 mm. DY= 310.047 mm. DZ= 532.844 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 26.067
RESTRAINTS
Node 7120 X2 K= 1,349 N./cm. Yield K= 1 N./cm. Yield Force= 3,588 N.
Dir Vec= .4864 .4394 .7552
Node 7120 X2 K= 192,886 N./cm. Yield K= 1 N./cm.
Yield Force= 512,990 N. Dir Vec= -.8407 .0000 .5415
Node 7120 X2 K= 192,886 N./cm. Yield K= 1 N./cm.
Yield Force= 512,990 N. Dir Vec= -.2379 .8983 -.3694
-----------------------------------------------------------------------------
From 7130 To 7139 DX= 250.478 mm. DY= 594.959 mm. DZ= 388.905 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7130 X2 K= 1,798 N./cm. Yield K= 1 N./cm. Yield Force= 4,781 N.
Dir Vec= .3324 .7895 .5160
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 7130 X2 K= 257,026 N./cm. Yield K= 1 N./cm.
Yield Force= 683,573 N. Dir Vec= -.8407 .0000 .5415
Node 7130 X2 K= 257,026 N./cm. Yield K= 1 N./cm.
Yield Force= 683,573 N. Dir Vec= -.4275 .6138 -.6637
-----------------------------------------------------------------------------
From 7139 To 7140 DX= 250.478 mm. DY= 594.959 mm. DZ= 388.905 mm.
RESTRAINTS
Node 7140 X2 K= 1,123 N./cm. Yield K= 1 N./cm. Yield Force= 2,987 N.
Dir Vec= .3324 .7895 .5160
Node 7140 X2 K= 160,583 N./cm. Yield K= 1 N./cm.
Yield Force= 427,077 N. Dir Vec= -.8407 .0000 .5415
Node 7140 X2 K= 160,583 N./cm. Yield K= 1 N./cm.
Yield Force= 427,077 N. Dir Vec= -.4275 .6138 -.6637
-----------------------------------------------------------------------------
From 7140 To 7150 DX= 631.515 mm. DY= 1,500.036 mm. DZ= 980.523 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0000
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 52.135 Angle/Node @1= 26.07
7149 Angle/Node @2= .00 7148
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 7150 To 7170 DX= 2,165.890 mm. DZ= 3,362.874 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7170 +Y
-----------------------------------------------------------------------------
From 7170 To 7210 DX= 2,165.890 mm. DZ= 3,362.874 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 7210 +Y Mu = .30
-----------------------------------------------------------------------------
From 7210 To 7230 TP-26 DX= 457.544 mm. DZ= 710.407 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 22.579 Angle/Node @1= 11.29
7229 Angle/Node @2= .00 7228
-----------------------------------------------------------------------------
From 7230 To 7250 DX= 4,114.000 mm. DZ= 2,842.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7250 +Y Mu = .30
-----------------------------------------------------------------------------
From 7250 To 7270 DX= 4,936.607 mm. DZ= 3,410.266 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7270 +Y Mu = .30
Node 7270 Guide
-----------------------------------------------------------------------------
From 7270 To 7290 DX= 4,936.607 mm. DZ= 3,410.266 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7290 +Y
-----------------------------------------------------------------------------
From 7290 To 7310 TP-27 DX= 509.293 mm. DZ= 351.826 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 21.765 Angle/Node @1= 10.88
7309 Angle/Node @2= .00 7308
-----------------------------------------------------------------------------
From 7310 To 7330 DX= 2,766.806 mm. DZ= 4,164.708 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7330 +Y Mu = .30
-----------------------------------------------------------------------------
From 7330 To 7350 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7350 +Y Mu = .30
Node 7350 Guide
-----------------------------------------------------------------------------
From 7350 To 7370 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7370 +Y Mu = .30
-----------------------------------------------------------------------------
From 7370 To 7390 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7390 +Y Mu = .30
Node 7390 Guide
-----------------------------------------------------------------------------
From 7390 To 7410 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7410 +Y Mu = .30
-----------------------------------------------------------------------------
From 7410 To 7430 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7430 +Y Mu = .30
Node 7430 Guide
-----------------------------------------------------------------------------
From 7430 To 7450 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7450 +Y Mu = .30
-----------------------------------------------------------------------------
From 7450 To 7470 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 7470 +Y Mu = .30
Node 7470 Guide
-----------------------------------------------------------------------------
From 7470 To 7490 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7490 +Y Mu = .30
-----------------------------------------------------------------------------
From 7490 To 7510 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7510 +Y Mu = .30
Node 7510 Guide
-----------------------------------------------------------------------------
From 7510 To 7530 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7530 +Y Mu = .30
-----------------------------------------------------------------------------
From 7530 To 7550 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7550 +Y Mu = .30
Node 7550 Guide
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 7550 To 7570 DX= 3,320.167 mm. DZ= 4,997.649 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7570 +Y Mu = .30
-----------------------------------------------------------------------------
From 7570 To 7590 TP-28 DX= 178.736 mm. DZ= 269.040 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 7.375 Angle/Node @1= 3.69 7589
-----------------------------------------------------------------------------
From 7590 To 7610 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7610 +Y Mu = .30
Node 7610 Guide
-----------------------------------------------------------------------------
From 7610 To 7630 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7630 +Y Mu = .30
-----------------------------------------------------------------------------
From 7630 To 7650 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7650 +Y Mu = .30
Node 7650 Guide
-----------------------------------------------------------------------------
From 7650 To 7670 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7670 +Y Mu = .30
-----------------------------------------------------------------------------
From 7670 To 7690 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7690 +Y Mu = .30
Node 7690 Guide
-----------------------------------------------------------------------------
From 7690 To 7710 DX= 2,651.000 mm. DZ= 5,382.000 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7710 +Y Mu = .30
-----------------------------------------------------------------------------
From 7710 To 7730 TP-29 DX= 505.943 mm. DZ= 1,027.155 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.664 Angle/Node @1= 14.33
7729 Angle/Node @2= .00 7728
-----------------------------------------------------------------------------
From 7730 To 7750 DX= 2,454.073 mm. DZ= 1,725.551 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
RESTRAINTS
Node 7750 +Y Mu = .30
-----------------------------------------------------------------------------
From 7750 To 7770 DX= 2,589.047 mm. DZ= 1,820.457 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 68.777 Angle/Node @1= 34.39
7769 Angle/Node @2= .00 7768
-----------------------------------------------------------------------------
From 7770 To 7780 DX= 473.795 mm. DY= -1,491.487 mm. DZ= 333.143 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0078334 kg./cu.cm. Fluid Den= .0010000 kg./cu.cm.
-----------------------------------------------------------------------------
From 7780 To 7781 DX= 170.331 mm. DY= -536.195 mm. DZ= 119.766 mm.
B31.4 (2006) Sy= 241,311 KPa Fac= .0010
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 7780 X2 K= 560 N./cm. Yield K= 1 N./cm. Yield Force= 1,488 N.
Dir Vec= .2961 -.9322 .2082
Node 7780 X2 K= 80,009 N./cm. Yield K= 1 N./cm.
Yield Force= 212,787 N. Dir Vec= -.5752 .0000 .8180
Node 7780 X2 K= 80,009 N./cm. Yield K= 1 N./cm.
Yield Force= 212,787 N. Dir Vec= .7625 .3620 .5362
ALLOWABLE STRESSES
-----------------------------------------------------------------------------
From 7781 To 7782 DX= 139.648 mm. DY= -439.607 mm. DZ= 98.192 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 34.389
RESTRAINTS
Node 7781 X2 K= 1,450 N./cm. Yield K= 1 N./cm. Yield Force= 3,855 N.
Dir Vec= .2961 -.9322 .2082
Node 7781 X2 K= 207,239 N./cm. Yield K= 1 N./cm.
Yield Force= 551,161 N. Dir Vec= -.5752 .0000 .8180
Node 7781 X2 K= 207,239 N./cm. Yield K= 1 N./cm.
Yield Force= 551,161 N. Dir Vec= .7625 .3620 .5362
-----------------------------------------------------------------------------
From 7782 To 7790 DX= 636.699 mm. DY= -532.711 mm. DZ= 447.687 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 34.389
RESTRAINTS
Node 7782 X2 K= 1,780 N./cm. Yield K= 1 N./cm. Yield Force= 4,734 N.
Dir Vec= .6751 -.5648 .4747
Node 7782 X2 K= 254,460 N./cm. Yield K= 1 N./cm.
Yield Force= 676,748 N. Dir Vec= -.5752 .0000 .8180
Node 7782 X2 K= 254,460 N./cm. Yield K= 1 N./cm.
Yield Force= 676,748 N. Dir Vec= .4620 .8252 .3249
-----------------------------------------------------------------------------
From 7790 To 7791 RC-9 DX= 1,147.119 mm. DY= .000 mm. DZ= 806.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7790 X2 K= 1,795 N./cm. Yield K= 1 N./cm. Yield Force= 4,775 N.
Dir Vec= .8180 .0000 .5752
Node 7790 X2 K= 256,688 N./cm. Yield K= 1 N./cm.
Yield Force= 682,674 N. Dir Vec= -.5752 .0000 .8180
Node 7790 Y2 K= 256,688 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 682,674 N.
-----------------------------------------------------------------------------
From 7791 To 7792 DX= 761.347 mm. DY= .000 mm. DZ= 535.332 mm.
RESTRAINTS
Node 7791 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .8180 .0000 .5752
Node 7791 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.5752 .0000 .8180
Node 7791 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7792 To 7793 DX= 761.347 mm. DY= .000 mm. DZ= 535.332 mm.
RESTRAINTS
Node 7792 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .8180 .0000 .5752
Node 7792 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.5752 .0000 .8180
Node 7792 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7793 To 7794 DX= 2,184.217 mm. DY= .000 mm. DZ= 1,535.806 mm.
RESTRAINTS
Node 7793 X2 K= 3,503 N./cm. Yield K= 1 N./cm. Yield Force= 9,317 N.
Dir Vec= .8180 .0000 .5752
Node 7793 X2 K= 500,859 N./cm. Yield K= 1 N./cm.
Yield Force= 1,332,058 N. Dir Vec= -.5752 .0000 .8180
Node 7793 Y2 K= 500,859 N./cm. Yield K= 1 N./cm.
Yield Force= 1,332,058 N.
-----------------------------------------------------------------------------
From 7794 To 7795 DX= 761.347 mm. DY= .000 mm. DZ= 535.332 mm.
RESTRAINTS
Node 7794 X2 K= 3,503 N./cm. Yield K= 1 N./cm. Yield Force= 9,317 N.
Dir Vec= .8180 .0000 .5752
Node 7794 X2 K= 500,859 N./cm. Yield K= 1 N./cm.
Yield Force= 1,332,058 N. Dir Vec= -.5752 .0000 .8180
Node 7794 Y2 K= 500,859 N./cm. Yield K= 1 N./cm.
Yield Force= 1,332,058 N.
-----------------------------------------------------------------------------
From 7795 To 7796 DX= 761.347 mm. DY= .000 mm. DZ= 535.332 mm.
RESTRAINTS
Node 7795 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .8180 .0000 .5752
Node 7795 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.5752 .0000 .8180
Node 7795 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7796 To 7797 DX= 761.347 mm. DY= .000 mm. DZ= 535.332 mm.
RESTRAINTS
Node 7796 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .8180 .0000 .5752
Node 7796 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.5752 .0000 .8180
Node 7796 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7797 To 7798 DX= 312.596 mm. DY= .000 mm. DZ= 219.798 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 7797 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= .8180 .0000 .5752
Node 7797 X2 K= 233,617 N./cm. Yield K= 1 N./cm.
Yield Force= 621,316 N. Dir Vec= -.5752 .0000 .8180
Node 7797 Y2 K= 233,617 N./cm. Yield K= 1 N./cm.
Yield Force= 621,316 N.
-----------------------------------------------------------------------------
From 7798 To 7810 DX= 551.189 mm. DY= 360.602 mm. DZ= 387.642 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 7798 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,875 N.
Dir Vec= .7212 .4718 .5072
Node 7798 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,032 N. Dir Vec= -.5753 .0000 .8180
Node 7798 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,032 N. Dir Vec= -.3859 .8817 -.2714
-----------------------------------------------------------------------------
From 7810 To 7820 DX= 620.052 mm. DY= 1,137.014 mm. DZ= 436.234 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7810 X2 K= 1,686 N./cm. Yield K= 1 N./cm. Yield Force= 4,485 N.
Dir Vec= .4537 .8320 .3192
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 7810 X2 K= 241,092 N./cm. Yield K= 1 N./cm.
Yield Force= 641,196 N. Dir Vec= -.5754 .0000 .8179
Node 7810 X2 K= 241,092 N./cm. Yield K= 1 N./cm.
Yield Force= 641,196 N. Dir Vec= -.6805 .5548 -.4787
-----------------------------------------------------------------------------
From 7820 To 7821 DX= 449.269 mm. DY= 823.842 mm. DZ= 316.081 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7820 X2 K= 1,921 N./cm. Yield K= 1 N./cm. Yield Force= 5,110 N.
Dir Vec= .4537 .8320 .3192
Node 7820 X2 K= 274,663 N./cm. Yield K= 1 N./cm.
Yield Force= 730,480 N. Dir Vec= -.5754 .0000 .8179
Node 7820 X2 K= 274,663 N./cm. Yield K= 1 N./cm.
Yield Force= 730,480 N. Dir Vec= -.6805 .5548 -.4787
-----------------------------------------------------------------------------
From 7821 To 7822 DX= 173.383 mm. DY= 317.940 mm. DZ= 121.983 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 7821 X2 K= 1,692 N./cm. Yield K= 1 N./cm. Yield Force= 4,500 N.
Dir Vec= .4537 .8320 .3192
Node 7821 X2 K= 241,889 N./cm. Yield K= 1 N./cm.
Yield Force= 643,316 N. Dir Vec= -.5754 .0000 .8179
Node 7821 X2 K= 241,889 N./cm. Yield K= 1 N./cm.
Yield Force= 643,316 N. Dir Vec= -.6805 .5548 -.4787
-----------------------------------------------------------------------------
From 7822 To 7830 DX= 551.121 mm. DY= 360.602 mm. DZ= 387.739 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.153
RESTRAINTS
Node 7822 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,875 N.
Dir Vec= .7211 .4718 .5073
Node 7822 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,032 N. Dir Vec= -.5754 .0000 .8179
Node 7822 X2 K= 208,318 N./cm. Yield K= 1 N./cm.
Yield Force= 554,032 N. Dir Vec= -.3859 .8817 -.2715
-----------------------------------------------------------------------------
From 7830 To 7850 DX= 1,281.262 mm. DY= .000 mm. DZ= 901.426 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7830 X2 K= 1,881 N./cm. Yield K= 1 N./cm. Yield Force= 5,003 N.
Dir Vec= .8179 .0000 .5754
Node 7830 X2 K= 268,911 N./cm. Yield K= 1 N./cm.
Yield Force= 715,182 N. Dir Vec= -.5754 .0000 .8179
Node 7830 Y2 K= 268,911 N./cm. Yield K= 1 N./cm.
Yield Force= 715,182 N.
-----------------------------------------------------------------------------
From 7850 To 7851 DX= 727.203 mm. DY= .000 mm. DZ= 511.620 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7850 X2 K= 2,017 N./cm. Yield K= 1 N./cm. Yield Force= 5,366 N.
Dir Vec= .8179 .0000 .5754
Node 7850 X2 K= 288,428 N./cm. Yield K= 1 N./cm.
Yield Force= 767,089 N. Dir Vec= -.5754 .0000 .8179
Node 7850 Y2 K= 288,428 N./cm. Yield K= 1 N./cm.
Yield Force= 767,089 N.
-----------------------------------------------------------------------------
From 7851 To 7852 DX= 727.203 mm. DY= .000 mm. DZ= 511.620 mm.
RESTRAINTS
Node 7851 X2 K= 1,730 N./cm. Yield K= 1 N./cm. Yield Force= 4,601 N.
Dir Vec= .8179 .0000 .5754
Node 7851 X2 K= 247,352 N./cm. Yield K= 1 N./cm.
Yield Force= 657,845 N. Dir Vec= -.5754 .0000 .8179
Node 7851 Y2 K= 247,352 N./cm. Yield K= 1 N./cm.
Yield Force= 657,845 N.
-----------------------------------------------------------------------------
From 7852 To 7853 DX= 761.201 mm. DY= .000 mm. DZ= 535.539 mm.
RESTRAINTS
Node 7852 X2 K= 1,771 N./cm. Yield K= 1 N./cm. Yield Force= 4,709 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Dir Vec= .8179 .0000 .5754
Node 7852 X2 K= 253,134 N./cm. Yield K= 1 N./cm.
Yield Force= 673,223 N. Dir Vec= -.5754 .0000 .8179
Node 7852 Y2 K= 253,134 N./cm. Yield K= 1 N./cm.
Yield Force= 673,223 N.
-----------------------------------------------------------------------------
From 7853 To 7854 DX= 8.585 mm. DY= .000 mm. DZ= 6.040 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .789
RESTRAINTS
Node 7853 X2 K= 926 N./cm. Yield K= 1 N./cm. Yield Force= 2,463 N.
Dir Vec= .8179 .0000 .5754
Node 7853 X2 K= 132,378 N./cm. Yield K= 1 N./cm.
Yield Force= 352,066 N. Dir Vec= -.5754 .0000 .8179
Node 7853 Y2 K= 132,378 N./cm. Yield K= 1 N./cm.
Yield Force= 352,066 N.
-----------------------------------------------------------------------------
From 7854 To 7870 DX= 17.002 mm. DY= .000 mm. DZ= 12.316 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .789
RESTRAINTS
Node 7854 X2 K= 41 N./cm. Yield K= 1 N./cm. Yield Force= 109 N.
Dir Vec= .8099 .0000 .5866
Node 7854 X2 K= 5,840 N./cm. Yield K= 1 N./cm.
Yield Force= 15,533 N. Dir Vec= -.5866 .0000 .8099
Node 7854 Y2 K= 5,840 N./cm. Yield K= 1 N./cm.
Yield Force= 15,533 N.
-----------------------------------------------------------------------------
From 7870 To 7871 DX= 754.576 mm. DY= .000 mm. DZ= 562.579 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7870 X2 K= 926 N./cm. Yield K= 1 N./cm. Yield Force= 2,463 N.
Dir Vec= .8017 .0000 .5977
Node 7870 X2 K= 132,378 N./cm. Yield K= 1 N./cm.
Yield Force= 352,066 N. Dir Vec= -.5977 .0000 .8017
Node 7870 Y2 K= 132,378 N./cm. Yield K= 1 N./cm.
Yield Force= 352,066 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 7871 To 7872 DX= 746.160 mm. DY= .000 mm. DZ= 556.304 mm.
RESTRAINTS
Node 7871 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .8017 .0000 .5977
Node 7871 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.5977 .0000 .8017
Node 7871 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 7872 To 7873 DX= 848.924 mm. DY= .000 mm. DZ= 632.921 mm.
RESTRAINTS
Node 7872 X2 K= 1,936 N./cm. Yield K= 1 N./cm. Yield Force= 5,148 N.
Dir Vec= .8017 .0000 .5977
Node 7872 X2 K= 276,746 N./cm. Yield K= 1 N./cm.
Yield Force= 736,019 N. Dir Vec= -.5977 .0000 .8017
Node 7872 Y2 K= 276,746 N./cm. Yield K= 1 N./cm.
Yield Force= 736,019 N.
-----------------------------------------------------------------------------
From 7873 To 7890 DX= 848.924 mm. DY= .000 mm. DZ= 632.921 mm.
RESTRAINTS
Node 7873 X2 K= 2,060 N./cm. Yield K= 1 N./cm. Yield Force= 5,480 N.
Dir Vec= .8017 .0000 .5977
Node 7873 X2 K= 294,576 N./cm. Yield K= 1 N./cm.
Yield Force= 783,437 N. Dir Vec= -.5977 .0000 .8017
Node 7873 Y2 K= 294,576 N./cm. Yield K= 1 N./cm.
Yield Force= 783,437 N.
-----------------------------------------------------------------------------
From 7890 To 7910 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7890 X2 K= 6,868 N./cm. Yield K= 1 N./cm.
Yield Force= 18,265 N. Dir Vec= .8017 .0000 .5977
Node 7890 X2 K= 981,861 N./cm. Yield K= 1 N./cm.
Yield Force= 2,611,305 N. Dir Vec= -.5977 .0000 .8017
Node 7890 Y2 K= 981,861 N./cm. Yield K= 1 N./cm.
Yield Force= 2,611,305 N.
-----------------------------------------------------------------------------
From 7910 To 7930 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7910 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 7910 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 7910 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 7930 To 7950 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7930 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 7930 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 7930 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 7950 To 7970 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7950 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 7950 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 7950 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 7970 To 7990 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7970 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 7970 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 7970 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 7990 To 8010 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 7990 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 7990 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 7990 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8010 To 8030 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8010 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 8010 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 8010 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8030 To 8050 DX= 4,810.240 mm. DY= .000 mm. DZ= 3,586.306 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8030 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .8017 .0000 .5977
Node 8030 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.5977 .0000 .8017
Node 8030 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8050 To 8051 TP-30 DX= 732.213 mm. DY= .000 mm. DZ= 545.906 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8050 X2 K= 6,726 N./cm. Yield K= 1 N./cm.
Yield Force= 17,889 N. Dir Vec= .8017 .0000 .5977
Node 8050 X2 K= 961,612 N./cm. Yield K= 1 N./cm.
Yield Force= 2,557,451 N. Dir Vec= -.5977 .0000 .8017
Node 8050 Y2 K= 961,612 N./cm. Yield K= 1 N./cm.
Yield Force= 2,557,451 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 8051 To 8052 DX= 732.213 mm. DY= .000 mm. DZ= 545.906 mm.
RESTRAINTS
Node 8051 X2 K= 1,777 N./cm. Yield K= 1 N./cm. Yield Force= 4,727 N.
Dir Vec= .8017 .0000 .5977
Node 8051 X2 K= 254,077 N./cm. Yield K= 1 N./cm.
Yield Force= 675,729 N. Dir Vec= -.5977 .0000 .8017
Node 8051 Y2 K= 254,077 N./cm. Yield K= 1 N./cm.
Yield Force= 675,729 N.
-----------------------------------------------------------------------------
From 8052 To 8053 DX= 746.159 mm. DY= .000 mm. DZ= 556.304 mm.
RESTRAINTS
Node 8052 X2 K= 1,794 N./cm. Yield K= 1 N./cm. Yield Force= 4,772 N.
Dir Vec= .8017 .0000 .5977
Node 8052 X2 K= 256,497 N./cm. Yield K= 1 N./cm.
Yield Force= 682,165 N. Dir Vec= -.5977 .0000 .8017
Node 8052 Y2 K= 256,497 N./cm. Yield K= 1 N./cm.
Yield Force= 682,165 N.
-----------------------------------------------------------------------------
From 8053 To 8054 DX= 250.257 mm. DY= .000 mm. DZ= 186.581 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.151
RESTRAINTS
Node 8053 X2 K= 1,505 N./cm. Yield K= 1 N./cm. Yield Force= 4,002 N.
Dir Vec= .8017 .0000 .5977
Node 8053 X2 K= 215,112 N./cm. Yield K= 1 N./cm.
Yield Force= 572,101 N. Dir Vec= -.5977 .0000 .8017
Node 8053 Y2 K= 215,112 N./cm. Yield K= 1 N./cm.
Yield Force= 572,101 N.
-----------------------------------------------------------------------------
From 8054 To 8070 DX= 313.497 mm. DY= .000 mm. DZ= 539.893 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 23.151
RESTRAINTS
Node 8054 X2 K= 1,198 N./cm. Yield K= 1 N./cm. Yield Force= 3,187 N.
Dir Vec= .5021 .0000 .8648
Node 8054 X2 K= 171,309 N./cm. Yield K= 1 N./cm.
Yield Force= 455,603 N. Dir Vec= -.8648 .0000 .5021
Node 8054 Y2 K= 171,309 N./cm. Yield K= 1 N./cm.
Yield Force= 455,603 N.
-----------------------------------------------------------------------------
From 8070 To 8071 DX= 151.274 mm. DY= .000 mm. DZ= 1,233.629 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8070 X2 K= 1,505 N./cm. Yield K= 1 N./cm. Yield Force= 4,002 N.
Dir Vec= .1217 .0000 .9926
Node 8070 X2 K= 215,112 N./cm. Yield K= 1 N./cm.
Yield Force= 572,101 N. Dir Vec= -.9926 .0000 .1217
Node 8070 Y2 K= 215,112 N./cm. Yield K= 1 N./cm.
Yield Force= 572,101 N.
-----------------------------------------------------------------------------
From 8071 To 8072 DX= 113.280 mm. DY= .000 mm. DZ= 923.794 mm.
RESTRAINTS
Node 8071 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .1217 .0000 .9926
Node 8071 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9926 .0000 .1217
Node 8071 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 8072 To 8090 DX= 120.124 mm. DY= .000 mm. DZ= 979.605 mm.
RESTRAINTS
Node 8072 X2 K= 1,866 N./cm. Yield K= 1 N./cm. Yield Force= 4,962 N.
Dir Vec= .1217 .0000 .9926
Node 8072 X2 K= 266,738 N./cm. Yield K= 1 N./cm.
Yield Force= 709,401 N. Dir Vec= -.9926 .0000 .1217
Node 8072 Y2 K= 266,738 N./cm. Yield K= 1 N./cm.
Yield Force= 709,401 N.
-----------------------------------------------------------------------------
From 8090 To 8110 DX= 730.281 mm. DY= .000 mm. DZ= 5,955.392 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8090 X2 K= 6,798 N./cm. Yield K= 1 N./cm.
Yield Force= 18,079 N. Dir Vec= .1217 .0000 .9926
Node 8090 X2 K= 971,853 N./cm. Yield K= 1 N./cm.
Yield Force= 2,584,687 N. Dir Vec= -.9926 .0000 .1217
Node 8090 Y2 K= 971,853 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 2,584,687 N.
-----------------------------------------------------------------------------
From 8110 To 8130 DX= 730.281 mm. DY= .000 mm. DZ= 5,955.392 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8110 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .1217 .0000 .9926
Node 8110 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9926 .0000 .1217
Node 8110 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8130 To 8131 TP-31 DX= 114.478 mm. DY= .000 mm. DZ= 933.559 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8130 X2 K= 6,753 N./cm. Yield K= 1 N./cm.
Yield Force= 17,959 N. Dir Vec= .1217 .0000 .9926
Node 8130 X2 K= 965,400 N./cm. Yield K= 1 N./cm.
Yield Force= 2,567,526 N. Dir Vec= -.9926 .0000 .1217
Node 8130 Y2 K= 965,400 N./cm. Yield K= 1 N./cm.
Yield Force= 2,567,526 N.
-----------------------------------------------------------------------------
From 8131 To 8132 DX= 113.280 mm. DY= .000 mm. DZ= 923.794 mm.
RESTRAINTS
Node 8131 X2 K= 1,821 N./cm. Yield K= 1 N./cm. Yield Force= 4,842 N.
Dir Vec= .1217 .0000 .9926
Node 8131 X2 K= 260,285 N./cm. Yield K= 1 N./cm.
Yield Force= 692,239 N. Dir Vec= -.9926 .0000 .1217
Node 8131 Y2 K= 260,285 N./cm. Yield K= 1 N./cm.
Yield Force= 692,239 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 8132 To 8133 DX= 55.920 mm. DY= .000 mm. DZ= 456.022 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 33.553
RESTRAINTS
Node 8132 X2 K= 1,774 N./cm. Yield K= 1 N./cm. Yield Force= 4,718 N.
Dir Vec= .1217 .0000 .9926
Node 8132 X2 K= 253,596 N./cm. Yield K= 1 N./cm.
Yield Force= 674,450 N. Dir Vec= -.9926 .0000 .1217
Node 8132 Y2 K= 253,596 N./cm. Yield K= 1 N./cm.
Yield Force= 674,450 N.
-----------------------------------------------------------------------------
From 8133 To 8150 DX= 597.296 mm. DY= .000 mm. DZ= 698.262 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 33.553
RESTRAINTS
Node 8133 X2 K= 1,737 N./cm. Yield K= 1 N./cm. Yield Force= 4,619 N.
Dir Vec= .6500 .0000 .7599
Node 8133 X2 K= 248,276 N./cm. Yield K= 1 N./cm.
Yield Force= 660,301 N. Dir Vec= -.7599 .0000 .6500
Node 8133 Y2 K= 248,276 N./cm. Yield K= 1 N./cm.
Yield Force= 660,301 N.
-----------------------------------------------------------------------------
From 8150 To 8151 DX= 1,336.943 mm. DY= .000 mm. DZ= 380.925 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8150 X2 K= 1,774 N./cm. Yield K= 1 N./cm. Yield Force= 4,718 N.
Dir Vec= .9617 .0000 .2740
Node 8150 X2 K= 253,596 N./cm. Yield K= 1 N./cm.
Yield Force= 674,450 N. Dir Vec= -.2740 .0000 .9617
Node 8150 Y2 K= 253,596 N./cm. Yield K= 1 N./cm.
Yield Force= 674,450 N.
-----------------------------------------------------------------------------
From 8151 To 8170 DX= 1,017.861 mm. DY= .000 mm. DZ= 290.011 mm.
RESTRAINTS
Node 8151 X2 K= 1,935 N./cm. Yield K= 1 N./cm. Yield Force= 5,147 N.
Dir Vec= .9617 .0000 .2740
Node 8151 X2 K= 276,673 N./cm. Yield K= 1 N./cm.
Yield Force= 735,824 N. Dir Vec= -.2740 .0000 .9617
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 8151 Y2 K= 276,673 N./cm. Yield K= 1 N./cm.
Yield Force= 735,824 N.
-----------------------------------------------------------------------------
From 8170 To 8190 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8170 X2 K= 6,867 N./cm. Yield K= 1 N./cm.
Yield Force= 18,264 N. Dir Vec= .9617 .0000 .2740
Node 8170 X2 K= 981,788 N./cm. Yield K= 1 N./cm.
Yield Force= 2,611,110 N. Dir Vec= -.2740 .0000 .9617
Node 8170 Y2 K= 981,788 N./cm. Yield K= 1 N./cm.
Yield Force= 2,611,110 N.
-----------------------------------------------------------------------------
From 8190 To 8210 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8190 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8190 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8190 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8210 To 8230 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8210 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8210 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8210 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8230 To 8250 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8230 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8230 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8230 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8250 To 8270 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8250 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8250 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8250 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8270 To 8290 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8270 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8270 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8270 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8290 To 8310 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8290 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8290 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8290 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8310 To 8330 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8310 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8310 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8310 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8330 To 8350 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8330 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8330 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8330 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8350 To 8370 DX= 5,770.350 mm. DY= .000 mm. DZ= 1,644.100 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8350 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9617 .0000 .2740
Node 8350 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.2740 .0000 .9617
Node 8350 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8370 To 8390 DX= 4,180.619 mm. DY= .000 mm. DZ= 1,191.150 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8370 X2 K= 10,067 N./cm. Yield K= 1 N./cm.
Yield Force= 26,774 N. Dir Vec= .9617 .0000 .2740
Node 8370 X2 K= 1,439,222 N./cm. Yield K= 1 N./cm.
Yield Force= 3,827,677 N. Dir Vec= -.2740 .0000 .9617
Node 8370 Y2 K= 1,439,222 N./cm. Yield K= 1 N./cm.
Yield Force= 3,827,677 N.
-----------------------------------------------------------------------------
From 8390 To 8410 DX= 2,885.194 mm. DY= .000 mm. DZ= 821.984 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8390 X2 K= 7,148 N./cm. Yield K= 1 N./cm.
Yield Force= 19,011 N. Dir Vec= .9617 .0000 .2740
Node 8390 X2 K= 1,021,935 N./cm. Yield K= 1 N./cm.
Yield Force= 2,717,884 N. Dir Vec= -.2740 .0000 .9617
Node 8390 Y2 K= 1,021,935 N./cm. Yield K= 1 N./cm.
Yield Force= 2,717,884 N.
-----------------------------------------------------------------------------
From 8410 To 8411 TP-32 DX= 843.748 mm. DY= .000 mm. DZ= 240.382 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8410 X2 K= 3,772 N./cm. Yield K= 1 N./cm.
Yield Force= 10,033 N. Dir Vec= .9617 .0000 .2740
Node 8410 X2 K= 539,318 N./cm. Yield K= 1 N./cm.
Yield Force= 1,434,342 N. Dir Vec= -.2740 .0000 .9617
Node 8410 Y2 K= 539,318 N./cm. Yield K= 1 N./cm.
Yield Force= 1,434,342 N.
-----------------------------------------------------------------------------
From 8411 To 8412 DX= 843.748 mm. DY= .000 mm. DZ= 240.382 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 8411 X2 K= 1,707 N./cm. Yield K= 1 N./cm. Yield Force= 4,540 N.
Dir Vec= .9617 .0000 .2740
Node 8411 X2 K= 244,063 N./cm. Yield K= 1 N./cm.
Yield Force= 649,097 N. Dir Vec= -.2740 .0000 .9617
Node 8411 Y2 K= 244,063 N./cm. Yield K= 1 N./cm.
Yield Force= 649,097 N.
-----------------------------------------------------------------------------
From 8412 To 8413 DX= 895.097 mm. DY= .000 mm. DZ= 255.011 mm.
RESTRAINTS
Node 8412 X2 K= 1,759 N./cm. Yield K= 1 N./cm. Yield Force= 4,678 N.
Dir Vec= .9617 .0000 .2740
Node 8412 X2 K= 251,490 N./cm. Yield K= 1 N./cm.
Yield Force= 668,849 N. Dir Vec= -.2740 .0000 .9617
Node 8412 Y2 K= 251,490 N./cm. Yield K= 1 N./cm.
Yield Force= 668,849 N.
-----------------------------------------------------------------------------
From 8413 To 8414 DX= 544.818 mm. DY= .000 mm. DZ= 155.217 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 40.782
RESTRAINTS
Node 8413 X2 K= 1,961 N./cm. Yield K= 1 N./cm. Yield Force= 5,215 N.
Dir Vec= .9617 .0000 .2740
Node 8413 X2 K= 280,342 N./cm. Yield K= 1 N./cm.
Yield Force= 745,583 N. Dir Vec= -.2740 .0000 .9617
Node 8413 Y2 K= 280,342 N./cm. Yield K= 1 N./cm.
Yield Force= 745,583 N.
-----------------------------------------------------------------------------
From 8414 To 8430 DX= 622.303 mm. DY= .000 mm. DZ= 946.791 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 40.782
RESTRAINTS
Node 8414 X2 K= 2,111 N./cm. Yield K= 1 N./cm. Yield Force= 5,614 N.
Dir Vec= .5493 .0000 .8357
Node 8414 X2 K= 301,768 N./cm. Yield K= 1 N./cm.
Yield Force= 802,566 N. Dir Vec= -.8357 .0000 .5493
Node 8414 Y2 K= 301,768 N./cm. Yield K= 1 N./cm.
Yield Force= 802,566 N.
-----------------------------------------------------------------------------
From 8430 To 8450 DX= -162.725 mm. DY= .000 mm. DZ= 1,241.719 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8430 X2 K= 1,723 N./cm. Yield K= 1 N./cm. Yield Force= 4,582 N.
Dir Vec= -.1299 .0000 .9915
Node 8430 X2 K= 246,281 N./cm. Yield K= 1 N./cm.
Yield Force= 654,996 N. Dir Vec= -.9915 .0000 -.1299
Node 8430 Y2 K= 246,281 N./cm. Yield K= 1 N./cm.
Yield Force= 654,996 N.
-----------------------------------------------------------------------------
From 8450 To 8470 DX= -649.687 mm. DY= .000 mm. DZ= 4,957.611 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8450 X2 K= 5,532 N./cm. Yield K= 1 N./cm.
Yield Force= 14,713 N. Dir Vec= -.1299 .0000 .9915
Node 8450 X2 K= 790,875 N./cm. Yield K= 1 N./cm.
Yield Force= 2,103,368 N. Dir Vec= -.9915 .0000 -.1299
Node 8450 Y2 K= 790,875 N./cm. Yield K= 1 N./cm.
Yield Force= 2,103,368 N.
-----------------------------------------------------------------------------
From 8470 To 8490 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8470 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= -.1299 .0000 .9915
Node 8470 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.9915 .0000 -.1299
Node 8470 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 8490 To 8510 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8490 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8490 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8490 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8510 To 8530 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8510 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8510 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8510 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8530 To 8550 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8530 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8530 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8530 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8550 To 8570 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8550 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8550 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8550 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8570 To 8590 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8570 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8570 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8570 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8590 To 8610 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8590 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8590 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8590 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8610 To 8630 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8610 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8610 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8610 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8630 To 8650 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8630 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8630 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8630 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 8650 To 8670 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8650 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8650 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8650 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8670 To 8690 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8670 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8670 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8670 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8690 To 8710 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 8690 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8690 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8690 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8710 To 8730 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8710 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8710 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8710 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8730 To 8750 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8730 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8730 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8730 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8750 To 8770 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8750 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8750 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8750 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8770 To 8790 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8770 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8770 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8770 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8790 To 8810 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8790 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8790 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8790 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8810 To 8830 DX= -779.624 mm. DY= .000 mm. DZ= 5,949.133 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8810 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.1299 .0000 .9915
Node 8810 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9915 .0000 -.1299
Node 8810 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8830 To 8831 DX= -65.335 mm. DY= .000 mm. DZ= 498.555 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8830 X2 K= 6,327 N./cm. Yield K= 1 N./cm.
Yield Force= 16,827 N. Dir Vec= -.1299 .0000 .9915
Node 8830 X2 K= 904,513 N./cm. Yield K= 1 N./cm.
Yield Force= 2,405,594 N. Dir Vec= -.9915 .0000 -.1299
Node 8830 Y2 K= 904,513 N./cm. Yield K= 1 N./cm.
Yield Force= 2,405,594 N.
-----------------------------------------------------------------------------
From 8831 To 8832 DX= -.337 mm. DY= .000 mm. DZ= 2.569 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .195
RESTRAINTS
Node 8831 X2 K= 494 N./cm. Yield K= 1 N./cm. Yield Force= 1,314 N.
Dir Vec= -.1299 .0000 .9915
Node 8831 X2 K= 70,661 N./cm. Yield K= 1 N./cm.
Yield Force= 187,925 N. Dir Vec= -.9915 .0000 -.1299
Node 8831 Y2 K= 70,661 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 187,925 N.
-----------------------------------------------------------------------------
From 8832 To 8850 DX= -.691 mm. DY= .000 mm. DZ= 5.136 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= .196
RESTRAINTS
Node 8832 X2 K= 10 N./cm. Yield K= 1 N./cm. Yield Force= 27 N.
Dir Vec= -.1333 .0000 .9911
Node 8832 X2 K= 1,442 N./cm. Yield K= 1 N./cm. Yield Force= 3,834 N.
Dir Vec= -.9911 .0000 -.1333
Node 8832 Y2 K= 1,442 N./cm. Yield K= 1 N./cm. Yield Force= 3,834 N.
-----------------------------------------------------------------------------
From 8850 To 8851 DX= -127.568 mm. DY= .000 mm. DZ= 924.559 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8850 X2 K= 911 N./cm. Yield K= 1 N./cm. Yield Force= 2,422 N.
Dir Vec= -.1367 .0000 .9906
Node 8850 X2 K= 130,179 N./cm. Yield K= 1 N./cm.
Yield Force= 346,217 N. Dir Vec= -.9906 .0000 -.1367
Node 8850 Y2 K= 130,179 N./cm. Yield K= 1 N./cm.
Yield Force= 346,217 N.
-----------------------------------------------------------------------------
From 8851 To 8852 DX= -127.212 mm. DY= .000 mm. DZ= 921.979 mm.
RESTRAINTS
Node 8851 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.1367 .0000 .9906
Node 8851 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9906 .0000 -.1367
Node 8851 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 8852 To 8853 DX= -127.212 mm. DY= .000 mm. DZ= 921.979 mm.
RESTRAINTS
Node 8852 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.1367 .0000 .9906
Node 8852 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9906 .0000 -.1367
Node 8852 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 8853 To 8854 DX= -218.826 mm. DY= .000 mm. DZ= 1,585.958 mm.
RESTRAINTS
Node 8853 X2 K= 2,463 N./cm. Yield K= 1 N./cm. Yield Force= 6,551 N.
Dir Vec= -.1367 .0000 .9906
Node 8853 X2 K= 352,148 N./cm. Yield K= 1 N./cm.
Yield Force= 936,553 N. Dir Vec= -.9906 .0000 -.1367
Node 8853 Y2 K= 352,148 N./cm. Yield K= 1 N./cm.
Yield Force= 936,553 N.
-----------------------------------------------------------------------------
From 8854 To 8870 DX= -218.826 mm. DY= .000 mm. DZ= 1,585.958 mm.
RESTRAINTS
Node 8854 X2 K= 3,115 N./cm. Yield K= 1 N./cm. Yield Force= 8,285 N.
Dir Vec= -.1367 .0000 .9906
Node 8854 X2 K= 445,379 N./cm. Yield K= 1 N./cm.
Yield Force= 1,184,507 N. Dir Vec= -.9906 .0000 -.1367
Node 8854 Y2 K= 445,379 N./cm. Yield K= 1 N./cm.
Yield Force= 1,184,507 N.
-----------------------------------------------------------------------------
From 8870 To 8871 TP-33 DX= -176.784 mm. DY= .000 mm. DZ= 1,281.253 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8870 X2 K= 2,816 N./cm. Yield K= 1 N./cm. Yield Force= 7,489 N.
Dir Vec= -.1367 .0000 .9906
Node 8870 X2 K= 402,595 N./cm. Yield K= 1 N./cm.
Yield Force= 1,070,719 N. Dir Vec= -.9906 .0000 -.1367
Node 8870 Y2 K= 402,595 N./cm. Yield K= 1 N./cm.
Yield Force= 1,070,719 N.
-----------------------------------------------------------------------------
From 8871 To 8872 DX= -127.212 mm. DY= .000 mm. DZ= 921.979 mm.
RESTRAINTS
Node 8871 X2 K= 2,164 N./cm. Yield K= 1 N./cm. Yield Force= 5,755 N.
Dir Vec= -.1367 .0000 .9906
Node 8871 X2 K= 309,363 N./cm. Yield K= 1 N./cm.
Yield Force= 822,766 N. Dir Vec= -.9906 .0000 -.1367
Node 8871 Y2 K= 309,363 N./cm. Yield K= 1 N./cm.
Yield Force= 822,766 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 8872 To 8873 DX= -52.307 mm. DY= .000 mm. DZ= 379.101 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.192
RESTRAINTS
Node 8872 X2 K= 1,635 N./cm. Yield K= 1 N./cm. Yield Force= 4,349 N.
Dir Vec= -.1367 .0000 .9906
Node 8872 X2 K= 233,763 N./cm. Yield K= 1 N./cm.
Yield Force= 621,704 N. Dir Vec= -.9906 .0000 -.1367
Node 8872 Y2 K= 233,763 N./cm. Yield K= 1 N./cm.
Yield Force= 621,704 N.
-----------------------------------------------------------------------------
From 8873 To 8890 DX= -450.402 mm. DY= .000 mm. DZ= 618.831 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.192
RESTRAINTS
Node 8873 X2 K= 1,459 N./cm. Yield K= 1 N./cm. Yield Force= 3,881 N.
Dir Vec= -.5885 .0000 .8085
Node 8873 X2 K= 208,610 N./cm. Yield K= 1 N./cm.
Yield Force= 554,807 N. Dir Vec= -.8085 .0000 -.5885
Node 8873 Y2 K= 208,610 N./cm. Yield K= 1 N./cm.
Yield Force= 554,807 N.
-----------------------------------------------------------------------------
From 8890 To 8891 DX= -1,182.886 mm. DY= .000 mm. DZ= 570.803 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8890 X2 K= 1,635 N./cm. Yield K= 1 N./cm. Yield Force= 4,349 N.
Dir Vec= -.9006 .0000 .4346
Node 8890 X2 K= 233,763 N./cm. Yield K= 1 N./cm.
Yield Force= 621,704 N. Dir Vec= -.4346 .0000 -.9006
Node 8890 Y2 K= 233,763 N./cm. Yield K= 1 N./cm.
Yield Force= 621,704 N.
-----------------------------------------------------------------------------
From 8891 To 8892 DX= -789.030 mm. DY= .000 mm. DZ= 380.747 mm.
RESTRAINTS
Node 8891 X2 K= 1,758 N./cm. Yield K= 1 N./cm. Yield Force= 4,675 N.
Dir Vec= -.9006 .0000 .4346
Node 8891 X2 K= 251,319 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 668,394 N. Dir Vec= -.4346 .0000 -.9006
Node 8891 Y2 K= 251,319 N./cm. Yield K= 1 N./cm.
Yield Force= 668,394 N.
-----------------------------------------------------------------------------
From 8892 To 8910 DX= -789.030 mm. DY= .000 mm. DZ= 380.747 mm.
RESTRAINTS
Node 8892 X2 K= 1,705 N./cm. Yield K= 1 N./cm. Yield Force= 4,534 N.
Dir Vec= -.9006 .0000 .4346
Node 8892 X2 K= 243,721 N./cm. Yield K= 1 N./cm.
Yield Force= 648,187 N. Dir Vec= -.4346 .0000 -.9006
Node 8892 Y2 K= 243,721 N./cm. Yield K= 1 N./cm.
Yield Force= 648,187 N.
-----------------------------------------------------------------------------
From 8910 To 8930 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8910 X2 K= 6,690 N./cm. Yield K= 1 N./cm.
Yield Force= 17,792 N. Dir Vec= -.9006 .0000 .4346
Node 8910 X2 K= 956,434 N./cm. Yield K= 1 N./cm.
Yield Force= 2,543,680 N. Dir Vec= -.4346 .0000 -.9006
Node 8910 Y2 K= 956,434 N./cm. Yield K= 1 N./cm.
Yield Force= 2,543,680 N.
-----------------------------------------------------------------------------
From 8930 To 8950 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8930 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 8930 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 8930 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8950 To 8970 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8950 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 8950 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 8950 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8970 To 8990 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 8970 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 8970 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 8970 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 8990 To 9010 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 8990 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 8990 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 8990 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9010 To 9030 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9010 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 9010 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 9010 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9030 To 9050 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9030 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 9030 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 9030 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9050 To 9070 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9050 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 9050 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 9050 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9070 To 9090 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9070 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 9070 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
Node 9070 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9090 To 9110 DX= -5,403.750 mm. DY= .000 mm. DZ= 2,607.583 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9090 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9006 .0000 .4346
Node 9090 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4346 .0000 -.9006
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 9090 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9110 To 9111 DX= -843.165 mm. DY= .000 mm. DZ= 406.870 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9110 X2 K= 6,748 N./cm. Yield K= 1 N./cm.
Yield Force= 17,948 N. Dir Vec= -.9006 .0000 .4346
Node 9110 X2 K= 964,795 N./cm. Yield K= 1 N./cm.
Yield Force= 2,565,916 N. Dir Vec= -.4346 .0000 -.9006
Node 9110 Y2 K= 964,795 N./cm. Yield K= 1 N./cm.
Yield Force= 2,565,916 N.
-----------------------------------------------------------------------------
From 9111 To 9112 DX= -838.224 mm. DY= .000 mm. DZ= 404.486 mm.
RESTRAINTS
Node 9111 X2 K= 1,816 N./cm. Yield K= 1 N./cm. Yield Force= 4,831 N.
Dir Vec= -.9006 .0000 .4346
Node 9111 X2 K= 259,679 N./cm. Yield K= 1 N./cm.
Yield Force= 690,629 N. Dir Vec= -.4346 .0000 -.9006
Node 9111 Y2 K= 259,679 N./cm. Yield K= 1 N./cm.
Yield Force= 690,629 N.
-----------------------------------------------------------------------------
From 9112 To 9113 DX= -838.224 mm. DY= .000 mm. DZ= 404.486 mm.
RESTRAINTS
Node 9112 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.9006 .0000 .4346
Node 9112 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.4346 .0000 -.9006
Node 9112 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 9113 To 9114 DX= -19.077 mm. DY= .000 mm. DZ= 9.206 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 1.592
RESTRAINTS
Node 9113 X2 K= 947 N./cm. Yield K= 1 N./cm. Yield Force= 2,518 N.
Dir Vec= -.9006 .0000 .4346
Node 9113 X2 K= 135,351 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 359,971 N. Dir Vec= -.4346 .0000 -.9006
Node 9113 Y2 K= 135,351 N./cm. Yield K= 1 N./cm.
Yield Force= 359,971 N.
-----------------------------------------------------------------------------
From 9114 To 9130 DX= -37.628 mm. DY= .000 mm. DZ= 19.465 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 1.593
RESTRAINTS
Node 9114 X2 K= 82 N./cm. Yield K= 1 N./cm. Yield Force= 219 N.
Dir Vec= -.8882 .0000 .4595
Node 9114 X2 K= 11,785 N./cm. Yield K= 1 N./cm.
Yield Force= 31,342 N. Dir Vec= -.4595 .0000 -.8882
Node 9114 Y2 K= 11,785 N./cm. Yield K= 1 N./cm.
Yield Force= 31,342 N.
-----------------------------------------------------------------------------
From 9130 To 9131 DX= -832.992 mm. DY= .000 mm. DZ= 460.688 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9130 X2 K= 947 N./cm. Yield K= 1 N./cm. Yield Force= 2,518 N.
Dir Vec= -.8751 .0000 .4840
Node 9130 X2 K= 135,351 N./cm. Yield K= 1 N./cm.
Yield Force= 359,971 N. Dir Vec= -.4840 .0000 -.8751
Node 9130 Y2 K= 135,351 N./cm. Yield K= 1 N./cm.
Yield Force= 359,971 N.
-----------------------------------------------------------------------------
From 9131 To 9132 DX= -814.454 mm. DY= .000 mm. DZ= 450.436 mm.
RESTRAINTS
Node 9131 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.8751 .0000 .4840
Node 9131 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.4840 .0000 -.8751
Node 9131 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 9132 To 9133 DX= -698.505 mm. DY= .000 mm. DZ= 386.310 mm.
RESTRAINTS
Node 9132 X2 K= 1,682 N./cm. Yield K= 1 N./cm. Yield Force= 4,474 N.
Dir Vec= -.8751 .0000 .4840
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 9132 X2 K= 240,486 N./cm. Yield K= 1 N./cm.
Yield Force= 639,584 N. Dir Vec= -.4840 .0000 -.8751
Node 9132 Y2 K= 240,486 N./cm. Yield K= 1 N./cm.
Yield Force= 639,584 N.
-----------------------------------------------------------------------------
From 9133 To 9150 DX= -698.505 mm. DY= .000 mm. DZ= 386.310 mm.
RESTRAINTS
Node 9133 X2 K= 1,553 N./cm. Yield K= 1 N./cm. Yield Force= 4,131 N.
Dir Vec= -.8751 .0000 .4840
Node 9133 X2 K= 222,056 N./cm. Yield K= 1 N./cm.
Yield Force= 590,568 N. Dir Vec= -.4840 .0000 -.8751
Node 9133 Y2 K= 222,056 N./cm. Yield K= 1 N./cm.
Yield Force= 590,568 N.
-----------------------------------------------------------------------------
From 9150 To 9170 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9150 X2 K= 6,614 N./cm. Yield K= 1 N./cm.
Yield Force= 17,591 N. Dir Vec= -.8751 .0000 .4840
Node 9150 X2 K= 945,601 N./cm. Yield K= 1 N./cm.
Yield Force= 2,514,870 N. Dir Vec= -.4840 .0000 -.8751
Node 9150 Y2 K= 945,601 N./cm. Yield K= 1 N./cm.
Yield Force= 2,514,870 N.
-----------------------------------------------------------------------------
From 9170 To 9190 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9170 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9170 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 9170 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9190 To 9210 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9190 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9190 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9190 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9210 To 9230 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9210 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9210 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9210 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9230 To 9250 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9230 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9230 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9230 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9250 To 9270 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9250 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9250 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9250 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9270 To 9290 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9270 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9270 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9270 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9290 To 9310 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9290 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9290 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9290 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9310 To 9330 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9310 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9310 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9310 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9330 To 9350 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9330 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9330 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9330 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9350 To 9370 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9350 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9350 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9350 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9370 To 9390 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9370 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9370 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9370 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9390 To 9410 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9390 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9390 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9390 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9410 To 9430 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9410 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9410 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9410 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9430 To 9450 DX= -5,250.513 mm. DY= .000 mm. DZ= 2,903.810 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9430 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.8751 .0000 .4840
Node 9430 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.4840 .0000 -.8751
Node 9430 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9450 To 9470 DX= -4,375.428 mm. DY= .000 mm. DZ= 2,419.842 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9450 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= -.8751 .0000 .4840
Node 9450 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.4840 .0000 -.8751
Node 9450 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
From 9470 To 9480 DX= -4,375.428 mm. DY= .000 mm. DZ= 2,419.841 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9470 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= -.8751 .0000 .4840
Node 9470 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N. Dir Vec= -.4840 .0000 -.8751
Node 9470 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N.
-----------------------------------------------------------------------------
From 9480 To 9481 TP-34 DX= -679.799 mm. DY= .000 mm. DZ= 375.965 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9480 X2 K= 5,621 N./cm. Yield K= 1 N./cm.
Yield Force= 14,948 N. Dir Vec= -.8751 .0000 .4840
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 9480 X2 K= 803,532 N./cm. Yield K= 1 N./cm.
Yield Force= 2,137,032 N. Dir Vec= -.4840 .0000 -.8751
Node 9480 Y2 K= 803,532 N./cm. Yield K= 1 N./cm.
Yield Force= 2,137,032 N.
-----------------------------------------------------------------------------
From 9481 To 9482 DX= -454.165 mm. DY= .000 mm. DZ= 251.177 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 37.612
RESTRAINTS
Node 9481 X2 K= 1,729 N./cm. Yield K= 1 N./cm. Yield Force= 4,599 N.
Dir Vec= -.8751 .0000 .4840
Node 9481 X2 K= 247,212 N./cm. Yield K= 1 N./cm.
Yield Force= 657,472 N. Dir Vec= -.4840 .0000 -.8751
Node 9481 Y2 K= 247,212 N./cm. Yield K= 1 N./cm.
Yield Force= 657,472 N.
-----------------------------------------------------------------------------
From 9482 To 9490 DX= -412.946 mm. DY= .000 mm. DZ= 952.313 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 37.612
RESTRAINTS
Node 9482 X2 K= 1,947 N./cm. Yield K= 1 N./cm. Yield Force= 5,177 N.
Dir Vec= -.3978 .0000 .9175
Node 9482 X2 K= 278,315 N./cm. Yield K= 1 N./cm.
Yield Force= 740,191 N. Dir Vec= -.9175 .0000 -.3978
Node 9482 Y2 K= 278,315 N./cm. Yield K= 1 N./cm.
Yield Force= 740,191 N.
-----------------------------------------------------------------------------
From 9490 To 9491 DX= 354.880 mm. DY= .000 mm. DZ= 1,405.602 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9490 X2 K= 1,879 N./cm. Yield K= 1 N./cm. Yield Force= 4,997 N.
Dir Vec= .2448 .0000 .9696
Node 9490 X2 K= 268,616 N./cm. Yield K= 1 N./cm.
Yield Force= 714,396 N. Dir Vec= -.9696 .0000 .2448
Node 9490 Y2 K= 268,616 N./cm. Yield K= 1 N./cm.
Yield Force= 714,396 N.
-----------------------------------------------------------------------------
From 9491 To 9492 DX= 227.833 mm. DY= .000 mm. DZ= 902.397 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 9491 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .2448 .0000 .9696
Node 9491 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9696 .0000 .2448
Node 9491 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 9492 To 9493 DX= 240.453 mm. DY= .000 mm. DZ= 952.383 mm.
RESTRAINTS
Node 9492 X2 K= 1,861 N./cm. Yield K= 1 N./cm. Yield Force= 4,950 N.
Dir Vec= .2448 .0000 .9696
Node 9492 X2 K= 266,087 N./cm. Yield K= 1 N./cm.
Yield Force= 707,672 N. Dir Vec= -.9696 .0000 .2448
Node 9492 Y2 K= 266,087 N./cm. Yield K= 1 N./cm.
Yield Force= 707,672 N.
-----------------------------------------------------------------------------
From 9493 To 9510 DX= 240.453 mm. DY= .000 mm. DZ= 952.383 mm.
RESTRAINTS
Node 9493 X2 K= 1,911 N./cm. Yield K= 1 N./cm. Yield Force= 5,083 N.
Dir Vec= .2448 .0000 .9696
Node 9493 X2 K= 273,258 N./cm. Yield K= 1 N./cm.
Yield Force= 726,743 N. Dir Vec= -.9696 .0000 .2448
Node 9493 Y2 K= 273,258 N./cm. Yield K= 1 N./cm.
Yield Force= 726,743 N.
-----------------------------------------------------------------------------
From 9510 To 9530 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9510 X2 K= 6,793 N./cm. Yield K= 1 N./cm.
Yield Force= 18,067 N. Dir Vec= .2448 .0000 .9696
Node 9510 X2 K= 971,203 N./cm. Yield K= 1 N./cm.
Yield Force= 2,582,958 N. Dir Vec= -.9696 .0000 .2448
Node 9510 Y2 K= 971,203 N./cm. Yield K= 1 N./cm.
Yield Force= 2,582,958 N.
-----------------------------------------------------------------------------
From 9530 To 9550 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9530 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9530 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9530 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9550 To 9570 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9550 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9550 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9550 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9570 To 9590 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9570 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9570 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9570 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9590 To 9610 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9590 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9590 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9590 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9610 To 9630 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9610 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9610 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9610 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9630 To 9650 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9630 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9630 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9630 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9650 To 9670 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9650 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9650 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9650 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9670 To 9690 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9670 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9670 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9670 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9690 To 9710 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9690 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9690 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9690 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9710 To 9730 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9710 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9710 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9710 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9730 To 9750 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9730 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 9730 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9730 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9750 To 9770 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9750 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9750 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9750 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9770 To 9790 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9770 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9770 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9770 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9790 To 9810 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9790 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9790 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9790 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9810 To 9830 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9810 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9810 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9810 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9830 To 9850 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9830 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9830 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9830 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 9850 To 9870 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9850 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9850 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9850 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9870 To 9890 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9870 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9870 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9870 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9890 To 9910 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9890 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9890 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9890 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9910 To 9930 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9910 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9910 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9910 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9930 To 9950 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9930 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9930 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9930 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9950 To 9970 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9950 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9950 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9950 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9970 To 9990 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9970 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9970 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9970 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 9990 To 10010 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 9990 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 9990 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 9990 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 10010 To 10030 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10010 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 10010 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 10010 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10030 To 10050 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10030 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 10030 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 10030 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10050 To 10070 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 10050 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 10050 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 10050 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10070 To 10090 DX= 1,468.762 mm. DY= .000 mm. DZ= 5,817.451 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10070 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .2448 .0000 .9696
Node 10070 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9696 .0000 .2448
Node 10070 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10090 To 10110 DX= 1,223.969 mm. DY= .000 mm. DZ= 4,847.876 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10090 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= .2448 .0000 .9696
Node 10090 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.9696 .0000 .2448
Node 10090 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
From 10110 To 10130 DX= 1,223.969 mm. DY= .000 mm. DZ= 4,847.876 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10110 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= .2448 .0000 .9696
Node 10110 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N. Dir Vec= -.9696 .0000 .2448
Node 10110 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N.
-----------------------------------------------------------------------------
From 10130 To 10150 DX= 1,223.969 mm. DY= .000 mm. DZ= 4,847.876 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10130 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= .2448 .0000 .9696
Node 10130 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N. Dir Vec= -.9696 .0000 .2448
Node 10130 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N.
-----------------------------------------------------------------------------
From 10150 To 10170 DX= 1,223.969 mm. DY= .000 mm. DZ= 4,847.876 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10150 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= .2448 .0000 .9696
Node 10150 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,310 N. Dir Vec= -.9696 .0000 .2448
Node 10150 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 3,699,310 N.
-----------------------------------------------------------------------------
From 10170 To 10171 DX= 252.464 mm. DY= .000 mm. DZ= 999.956 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10170 X2 K= 5,868 N./cm. Yield K= 1 N./cm.
Yield Force= 15,607 N. Dir Vec= .2448 .0000 .9696
Node 10170 X2 K= 838,932 N./cm. Yield K= 1 N./cm.
Yield Force= 2,231,178 N. Dir Vec= -.9696 .0000 .2448
Node 10170 Y2 K= 838,932 N./cm. Yield K= 1 N./cm.
Yield Force= 2,231,178 N.
-----------------------------------------------------------------------------
From 10171 To 10172 DX= 227.833 mm. DY= .000 mm. DZ= 902.397 mm.
RESTRAINTS
Node 10171 X2 K= 1,909 N./cm. Yield K= 1 N./cm. Yield Force= 5,077 N.
Dir Vec= .2448 .0000 .9696
Node 10171 X2 K= 272,912 N./cm. Yield K= 1 N./cm.
Yield Force= 725,823 N. Dir Vec= -.9696 .0000 .2448
Node 10171 Y2 K= 272,912 N./cm. Yield K= 1 N./cm.
Yield Force= 725,823 N.
-----------------------------------------------------------------------------
From 10172 To 10173 DX= 119.052 mm. DY= .000 mm. DZ= 471.538 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.398
RESTRAINTS
Node 10172 X2 K= 1,822 N./cm. Yield K= 1 N./cm. Yield Force= 4,845 N.
Dir Vec= .2448 .0000 .9696
Node 10172 X2 K= 260,421 N./cm. Yield K= 1 N./cm.
Yield Force= 692,602 N. Dir Vec= -.9696 .0000 .2448
Node 10172 Y2 K= 260,421 N./cm. Yield K= 1 N./cm.
Yield Force= 692,602 N.
-----------------------------------------------------------------------------
From 10173 To 10190 DX= 194.090 mm. DY= -563.414 mm. DZ= 768.750 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.398
RESTRAINTS
Node 10173 X2 K= 1,832 N./cm. Yield K= 1 N./cm. Yield Force= 4,873 N.
Dir Vec= .1995 -.5792 .7904
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 10173 X2 K= 261,926 N./cm. Yield K= 1 N./cm.
Yield Force= 696,604 N. Dir Vec= -.9696 .0000 .2448
Node 10173 X2 K= 261,926 N./cm. Yield K= 1 N./cm.
Yield Force= 696,604 N. Dir Vec= .1418 .8152 .5616
-----------------------------------------------------------------------------
From 10190 To 10210 DX= 72.744 mm. DY= -853.108 mm. DZ= 288.125 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10190 X2 K= 1,322 N./cm. Yield K= 1 N./cm. Yield Force= 3,515 N.
Dir Vec= .0805 -.9443 .3189
Node 10190 X2 K= 188,973 N./cm. Yield K= 1 N./cm.
Yield Force= 502,581 N. Dir Vec= -.9696 .0000 .2448
Node 10190 X2 K= 188,973 N./cm. Yield K= 1 N./cm.
Yield Force= 502,581 N. Dir Vec= .2312 .3289 .9156
-----------------------------------------------------------------------------
From 10210 To 10211 DX= 47.819 mm. DY= -560.795 mm. DZ= 189.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10210 X2 K= 984 N./cm. Yield K= 1 N./cm. Yield Force= 2,616 N.
Dir Vec= .0805 -.9443 .3189
Node 10210 X2 K= 140,611 N./cm. Yield K= 1 N./cm.
Yield Force= 373,960 N. Dir Vec= -.9696 .0000 .2448
Node 10210 X2 K= 140,611 N./cm. Yield K= 1 N./cm.
Yield Force= 373,960 N. Dir Vec= .2312 .3289 .9156
-----------------------------------------------------------------------------
From 10211 To 10212 DX= 39.162 mm. DY= -459.269 mm. DZ= 155.111 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.398
RESTRAINTS
Node 10211 X2 K= 1,494 N./cm. Yield K= 1 N./cm. Yield Force= 3,973 N.
Dir Vec= .0805 -.9443 .3189
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 10211 X2 K= 213,564 N./cm. Yield K= 1 N./cm.
Yield Force= 567,983 N. Dir Vec= -.9696 .0000 .2448
Node 10211 X2 K= 213,564 N./cm. Yield K= 1 N./cm.
Yield Force= 567,983 N. Dir Vec= .2312 .3289 .9156
-----------------------------------------------------------------------------
From 10212 To 10230 DX= 194.090 mm. DY= -563.414 mm. DZ= 768.750 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.398
RESTRAINTS
Node 10212 X2 K= 1,832 N./cm. Yield K= 1 N./cm. Yield Force= 4,873 N.
Dir Vec= .1995 -.5792 .7904
Node 10212 X2 K= 261,926 N./cm. Yield K= 1 N./cm.
Yield Force= 696,604 N. Dir Vec= -.9696 .0000 .2448
Node 10212 X2 K= 261,926 N./cm. Yield K= 1 N./cm.
Yield Force= 696,604 N. Dir Vec= .1418 .8152 .5616
-----------------------------------------------------------------------------
From 10230 To 10231 DX= 346.885 mm. DY= .000 mm. DZ= 1,373.935 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10230 X2 K= 1,822 N./cm. Yield K= 1 N./cm. Yield Force= 4,845 N.
Dir Vec= .2448 .0000 .9696
Node 10230 X2 K= 260,421 N./cm. Yield K= 1 N./cm.
Yield Force= 692,602 N. Dir Vec= -.9696 .0000 .2448
Node 10230 Y2 K= 260,421 N./cm. Yield K= 1 N./cm.
Yield Force= 692,602 N.
-----------------------------------------------------------------------------
From 10231 To 10232 DX= 227.833 mm. DY= .000 mm. DZ= 902.397 mm.
RESTRAINTS
Node 10231 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .2448 .0000 .9696
Node 10231 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9696 .0000 .2448
Node 10231 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10232 To 10233 DX= 360.474 mm. DY= .000 mm. DZ= 1,427.760 mm.
RESTRAINTS
Node 10232 X2 K= 2,338 N./cm. Yield K= 1 N./cm. Yield Force= 6,219 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Dir Vec= .2448 .0000 .9696
Node 10232 X2 K= 334,285 N./cm. Yield K= 1 N./cm.
Yield Force= 889,047 N. Dir Vec= -.9696 .0000 .2448
Node 10232 Y2 K= 334,285 N./cm. Yield K= 1 N./cm.
Yield Force= 889,047 N.
-----------------------------------------------------------------------------
From 10233 To 10234 DX= 227.833 mm. DY= .000 mm. DZ= 902.397 mm.
RESTRAINTS
Node 10233 X2 K= 2,338 N./cm. Yield K= 1 N./cm. Yield Force= 6,219 N.
Dir Vec= .2448 .0000 .9696
Node 10233 X2 K= 334,285 N./cm. Yield K= 1 N./cm.
Yield Force= 889,047 N. Dir Vec= -.9696 .0000 .2448
Node 10233 Y2 K= 334,285 N./cm. Yield K= 1 N./cm.
Yield Force= 889,047 N.
-----------------------------------------------------------------------------
From 10234 To 10235 DX= 227.833 mm. DY= .000 mm. DZ= 902.397 mm.
RESTRAINTS
Node 10234 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .2448 .0000 .9696
Node 10234 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9696 .0000 .2448
Node 10234 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10235 To 10236 DX= 93.553 mm. DY= .000 mm. DZ= 370.542 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 10235 X2 K= 1,634 N./cm. Yield K= 1 N./cm. Yield Force= 4,346 N.
Dir Vec= .2448 .0000 .9696
Node 10235 X2 K= 233,626 N./cm. Yield K= 1 N./cm.
Yield Force= 621,340 N. Dir Vec= -.9696 .0000 .2448
Node 10235 Y2 K= 233,626 N./cm. Yield K= 1 N./cm.
Yield Force= 621,340 N.
-----------------------------------------------------------------------------
From 10236 To 10250 DX= 165.017 mm. DY= 360.663 mm. DZ= 653.381 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 10236 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= .2159 .4719 .8548
Node 10236 X2 K= 208,336 N./cm. Yield K= 1 N./cm.
Yield Force= 554,080 N. Dir Vec= -.9696 .0000 .2449
Node 10236 X2 K= 208,336 N./cm. Yield K= 1 N./cm.
Yield Force= 554,080 N. Dir Vec= -.1155 .8817 -.4575
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
-----------------------------------------------------------------------------
From 10250 To 10251 DX= 186.092 mm. DY= 1,139.337 mm. DZ= 736.391 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10250 X2 K= 1,689 N./cm. Yield K= 1 N./cm. Yield Force= 4,492 N.
Dir Vec= .1359 .8321 .5378
Node 10250 X2 K= 241,474 N./cm. Yield K= 1 N./cm.
Yield Force= 642,211 N. Dir Vec= -.9695 .0000 .2450
Node 10250 X2 K= 241,474 N./cm. Yield K= 1 N./cm.
Yield Force= 642,211 N. Dir Vec= -.2039 .5547 -.8067
-----------------------------------------------------------------------------
From 10251 To 10252 DX= 134.154 mm. DY= 821.350 mm. DZ= 530.866 mm.
RESTRAINTS
Node 10251 X2 K= 1,921 N./cm. Yield K= 1 N./cm. Yield Force= 5,109 N.
Dir Vec= .1359 .8321 .5378
Node 10251 X2 K= 274,612 N./cm. Yield K= 1 N./cm.
Yield Force= 730,342 N. Dir Vec= -.9695 .0000 .2450
Node 10251 X2 K= 274,612 N./cm. Yield K= 1 N./cm.
Yield Force= 730,342 N. Dir Vec= -.2039 .5547 -.8067
-----------------------------------------------------------------------------
From 10252 To 10253 DX= 51.938 mm. DY= 317.987 mm. DZ= 205.525 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 10252 X2 K= 1,689 N./cm. Yield K= 1 N./cm. Yield Force= 4,492 N.
Dir Vec= .1359 .8321 .5378
Node 10252 X2 K= 241,474 N./cm. Yield K= 1 N./cm.
Yield Force= 642,211 N. Dir Vec= -.9695 .0000 .2450
Node 10252 X2 K= 241,474 N./cm. Yield K= 1 N./cm.
Yield Force= 642,211 N. Dir Vec= -.2039 .5547 -.8067
-----------------------------------------------------------------------------
From 10253 To 10270 DX= 165.108 mm. DY= 360.663 mm. DZ= 653.358 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 28.155
RESTRAINTS
Node 10253 X2 K= 1,457 N./cm. Yield K= 1 N./cm. Yield Force= 3,876 N.
Dir Vec= .2160 .4719 .8548
Node 10253 X2 K= 208,336 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 554,080 N. Dir Vec= -.9695 .0000 .2450
Node 10253 X2 K= 208,336 N./cm. Yield K= 1 N./cm.
Yield Force= 554,080 N. Dir Vec= -.1156 .8817 -.4575
-----------------------------------------------------------------------------
From 10270 To 10271 TP-35 DX= 282.850 mm. DY= .000 mm. DZ= 1,119.277 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10270 X2 K= 1,480 N./cm. Yield K= 1 N./cm. Yield Force= 3,936 N.
Dir Vec= .2450 .0000 .9695
Node 10270 X2 K= 211,591 N./cm. Yield K= 1 N./cm.
Yield Force= 562,736 N. Dir Vec= -.9695 .0000 .2450
Node 10270 Y2 K= 211,591 N./cm. Yield K= 1 N./cm.
Yield Force= 562,736 N.
-----------------------------------------------------------------------------
From 10271 To 10272 DX= 124.033 mm. DY= .000 mm. DZ= 490.818 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 36.751
RESTRAINTS
Node 10271 X2 K= 1,702 N./cm. Yield K= 1 N./cm. Yield Force= 4,528 N.
Dir Vec= .2450 .0000 .9695
Node 10271 X2 K= 243,394 N./cm. Yield K= 1 N./cm.
Yield Force= 647,318 N. Dir Vec= -.9695 .0000 .2450
Node 10271 Y2 K= 243,394 N./cm. Yield K= 1 N./cm.
Yield Force= 647,318 N.
-----------------------------------------------------------------------------
From 10272 To 10290 DX= 786.115 mm. DY= .000 mm. DZ= 638.098 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 36.751
RESTRAINTS
Node 10272 X2 K= 1,902 N./cm. Yield K= 1 N./cm. Yield Force= 5,059 N.
Dir Vec= .7764 .0000 .6302
Node 10272 X2 K= 271,943 N./cm. Yield K= 1 N./cm.
Yield Force= 723,245 N. Dir Vec= -.6302 .0000 .7764
Node 10272 Y2 K= 271,943 N./cm. Yield K= 1 N./cm.
Yield Force= 723,245 N.
-----------------------------------------------------------------------------
From 10290 To 10291 DX= 1,435.788 mm. DY= .000 mm. DZ= 58.052 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10290 X2 K= 1,857 N./cm. Yield K= 1 N./cm. Yield Force= 4,938 N.
Dir Vec= .9992 .0000 .0404
Node 10290 X2 K= 265,430 N./cm. Yield K= 1 N./cm.
Yield Force= 705,922 N. Dir Vec= -.0404 .0000 .9992
Node 10290 Y2 K= 265,430 N./cm. Yield K= 1 N./cm.
Yield Force= 705,922 N.
-----------------------------------------------------------------------------
From 10291 To 10292 DX= 929.954 mm. DY= .000 mm. DZ= 37.600 mm.
RESTRAINTS
Node 10291 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9992 .0000 .0404
Node 10291 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.0404 .0000 .9992
Node 10291 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10292 To 10293 DX= 999.472 mm. DY= .000 mm. DZ= 40.411 mm.
RESTRAINTS
Node 10292 X2 K= 1,879 N./cm. Yield K= 1 N./cm. Yield Force= 4,997 N.
Dir Vec= .9992 .0000 .0404
Node 10292 X2 K= 268,594 N./cm. Yield K= 1 N./cm.
Yield Force= 714,338 N. Dir Vec= -.0404 .0000 .9992
Node 10292 Y2 K= 268,594 N./cm. Yield K= 1 N./cm.
Yield Force= 714,338 N.
-----------------------------------------------------------------------------
From 10293 To 10310 DX= 999.472 mm. DY= .000 mm. DZ= 40.411 mm.
RESTRAINTS
Node 10293 X2 K= 1,946 N./cm. Yield K= 1 N./cm. Yield Force= 5,177 N.
Dir Vec= .9992 .0000 .0404
Node 10293 X2 K= 278,271 N./cm. Yield K= 1 N./cm.
Yield Force= 740,076 N. Dir Vec= -.0404 .0000 .9992
Node 10293 Y2 K= 278,271 N./cm. Yield K= 1 N./cm.
Yield Force= 740,076 N.
-----------------------------------------------------------------------------
From 10310 To 10330 DX= 5,995.102 mm. DY= .000 mm. DZ= 242.396 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10310 X2 K= 6,811 N./cm. Yield K= 1 N./cm.
Yield Force= 18,114 N. Dir Vec= .9992 .0000 .0404
Node 10310 X2 K= 973,709 N./cm. Yield K= 1 N./cm.
Yield Force= 2,589,624 N. Dir Vec= -.0404 .0000 .9992
Node 10310 Y2 K= 973,709 N./cm. Yield K= 1 N./cm.
Yield Force= 2,589,624 N.
-----------------------------------------------------------------------------
From 10330 To 10350 DX= 3,996.735 mm. DY= .000 mm. DZ= 161.597 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10330 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= .9992 .0000 .0404
Node 10330 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,311 N. Dir Vec= -.0404 .0000 .9992
Node 10330 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,311 N.
-----------------------------------------------------------------------------
From 10350 To 10370 DX= 3,996.735 mm. DY= .000 mm. DZ= 161.597 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10350 X2 K= 7,784 N./cm. Yield K= 1 N./cm.
Yield Force= 20,701 N. Dir Vec= .9992 .0000 .0404
Node 10350 X2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N. Dir Vec= -.0404 .0000 .9992
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 10350 Y2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N.
-----------------------------------------------------------------------------
From 10370 To 10390 DX= 3,996.735 mm. DY= .000 mm. DZ= 161.597 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10370 X2 K= 7,784 N./cm. Yield K= 1 N./cm.
Yield Force= 20,701 N. Dir Vec= .9992 .0000 .0404
Node 10370 X2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N. Dir Vec= -.0404 .0000 .9992
Node 10370 Y2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N.
-----------------------------------------------------------------------------
From 10390 To 10410 DX= 3,996.735 mm. DY= .000 mm. DZ= 161.597 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10390 X2 K= 7,784 N./cm. Yield K= 1 N./cm.
Yield Force= 20,701 N. Dir Vec= .9992 .0000 .0404
Node 10390 X2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N. Dir Vec= -.0404 .0000 .9992
Node 10390 Y2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N.
-----------------------------------------------------------------------------
From 10410 To 10430 DX= 3,996.735 mm. DY= .000 mm. DZ= 161.597 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10410 X2 K= 7,784 N./cm. Yield K= 1 N./cm.
Yield Force= 20,701 N. Dir Vec= .9992 .0000 .0404
Node 10410 X2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N. Dir Vec= -.0404 .0000 .9992
Node 10410 Y2 K= 1,112,765 N./cm. Yield K= 1 N./cm.
Yield Force= 2,959,449 N.
-----------------------------------------------------------------------------
From 10430 To 10431 TP-36 DX= 667.604 mm. DY= .000 mm. DZ= 26.993 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10430 X2 K= 4,542 N./cm. Yield K= 1 N./cm.
Yield Force= 12,079 N. Dir Vec= .9992 .0000 .0404
Node 10430 X2 K= 649,319 N./cm. Yield K= 1 N./cm.
Yield Force= 1,726,893 N. Dir Vec= -.0404 .0000 .9992
Node 10430 Y2 K= 649,319 N./cm. Yield K= 1 N./cm.
Yield Force= 1,726,893 N.
-----------------------------------------------------------------------------
From 10431 To 10432 DX= 667.604 mm. DY= .000 mm. DZ= 26.993 mm.
RESTRAINTS
Node 10431 X2 K= 1,300 N./cm. Yield K= 1 N./cm. Yield Force= 3,458 N.
Dir Vec= .9992 .0000 .0404
Node 10431 X2 K= 185,873 N./cm. Yield K= 1 N./cm.
Yield Force= 494,338 N. Dir Vec= -.0404 .0000 .9992
Node 10431 Y2 K= 185,873 N./cm. Yield K= 1 N./cm.
Yield Force= 494,338 N.
-----------------------------------------------------------------------------
From 10432 To 10433 DX= 929.954 mm. DY= .000 mm. DZ= 37.600 mm.
RESTRAINTS
Node 10432 X2 K= 1,556 N./cm. Yield K= 1 N./cm. Yield Force= 4,137 N.
Dir Vec= .9992 .0000 .0404
Node 10432 X2 K= 222,395 N./cm. Yield K= 1 N./cm.
Yield Force= 591,469 N. Dir Vec= -.0404 .0000 .9992
Node 10432 Y2 K= 222,395 N./cm. Yield K= 1 N./cm.
Yield Force= 591,469 N.
-----------------------------------------------------------------------------
From 10433 To 10434 DX= 430.277 mm. DY= .000 mm. DZ= 17.397 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 31.557
RESTRAINTS
Node 10433 X2 K= 1,722 N./cm. Yield K= 1 N./cm. Yield Force= 4,580 N.
Dir Vec= .9992 .0000 .0404
Node 10433 X2 K= 246,211 N./cm. Yield K= 1 N./cm.
Yield Force= 654,810 N. Dir Vec= -.0404 .0000 .9992
Node 10433 Y2 K= 246,211 N./cm. Yield K= 1 N./cm.
Yield Force= 654,810 N.
-----------------------------------------------------------------------------
From 10434 To 10450 DX= 715.087 mm. DY= .000 mm. DZ= 480.014 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 31.557
RESTRAINTS
Node 10434 X2 K= 1,633 N./cm. Yield K= 1 N./cm. Yield Force= 4,344 N.
Dir Vec= .8303 .0000 .5573
Node 10434 X2 K= 233,506 N./cm. Yield K= 1 N./cm.
Yield Force= 621,021 N. Dir Vec= -.5573 .0000 .8303
Node 10434 Y2 K= 233,506 N./cm. Yield K= 1 N./cm.
Yield Force= 621,021 N.
-----------------------------------------------------------------------------
From 10450 To 10451 DX= 566.075 mm. DY= .000 mm. DZ= 1,238.068 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10450 X2 K= 1,722 N./cm. Yield K= 1 N./cm. Yield Force= 4,580 N.
Dir Vec= .4158 .0000 .9094
Node 10450 X2 K= 246,211 N./cm. Yield K= 1 N./cm.
Yield Force= 654,810 N. Dir Vec= -.9094 .0000 .4158
Node 10450 Y2 K= 246,211 N./cm. Yield K= 1 N./cm.
Yield Force= 654,810 N.
-----------------------------------------------------------------------------
From 10451 To 10452 DX= 387.011 mm. DY= .000 mm. DZ= 846.434 mm.
RESTRAINTS
Node 10451 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .4158 .0000 .9094
Node 10451 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.9094 .0000 .4158
Node 10451 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10452 To 10453 DX= 457.888 mm. DY= .000 mm. DZ= 1,001.450 mm.
RESTRAINTS
Node 10452 X2 K= 1,977 N./cm. Yield K= 1 N./cm. Yield Force= 5,258 N.
Dir Vec= .4158 .0000 .9094
Node 10452 X2 K= 282,625 N./cm. Yield K= 1 N./cm.
Yield Force= 751,655 N. Dir Vec= -.9094 .0000 .4158
Node 10452 Y2 K= 282,625 N./cm. Yield K= 1 N./cm.
Yield Force= 751,655 N.
-----------------------------------------------------------------------------
From 10453 To 10470 DX= 457.888 mm. DY= .000 mm. DZ= 1,001.450 mm.
RESTRAINTS
Node 10453 X2 K= 2,143 N./cm. Yield K= 1 N./cm. Yield Force= 5,699 N.
Dir Vec= .4158 .0000 .9094
Node 10453 X2 K= 306,334 N./cm. Yield K= 1 N./cm.
Yield Force= 814,710 N. Dir Vec= -.9094 .0000 .4158
Node 10453 Y2 K= 306,334 N./cm. Yield K= 1 N./cm.
Yield Force= 814,710 N.
-----------------------------------------------------------------------------
From 10470 To 10490 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10470 X2 K= 6,909 N./cm. Yield K= 1 N./cm.
Yield Force= 18,375 N. Dir Vec= .4158 .0000 .9094
Node 10470 X2 K= 987,741 N./cm. Yield K= 1 N./cm.
Yield Force= 2,626,941 N. Dir Vec= -.9094 .0000 .4158
Node 10470 Y2 K= 987,741 N./cm. Yield K= 1 N./cm.
Yield Force= 2,626,941 N.
-----------------------------------------------------------------------------
From 10490 To 10510 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10490 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10490 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10490 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10510 To 10530 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10510 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10510 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10510 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10530 To 10550 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10530 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10530 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10530 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10550 To 10570 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10550 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10550 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10550 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10570 To 10590 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10570 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10570 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10570 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10590 To 10610 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10590 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10590 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10590 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10610 To 10630 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10610 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10610 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10610 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10630 To 10650 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10630 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10630 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10630 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10650 To 10670 DX= 2,494.927 mm. DY= .000 mm. DZ= 5,456.679 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10650 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .4158 .0000 .9094
Node 10650 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9094 .0000 .4158
Node 10650 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10670 To 10690 DX= 1,455.374 mm. DY= .000 mm. DZ= 3,183.063 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10670 X2 K= 9,243 N./cm. Yield K= 1 N./cm.
Yield Force= 24,582 N. Dir Vec= .4158 .0000 .9094
Node 10670 X2 K= 1,321,408 N./cm. Yield K= 1 N./cm.
Yield Force= 3,514,345 N. Dir Vec= -.9094 .0000 .4158
Node 10670 Y2 K= 1,321,408 N./cm. Yield K= 1 N./cm.
Yield Force= 3,514,345 N.
-----------------------------------------------------------------------------
From 10690 To 10691 TP-37 DX= 402.016 mm. DY= .000 mm. DZ= 879.252 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10690 X2 K= 4,346 N./cm. Yield K= 1 N./cm.
Yield Force= 11,558 N. Dir Vec= .4158 .0000 .9094
Node 10690 X2 K= 621,312 N./cm. Yield K= 1 N./cm.
Yield Force= 1,652,408 N. Dir Vec= -.9094 .0000 .4158
Node 10690 Y2 K= 621,312 N./cm. Yield K= 1 N./cm.
Yield Force= 1,652,408 N.
-----------------------------------------------------------------------------
From 10691 To 10692 DX= 200.281 mm. DY= .000 mm. DZ= 438.037 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.078
RESTRAINTS
Node 10691 X2 K= 1,848 N./cm. Yield K= 1 N./cm. Yield Force= 4,916 N.
Dir Vec= .4158 .0000 .9094
Node 10691 X2 K= 264,257 N./cm. Yield K= 1 N./cm.
Yield Force= 702,804 N. Dir Vec= -.9094 .0000 .4158
Node 10691 Y2 K= 264,257 N./cm. Yield K= 1 N./cm.
Yield Force= 702,804 N.
-----------------------------------------------------------------------------
From 10692 To 10710 DX= 831.278 mm. DY= .000 mm. DZ= 486.757 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 35.078
RESTRAINTS
Node 10692 X2 K= 1,816 N./cm. Yield K= 1 N./cm. Yield Force= 4,829 N.
Dir Vec= .8629 .0000 .5053
Node 10692 X2 K= 259,560 N./cm. Yield K= 1 N./cm.
Yield Force= 690,311 N. Dir Vec= -.5053 .0000 .8629
Node 10692 Y2 K= 259,560 N./cm. Yield K= 1 N./cm.
Yield Force= 690,311 N.
-----------------------------------------------------------------------------
From 10710 To 10711 DX= 1,407.563 mm. DY= .000 mm. DZ= -116.379 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10710 X2 K= 1,813 N./cm. Yield K= 1 N./cm. Yield Force= 4,823 N.
Dir Vec= .9966 .0000 -.0824
Node 10710 X2 K= 259,238 N./cm. Yield K= 1 N./cm.
Yield Force= 689,455 N. Dir Vec= .0824 .0000 .9966
Node 10710 Y2 K= 259,238 N./cm. Yield K= 1 N./cm.
Yield Force= 689,455 N.
-----------------------------------------------------------------------------
From 10711 To 10712 DX= 927.549 mm. DY= .000 mm. DZ= -76.691 mm.
RESTRAINTS
Node 10711 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9966 .0000 -.0824
Node 10711 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .0824 .0000 .9966
Node 10711 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10712 To 10713 DX= 1,030.670 mm. DY= .000 mm. DZ= -85.217 mm.
RESTRAINTS
Node 10712 X2 K= 1,912 N./cm. Yield K= 1 N./cm. Yield Force= 5,084 N.
Dir Vec= .9966 .0000 -.0824
Node 10712 X2 K= 273,309 N./cm. Yield K= 1 N./cm.
Yield Force= 726,878 N. Dir Vec= .0824 .0000 .9966
Node 10712 Y2 K= 273,309 N./cm. Yield K= 1 N./cm.
Yield Force= 726,878 N.
-----------------------------------------------------------------------------
From 10713 To 10730 DX= 1,030.670 mm. DY= .000 mm. DZ= -85.217 mm.
RESTRAINTS
Node 10713 X2 K= 2,012 N./cm. Yield K= 1 N./cm. Yield Force= 5,352 N.
Dir Vec= .9966 .0000 -.0824
Node 10713 X2 K= 287,702 N./cm. Yield K= 1 N./cm.
Yield Force= 765,156 N. Dir Vec= .0824 .0000 .9966
Node 10713 Y2 K= 287,702 N./cm. Yield K= 1 N./cm.
Yield Force= 765,156 N.
-----------------------------------------------------------------------------
From 10730 To 10750 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10730 X2 K= 6,844 N./cm. Yield K= 1 N./cm.
Yield Force= 18,201 N. Dir Vec= .9966 .0000 -.0824
Node 10730 X2 K= 978,424 N./cm. Yield K= 1 N./cm.
Yield Force= 2,602,164 N. Dir Vec= .0824 .0000 .9966
Node 10730 Y2 K= 978,424 N./cm. Yield K= 1 N./cm.
Yield Force= 2,602,164 N.
-----------------------------------------------------------------------------
From 10750 To 10770 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10750 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10750 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10750 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10770 To 10790 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10770 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10770 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10770 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10790 To 10810 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10790 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10790 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10790 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10810 To 10830 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10810 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10810 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10810 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10830 To 10850 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10830 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10830 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10830 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10850 To 10870 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10850 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10850 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10850 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10870 To 10890 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10870 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10870 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10870 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10890 To 10910 DX= 5,979.596 mm. DY= .000 mm. DZ= -494.400 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10890 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .9966 .0000 -.0824
Node 10890 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= .0824 .0000 .9966
Node 10890 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 10910 To 10930 DX= 4,385.037 mm. DY= .000 mm. DZ= -362.560 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10910 X2 K= 10,119 N./cm. Yield K= 1 N./cm.
Yield Force= 26,911 N. Dir Vec= .9966 .0000 -.0824
Node 10910 X2 K= 1,446,594 N./cm. Yield K= 1 N./cm.
Yield Force= 3,847,283 N. Dir Vec= .0824 .0000 .9966
Node 10910 Y2 K= 1,446,594 N./cm. Yield K= 1 N./cm.
Yield Force= 3,847,283 N.
-----------------------------------------------------------------------------
From 10930 To 10931 TP-38 DX= 846.548 mm. DY= .000 mm. DZ= -69.994 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10930 X2 K= 5,107 N./cm. Yield K= 1 N./cm.
Yield Force= 13,583 N. Dir Vec= .9966 .0000 -.0824
Node 10930 X2 K= 730,173 N./cm. Yield K= 1 N./cm.
Yield Force= 1,941,930 N. Dir Vec= .0824 .0000 .9966
Node 10930 Y2 K= 730,173 N./cm. Yield K= 1 N./cm.
Yield Force= 1,941,930 N.
-----------------------------------------------------------------------------
From 10931 To 10932 DX= 846.548 mm. DY= .000 mm. DZ= -69.994 mm.
RESTRAINTS
Node 10931 X2 K= 1,653 N./cm. Yield K= 1 N./cm. Yield Force= 4,396 N.
Dir Vec= .9966 .0000 -.0824
Node 10931 X2 K= 236,306 N./cm. Yield K= 1 N./cm.
Yield Force= 628,466 N. Dir Vec= .0824 .0000 .9966
Node 10931 Y2 K= 236,306 N./cm. Yield K= 1 N./cm.
Yield Force= 628,466 N.
-----------------------------------------------------------------------------
From 10932 To 10933 DX= 927.549 mm. DY= .000 mm. DZ= -76.691 mm.
RESTRAINTS
Node 10932 X2 K= 1,732 N./cm. Yield K= 1 N./cm. Yield Force= 4,606 N.
Dir Vec= .9966 .0000 -.0824
Node 10932 X2 K= 247,611 N./cm. Yield K= 1 N./cm.
Yield Force= 658,533 N. Dir Vec= .0824 .0000 .9966
Node 10932 Y2 K= 247,611 N./cm. Yield K= 1 N./cm.
Yield Force= 658,533 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 10933 To 10934 DX= 927.549 mm. DY= .000 mm. DZ= -76.691 mm.
RESTRAINTS
Node 10933 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= .9966 .0000 -.0824
Node 10933 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= .0824 .0000 .9966
Node 10933 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 10934 To 10935 DX= 407.624 mm. DY= .000 mm. DZ= -33.703 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 30.046
RESTRAINTS
Node 10934 X2 K= 1,683 N./cm. Yield K= 1 N./cm. Yield Force= 4,476 N.
Dir Vec= .9966 .0000 -.0824
Node 10934 X2 K= 240,623 N./cm. Yield K= 1 N./cm.
Yield Force= 639,947 N. Dir Vec= .0824 .0000 .9966
Node 10934 Y2 K= 240,623 N./cm. Yield K= 1 N./cm.
Yield Force= 639,947 N.
-----------------------------------------------------------------------------
From 10935 To 10936 DX= 739.445 mm. DY= .000 mm. DZ= 349.846 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 30.046
RESTRAINTS
Node 10935 X2 K= 1,555 N./cm. Yield K= 1 N./cm. Yield Force= 4,136 N.
Dir Vec= .9039 .0000 .4277
Node 10935 X2 K= 222,329 N./cm. Yield K= 1 N./cm.
Yield Force= 591,295 N. Dir Vec= -.4277 .0000 .9039
Node 10935 Y2 K= 222,329 N./cm. Yield K= 1 N./cm.
Yield Force= 591,295 N.
-----------------------------------------------------------------------------
From 10936 To 10950 DX= 464.911 mm. DY= .000 mm. DZ= 673.074 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 30.046
RESTRAINTS
Node 10936 X2 K= 1,555 N./cm. Yield K= 1 N./cm. Yield Force= 4,136 N.
Dir Vec= .5683 .0000 .8228
Node 10936 X2 K= 222,329 N./cm. Yield K= 1 N./cm.
Yield Force= 591,295 N. Dir Vec= -.8228 .0000 .5683
Node 10936 Y2 K= 222,329 N./cm. Yield K= 1 N./cm.
Yield Force= 591,295 N.
-----------------------------------------------------------------------------
From 10950 To 10970 DX= 70.507 mm. DY= .000 mm. DZ= 878.695 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10950 X2 K= 1,237 N./cm. Yield K= 1 N./cm. Yield Force= 3,291 N.
Dir Vec= .0800 .0000 .9968
Node 10950 X2 K= 176,888 N./cm. Yield K= 1 N./cm.
Yield Force= 470,442 N. Dir Vec= -.9968 .0000 .0800
Node 10950 Y2 K= 176,888 N./cm. Yield K= 1 N./cm.
Yield Force= 470,442 N.
-----------------------------------------------------------------------------
From 10970 To 10990 DX= 399.918 mm. DY= .000 mm. DZ= 4,983.981 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10970 X2 K= 5,324 N./cm. Yield K= 1 N./cm.
Yield Force= 14,161 N. Dir Vec= .0800 .0000 .9968
Node 10970 X2 K= 761,201 N./cm. Yield K= 1 N./cm.
Yield Force= 2,024,449 N. Dir Vec= -.9968 .0000 .0800
Node 10970 Y2 K= 761,201 N./cm. Yield K= 1 N./cm.
Yield Force= 2,024,449 N.
-----------------------------------------------------------------------------
From 10990 To 11010 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 10990 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= .0800 .0000 .9968
Node 10990 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.9968 .0000 .0800
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 10990 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
From 11010 To 11030 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11010 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11010 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11010 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11030 To 11050 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11030 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11030 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11030 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11050 To 11070 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11050 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11050 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11050 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11070 To 11090 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11070 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11070 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11070 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11090 To 11110 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11090 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11090 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11090 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11110 To 11130 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11110 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11110 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11110 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11130 To 11150 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11130 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11130 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11130 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11150 To 11170 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11150 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11150 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11150 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11170 To 11190 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11170 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11170 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11170 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11190 To 11210 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11190 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11190 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11190 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11210 To 11230 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11210 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11210 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11210 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11230 To 11250 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11230 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11230 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11230 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11250 To 11270 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11250 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11250 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11250 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11270 To 11290 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11270 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11270 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11270 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11290 To 11310 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11290 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11290 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11290 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11310 To 11330 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11310 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 11310 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11310 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11330 To 11350 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11330 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11330 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11330 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11350 To 11370 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11350 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11350 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11350 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11370 To 11390 DX= 479.902 mm. DY= .000 mm. DZ= 5,980.777 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11370 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= .0800 .0000 .9968
Node 11370 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.9968 .0000 .0800
Node 11370 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11390 To 11410 DX= 319.935 mm. DY= .000 mm. DZ= 3,987.185 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11390 X2 K= 9,729 N./cm. Yield K= 1 N./cm.
Yield Force= 25,876 N. Dir Vec= .0800 .0000 .9968
Node 11390 X2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,311 N. Dir Vec= -.9968 .0000 .0800
Node 11390 Y2 K= 1,390,956 N./cm. Yield K= 1 N./cm.
Yield Force= 3,699,311 N.
-----------------------------------------------------------------------------
From 11410 To 11411 TP-40 DX= 89.805 mm. DY= .000 mm. DZ= 1,119.193 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11410 X2 K= 4,984 N./cm. Yield K= 1 N./cm.
Yield Force= 13,256 N. Dir Vec= .0800 .0000 .9968
Node 11410 X2 K= 712,557 N./cm. Yield K= 1 N./cm.
Yield Force= 1,895,079 N. Dir Vec= -.9968 .0000 .0800
Node 11410 Y2 K= 712,557 N./cm. Yield K= 1 N./cm.
Yield Force= 1,895,079 N.
-----------------------------------------------------------------------------
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
From 11411 To 11412 DX= 32.607 mm. DY= .000 mm. DZ= 406.371 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 29.952
RESTRAINTS
Node 11411 X2 K= 1,868 N./cm. Yield K= 1 N./cm. Yield Force= 4,967 N.
Dir Vec= .0800 .0000 .9968
Node 11411 X2 K= 266,993 N./cm. Yield K= 1 N./cm.
Yield Force= 710,079 N. Dir Vec= -.9968 .0000 .0800
Node 11411 Y2 K= 266,993 N./cm. Yield K= 1 N./cm.
Yield Force= 710,079 N.
-----------------------------------------------------------------------------
From 11412 To 11413 DX= -349.281 mm. DY= .000 mm. DZ= 736.752 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 29.952
RESTRAINTS
Node 11412 X2 K= 1,550 N./cm. Yield K= 1 N./cm. Yield Force= 4,123 N.
Dir Vec= -.4284 .0000 .9036
Node 11412 X2 K= 221,635 N./cm. Yield K= 1 N./cm.
Yield Force= 589,448 N. Dir Vec= -.9036 .0000 -.4284
Node 11412 Y2 K= 221,635 N./cm. Yield K= 1 N./cm.
Yield Force= 589,448 N.
-----------------------------------------------------------------------------
From 11413 To 11430 DX= -670.478 mm. DY= .000 mm. DZ= 463.962 mm.
BEND at "TO" end
Radius= 1,524.000 mm. (user) Bend Angle= 29.952
RESTRAINTS
Node 11413 X2 K= 1,550 N./cm. Yield K= 1 N./cm. Yield Force= 4,123 N.
Dir Vec= -.8223 .0000 .5690
Node 11413 X2 K= 221,635 N./cm. Yield K= 1 N./cm.
Yield Force= 589,448 N. Dir Vec= -.5690 .0000 -.8223
Node 11413 Y2 K= 221,635 N./cm. Yield K= 1 N./cm.
Yield Force= 589,448 N.
-----------------------------------------------------------------------------
From 11430 To 11431 DX= -1,333.832 mm. DY= .000 mm. DZ= 110.371 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11430 X2 K= 1,681 N./cm. Yield K= 1 N./cm. Yield Force= 4,470 N.
Dir Vec= -.9966 .0000 .0825
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node 11430 X2 K= 240,276 N./cm. Yield K= 1 N./cm.
Yield Force= 639,024 N. Dir Vec= -.0825 .0000 -.9966
Node 11430 Y2 K= 240,276 N./cm. Yield K= 1 N./cm.
Yield Force= 639,024 N.
-----------------------------------------------------------------------------
From 11431 To 11432 DX= -927.544 mm. DY= .000 mm. DZ= 76.752 mm.
RESTRAINTS
Node 11431 X2 K= 1,811 N./cm. Yield K= 1 N./cm. Yield Force= 4,817 N.
Dir Vec= -.9966 .0000 .0825
Node 11431 X2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N. Dir Vec= -.0825 .0000 -.9966
Node 11431 Y2 K= 258,916 N./cm. Yield K= 1 N./cm.
Yield Force= 688,600 N.
-----------------------------------------------------------------------------
From 11432 To 11433 DX= -806.425 mm. DY= .000 mm. DZ= 66.730 mm.
RESTRAINTS
Node 11432 X2 K= 1,693 N./cm. Yield K= 1 N./cm. Yield Force= 4,502 N.
Dir Vec= -.9966 .0000 .0825
Node 11432 X2 K= 242,012 N./cm. Yield K= 1 N./cm.
Yield Force= 643,641 N. Dir Vec= -.0825 .0000 -.9966
Node 11432 Y2 K= 242,012 N./cm. Yield K= 1 N./cm.
Yield Force= 643,641 N.
-----------------------------------------------------------------------------
From 11433 To 11450 DX= -806.425 mm. DY= .000 mm. DZ= 66.730 mm.
RESTRAINTS
Node 11433 X2 K= 1,575 N./cm. Yield K= 1 N./cm. Yield Force= 4,188 N.
Dir Vec= -.9966 .0000 .0825
Node 11433 X2 K= 225,107 N./cm. Yield K= 1 N./cm.
Yield Force= 598,683 N. Dir Vec= -.0825 .0000 -.9966
Node 11433 Y2 K= 225,107 N./cm. Yield K= 1 N./cm.
Yield Force= 598,683 N.
-----------------------------------------------------------------------------
From 11450 To 11470 DX= -5,979.563 mm. DY= .000 mm. DZ= 494.794 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11450 X2 K= 6,625 N./cm. Yield K= 1 N./cm.
Yield Force= 17,619 N. Dir Vec= -.9966 .0000 .0825
Node 11450 X2 K= 947,127 N./cm. Yield K= 1 N./cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Yield Force= 2,518,928 N. Dir Vec= -.0825 .0000 -.9966
Node 11450 Y2 K= 947,127 N./cm. Yield K= 1 N./cm.
Yield Force= 2,518,928 N.
-----------------------------------------------------------------------------
From 11470 To 11490 DX= -5,979.563 mm. DY= .000 mm. DZ= 494.794 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11470 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9966 .0000 .0825
Node 11470 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.0825 .0000 -.9966
Node 11470 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11490 To 11510 DX= -5,979.563 mm. DY= .000 mm. DZ= 494.794 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11490 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9966 .0000 .0825
Node 11490 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.0825 .0000 -.9966
Node 11490 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11510 To 11530 DX= -5,979.563 mm. DY= .000 mm. DZ= 494.794 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11510 X2 K= 11,675 N./cm. Yield K= 1 N./cm.
Yield Force= 31,051 N. Dir Vec= -.9966 .0000 .0825
Node 11510 X2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N. Dir Vec= -.0825 .0000 -.9966
Node 11510 Y2 K= 1,669,147 N./cm. Yield K= 1 N./cm.
Yield Force= 4,439,173 N.
-----------------------------------------------------------------------------
From 11530 To 11550 DX= -4,982.969 mm. DY= .000 mm. DZ= 412.328 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11530 X2 K= 10,702 N./cm. Yield K= 1 N./cm.
Yield Force= 28,463 N. Dir Vec= -.9966 .0000 .0825
Node 11530 X2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N. Dir Vec= -.0825 .0000 -.9966
Node 11530 Y2 K= 1,530,051 N./cm. Yield K= 1 N./cm.
Yield Force= 4,069,242 N.
-----------------------------------------------------------------------------
From 11550 To 11551 DX= -702.243 mm. DY= .000 mm. DZ= 58.109 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11550 X2 K= 5,550 N./cm. Yield K= 1 N./cm.
Yield Force= 14,761 N. Dir Vec= -.9966 .0000 .0825
Node 11550 X2 K= 793,491 N./cm. Yield K= 1 N./cm.
Yield Force= 2,110,325 N. Dir Vec= -.0825 .0000 -.9966
Node 11550 Y2 K= 793,491 N./cm. Yield K= 1 N./cm.
Yield Force= 2,110,325 N.
-----------------------------------------------------------------------------
From 11551 To 11552 DX= -702.243 mm. DY= .000 mm. DZ= 58.109 mm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
RESTRAINTS
Node 11551 X2 K= 1,371 N./cm. Yield K= 1 N./cm. Yield Force= 3,647 N.
Dir Vec= -.9966 .0000 .0825
Node 11551 X2 K= 196,025 N./cm. Yield K= 1 N./cm.
Yield Force= 521,339 N. Dir Vec= -.0825 .0000 -.9966
Node 11551 Y2 K= 196,025 N./cm. Yield K= 1 N./cm.
Yield Force= 521,339 N.
-----------------------------------------------------------------------------
From 11552 To 11590 DX= -927.544 mm. DY= .000 mm. DZ= 76.752 mm.
RESTRAINTS
Node 11552 X2 K= 1,591 N./cm. Yield K= 1 N./cm. Yield Force= 4,232 N.
Dir Vec= -.9966 .0000 .0825
Node 11552 X2 K= 227,471 N./cm. Yield K= 1 N./cm.
Yield Force= 604,969 N. Dir Vec= -.0825 .0000 -.9966
Node 11552 Y2 K= 227,471 N./cm. Yield K= 1 N./cm.
Yield Force= 604,969 N.
-----------------------------------------------------------------------------
From 11590 To 11599 DX= -498.297 mm. DY= .000 mm. DZ= 41.233 mm.
GENERAL
PHyd= 25.3950 bars Mat= (305)API-5L B E= 203,390,704 KPa
EH1= 202,685,024 KPa EH2= 203,390,704 KPa EH3= 203,390,704 KPa
EH4= 203,390,704 KPa EH5= 203,390,704 KPa EH6= 203,390,704 KPa
EH7= 203,390,704 KPa EH8= 203,390,704 KPa EH9= 203,390,704 KPa
v = .292 Pipe Den= .0000000 kg./cu.cm. Fluid Den= .0000000 kg./cu.cm.
Refract. Den= .0000000 kg./cu.cm. Insul Den= .0000000 kg./cu.cm.
Clad Den= .0000000 kg./cu.cm. Insul/Clad Unit Wt= .00 N./cm.
RESTRAINTS
Node 11590 X2 K= 1,878 N./cm. Yield K= 1 N./cm. Yield Force= 4,996 N.
Dir Vec= -.9966 .0000 .0825
Node 11590 X2 K= 268,554 N./cm. Yield K= 1 N./cm.
Yield Force= 714,231 N. Dir Vec= -.0825 .0000 -.9966
Node 11590 Y2 K= 268,554 N./cm. Yield K= 1 N./cm.
Yield Force= 714,231 N.
-----------------------------------------------------------------------------
From 11599 To 11600 DX= -498.297 mm. DY= .000 mm. DZ= 41.233 mm.
RESTRAINTS
Node 11600 X2 K= 973 N./cm. Yield K= 1 N./cm. Yield Force= 2,588 N.
Dir Vec= -.9966 .0000 .0825
Node 11600 X2 K= 139,096 N./cm. Yield K= 1 N./cm.
Yield Force= 369,931 N. Dir Vec= -.0825 .0000 -.9966
Node 11600 Y2 K= 139,096 N./cm. Yield K= 1 N./cm.
Yield Force= 369,931 N.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
NODENAMES
30 50 From= To= TP-1
90 110 From= To= TP-2
530 550 From= To= TP-3
550 570 From= To= TP-4
690 710 From= To= TP-5
790 810 From= To= TP-6
850 870 From= To= TP-7
1290 1310 From= To= TP-8
1510 1530 From= To= TP-9
1810 1830 From= To= TP-10
2050 2070 From= To= TP-11
2340 2350 From= To= TP-12
3030 3040 From= To= TP-13
3070 3090 From= To= TP-14
4070 4080 From= To= TP-15
4310 4330 From= To= TP-16
4450 4451 From= To= TP-17
4690 4691 From= To= TP-18
4890 4910 From= To= TP-19
5030 5050 From= To= TP-20
5370 5390 From= To= TP-21
6470 6490 From= To= TP-22
6550 6570 From= To= TP-23
6700 6710 From= To= TP-24
7040 7050 From= To= TP-25
7100 7101 From= To= RC-8
7210 7230 From= To= TP-26
7290 7310 From= To= TP-27
7570 7590 From= To= TP-28
7710 7730 From= To= TP-29
7790 7791 From= To= RC-9
8050 8051 From= To= TP-30
8130 8131 From= To= TP-31
8410 8411 From= To= TP-32
8870 8871 From= To= TP-33
9480 9481 From= To= TP-34
10270 10271 From= To= TP-35
10430 10431 From= To= TP-36
10690 10691 From= To= TP-37
10930 10931 From= To= TP-38
11410 11411 From= To= TP-40
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
MATERIAL Changes:
10 30 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
30 50 TP-1 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
50 70 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
70 90 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
90 110 TP-2 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
110 130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
130 150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
150 170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
170 190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
190 210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
210 230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
230 250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
250 270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
270 290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
290 310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
310 330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
330 350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
350 370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
370 390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
390 410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
410 430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
430 450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
450 470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
470 490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
490 510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
510 530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
530 550 TP-3 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
550 570 TP-4 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
570 590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
590 591 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
610 611 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
630 649 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
650 670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
670 690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
690 710 TP-5 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
710 730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
730 750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
750 770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
770 790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
790 810 TP-6 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
810 830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
830 850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
850 870 TP-7 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
870 890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
890 910 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
910 930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
930 950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
950 970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
970 990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
990 1010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1010 1030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1030 1050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1050 1070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1070 1090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1090 1110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1110 1130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1130 1150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1150 1170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1170 1190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1190 1210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1210 1230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1230 1250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1250 1270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1270 1290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1290 1310 TP-8 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1310 1330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1330 1350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1350 1370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1370 1390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1390 1391 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1410 1411 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1430 1449 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1450 1470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1470 1490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1490 1510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1510 1530 TP-9 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1530 1550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1550 1570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1570 1590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1590 1610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1610 1630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1630 1650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1650 1670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1670 1671 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1690 1691 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1710 1729 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
1730 1750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1750 1770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1770 1790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1790 1810 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
1810 1830 TP-10 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1830 1850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1850 1870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1870 1890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1890 1910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1910 1930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1930 1950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1950 1970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1970 1990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
1990 2010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2010 2030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2030 2050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2050 2070 TP-11 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2070 2090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2090 2110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2110 2130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2130 2150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2150 2170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2170 2190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2190 2210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2210 2230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2230 2250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
2250 2270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2270 2290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2290 2310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2310 2330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2330 2340 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2340 2350 TP-12 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2350 2370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2370 2390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2390 2410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2410 2530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2530 2550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2550 2570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2570 2590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2590 2610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2610 2630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2630 2650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2650 2670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2670 2671 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
2690 2691 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
2710 2729 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
2730 2750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2750 2770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2770 2790 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
2790 2930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2930 2950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2950 2970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2970 2990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
2990 3010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3010 3030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3030 3040 TP-13 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3040 3050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3050 3060 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3060 3070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3070 3090 TP-14 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3090 3110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3110 3130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3130 3150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3150 3170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3170 3190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3190 3210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3210 3230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3230 3250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3250 3270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3270 3290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3290 3310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
3310 3320 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3320 3323 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3323 3326 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3326 3329 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3329 3332 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3332 3335 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3335 3338 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3338 3341 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3341 3344 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3344 3350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3350 3370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3370 3390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3390 3410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3410 3430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3430 3450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3450 3470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3470 3490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3490 3510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3510 3530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3530 3550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3550 3570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3570 3590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3590 3610 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
3610 3630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3630 3631 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
3650 3651 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
3670 3689 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
3690 3710 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3710 3730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3730 3750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3750 3770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3770 3790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3790 3810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3810 3830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3830 3850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3850 3870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3870 3890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3890 3910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3910 3930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3930 3950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3950 3952 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3952 3968 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3968 3970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3970 3990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
3990 4010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4010 4030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4030 4050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4050 4070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4070 4080 TP-15 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4080 4090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4090 4110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4110 4130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4130 4131 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4150 4151 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4170 4190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4190 4191 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4210 4230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4230 4250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4250 4270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4270 4290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4290 4310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4310 4330 TP-16 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4330 4350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4350 4370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4370 4390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4390 4410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4410 4430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4430 4450 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
4450 4451 TP-17 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4470 4471 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4490 4510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4510 4530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4530 4550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4550 4570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4570 4590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4590 4610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4610 4630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4630 4650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4650 4670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4670 4690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4690 4691 TP-18 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4710 4711 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4730 4750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4750 4751 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4770 4790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4790 4791 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4810 4811 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4830 4849 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
4850 4870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4870 4890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4890 4910 TP-19 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4910 4930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4930 4950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4950 4970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4970 4990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
4990 5010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5010 5030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5030 5050 TP-20 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5050 5070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5070 5090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5090 5110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5110 5130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5130 5150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5150 5170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5170 5190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5190 5210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5210 5220 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5220 5225 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5225 5250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5250 5270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5270 5290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5290 5310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5310 5330 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
5330 5350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5350 5370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5370 5390 TP-21 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5390 5410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5410 5430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5430 5450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5450 5470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5470 5490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5490 5510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5510 5530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5530 5550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5550 5570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5570 5590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5590 5610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5610 5630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5630 5635 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5635 5640 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5640 5650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5650 5670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5670 5690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5690 5710 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5710 5730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
5730 5750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5750 5770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5770 5790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5790 5810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5810 5830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5830 5850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5850 5870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5870 5890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5890 5895 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5895 5920 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5920 5930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5930 5950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5950 5970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5970 5990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
5990 6010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6010 6030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6030 6050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6050 6070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6070 6170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6170 6190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6190 6210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6210 6220 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6220 6225 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
6225 6250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6250 6270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6270 6290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6290 6310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6310 6330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6330 6350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6350 6370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6370 6390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6390 6410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6410 6430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6430 6450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6450 6470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6470 6490 TP-22 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6490 6510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6510 6530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6530 6550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6550 6570 TP-23 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6570 6590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6590 6610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6610 6630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6630 6640 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6640 6645 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
6645 6650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6650 6655 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6655 6660 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6660 6665 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6665 6670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6670 6690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6690 6700 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6700 6710 TP-24 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6710 6730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6730 6810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6810 6830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6830 6850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6850 6870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6870 6890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6890 6910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6910 6930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6930 6950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6950 6970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6970 6990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
6990 7010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7010 7030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7030 7040 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7040 7050 TP-25 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0078 kg./cu.cm.
7050 7070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7070 7090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7090 7100 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7100 7101 RC-8 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7110 7111 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7130 7139 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7140 7150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7150 7170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7170 7210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7210 7230 TP-26 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7230 7250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7250 7270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7270 7290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7290 7310 TP-27 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7310 7330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7330 7350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7350 7370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7370 7390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7390 7410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7410 7430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7430 7450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7450 7470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7470 7490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7490 7510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7510 7530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7530 7550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7550 7570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7570 7590 TP-28 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7590 7610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7610 7630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7630 7650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7650 7670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7670 7690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7690 7710 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7710 7730 TP-29 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7730 7750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7750 7770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7770 7780 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0078 kg./cu.cm.
7780 7781 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7790 7791 RC-9 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7810 7820 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7820 7821 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7830 7850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7850 7851 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7870 7871 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
7890 7910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7910 7930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7930 7950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7950 7970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7970 7990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
7990 8010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8010 8030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8030 8050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8050 8051 TP-30 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8070 8071 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8090 8110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8110 8130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8130 8131 TP-31 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8150 8151 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8170 8190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8190 8210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8210 8230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8230 8250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8250 8270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8270 8290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8290 8310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8310 8330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8330 8350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8350 8370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8370 8390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8390 8410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8410 8411 TP-32 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8430 8450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8450 8470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8470 8490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8490 8510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8510 8530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8530 8550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8550 8570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8570 8590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8590 8610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8610 8630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8630 8650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8650 8670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8670 8690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8690 8710 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8710 8730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8730 8750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8750 8770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8770 8790 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
8790 8810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8810 8830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8830 8831 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8850 8851 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8870 8871 TP-33 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8890 8891 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8910 8930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8930 8950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8950 8970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8970 8990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
8990 9010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9010 9030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9030 9050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9050 9070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9070 9090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9090 9110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9110 9111 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9130 9131 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9150 9170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9170 9190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9190 9210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9210 9230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9230 9250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9250 9270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9270 9290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9290 9310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9310 9330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9330 9350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9350 9370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9370 9390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9390 9410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9410 9430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9430 9450 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9450 9470 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9470 9480 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9480 9481 TP-34 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9490 9491 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9510 9530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9530 9550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9550 9570 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9570 9590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9590 9610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9610 9630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9630 9650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9650 9670 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
9670 9690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9690 9710 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9710 9730 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9730 9750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9750 9770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9770 9790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9790 9810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9810 9830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9830 9850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9850 9870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9870 9890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9890 9910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9910 9930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9930 9950 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9950 9970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9970 9990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
9990 10010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10010 10030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10030 10050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10050 10070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10070 10090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10090 10110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10110 10130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10130 10150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10150 10170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10170 10171 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10190 10210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10210 10211 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10230 10231 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10250 10251 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10270 10271 TP-35 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10290 10291 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10310 10330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10330 10350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10350 10370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10370 10390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10390 10410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10410 10430 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10430 10431 TP-36 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10450 10451 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10470 10490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10490 10510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10510 10530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10530 10550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10550 10570 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
10570 10590 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10590 10610 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10610 10630 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10630 10650 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10650 10670 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10670 10690 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10690 10691 TP-37 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10710 10711 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10730 10750 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10750 10770 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10770 10790 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10790 10810 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10810 10830 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10830 10850 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10850 10870 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10870 10890 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10890 10910 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10910 10930 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10930 10931 TP-38 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10950 10970 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10970 10990 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
10990 11010 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
11010 11030 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11030 11050 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11050 11070 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11070 11090 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11090 11110 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11110 11130 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11130 11150 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11150 11170 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11170 11190 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11190 11210 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11210 11230 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11230 11250 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11250 11270 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11270 11290 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11290 11310 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11310 11330 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11330 11350 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11350 11370 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11370 11390 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11390 11410 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11410 11411 TP-40 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11430 11431 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11450 11470 Mat= (305)API-5L B E= 203,390,704 KPa
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
v = .292 Density= .0000 kg./cu.cm.
11470 11490 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11490 11510 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11510 11530 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11530 11550 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11550 11551 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
11590 11599 Mat= (305)API-5L B E= 203,390,704 KPa
v = .292 Density= .0000 kg./cu.cm.
JOBNAME: D:\PROJECTS\PETROCON\RTPL\10 INCH LINE\REV-1\CAESAR FILES\10 INCH
LINE
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Fac= .0000
7780 7781 B31.4 (2006) Sy= 241,311 KPa
Fac= .0010
BEND ELEMENTS
30 50 TP-1 Radius= 1,524.000 mm. (user)
Bend Angle= 88.943 Angle/Node @1= 44.47 49
Angle/Node @2= .00 48
90 110 TP-2 Radius= 1,524.000 mm. (user)
Bend Angle= 90.355 Angle/Node @1= 45.18
109 Angle/Node @2= .00 108
530 550 TP-3 Radius= 1,524.000 mm. (user)
Bend Angle= 90.246 Angle/Node @1= 45.12
549 Angle/Node @2= .00 548
550 570 TP-4 Radius= 381.000 mm. (LONG)
Bend Angle= 90.558 Angle/Node @1= 45.28
569 Angle/Node @2= .00 568
591 592 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
592 610 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
619 620 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
620 630 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
650 670 Radius= 1,524.000 mm. (user)
Bend Angle= 56.311 Angle/Node @1= 28.16
669 Angle/Node @2= .00 668
690 710 TP-5 Radius= 1,524.000 mm. (user)
Bend Angle= 79.569 Angle/Node @1= 39.78
709 Angle/Node @2= .00 708
790 810 TP-6 Radius= 1,524.000 mm. (user)
Bend Angle= 16.991 Angle/Node @1= 8.50 809
Angle/Node @2= .00 808
850 870 TP-7 Radius= 1,524.000 mm. (user)
Bend Angle= 20.048 Angle/Node @1= 10.02
869 Angle/Node @2= .00 868
1290 1310 TP-8 Radius= 1,524.000 mm. (user)
Bend Angle= 4.962 Angle/Node @1= 2.48 1309
Angle/Node @2= .00 1308
1350 1370 Radius= 1,524.000 mm. (user)
Bend Angle= 56.099 Angle/Node @1= 28.05
1369 Angle/Node @2= .00 1368
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1391 1392 Radius= 1,524.000 mm. (user)
Bend Angle= 28.049
1392 1410 Radius= 1,524.000 mm. (user)
Bend Angle= 28.049
1413 1414 Radius= 1,524.000 mm. (user)
Bend Angle= 28.049
1414 1430 Radius= 1,524.000 mm. (user)
Bend Angle= 28.049
1450 1470 Radius= 1,524.000 mm. (user)
Bend Angle= 56.099 Angle/Node @1= 28.05
1469 Angle/Node @2= .00 1468
1510 1530 TP-9 Radius= 1,524.000 mm. (user)
Bend Angle= 2.287 Angle/Node @1= 1.14 1529
Angle/Node @2= .00 1528
1630 1650 Radius= 1,524.000 mm. (user)
Bend Angle= 47.851 Angle/Node @1= 23.93
1649 Angle/Node @2= .00 1648
1671 1672 Radius= 1,524.000 mm. (user)
Bend Angle= 23.925
1672 1690 Radius= 1,524.000 mm. (user)
Bend Angle= 23.925
1695 1696 Radius= 1,524.000 mm. (user)
Bend Angle= 28.264
1696 1710 Radius= 1,524.000 mm. (user)
Bend Angle= 28.264
1730 1750 Radius= 1,524.000 mm. (user)
Bend Angle= 56.528 Angle/Node @1= 28.26
1749 Angle/Node @2= .00 1748
1810 1830 TP-10 Radius= 1,524.000 mm. (user)
Bend Angle= 85.962 Angle/Node @1= 42.98
1829 Angle/Node @2= .00 1828
2050 2070 TP-11 Radius= 1,524.000 mm. (user)
Bend Angle= 62.598 Angle/Node @1= 31.30
2069 Angle/Node @2= .00 2068
2340 2350 TP-12 Radius= 1,524.000 mm. (user)
Bend Angle= 82.069 Angle/Node @1= 41.03
2349 Angle/Node @2= .00 2348
2630 2650 Radius= 1,524.000 mm. (user)
Bend Angle= 56.431 Angle/Node @1= 28.22
2649 Angle/Node @2= .00 2648
2671 2672 Radius= 1,524.000 mm. (user)
Bend Angle= 28.215
2672 2690 Radius= 1,524.000 mm. (user)
Bend Angle= 28.215
2691 2692 Radius= 1,524.000 mm. (user)
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Bend Angle= 28.215
2692 2710 Radius= 1,524.000 mm. (user)
Bend Angle= 28.215
2730 2750 Radius= 1,524.000 mm. (user)
Bend Angle= 56.430 Angle/Node @1= 28.22
2749 Angle/Node @2= .00 2748
3030 3040 TP-13 Radius= 1,524.000 mm. (user)
Bend Angle= 43.884 Angle/Node @1= 21.94
3039 Angle/Node @2= .00 3038
3070 3090 TP-14 Radius= 1,524.000 mm. (user)
Bend Angle= 45.088 Angle/Node @1= 22.54
3089 Angle/Node @2= .00 3088
3590 3610 Radius= 1,524.000 mm. (user)
Bend Angle= 56.310 Angle/Node @1= 28.15
3609 Angle/Node @2= .00 3608
3631 3632 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
3632 3650 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
3655 3656 Radius= 1,524.000 mm. (user)
Bend Angle= 23.343
3656 3670 Radius= 1,524.000 mm. (user)
Bend Angle= 23.343
3690 3710 Radius= 1,524.000 mm. (user)
Bend Angle= 46.686 Angle/Node @1= 23.34
3709 Angle/Node @2= .00 3708
4090 4110 Radius= 1,524.000 mm. (user)
Bend Angle= 56.310 Angle/Node @1= 28.15
4109 Angle/Node @2= .00 4108
4131 4132 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4132 4150 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4159 4160 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4160 4170 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4191 4192 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4192 4210 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
4451 4452 Radius= 1,524.000 mm. (user)
Bend Angle= 4.214
4452 4470 Radius= 1,524.000 mm. (user)
Bend Angle= 4.214
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4694 4695 Radius= 1,524.000 mm. (user)
Bend Angle= 1.464
4695 4710 Radius= 1,524.000 mm. (user)
Bend Angle= 1.464
4753 4754 Radius= 1,524.000 mm. (user)
Bend Angle= 32.630
4754 4770 Radius= 1,524.000 mm. (user)
Bend Angle= 32.630
4791 4792 Radius= 1,524.000 mm. (user)
Bend Angle= 32.630
4792 4810 Radius= 1,524.000 mm. (user)
Bend Angle= 32.630
4819 4820 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
4820 4830 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
4850 4870 Radius= 1,524.000 mm. (user)
Bend Angle= 56.306 Angle/Node @1= 28.15
4869 Angle/Node @2= .00 4868
4890 4910 TP-19 Radius= 1,524.000 mm. (user)
Bend Angle= 5.306 Angle/Node @1= 2.65 4909
Angle/Node @2= .00 4908
5030 5050 TP-20 Radius= 1,524.000 mm. (user)
Bend Angle= 4.246 Angle/Node @1= 2.12 5049
Angle/Node @2= .00 5048
5370 5390 TP-21 Radius= 1,524.000 mm. (user)
Bend Angle= 11.962 Angle/Node @1= 5.98
5389 Angle/Node @2= .00 5388
5530 5550 Radius= 1,524.000 mm. (user)
Bend Angle= .864 Angle/Node @1= .43 5549
Angle/Node @2= .00 5548
5630 5635 Radius= 1,524.000 mm. (user)
Bend Angle= 36.870 Angle/Node @1= 18.43
5634 Angle/Node @2= .00 5633
5635 5640 Radius= 1,524.000 mm. (user)
Bend Angle= 36.870 Angle/Node @1= 18.43
5639 Angle/Node @2= .00 5638
5830 5850 Radius= 1,524.000 mm. (user)
Bend Angle= .529 Angle/Node @1= .26 5849
Angle/Node @2= .00 5848
6470 6490 TP-22 Radius= 1,524.000 mm. (user)
Bend Angle= 5.275 Angle/Node @1= 2.64 6489
Angle/Node @2= .00 6488
6550 6570 TP-23 Radius= 1,524.000 mm. (user)
Bend Angle= 2.243 Angle/Node @1= 1.12 6569
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Angle/Node @2= .00 6568
6610 6630 Radius= 1,524.000 mm. (user)
Bend Angle= 2.731 Angle/Node @1= 1.37 6629
Angle/Node @2= .00 6628
6700 6710 TP-24 Radius= 1,524.000 mm. (user)
Bend Angle= 4.127 Angle/Node @1= 2.06 6709
Angle/Node @2= .00 6708
6730 6810 Radius= 1,524.000 mm. (user)
Bend Angle= .263 Angle/Node @1= .13 6809
Angle/Node @2= .00 6808
6810 6830 Radius= 1,524.000 mm. (user)
Bend Angle= 2.147 Angle/Node @1= 1.07 6829
Angle/Node @2= .00 6828
6830 6850 Radius= 1,524.000 mm. (user)
Bend Angle= 2.166 Angle/Node @1= 1.08 6849
Angle/Node @2= .00 6848
6850 6870 Radius= 1,524.000 mm. (user)
Bend Angle= 2.142 Angle/Node @1= 1.07 6869
Angle/Node @2= .00 6868
6870 6890 Radius= 1,524.000 mm. (user)
Bend Angle= 2.187 Angle/Node @1= 1.09 6889
Angle/Node @2= .00 6888
6890 6910 Radius= 1,524.000 mm. (user)
Bend Angle= 2.167 Angle/Node @1= 1.08 6909
Angle/Node @2= .00 6908
6910 6930 Radius= 1,524.000 mm. (user)
Bend Angle= 2.190 Angle/Node @1= 1.09 6929
Angle/Node @2= .00 6928
6930 6950 Radius= 1,524.000 mm. (user)
Bend Angle= 2.107 Angle/Node @1= 1.05 6949
Angle/Node @2= .00 6948
6950 6970 Radius= 1,524.000 mm. (user)
Bend Angle= 1.107 Angle/Node @1= .55 6969
Angle/Node @2= .00 6968
7040 7050 TP-25 Radius= 1,524.000 mm. (user)
Bend Angle= 10.136 Angle/Node @1= 5.07
7049 Angle/Node @2= .00 7048
7070 7090 Radius= 1,524.000 mm. (user)
Bend Angle= 60.939 Angle/Node @1= 30.47
7089 Angle/Node @2= .00 7088
7101 7102 Radius= 1,524.000 mm. (user)
Bend Angle= 30.466
7102 7110 Radius= 1,524.000 mm. (user)
Bend Angle= 30.466
7119 7120 Radius= 1,524.000 mm. (user)
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Bend Angle= 26.067
7120 7130 Radius= 1,524.000 mm. (user)
Bend Angle= 26.067
7140 7150 Radius= 1,524.000 mm. (user)
Bend Angle= 52.135 Angle/Node @1= 26.07
7149 Angle/Node @2= .00 7148
7210 7230 TP-26 Radius= 1,524.000 mm. (user)
Bend Angle= 22.579 Angle/Node @1= 11.29
7229 Angle/Node @2= .00 7228
7290 7310 TP-27 Radius= 1,524.000 mm. (user)
Bend Angle= 21.765 Angle/Node @1= 10.88
7309 Angle/Node @2= .00 7308
7570 7590 TP-28 Radius= 1,524.000 mm. (user)
Bend Angle= 7.375 Angle/Node @1= 3.69 7589
7710 7730 TP-29 Radius= 1,524.000 mm. (user)
Bend Angle= 28.664 Angle/Node @1= 14.33
7729 Angle/Node @2= .00 7728
7750 7770 Radius= 1,524.000 mm. (user)
Bend Angle= 68.777 Angle/Node @1= 34.39
7769 Angle/Node @2= .00 7768
7781 7782 Radius= 1,524.000 mm. (user)
Bend Angle= 34.389
7782 7790 Radius= 1,524.000 mm. (user)
Bend Angle= 34.389
7797 7798 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
7798 7810 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
7821 7822 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
7822 7830 Radius= 1,524.000 mm. (user)
Bend Angle= 28.153
7853 7854 Radius= 1,524.000 mm. (user)
Bend Angle= .789
7854 7870 Radius= 1,524.000 mm. (user)
Bend Angle= .789
8053 8054 Radius= 1,524.000 mm. (user)
Bend Angle= 23.151
8054 8070 Radius= 1,524.000 mm. (user)
Bend Angle= 23.151
8132 8133 Radius= 1,524.000 mm. (user)
Bend Angle= 33.553
8133 8150 Radius= 1,524.000 mm. (user)
Bend Angle= 33.553
8413 8414 Radius= 1,524.000 mm. (user)
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Bend Angle= 40.782
8414 8430 Radius= 1,524.000 mm. (user)
Bend Angle= 40.782
8831 8832 Radius= 1,524.000 mm. (user)
Bend Angle= .195
8832 8850 Radius= 1,524.000 mm. (user)
Bend Angle= .196
8872 8873 Radius= 1,524.000 mm. (user)
Bend Angle= 28.192
8873 8890 Radius= 1,524.000 mm. (user)
Bend Angle= 28.192
9113 9114 Radius= 1,524.000 mm. (user)
Bend Angle= 1.592
9114 9130 Radius= 1,524.000 mm. (user)
Bend Angle= 1.593
9481 9482 Radius= 1,524.000 mm. (user)
Bend Angle= 37.612
9482 9490 Radius= 1,524.000 mm. (user)
Bend Angle= 37.612
10172 10173 Radius= 1,524.000 mm. (user)
Bend Angle= 35.398
10173 10190 Radius= 1,524.000 mm. (user)
Bend Angle= 35.398
10211 10212 Radius= 1,524.000 mm. (user)
Bend Angle= 35.398
10212 10230 Radius= 1,524.000 mm. (user)
Bend Angle= 35.398
10235 10236 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
10236 10250 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
10252 10253 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
10253 10270 Radius= 1,524.000 mm. (user)
Bend Angle= 28.155
10271 10272 Radius= 1,524.000 mm. (user)
Bend Angle= 36.751
10272 10290 Radius= 1,524.000 mm. (user)
Bend Angle= 36.751
10433 10434 Radius= 1,524.000 mm. (user)
Bend Angle= 31.557
10434 10450 Radius= 1,524.000 mm. (user)
Bend Angle= 31.557
10691 10692 Radius= 1,524.000 mm. (user)
Bend Angle= 35.078
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10692 10710 Radius= 1,524.000 mm. (user)
Bend Angle= 35.078
10934 10935 Radius= 1,524.000 mm. (user)
Bend Angle= 30.046
10935 10936 Radius= 1,524.000 mm. (user)
Bend Angle= 30.046
10936 10950 Radius= 1,524.000 mm. (user)
Bend Angle= 30.046
11411 11412 Radius= 1,524.000 mm. (user)
Bend Angle= 29.952
11412 11413 Radius= 1,524.000 mm. (user)
Bend Angle= 29.952
11413 11430 Radius= 1,524.000 mm. (user)
Bend Angle= 29.952
RESTRAINTS Len MU
GAP YIELD Dir
NODE TYPE CNODE STIF1 STIF2 FORCE Vectors
-------+-------+------+----------+----------+----------+---------------------
10 ANC .000 .000 .000
30 +Y .30 .000 1.000 .000
70 +Y .30 .000 1.000 .000
90 +Y .30 .000 1.000 .000
130 +Y .30 .000 1.000 .000
150 +Y .30 .000 1.000 .000
170 +Y .30 .000 1.000 .000
170 Guide .000 .000 .000
190 +Y .30 .000 1.000 .000
210 +Y .30 .000 1.000 .000
210 Guide .000 .000 .000
230 +Y .30 .000 1.000 .000
250 +Y .30 .000 1.000 .000
250 Guide .000 .000 .000
270 +Y .30 .000 1.000 .000
290 +Y .30 .000 1.000 .000
290 Guide .000 .000 .000
310 +Y .30 .000 1.000 .000
330 +Y .30 .000 1.000 .000
330 Guide .000 .000 .000
350 +Y .30 .000 1.000 .000
370 +Y .30 .000 1.000 .000
370 Guide .000 .000 .000
390 +Y .30 .000 1.000 .000
410 +Y .30 .000 1.000 .000
410 Guide .000 .000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
430 +Y .30 .000 1.000 .000
450 +Y .30 .000 1.000 .000
450 Guide .000 .000 .000
470 +Y .30 .000 1.000 .000
490 +Y .30 .000 1.000 .000
490 Guide .000 .000 .000
510 +Y .30 .000 1.000 .000
530 +Y .30 .000 1.000 .000
590 X2 963 1.00 2561.38 .548 -.832 -.084
590 X2 137688 1.00 366186.94 .151 .000 .989
590 X2 137688 1.00 366186.94 .823 .555 -.126
591 X2 1692 1.00 4499.22 .548 -.832 -.084
591 X2 241857 1.00 643228.50 .151 .000 .989
591 X2 241857 1.00 643228.50 .823 .555 -.126
592 X2 1457 1.00 3875.67 .872 -.472 -.133
592 X2 208337 1.00 554083.19 .151 .000 .988
592 X2 208337 1.00 554083.19 .466 .882 -.071
610 X2 1634 1.00 4346.13 .988 .000 -.152
610 X2 233627 1.00 621341.56 .152 .000 .988
610 Y2 233627 1.00 621341.56 .000 1.000 .000
611 X2 1811 1.00 4816.58 .988 .000 -.152
611 X2 258916 1.00 688599.94 .152 .000 .988
611 Y2 258916 1.00 688599.94 .000 1.000 .000
612 X2 1811 1.00 4816.58 .988 .000 -.152
612 X2 258916 1.00 688599.94 .152 .000 .988
612 Y2 258916 1.00 688599.94 .000 1.000 .000
613 X2 2264 1.00 6020.73 .988 .000 -.152
613 X2 323645 1.00 860749.94 .152 .000 .988
613 Y2 323645 1.00 860749.94 .000 1.000 .000
614 X2 2471 1.00 6571.51 .988 .000 -.152
614 X2 353253 1.00 939492.50 .152 .000 .988
614 Y2 353253 1.00 939492.50 .000 1.000 .000
615 X2 2471 1.00 6571.51 .988 .000 -.152
615 X2 353253 1.00 939492.50 .152 .000 .988
615 Y2 353253 1.00 939492.50 .000 1.000 .000
616 X2 2264 1.00 6020.73 .988 .000 -.152
616 X2 323645 1.00 860749.94 .152 .000 .988
616 Y2 323645 1.00 860749.94 .000 1.000 .000
617 X2 1811 1.00 4816.58 .988 .000 -.152
617 X2 258916 1.00 688599.94 .152 .000 .988
617 Y2 258916 1.00 688599.94 .000 1.000 .000
618 X2 1811 1.00 4816.58 .988 .000 -.152
618 X2 258916 1.00 688599.94 .152 .000 .988
618 Y2 258916 1.00 688599.94 .000 1.000 .000
619 X2 1634 1.00 4346.13 .988 .000 -.152
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
619 X2 233627 1.00 621341.50 .152 .000 .988
619 Y2 233627 1.00 621341.50 .000 1.000 .000
620 X2 1457 1.00 3875.67 .872 .472 -.133
620 X2 208337 1.00 554083.13 .151 .000 .988
620 X2 208337 1.00 554083.13 -.466 .882 .071
630 X2 1686 1.00 4484.95 .548 .832 -.084
630 X2 241089 1.00 641188.63 .151 .000 .989
630 X2 241089 1.00 641188.63 -.823 .555 .126
650 X2 958 1.00 2547.12 .548 .832 -.084
650 X2 136921 1.00 364147.06 .151 .000 .989
650 X2 136921 1.00 364147.06 -.823 .555 .126
690 +Y .30 .000 1.000 .000
730 +Y .30 .000 1.000 .000
750 +Y .30 .000 1.000 .000
750 Guide .000 .000 .000
770 +Y .30 .000 1.000 .000
790 +Y .30 .000 1.000 .000
790 Guide .000 .000 .000
830 +Y .30 .000 1.000 .000
850 +Y .30 .000 1.000 .000
890 +Y .30 .000 1.000 .000
910 +Y .30 .000 1.000 .000
910 Guide .000 .000 .000
930 +Y .30 .000 1.000 .000
950 +Y .30 .000 1.000 .000
950 Guide .000 .000 .000
970 +Y .30 .000 1.000 .000
990 +Y .30 .000 1.000 .000
990 Guide .000 .000 .000
1010 +Y .30 .000 1.000 .000
1030 +Y .30 .000 1.000 .000
1030 Guide .000 .000 .000
1050 +Y .30 .000 1.000 .000
1070 +Y .30 .000 1.000 .000
1070 Guide .000 .000 .000
1090 +Y .30 .000 1.000 .000
1110 +Y .30 .000 1.000 .000
1110 Guide .000 .000 .000
1130 +Y .30 .000 1.000 .000
1150 +Y .30 .000 1.000 .000
1150 Guide .000 .000 .000
1170 +Y .30 .000 1.000 .000
1190 +Y .30 .000 1.000 .000
1190 Guide .000 .000 .000
1210 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1230 +Y .30 .000 1.000 .000
1230 Guide .000 .000 .000
1250 +Y .30 .000 1.000 .000
1270 +Y .30 .000 1.000 .000
1270 Guide .000 .000 .000
1290 +Y .30 .000 1.000 .000
1330 +Y .30 .000 1.000 .000
1330 Guide .000 .000 .000
1350 +Y .30 .000 1.000 .000
1390 X2 975 1.00 2593.88 .200 -.830 .521
1390 X2 139435 1.00 370832.91 -.933 .000 .359
1390 X2 139435 1.00 370832.91 .298 .558 .775
1391 X2 1701 1.00 4524.42 .200 -.830 .521
1391 X2 243211 1.00 646831.88 -.933 .000 .359
1391 X2 243211 1.00 646831.88 .298 .558 .775
1392 X2 1452 1.00 3861.09 .317 -.470 .824
1392 X2 207553 1.00 551997.94 -.933 .000 .359
1392 X2 207553 1.00 551997.94 .169 .883 .439
1410 X2 1631 1.00 4338.83 .359 .000 .933
1410 X2 233235 1.00 620298.94 -.933 .000 .359
1410 Y2 233235 1.00 620298.94 .000 1.000 .000
1411 X2 2105 1.00 5597.84 .359 .000 .933
1411 X2 300913 1.00 800291.94 -.933 .000 .359
1411 Y2 300913 1.00 800291.94 .000 1.000 .000
1412 X2 2105 1.00 5597.84 .359 .000 .933
1412 X2 300913 1.00 800291.94 -.933 .000 .359
1412 Y2 300913 1.00 800291.94 .000 1.000 .000
1413 X2 1631 1.00 4338.83 .359 .000 .933
1413 X2 233235 1.00 620298.94 -.933 .000 .359
1413 Y2 233235 1.00 620298.94 .000 1.000 .000
1414 X2 1452 1.00 3861.09 .317 .470 .824
1414 X2 207553 1.00 551997.94 -.933 .000 .359
1414 X2 207553 1.00 551997.94 -.169 .883 -.439
1430 X2 1687 1.00 4487.03 .200 .830 .521
1430 X2 241201 1.00 641486.00 -.933 .000 .359
1430 X2 241201 1.00 641486.00 -.298 .558 -.775
1450 X2 961 1.00 2556.49 .200 .830 .521
1450 X2 137425 1.00 365487.00 -.933 .000 .359
1450 X2 137425 1.00 365487.00 -.298 .558 -.775
1490 +Y .30 .000 1.000 .000
1510 +Y .30 .000 1.000 .000
1510 Guide .000 .000 .000
1550 +Y .30 .000 1.000 .000
1570 +Y .30 .000 1.000 .000
1570 Guide .000 .000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1590 +Y .30 .000 1.000 .000
1610 +Y .30 .000 1.000 .000
1610 Guide .000 .000 .000
1670 X2 1333 1.00 3545.74 .213 -.741 .636
1670 X2 190602 1.00 506915.25 -.948 .000 .317
1670 X2 190602 1.00 506915.25 .235 .671 .703
1671 X2 1952 1.00 5192.42 .213 -.741 .636
1671 X2 279120 1.00 742331.63 -.948 .000 .317
1671 X2 279120 1.00 742331.63 .235 .671 .703
1672 X2 1238 1.00 3293.36 .290 -.406 .867
1672 X2 177035 1.00 470832.78 -.948 .000 .317
1672 X2 177035 1.00 470832.78 .129 .914 .385
1690 X2 1525 1.00 4054.97 .317 .000 .948
1690 X2 217976 1.00 579716.38 -.948 .000 .317
1690 Y2 217976 1.00 579716.38 .000 1.000 .000
1691 X2 1811 1.00 4816.58 .317 .000 .948
1691 X2 258916 1.00 688599.94 -.948 .000 .317
1691 Y2 258916 1.00 688599.94 .000 1.000 .000
1692 X2 2284 1.00 6074.47 .317 .000 .948
1692 X2 326534 1.00 868433.13 -.948 .000 .317
1692 Y2 326534 1.00 868433.13 .000 1.000 .000
1693 X2 2284 1.00 6074.47 .317 .000 .948
1693 X2 326534 1.00 868433.13 -.948 .000 .317
1693 Y2 326534 1.00 868433.13 .000 1.000 .000
1694 X2 1811 1.00 4816.58 .317 .000 .948
1694 X2 258916 1.00 688599.94 -.948 .000 .317
1694 Y2 258916 1.00 688599.94 .000 1.000 .000
1695 X2 1637 1.00 4353.60 .317 .000 .948
1695 X2 234029 1.00 622409.88 -.948 .000 .317
1695 Y2 234029 1.00 622409.88 .000 1.000 .000
1696 X2 1463 1.00 3890.62 .275 .474 .837
1696 X2 209141 1.00 556219.88 -.950 .000 .312
1696 X2 209141 1.00 556219.88 -.148 .881 -.450
1710 X2 1729 1.00 4599.24 .167 .834 .526
1710 X2 247233 1.00 657528.13 -.953 .000 .302
1710 X2 247233 1.00 657528.13 -.252 .552 -.795
1730 X2 998 1.00 2653.93 .167 .834 .526
1730 X2 142663 1.00 379418.19 -.953 .000 .302
1730 X2 142663 1.00 379418.19 -.252 .552 -.795
1790 +Y .30 .000 1.000 .000
1790 Guide .000 .000 .000
1810 +Y .30 .000 1.000 .000
1850 +Y .30 .000 1.000 .000
1870 +Y .30 .000 1.000 .000
1890 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1890 Guide .000 .000 .000
1910 +Y .30 .000 1.000 .000
1930 +Y .30 .000 1.000 .000
1930 Guide .000 .000 .000
1950 +Y .30 .000 1.000 .000
1970 +Y .30 .000 1.000 .000
1970 Guide .000 .000 .000
1990 +Y .30 .000 1.000 .000
2010 +Y .30 .000 1.000 .000
2010 Guide .000 .000 .000
2030 +Y .30 .000 1.000 .000
2050 +Y .30 .000 1.000 .000
2090 +Y .30 .000 1.000 .000
2130 +Y .30 .000 1.000 .000
2130 Guide 5.00 .000 .000 .000
2150 +Y .30 .000 1.000 .000
2170 +Y .30 .000 1.000 .000
2170 Guide .000 .000 .000
2190 +Y .30 .000 1.000 .000
2210 +Y .30 .000 1.000 .000
2210 Guide .000 .000 .000
2230 +Y .30 .000 1.000 .000
2250 +Y .30 .000 1.000 .000
2250 Guide .000 .000 .000
2270 +Y .30 .000 1.000 .000
2290 +Y .30 .000 1.000 .000
2290 Guide .000 .000 .000
2310 +Y .30 .000 1.000 .000
2330 +Y .30 .000 1.000 .000
2330 Guide 5.00 .000 .000 .000
2340 +Y .30 .000 1.000 .000
2370 +Y .30 .000 1.000 .000
2390 +Y .30 .000 1.000 .000
2410 +Y .30 .000 1.000 .000
2410 Guide .000 .000 .000
2530 +Y .30 .000 1.000 .000
2530 Guide .000 .000 .000
2550 +Y .30 .000 1.000 .000
2570 +Y .30 .000 1.000 .000
2570 Guide .000 .000 .000
2590 +Y .30 .000 1.000 .000
2670 X2 956 1.00 2543.17 -.357 -.833 .422
2670 X2 136708 1.00 363582.31 -.763 .000 -.646
2670 X2 136708 1.00 363582.31 -.539 .553 .636
2671 X2 1686 1.00 4485.11 -.357 -.833 .422
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
2671 X2 241098 1.00 641211.56 -.763 .000 -.646
2671 X2 241098 1.00 641211.56 -.539 .553 .636
2672 X2 1460 1.00 3883.89 -.569 -.473 .672
2672 X2 208779 1.00 555258.50 -.763 .000 -.646
2672 X2 208779 1.00 555258.50 -.306 .881 .361
2690 X2 1279 1.00 3402.25 -.646 .000 .763
2690 X2 182889 1.00 486400.63 -.763 .000 -.646
2690 Y2 182889 1.00 486400.63 .000 1.000 .000
2691 X2 1279 1.00 3402.25 -.646 .000 .763
2691 X2 182889 1.00 486400.63 -.763 .000 -.646
2691 Y2 182889 1.00 486400.63 .000 1.000 .000
2692 X2 1460 1.00 3883.89 -.569 .473 .672
2692 X2 208779 1.00 555258.50 -.763 .000 -.646
2692 X2 208779 1.00 555258.50 .306 .881 -.361
2710 X2 1686 1.00 4483.77 -.357 .833 .422
2710 X2 241026 1.00 641019.88 -.763 .000 -.646
2710 X2 241026 1.00 641019.88 .539 .553 -.636
2730 X2 956 1.00 2541.83 -.357 .833 .422
2730 X2 136636 1.00 363390.63 -.763 .000 -.646
2730 X2 136636 1.00 363390.63 .539 .553 -.636
2790 +Y .30 .000 1.000 .000
2790 Guide .000 .000 .000
2930 +Y .30 .000 1.000 .000
2950 +Y .30 .000 1.000 .000
2950 Guide .000 .000 .000
2970 +Y .30 .000 1.000 .000
2990 +Y .30 .000 1.000 .000
2990 Guide .000 .000 .000
3010 +Y .30 .000 1.000 .000
3030 +Y .30 .000 1.000 .000
3050 +Y .30 .000 1.000 .000
3060 +Y .30 .000 1.000 .000
3070 +Y .30 .000 1.000 .000
3110 +Y .30 .000 1.000 .000
3130 +Y .30 .000 1.000 .000
3130 Guide 5.00 .000 .000 .000
3150 +Y .30 .000 1.000 .000
3170 +Y .30 .000 1.000 .000
3170 Guide .000 .000 .000
3190 +Y .30 .000 1.000 .000
3210 +Y .30 .000 1.000 .000
3210 Guide .000 .000 .000
3230 +Y .30 .000 1.000 .000
3250 +Y .30 .000 1.000 .000
3250 Guide .000 .000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
3270 +Y .30 .000 1.000 .000
3310 +Y .30 .000 1.000 .000
3310 Guide .000 .000 .000
3320 +Y .30 .000 1.000 .000
3323 +Y .30 .000 1.000 .000
3323 Guide .000 .000 .000
3326 +Y .30 .000 1.000 .000
3329 +Y .30 .000 1.000 .000
3329 Guide .000 .000 .000
3332 +Y .30 .000 1.000 .000
3335 +Y .30 .000 1.000 .000
3335 Guide .000 .000 .000
3338 +Y .30 .000 1.000 .000
3341 +Y .30 .000 1.000 .000
3341 Guide .000 .000 .000
3344 +Y .30 .000 1.000 .000
3350 +Y .30 .000 1.000 .000
3350 Guide .000 .000 .000
3370 +Y .30 .000 1.000 .000
3390 +Y .30 .000 1.000 .000
3390 Guide .000 .000 .000
3410 +Y .30 .000 1.000 .000
3430 +Y .30 .000 1.000 .000
3430 Guide .000 .000 .000
3450 +Y .30 .000 1.000 .000
3470 +Y .30 .000 1.000 .000
3470 Guide .000 .000 .000
3490 +Y .30 .000 1.000 .000
3510 +Y .30 .000 1.000 .000
3510 Guide .000 .000 .000
3530 +Y .30 .000 1.000 .000
3550 +Y .30 .000 1.000 .000
3550 Guide .000 .000 .000
3570 +Y .30 .000 1.000 .000
3590 +Y .30 .000 1.000 .000
3630 X2 963 1.00 2561.52 -.346 -.832 .433
3630 X2 137695 1.00 366206.28 -.781 .000 -.624
3630 X2 137695 1.00 366206.28 -.520 .555 .650
3631 X2 1692 1.00 4499.32 -.346 -.832 .433
3631 X2 241862 1.00 643243.50 -.781 .000 -.624
3631 X2 241862 1.00 643243.50 -.520 .555 .650
3632 X2 1457 1.00 3875.61 -.551 -.472 .689
3632 X2 208334 1.00 554074.38 -.781 .000 -.624
3632 X2 208334 1.00 554074.38 -.295 .882 .369
3650 X2 1634 1.00 4346.10 -.624 .000 .781
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
3650 X2 233625 1.00 621337.13 -.781 .000 -.624
3650 Y2 233625 1.00 621337.13 .000 1.000 .000
3651 X2 1811 1.00 4816.58 -.624 .000 .781
3651 X2 258916 1.00 688599.94 -.781 .000 -.624
3651 Y2 258916 1.00 688599.94 .000 1.000 .000
3652 X2 1848 1.00 4915.21 -.624 .000 .781
3652 X2 264218 1.00 702699.81 -.781 .000 -.624
3652 Y2 264218 1.00 702699.81 .000 1.000 .000
3653 X2 1848 1.00 4915.21 -.624 .000 .781
3653 X2 264218 1.00 702699.81 -.781 .000 -.624
3653 Y2 264218 1.00 702699.81 .000 1.000 .000
3654 X2 1811 1.00 4816.58 -.624 .000 .781
3654 X2 258916 1.00 688599.94 -.781 .000 -.624
3654 Y2 258916 1.00 688599.94 .000 1.000 .000
3655 X2 1510 1.00 4014.91 -.624 .000 .781
3655 X2 215822 1.00 573989.44 -.781 .000 -.624
3655 Y2 215822 1.00 573989.44 .000 1.000 .000
3656 X2 1208 1.00 3213.24 -.573 .396 .717
3656 X2 172728 1.00 459378.97 -.781 .000 -.624
3656 X2 172728 1.00 459378.97 .247 .918 -.309
3670 X2 1618 1.00 4303.66 -.428 .728 .536
3670 X2 231344 1.00 615269.81 -.781 .000 -.624
3670 X2 231344 1.00 615269.81 .454 .686 -.568
3690 X2 1014 1.00 2697.04 -.428 .728 .536
3690 X2 144980 1.00 385580.34 -.781 .000 -.624
3690 X2 144980 1.00 385580.34 .454 .686 -.568
3730 +Y .30 .000 1.000 .000
3750 +Y .30 .000 1.000 .000
3750 Guide .000 .000 .000
3770 +Y .30 .000 1.000 .000
3790 +Y .30 .000 1.000 .000
3790 Guide .000 .000 .000
3830 +Y .30 .000 1.000 .000
3850 +Y .30 .000 1.000 .000
3850 Guide .000 .000 .000
3870 +Y .30 .000 1.000 .000
3890 +Y .30 .000 1.000 .000
3890 Guide .000 .000 .000
3930 +Y .30 .000 1.000 .000
3950 +Y .30 .000 1.000 .000
3950 Guide .000 .000 .000
3950 LIM .000 .000 .000
3952 +Y .30 .000 1.000 .000
3968 +Y .30 .000 1.000 .000
3968 Guide .000 .000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
3970 +Y .30 .000 1.000 .000
3990 +Y .30 .000 1.000 .000
3990 Guide .000 .000 .000
4010 +Y .30 .000 1.000 .000
4030 +Y .30 .000 1.000 .000
4030 Guide .000 .000 .000
4050 +Y .30 .000 1.000 .000
4070 +Y .30 .000 1.000 .000
4070 Guide 3.00 .000 .000 .000
4090 +Y .30 .000 1.000 .000
4130 X2 671 1.00 1785.25 -.324 -.832 .451
4130 X2 95966 1.00 255226.86 -.812 .000 -.583
4130 X2 95966 1.00 255226.86 -.485 .555 .676
4131 X2 1400 1.00 3723.05 -.324 -.832 .451
4131 X2 200133 1.00 532264.06 -.812 .000 -.583
4131 X2 200133 1.00 532264.06 -.485 .555 .676
4132 X2 1457 1.00 3875.61 -.514 -.472 .716
4132 X2 208334 1.00 554074.44 -.812 .000 -.583
4132 X2 208334 1.00 554074.44 -.275 .882 .383
4150 X2 1634 1.00 4346.10 -.583 .000 .812
4150 X2 233625 1.00 621337.19 -.812 .000 -.583
4150 Y2 233625 1.00 621337.19 .000 1.000 .000
4151 X2 1811 1.00 4816.58 -.583 .000 .812
4151 X2 258916 1.00 688599.94 -.812 .000 -.583
4151 Y2 258916 1.00 688599.94 .000 1.000 .000
4152 X2 1811 1.00 4816.58 -.583 .000 .812
4152 X2 258916 1.00 688599.94 -.812 .000 -.583
4152 Y2 258916 1.00 688599.94 .000 1.000 .000
4153 X2 2264 1.00 6020.73 -.583 .000 .812
4153 X2 323645 1.00 860749.94 -.812 .000 -.583
4153 Y2 323645 1.00 860749.94 .000 1.000 .000
4154 X2 9683 1.00 25752.58 -.583 .000 .812
4154 X2 1384335 1.00 3681703.50 -.812 .000 -.583
4154 Y2 1384335 1.00 3681703.50 .000 1.000 .000
4155 X2 9683 1.00 25752.58 -.583 .000 .812
4155 X2 1384335 1.00 3681703.50 -.812 .000 -.583
4155 Y2 1384335 1.00 3681703.50 .000 1.000 .000
4156 X2 2264 1.00 6020.73 -.583 .000 .812
4156 X2 323645 1.00 860749.94 -.812 .000 -.583
4156 Y2 323645 1.00 860749.94 .000 1.000 .000
4157 X2 1811 1.00 4816.58 -.583 .000 .812
4157 X2 258916 1.00 688599.94 -.812 .000 -.583
4157 Y2 258916 1.00 688599.94 .000 1.000 .000
4158 X2 1811 1.00 4816.58 -.583 .000 .812
4158 X2 258916 1.00 688599.94 -.812 .000 -.583
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4158 Y2 258916 1.00 688599.94 .000 1.000 .000
4159 X2 1634 1.00 4346.10 -.583 .000 .812
4159 X2 233625 1.00 621337.19 -.812 .000 -.583
4159 Y2 233625 1.00 621337.19 .000 1.000 .000
4160 X2 1457 1.00 3875.61 -.514 .472 .716
4160 X2 208334 1.00 554074.44 -.812 .000 -.583
4160 X2 208334 1.00 554074.44 .275 .882 -.383
4170 X2 1686 1.00 4484.96 -.324 .832 .451
4170 X2 241090 1.00 641189.94 -.812 .000 -.583
4170 X2 241090 1.00 641189.94 .485 .555 -.676
4190 X2 1921 1.00 5108.68 -.324 .832 .451
4190 X2 274618 1.00 730359.00 -.812 .000 -.583
4190 X2 274618 1.00 730359.00 .485 .555 -.676
4191 X2 1692 1.00 4499.32 -.324 .832 .451
4191 X2 241862 1.00 643243.50 -.812 .000 -.583
4191 X2 241862 1.00 643243.50 .485 .555 -.676
4192 X2 1457 1.00 3875.61 -.514 .472 .716
4192 X2 208334 1.00 554074.44 -.812 .000 -.583
4192 X2 208334 1.00 554074.44 .275 .882 -.383
4210 X2 1811 1.00 4816.17 -.583 .000 .812
4210 X2 258894 1.00 688541.06 -.812 .000 -.583
4210 Y2 258894 1.00 688541.06 .000 1.000 .000
4230 X2 6920 1.00 18403.81 -.583 .000 .812
4230 X2 989300 1.00 2631090.00 -.812 .000 -.583
4230 Y2 989300 1.00 2631090.00 .000 1.000 .000
4250 X2 11675 1.00 31050.88 -.583 .000 .812
4250 X2 1669147 1.00 4439172.50 -.812 .000 -.583
4250 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4270 X2 11675 1.00 31050.88 -.583 .000 .812
4270 X2 1669147 1.00 4439172.50 -.812 .000 -.583
4270 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4290 X2 11675 1.00 31050.88 -.583 .000 .812
4290 X2 1669147 1.00 4439172.50 -.812 .000 -.583
4290 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4310 X2 10474 1.00 27855.23 -.583 .000 .812
4310 X2 1497364 1.00 3982307.50 -.812 .000 -.583
4310 Y2 1497364 1.00 3982307.50 .000 1.000 .000
4330 X2 5609 1.00 14917.36 -.580 .000 .815
4330 X2 801886 1.00 2132652.50 -.815 .000 -.580
4330 Y2 801886 1.00 2132652.50 .000 1.000 .000
4350 X2 6811 1.00 18113.02 -.580 .000 .815
4350 X2 973669 1.00 2589517.25 -.815 .000 -.580
4350 Y2 973669 1.00 2589517.25 .000 1.000 .000
4370 X2 11675 1.00 31050.88 -.580 .000 .815
4370 X2 1669147 1.00 4439172.50 -.815 .000 -.580
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4370 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4390 X2 11675 1.00 31050.88 -.580 .000 .815
4390 X2 1669147 1.00 4439172.50 -.815 .000 -.580
4390 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4410 X2 11675 1.00 31050.88 -.580 .000 .815
4410 X2 1669147 1.00 4439172.50 -.815 .000 -.580
4410 Y2 1669147 1.00 4439172.50 .000 1.000 .000
4430 X2 10702 1.00 28463.31 -.580 .000 .815
4430 X2 1530051 1.00 4069241.50 -.815 .000 -.580
4430 Y2 1530051 1.00 4069241.50 .000 1.000 .000
4450 X2 5071 1.00 13485.66 -.580 .000 .815
4450 X2 724925 1.00 1927970.12 -.815 .000 -.580
4450 Y2 724925 1.00 1927970.12 .000 1.000 .000
4451 X2 315 1.00 837.85 -.580 .000 .815
4451 X2 45039 1.00 119782.72 -.815 .000 -.580
4451 Y2 45039 1.00 119782.72 .000 1.000 .000
4452 X2 218 1.00 580.11 -.518 .000 .855
4452 X2 31184 1.00 82935.40 -.855 .000 -.518
4452 Y2 31184 1.00 82935.40 .000 1.000 .000
4470 X2 1015 1.00 2698.35 -.454 .000 .891
4470 X2 145050 1.00 385767.66 -.891 .000 -.454
4470 Y2 145050 1.00 385767.66 .000 1.000 .000
4471 X2 1811 1.00 4816.58 -.454 .000 .891
4471 X2 258916 1.00 688599.94 -.891 .000 -.454
4471 Y2 258916 1.00 688599.94 .000 1.000 .000
4472 X2 1811 1.00 4816.58 -.454 .000 .891
4472 X2 258916 1.00 688599.94 -.891 .000 -.454
4472 Y2 258916 1.00 688599.94 .000 1.000 .000
4473 X2 2412 1.00 6413.86 -.454 .000 .891
4473 X2 344778 1.00 916954.00 -.891 .000 -.454
4473 Y2 344778 1.00 916954.00 .000 1.000 .000
4474 X2 3012 1.00 8011.14 -.454 .000 .891
4474 X2 430640 1.00 1145308.12 -.891 .000 -.454
4474 Y2 430640 1.00 1145308.12 .000 1.000 .000
4490 X2 7344 1.00 19532.16 -.454 .000 .891
4490 X2 1049955 1.00 2792404.75 -.891 .000 -.454
4490 Y2 1049955 1.00 2792404.75 .000 1.000 .000
4510 X2 11676 1.00 31053.18 -.454 .000 .891
4510 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4510 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4530 X2 11676 1.00 31053.18 -.454 .000 .891
4530 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4530 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4550 X2 11676 1.00 31053.18 -.454 .000 .891
4550 X2 1669270 1.00 4439501.50 -.891 .000 -.454
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4550 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4570 X2 11676 1.00 31053.18 -.454 .000 .891
4570 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4570 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4590 X2 11676 1.00 31053.18 -.454 .000 .891
4590 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4590 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4610 X2 11676 1.00 31053.18 -.454 .000 .891
4610 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4610 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4630 X2 11676 1.00 31053.18 -.454 .000 .891
4630 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4630 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4650 X2 11676 1.00 31053.18 -.454 .000 .891
4650 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4650 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4670 X2 11676 1.00 31053.18 -.454 .000 .891
4670 X2 1669270 1.00 4439501.50 -.891 .000 -.454
4670 Y2 1669270 1.00 4439501.50 .000 1.000 .000
4690 X2 7241 1.00 19257.65 -.454 .000 .891
4690 X2 1035199 1.00 2753159.75 -.891 .000 -.454
4690 Y2 1035199 1.00 2753159.75 .000 1.000 .000
4691 X2 2308 1.00 6139.35 -.454 .000 .891
4691 X2 330022 1.00 877709.00 -.891 .000 -.454
4691 Y2 330022 1.00 877709.00 .000 1.000 .000
4692 X2 1811 1.00 4816.58 -.454 .000 .891
4692 X2 258916 1.00 688599.94 -.891 .000 -.454
4692 Y2 258916 1.00 688599.94 .000 1.000 .000
4693 X2 1811 1.00 4816.58 -.454 .000 .891
4693 X2 258916 1.00 688599.94 -.891 .000 -.454
4693 Y2 258916 1.00 688599.94 .000 1.000 .000
4694 X2 943 1.00 2509.04 -.454 .000 .891
4694 X2 134874 1.00 358703.22 -.891 .000 -.454
4694 Y2 134874 1.00 358703.22 .000 1.000 .000
4695 X2 76 1.00 201.49 -.477 .000 .879
4695 X2 10831 1.00 28806.50 -.879 .000 -.477
4695 Y2 10831 1.00 28806.50 .000 1.000 .000
4710 X2 943 1.00 2509.04 -.499 .000 .867
4710 X2 134874 1.00 358703.22 -.867 .000 -.499
4710 Y2 134874 1.00 358703.22 .000 1.000 .000
4711 X2 1908 1.00 5074.37 -.499 .000 .867
4711 X2 272774 1.00 725455.00 -.867 .000 -.499
4711 Y2 272774 1.00 725455.00 .000 1.000 .000
4730 X2 6840 1.00 18191.52 -.499 .000 .867
4730 X2 977889 1.00 2600741.25 -.867 .000 -.499
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4730 Y2 977889 1.00 2600741.25 .000 1.000 .000
4750 X2 6914 1.00 18389.43 -.499 .000 .867
4750 X2 988527 1.00 2629034.00 -.867 .000 -.499
4750 Y2 988527 1.00 2629034.00 .000 1.000 .000
4751 X2 1982 1.00 5272.27 -.499 .000 .867
4751 X2 283412 1.00 753747.75 -.867 .000 -.499
4751 Y2 283412 1.00 753747.75 .000 1.000 .000
4752 X2 1811 1.00 4816.58 -.499 .000 .867
4752 X2 258916 1.00 688599.94 -.867 .000 -.499
4752 Y2 258916 1.00 688599.94 .000 1.000 .000
4753 X2 1750 1.00 4654.07 -.499 .000 .867
4753 X2 250181 1.00 665366.81 -.867 .000 -.499
4753 Y2 250181 1.00 665366.81 .000 1.000 .000
4754 X2 1689 1.00 4491.56 -.420 -.539 .730
4754 X2 241445 1.00 642133.69 -.867 .000 -.499
4754 X2 241445 1.00 642133.69 -.269 .842 .467
4770 X2 1452 1.00 3861.07 -.209 -.908 .363
4770 X2 207553 1.00 551996.25 -.867 .000 -.499
4770 X2 207553 1.00 551996.25 -.453 .419 .787
4790 X2 1315 1.00 3497.61 -.209 -.908 .363
4790 X2 188015 1.00 500034.50 -.867 .000 -.499
4790 X2 188015 1.00 500034.50 -.453 .419 .787
4791 X2 1552 1.00 4128.10 -.209 -.908 .363
4791 X2 221907 1.00 590172.00 -.867 .000 -.499
4791 X2 221907 1.00 590172.00 -.453 .419 .787
4792 X2 1689 1.00 4491.56 -.420 -.539 .730
4792 X2 241445 1.00 642133.69 -.867 .000 -.499
4792 X2 241445 1.00 642133.69 -.269 .842 .467
4810 X2 1750 1.00 4654.07 -.499 .000 .867
4810 X2 250181 1.00 665366.81 -.867 .000 -.499
4810 Y2 250181 1.00 665366.81 .000 1.000 .000
4811 X2 1811 1.00 4816.58 -.499 .000 .867
4811 X2 258916 1.00 688599.94 -.867 .000 -.499
4811 Y2 258916 1.00 688599.94 .000 1.000 .000
4812 X2 1811 1.00 4816.58 -.499 .000 .867
4812 X2 258916 1.00 688599.94 -.867 .000 -.499
4812 Y2 258916 1.00 688599.94 .000 1.000 .000
4813 X2 2264 1.00 6020.73 -.499 .000 .867
4813 X2 323645 1.00 860749.94 -.867 .000 -.499
4813 Y2 323645 1.00 860749.94 .000 1.000 .000
4814 X2 4760 1.00 12659.32 -.499 .000 .867
4814 X2 680504 1.00 1809832.25 -.867 .000 -.499
4814 Y2 680504 1.00 1809832.25 .000 1.000 .000
4815 X2 4760 1.00 12659.32 -.499 .000 .867
4815 X2 680504 1.00 1809832.25 -.867 .000 -.499
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4815 Y2 680504 1.00 1809832.25 .000 1.000 .000
4816 X2 2264 1.00 6020.73 -.499 .000 .867
4816 X2 323645 1.00 860749.94 -.867 .000 -.499
4816 Y2 323645 1.00 860749.94 .000 1.000 .000
4817 X2 1811 1.00 4816.58 -.499 .000 .867
4817 X2 258916 1.00 688599.94 -.867 .000 -.499
4817 Y2 258916 1.00 688599.94 .000 1.000 .000
4818 X2 1811 1.00 4816.58 -.499 .000 .867
4818 X2 258916 1.00 688599.94 -.867 .000 -.499
4818 Y2 258916 1.00 688599.94 .000 1.000 .000
4819 X2 1634 1.00 4345.95 -.499 .000 .867
4819 X2 233617 1.00 621316.25 -.867 .000 -.499
4819 Y2 233617 1.00 621316.25 .000 1.000 .000
4820 X2 1457 1.00 3875.32 -.440 .472 .764
4820 X2 208318 1.00 554032.50 -.866 .000 -.499
4820 X2 208318 1.00 554032.50 .236 .882 -.409
4830 X2 1686 1.00 4485.00 -.277 .832 .481
4830 X2 241092 1.00 641195.88 -.866 .000 -.499
4830 X2 241092 1.00 641195.88 .416 .555 -.721
4850 X2 958 1.00 2547.34 -.277 .832 .481
4850 X2 136933 1.00 364179.63 -.866 .000 -.499
4850 X2 136933 1.00 364179.63 .416 .555 -.721
4890 +Y .000 1.000 .000
4890 -Y .000 1.000 .000
4890 Guide 7.00 .000 .000 .000
4930 +Y .30 .000 1.000 .000
4930 Guide .000 .000 .000
4930 -Y .000 1.000 .000
4950 +Y .30 .000 1.000 .000
4970 +Y .30 .000 1.000 .000
4970 Guide .000 .000 .000
4970 -Y .000 1.000 .000
4990 +Y .30 .000 1.000 .000
5010 +Y .30 .000 1.000 .000
5010 Guide .000 .000 .000
5030 +Y .30 .000 1.000 .000
5070 +Y .30 .000 1.000 .000
5070 Guide .000 .000 .000
5090 +Y .30 .000 1.000 .000
5110 +Y .30 .000 1.000 .000
5110 Guide .000 .000 .000
5130 +Y .30 .000 1.000 .000
5150 +Y .30 .000 1.000 .000
5150 Guide .000 .000 .000
5170 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
5190 +Y .30 .000 1.000 .000
5190 Guide .000 .000 .000
5210 +Y .30 .000 1.000 .000
5220 +Y .30 .000 1.000 .000
5220 Guide .000 .000 .000
5250 +Y .30 .000 1.000 .000
5270 +Y .30 .000 1.000 .000
5270 Guide .000 .000 .000
5290 +Y .30 .000 1.000 .000
5310 +Y .30 .000 1.000 .000
5310 Guide .000 .000 .000
5330 +Y .30 .000 1.000 .000
5350 +Y .30 .000 1.000 .000
5350 Guide .000 .000 .000
5370 +Y .30 .000 1.000 .000
5410 +Y .30 .000 1.000 .000
5410 Guide 5.00 .000 .000 .000
5430 +Y .30 .000 1.000 .000
5450 +Y .30 .000 1.000 .000
5450 Guide .000 .000 .000
5470 +Y .30 .000 1.000 .000
5490 +Y .30 .000 1.000 .000
5490 Guide .000 .000 .000
5510 +Y .30 .000 1.000 .000
5530 +Y .30 .000 1.000 .000
5530 Guide .000 .000 .000
5570 +Y .30 .000 1.000 .000
5590 +Y .30 .000 1.000 .000
5590 Guide .000 .000 .000
5610 +Y .30 .000 1.000 .000
5630 +Y .30 .000 1.000 .000
5630 Guide .000 .000 .000
5650 +Y .30 .000 1.000 .000
5650 -Y .30 .000 1.000 .000
5650 Guide .000 .000 .000
5670 +Y .30 .000 1.000 .000
5670 Guide .000 .000 .000
5690 +Y .30 .000 1.000 .000
5710 +Y .30 .000 1.000 .000
5710 Guide .000 .000 .000
5730 +Y .30 .000 1.000 .000
5770 +Y .30 .000 1.000 .000
5770 Guide .000 .000 .000
5790 +Y .30 .000 1.000 .000
5810 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
5810 Guide .000 .000 .000
5830 +Y .30 .000 1.000 .000
5870 +Y .30 .000 1.000 .000
5870 Guide .000 .000 .000
5890 +Y .30 .000 1.000 .000
5920 +Y .30 .000 1.000 .000
5920 Guide .000 .000 .000
5930 +Y .30 .000 1.000 .000
5950 +Y .30 .000 1.000 .000
5950 Guide .000 .000 .000
5970 +Y .30 .000 1.000 .000
5990 +Y .30 .000 1.000 .000
5990 Guide .000 .000 .000
6010 +Y .30 .000 1.000 .000
6030 +Y .30 .000 1.000 .000
6030 Guide .000 .000 .000
6050 +Y .30 .000 1.000 .000
6070 +Y .30 .000 1.000 .000
6070 Guide .000 .000 .000
6170 +Y .30 .000 1.000 .000
6190 +Y .30 .000 1.000 .000
6190 Guide .000 .000 .000
6210 +Y .30 .000 1.000 .000
6220 +Y .30 .000 1.000 .000
6220 Guide .000 .000 .000
6250 +Y .30 .000 1.000 .000
6270 +Y .30 .000 1.000 .000
6270 Guide .000 .000 .000
6290 +Y .30 .000 1.000 .000
6310 +Y .30 .000 1.000 .000
6310 Guide .000 .000 .000
6330 +Y .30 .000 1.000 .000
6350 +Y .30 .000 1.000 .000
6350 Guide .000 .000 .000
6370 +Y .30 .000 1.000 .000
6390 +Y .30 .000 1.000 .000
6390 Guide .000 .000 .000
6430 +Y .30 .000 1.000 .000
6450 +Y .30 .000 1.000 .000
6450 Guide .000 .000 .000
6470 +Y .30 .000 1.000 .000
6510 +Y .30 .000 1.000 .000
6510 Guide .000 .000 .000
6530 +Y .30 .000 1.000 .000
6550 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
6550 Guide .000 .000 .000
6590 +Y .30 .000 1.000 .000
6590 Guide .000 .000 .000
6610 +Y .30 .000 1.000 .000
6640 +Y .30 .000 1.000 .000
6640 Guide .000 .000 .000
6645 +Y .30 .000 1.000 .000
6650 +Y .30 .000 1.000 .000
6650 Guide .000 .000 .000
6655 +Y .30 .000 1.000 .000
6660 +Y .30 .000 1.000 .000
6660 Guide .000 .000 .000
6665 +Y .30 .000 1.000 .000
6670 +Y .30 .000 1.000 .000
6690 +Y .30 .000 1.000 .000
6690 Guide .000 .000 .000
6700 +Y .30 .000 1.000 .000
6730 +Y .30 .000 1.000 .000
6810 +Y .30 .000 1.000 .000
6830 +Y .30 .000 1.000 .000
6830 Guide .000 .000 .000
6850 +Y .30 .000 1.000 .000
6870 +Y .30 .000 1.000 .000
6870 Guide .000 .000 .000
6890 +Y .30 .000 1.000 .000
6910 +Y .30 .000 1.000 .000
6910 Guide .000 .000 .000
6930 +Y .30 .000 1.000 .000
6950 +Y .30 .000 1.000 .000
2130 Guide .000 .000 .000
6970 +Y .30 .000 1.000 .000
6970 Guide .000 .000 .000
6990 +Y .30 .000 1.000 .000
7010 +Y .30 .000 1.000 .000
7010 Guide .000 .000 .000
7030 +Y .30 .000 1.000 .000
7040 +Y .30 .000 1.000 .000
7070 +Y .30 .000 1.000 .000
7100 X2 813 1.00 2162.89 .263 -.874 .408
7100 X2 116266 1.00 309216.06 -.841 .000 .541
7100 X2 116266 1.00 309216.06 .473 .486 .735
7101 X2 1602 1.00 4259.73 .263 -.874 .408
7101 X2 228982 1.00 608989.50 -.841 .000 .541
7101 X2 228982 1.00 608989.50 .473 .486 .735
7102 X2 1577 1.00 4193.68 .467 -.507 .725
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7102 X2 225432 1.00 599546.81 -.841 .000 .541
7102 X2 225432 1.00 599546.81 .275 .862 .426
7110 X2 1694 1.00 4505.13 .541 .000 .841
7110 X2 242174 1.00 644073.38 -.841 .000 .541
7110 Y2 242174 1.00 644073.38 .000 1.000 .000
7111 X2 1811 1.00 4816.58 .541 .000 .841
7111 X2 258916 1.00 688599.94 -.841 .000 .541
7111 Y2 258916 1.00 688599.94 .000 1.000 .000
7112 X2 1811 1.00 4816.58 .541 .000 .841
7112 X2 258916 1.00 688599.94 -.841 .000 .541
7112 Y2 258916 1.00 688599.94 .000 1.000 .000
7113 X2 2264 1.00 6020.73 .541 .000 .841
7113 X2 323645 1.00 860749.94 -.841 .000 .541
7113 Y2 323645 1.00 860749.94 .000 1.000 .000
7114 X2 6808 1.00 18106.93 .541 .000 .841
7114 X2 973342 1.00 2588647.75 -.841 .000 .541
7114 Y2 973342 1.00 2588647.75 .000 1.000 .000
7115 X2 6808 1.00 18106.93 .541 .000 .841
7115 X2 973342 1.00 2588647.75 -.841 .000 .541
7115 Y2 973342 1.00 2588647.75 .000 1.000 .000
7116 X2 2264 1.00 6020.73 .541 .000 .841
7116 X2 323645 1.00 860749.94 -.841 .000 .541
7116 Y2 323645 1.00 860749.94 .000 1.000 .000
7117 X2 1811 1.00 4816.58 .541 .000 .841
7117 X2 258916 1.00 688599.94 -.841 .000 .541
7117 Y2 258916 1.00 688599.94 .000 1.000 .000
7118 X2 1811 1.00 4816.58 .541 .000 .841
7118 X2 258916 1.00 688599.94 -.841 .000 .541
7118 Y2 258916 1.00 688599.94 .000 1.000 .000
7119 X2 1580 1.00 4202.41 .541 .000 .841
7119 X2 225901 1.00 600795.13 -.841 .000 .541
7119 Y2 225901 1.00 600795.13 .000 1.000 .000
7120 X2 1349 1.00 3588.24 .486 .439 .755
7120 X2 192886 1.00 512990.25 -.841 .000 .541
7120 X2 192886 1.00 512990.25 -.238 .898 -.369
7130 X2 1798 1.00 4781.42 .332 .789 .516
7130 X2 257026 1.00 683572.50 -.841 .000 .541
7130 X2 257026 1.00 683572.50 -.427 .614 -.664
7140 X2 1123 1.00 2987.30 .332 .789 .516
7140 X2 160583 1.00 427077.38 -.841 .000 .541
7140 X2 160583 1.00 427077.38 -.427 .614 -.664
7170 +Y .000 1.000 .000
7210 +Y .30 .000 1.000 .000
7250 +Y .30 .000 1.000 .000
7270 +Y .30 .000 1.000 .000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7270 Guide .000 .000 .000
7290 +Y .000 1.000 .000
7330 +Y .30 .000 1.000 .000
7350 +Y .30 .000 1.000 .000
7350 Guide .000 .000 .000
7370 +Y .30 .000 1.000 .000
7390 +Y .30 .000 1.000 .000
7390 Guide .000 .000 .000
7410 +Y .30 .000 1.000 .000
7430 +Y .30 .000 1.000 .000
7430 Guide .000 .000 .000
7450 +Y .30 .000 1.000 .000
7470 +Y .30 .000 1.000 .000
7470 Guide .000 .000 .000
7490 +Y .30 .000 1.000 .000
7510 +Y .30 .000 1.000 .000
7510 Guide .000 .000 .000
7530 +Y .30 .000 1.000 .000
7550 +Y .30 .000 1.000 .000
7550 Guide .000 .000 .000
7570 +Y .30 .000 1.000 .000
7610 +Y .30 .000 1.000 .000
7610 Guide .000 .000 .000
7630 +Y .30 .000 1.000 .000
7650 +Y .30 .000 1.000 .000
7650 Guide .000 .000 .000
7670 +Y .30 .000 1.000 .000
7690 +Y .30 .000 1.000 .000
7690 Guide .000 .000 .000
7710 +Y .30 .000 1.000 .000
7750 +Y .30 .000 1.000 .000
7780 X2 560 1.00 1488.39 .296 -.932 .208
7780 X2 80009 1.00 212786.61 -.575 .000 .818
7780 X2 80009 1.00 212786.61 .763 .362 .536
7781 X2 1450 1.00 3855.23 .296 -.932 .208
7781 X2 207239 1.00 551160.81 -.575 .000 .818
7781 X2 207239 1.00 551160.81 .763 .362 .536
7782 X2 1780 1.00 4733.68 .675 -.565 .475
7782 X2 254460 1.00 676748.44 -.575 .000 .818
7782 X2 254460 1.00 676748.44 .462 .825 .325
7790 X2 1795 1.00 4775.13 .818 .000 .575
7790 X2 256688 1.00 682674.19 -.575 .000 .818
7790 Y2 256688 1.00 682674.19 .000 1.000 .000
7791 X2 1811 1.00 4816.58 .818 .000 .575
7791 X2 258916 1.00 688599.94 -.575 .000 .818
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7791 Y2 258916 1.00 688599.94 .000 1.000 .000
7792 X2 1811 1.00 4816.58 .818 .000 .575
7792 X2 258916 1.00 688599.94 -.575 .000 .818
7792 Y2 258916 1.00 688599.94 .000 1.000 .000
7793 X2 3503 1.00 9317.40 .818 .000 .575
7793 X2 500859 1.00 1332057.50 -.575 .000 .818
7793 Y2 500859 1.00 1332057.50 .000 1.000 .000
7794 X2 3503 1.00 9317.40 .818 .000 .575
7794 X2 500859 1.00 1332057.50 -.575 .000 .818
7794 Y2 500859 1.00 1332057.50 .000 1.000 .000
7795 X2 1811 1.00 4816.58 .818 .000 .575
7795 X2 258916 1.00 688599.94 -.575 .000 .818
7795 Y2 258916 1.00 688599.94 .000 1.000 .000
7796 X2 1811 1.00 4816.58 .818 .000 .575
7796 X2 258916 1.00 688599.94 -.575 .000 .818
7796 Y2 258916 1.00 688599.94 .000 1.000 .000
7797 X2 1634 1.00 4345.95 .818 .000 .575
7797 X2 233617 1.00 621316.13 -.575 .000 .818
7797 Y2 233617 1.00 621316.13 .000 1.000 .000
7798 X2 1457 1.00 3875.31 .721 .472 .507
7798 X2 208318 1.00 554032.25 -.575 .000 .818
7798 X2 208318 1.00 554032.25 -.386 .882 -.271
7810 X2 1686 1.00 4485.00 .454 .832 .319
7810 X2 241092 1.00 641195.94 -.575 .000 .818
7810 X2 241092 1.00 641195.94 -.680 .555 -.479
7820 X2 1921 1.00 5109.52 .454 .832 .319
7820 X2 274663 1.00 730479.69 -.575 .000 .818
7820 X2 274663 1.00 730479.69 -.680 .555 -.479
7821 X2 1692 1.00 4499.83 .454 .832 .319
7821 X2 241889 1.00 643316.00 -.575 .000 .818
7821 X2 241889 1.00 643316.00 -.680 .555 -.479
7822 X2 1457 1.00 3875.31 .721 .472 .507
7822 X2 208318 1.00 554032.25 -.575 .000 .818
7822 X2 208318 1.00 554032.25 -.386 .882 -.271
7830 X2 1881 1.00 5002.52 .818 .000 .575
7830 X2 268911 1.00 715182.19 -.575 .000 .818
7830 Y2 268911 1.00 715182.19 .000 1.000 .000
7850 X2 2017 1.00 5365.59 .818 .000 .575
7850 X2 288428 1.00 767088.63 -.575 .000 .818
7850 Y2 288428 1.00 767088.63 .000 1.000 .000
7851 X2 1730 1.00 4601.46 .818 .000 .575
7851 X2 247352 1.00 657845.13 -.575 .000 .818
7851 Y2 247352 1.00 657845.13 .000 1.000 .000
7852 X2 1771 1.00 4709.02 .818 .000 .575
7852 X2 253134 1.00 673222.50 -.575 .000 .818
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7852 Y2 253134 1.00 673222.50 .000 1.000 .000
7853 X2 926 1.00 2462.61 .818 .000 .575
7853 X2 132378 1.00 352066.22 -.575 .000 .818
7853 Y2 132378 1.00 352066.22 .000 1.000 .000
7854 X2 41 1.00 108.65 .810 .000 .587
7854 X2 5840 1.00 15532.52 -.587 .000 .810
7854 Y2 5840 1.00 15532.52 .000 1.000 .000
7870 X2 926 1.00 2462.61 .802 .000 .598
7870 X2 132378 1.00 352066.22 -.598 .000 .802
7870 Y2 132378 1.00 352066.22 .000 1.000 .000
7871 X2 1811 1.00 4816.58 .802 .000 .598
7871 X2 258916 1.00 688599.94 -.598 .000 .802
7871 Y2 258916 1.00 688599.94 .000 1.000 .000
7872 X2 1936 1.00 5148.26 .802 .000 .598
7872 X2 276746 1.00 736018.63 -.598 .000 .802
7872 Y2 276746 1.00 736018.63 .000 1.000 .000
7873 X2 2060 1.00 5479.94 .802 .000 .598
7873 X2 294576 1.00 783437.25 -.598 .000 .802
7873 Y2 294576 1.00 783437.25 .000 1.000 .000
7890 X2 6868 1.00 18265.41 .802 .000 .598
7890 X2 981861 1.00 2611305.00 -.598 .000 .802
7890 Y2 981861 1.00 2611305.00 .000 1.000 .000
7910 X2 11675 1.00 31050.88 .802 .000 .598
7910 X2 1669147 1.00 4439172.50 -.598 .000 .802
7910 Y2 1669147 1.00 4439172.50 .000 1.000 .000
7930 X2 11675 1.00 31050.88 .802 .000 .598
7930 X2 1669147 1.00 4439172.50 -.598 .000 .802
7930 Y2 1669147 1.00 4439172.50 .000 1.000 .000
7950 X2 11675 1.00 31050.88 .802 .000 .598
7950 X2 1669147 1.00 4439172.50 -.598 .000 .802
7950 Y2 1669147 1.00 4439172.50 .000 1.000 .000
7970 X2 11675 1.00 31050.88 .802 .000 .598
7970 X2 1669147 1.00 4439172.50 -.598 .000 .802
7970 Y2 1669147 1.00 4439172.50 .000 1.000 .000
7990 X2 11675 1.00 31050.88 .802 .000 .598
7990 X2 1669147 1.00 4439172.50 -.598 .000 .802
7990 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8010 X2 11675 1.00 31050.88 .802 .000 .598
8010 X2 1669147 1.00 4439172.50 -.598 .000 .802
8010 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8030 X2 11675 1.00 31050.88 .802 .000 .598
8030 X2 1669147 1.00 4439172.50 -.598 .000 .802
8030 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8050 X2 6726 1.00 17888.72 .802 .000 .598
8050 X2 961612 1.00 2557450.75 -.598 .000 .802
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8050 Y2 961612 1.00 2557450.75 .000 1.000 .000
8051 X2 1777 1.00 4726.55 .802 .000 .598
8051 X2 254077 1.00 675729.06 -.598 .000 .802
8051 Y2 254077 1.00 675729.06 .000 1.000 .000
8052 X2 1794 1.00 4771.57 .802 .000 .598
8052 X2 256497 1.00 682164.50 -.598 .000 .802
8052 Y2 256497 1.00 682164.50 .000 1.000 .000
8053 X2 1505 1.00 4001.70 .802 .000 .598
8053 X2 215112 1.00 572101.38 -.598 .000 .802
8053 Y2 215112 1.00 572101.38 .000 1.000 .000
8054 X2 1198 1.00 3186.83 .502 .000 .865
8054 X2 171309 1.00 455602.84 -.865 .000 .502
8054 Y2 171309 1.00 455602.84 .000 1.000 .000
8070 X2 1505 1.00 4001.70 .122 .000 .993
8070 X2 215112 1.00 572101.38 -.993 .000 .122
8070 Y2 215112 1.00 572101.38 .000 1.000 .000
8071 X2 1811 1.00 4816.58 .122 .000 .993
8071 X2 258916 1.00 688599.94 -.993 .000 .122
8071 Y2 258916 1.00 688599.94 .000 1.000 .000
8072 X2 1866 1.00 4962.08 .122 .000 .993
8072 X2 266738 1.00 709400.75 -.993 .000 .122
8072 Y2 266738 1.00 709400.75 .000 1.000 .000
8090 X2 6798 1.00 18079.23 .122 .000 .993
8090 X2 971853 1.00 2584687.00 -.993 .000 .122
8090 Y2 971853 1.00 2584687.00 .000 1.000 .000
8110 X2 11675 1.00 31050.88 .122 .000 .993
8110 X2 1669147 1.00 4439172.50 -.993 .000 .122
8110 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8130 X2 6753 1.00 17959.19 .122 .000 .993
8130 X2 965400 1.00 2567525.75 -.993 .000 .122
8130 Y2 965400 1.00 2567525.75 .000 1.000 .000
8131 X2 1821 1.00 4842.04 .122 .000 .993
8131 X2 260285 1.00 692239.38 -.993 .000 .122
8131 Y2 260285 1.00 692239.38 .000 1.000 .000
8132 X2 1774 1.00 4717.61 .122 .000 .993
8132 X2 253596 1.00 674450.25 -.993 .000 .122
8132 Y2 253596 1.00 674450.25 .000 1.000 .000
8133 X2 1737 1.00 4618.64 .650 .000 .760
8133 X2 248276 1.00 660300.63 -.760 .000 .650
8133 Y2 248276 1.00 660300.63 .000 1.000 .000
8150 X2 1774 1.00 4717.61 .962 .000 .274
8150 X2 253596 1.00 674450.25 -.274 .000 .962
8150 Y2 253596 1.00 674450.25 .000 1.000 .000
8151 X2 1935 1.00 5146.90 .962 .000 .274
8151 X2 276673 1.00 735823.88 -.274 .000 .962
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8151 Y2 276673 1.00 735823.88 .000 1.000 .000
8170 X2 6867 1.00 18264.05 .962 .000 .274
8170 X2 981788 1.00 2611110.25 -.274 .000 .962
8170 Y2 981788 1.00 2611110.25 .000 1.000 .000
8190 X2 11675 1.00 31050.88 .962 .000 .274
8190 X2 1669147 1.00 4439172.50 -.274 .000 .962
8190 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8210 X2 11675 1.00 31050.88 .962 .000 .274
8210 X2 1669147 1.00 4439172.50 -.274 .000 .962
8210 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8230 X2 11675 1.00 31050.88 .962 .000 .274
8230 X2 1669147 1.00 4439172.50 -.274 .000 .962
8230 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8250 X2 11675 1.00 31050.88 .962 .000 .274
8250 X2 1669147 1.00 4439172.50 -.274 .000 .962
8250 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8270 X2 11675 1.00 31050.88 .962 .000 .274
8270 X2 1669147 1.00 4439172.50 -.274 .000 .962
8270 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8290 X2 11675 1.00 31050.88 .962 .000 .274
8290 X2 1669147 1.00 4439172.50 -.274 .000 .962
8290 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8310 X2 11675 1.00 31050.88 .962 .000 .274
8310 X2 1669147 1.00 4439172.50 -.274 .000 .962
8310 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8330 X2 11675 1.00 31050.88 .962 .000 .274
8330 X2 1669147 1.00 4439172.50 -.274 .000 .962
8330 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8350 X2 11675 1.00 31050.88 .962 .000 .274
8350 X2 1669147 1.00 4439172.50 -.274 .000 .962
8350 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8370 X2 10067 1.00 26773.63 .962 .000 .274
8370 X2 1439222 1.00 3827676.50 -.274 .000 .962
8370 Y2 1439222 1.00 3827676.50 .000 1.000 .000
8390 X2 7148 1.00 19010.90 .962 .000 .274
8390 X2 1021935 1.00 2717883.50 -.274 .000 .962
8390 Y2 1021935 1.00 2717883.50 .000 1.000 .000
8410 X2 3772 1.00 10032.86 .962 .000 .274
8410 X2 539318 1.00 1434341.75 -.274 .000 .962
8410 Y2 539318 1.00 1434341.75 .000 1.000 .000
8411 X2 1707 1.00 4540.27 .962 .000 .274
8411 X2 244063 1.00 649097.13 -.274 .000 .962
8411 Y2 244063 1.00 649097.13 .000 1.000 .000
8412 X2 1759 1.00 4678.43 .962 .000 .274
8412 X2 251490 1.00 668848.50 -.274 .000 .962
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8412 Y2 251490 1.00 668848.50 .000 1.000 .000
8413 X2 1961 1.00 5215.16 .962 .000 .274
8413 X2 280342 1.00 745583.06 -.274 .000 .962
8413 Y2 280342 1.00 745583.06 .000 1.000 .000
8414 X2 2111 1.00 5613.75 .549 .000 .836
8414 X2 301768 1.00 802566.19 -.836 .000 .549
8414 Y2 301768 1.00 802566.19 .000 1.000 .000
8430 X2 1723 1.00 4581.53 -.130 .000 .992
8430 X2 246281 1.00 654996.25 -.992 .000 -.130
8430 Y2 246281 1.00 654996.25 .000 1.000 .000
8450 X2 5532 1.00 14712.53 -.130 .000 .992
8450 X2 790875 1.00 2103368.25 -.992 .000 -.130
8450 Y2 790875 1.00 2103368.25 .000 1.000 .000
8470 X2 10702 1.00 28463.31 -.130 .000 .992
8470 X2 1530051 1.00 4069241.50 -.992 .000 -.130
8470 Y2 1530051 1.00 4069241.50 .000 1.000 .000
8490 X2 11675 1.00 31050.88 -.130 .000 .992
8490 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8490 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8510 X2 11675 1.00 31050.88 -.130 .000 .992
8510 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8510 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8530 X2 11675 1.00 31050.88 -.130 .000 .992
8530 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8530 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8550 X2 11675 1.00 31050.88 -.130 .000 .992
8550 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8550 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8570 X2 11675 1.00 31050.88 -.130 .000 .992
8570 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8570 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8590 X2 11675 1.00 31050.88 -.130 .000 .992
8590 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8590 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8610 X2 11675 1.00 31050.88 -.130 .000 .992
8610 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8610 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8630 X2 11675 1.00 31050.88 -.130 .000 .992
8630 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8630 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8650 X2 11675 1.00 31050.88 -.130 .000 .992
8650 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8650 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8670 X2 11675 1.00 31050.88 -.130 .000 .992
8670 X2 1669147 1.00 4439172.50 -.992 .000 -.130
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8670 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8690 X2 11675 1.00 31050.88 -.130 .000 .992
8690 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8690 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8710 X2 11675 1.00 31050.88 -.130 .000 .992
8710 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8710 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8730 X2 11675 1.00 31050.88 -.130 .000 .992
8730 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8730 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8750 X2 11675 1.00 31050.88 -.130 .000 .992
8750 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8750 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8770 X2 11675 1.00 31050.88 -.130 .000 .992
8770 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8770 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8790 X2 11675 1.00 31050.88 -.130 .000 .992
8790 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8790 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8810 X2 11675 1.00 31050.88 -.130 .000 .992
8810 X2 1669147 1.00 4439172.50 -.992 .000 -.130
8810 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8830 X2 6327 1.00 16826.52 -.130 .000 .992
8830 X2 904513 1.00 2405594.00 -.992 .000 -.130
8830 Y2 904513 1.00 2405594.00 .000 1.000 .000
8831 X2 494 1.00 1314.49 -.130 .000 .992
8831 X2 70661 1.00 187924.94 -.992 .000 -.130
8831 Y2 70661 1.00 187924.94 .000 1.000 .000
8832 X2 10 1.00 26.82 -.133 .000 .991
8832 X2 1442 1.00 3834.22 -.991 .000 -.133
8832 Y2 1442 1.00 3834.22 .000 1.000 .000
8850 X2 911 1.00 2421.70 -.137 .000 .991
8850 X2 130179 1.00 346217.09 -.991 .000 -.137
8850 Y2 130179 1.00 346217.09 .000 1.000 .000
8851 X2 1811 1.00 4816.58 -.137 .000 .991
8851 X2 258916 1.00 688599.94 -.991 .000 -.137
8851 Y2 258916 1.00 688599.94 .000 1.000 .000
8852 X2 1811 1.00 4816.58 -.137 .000 .991
8852 X2 258916 1.00 688599.94 -.991 .000 -.137
8852 Y2 258916 1.00 688599.94 .000 1.000 .000
8853 X2 2463 1.00 6550.95 -.137 .000 .991
8853 X2 352148 1.00 936553.38 -.991 .000 -.137
8853 Y2 352148 1.00 936553.38 .000 1.000 .000
8854 X2 3115 1.00 8285.32 -.137 .000 .991
8854 X2 445379 1.00 1184506.75 -.991 .000 -.137
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8854 Y2 445379 1.00 1184506.75 .000 1.000 .000
8870 X2 2816 1.00 7489.41 -.137 .000 .991
8870 X2 402595 1.00 1070719.00 -.991 .000 -.137
8870 Y2 402595 1.00 1070719.00 .000 1.000 .000
8871 X2 2164 1.00 5755.04 -.137 .000 .991
8871 X2 309363 1.00 822765.56 -.991 .000 -.137
8871 Y2 309363 1.00 822765.56 .000 1.000 .000
8872 X2 1635 1.00 4348.66 -.137 .000 .991
8872 X2 233763 1.00 621703.63 -.991 .000 -.137
8872 Y2 233763 1.00 621703.63 .000 1.000 .000
8873 X2 1459 1.00 3880.74 -.588 .000 .809
8873 X2 208610 1.00 554807.31 -.809 .000 -.588
8873 Y2 208610 1.00 554807.31 .000 1.000 .000
8890 X2 1635 1.00 4348.66 -.901 .000 .435
8890 X2 233763 1.00 621703.63 -.435 .000 -.901
8890 Y2 233763 1.00 621703.63 .000 1.000 .000
8891 X2 1758 1.00 4675.24 -.901 .000 .435
8891 X2 251319 1.00 668393.50 -.435 .000 -.901
8891 Y2 251319 1.00 668393.50 .000 1.000 .000
8892 X2 1705 1.00 4533.90 -.901 .000 .435
8892 X2 243721 1.00 648187.06 -.435 .000 -.901
8892 Y2 243721 1.00 648187.06 .000 1.000 .000
8910 X2 6690 1.00 17792.39 -.901 .000 .435
8910 X2 956434 1.00 2543679.75 -.435 .000 -.901
8910 Y2 956434 1.00 2543679.75 .000 1.000 .000
8930 X2 11675 1.00 31050.88 -.901 .000 .435
8930 X2 1669147 1.00 4439172.50 -.435 .000 -.901
8930 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8950 X2 11675 1.00 31050.88 -.901 .000 .435
8950 X2 1669147 1.00 4439172.50 -.435 .000 -.901
8950 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8970 X2 11675 1.00 31050.88 -.901 .000 .435
8970 X2 1669147 1.00 4439172.50 -.435 .000 -.901
8970 Y2 1669147 1.00 4439172.50 .000 1.000 .000
8990 X2 11675 1.00 31050.88 -.901 .000 .435
8990 X2 1669147 1.00 4439172.50 -.435 .000 -.901
8990 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9010 X2 11675 1.00 31050.88 -.901 .000 .435
9010 X2 1669147 1.00 4439172.50 -.435 .000 -.901
9010 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9030 X2 11675 1.00 31050.88 -.901 .000 .435
9030 X2 1669147 1.00 4439172.50 -.435 .000 -.901
9030 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9050 X2 11675 1.00 31050.88 -.901 .000 .435
9050 X2 1669147 1.00 4439172.50 -.435 .000 -.901
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9050 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9070 X2 11675 1.00 31050.88 -.901 .000 .435
9070 X2 1669147 1.00 4439172.50 -.435 .000 -.901
9070 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9090 X2 11675 1.00 31050.88 -.901 .000 .435
9090 X2 1669147 1.00 4439172.50 -.435 .000 -.901
9090 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9110 X2 6748 1.00 17947.93 -.901 .000 .435
9110 X2 964795 1.00 2565915.50 -.435 .000 -.901
9110 Y2 964795 1.00 2565915.50 .000 1.000 .000
9111 X2 1816 1.00 4830.78 -.901 .000 .435
9111 X2 259679 1.00 690629.25 -.435 .000 -.901
9111 Y2 259679 1.00 690629.25 .000 1.000 .000
9112 X2 1811 1.00 4816.58 -.901 .000 .435
9112 X2 258916 1.00 688599.94 -.435 .000 -.901
9112 Y2 258916 1.00 688599.94 .000 1.000 .000
9113 X2 947 1.00 2517.91 -.901 .000 .435
9113 X2 135351 1.00 359970.94 -.435 .000 -.901
9113 Y2 135351 1.00 359970.94 .000 1.000 .000
9114 X2 82 1.00 219.23 -.888 .000 .459
9114 X2 11785 1.00 31341.94 -.459 .000 -.888
9114 Y2 11785 1.00 31341.94 .000 1.000 .000
9130 X2 947 1.00 2517.91 -.875 .000 .484
9130 X2 135351 1.00 359970.94 -.484 .000 -.875
9130 Y2 135351 1.00 359970.94 .000 1.000 .000
9131 X2 1811 1.00 4816.58 -.875 .000 .484
9131 X2 258916 1.00 688599.94 -.484 .000 -.875
9131 Y2 258916 1.00 688599.94 .000 1.000 .000
9132 X2 1682 1.00 4473.73 -.875 .000 .484
9132 X2 240486 1.00 639584.00 -.484 .000 -.875
9132 Y2 240486 1.00 639584.00 .000 1.000 .000
9133 X2 1553 1.00 4130.87 -.875 .000 .484
9133 X2 222056 1.00 590568.00 -.484 .000 -.875
9133 Y2 222056 1.00 590568.00 .000 1.000 .000
9150 X2 6614 1.00 17590.88 -.875 .000 .484
9150 X2 945601 1.00 2514870.25 -.484 .000 -.875
9150 Y2 945601 1.00 2514870.25 .000 1.000 .000
9170 X2 11675 1.00 31050.88 -.875 .000 .484
9170 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9170 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9190 X2 11675 1.00 31050.88 -.875 .000 .484
9190 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9190 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9210 X2 11675 1.00 31050.88 -.875 .000 .484
9210 X2 1669147 1.00 4439172.50 -.484 .000 -.875
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9210 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9230 X2 11675 1.00 31050.88 -.875 .000 .484
9230 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9230 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9250 X2 11675 1.00 31050.88 -.875 .000 .484
9250 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9250 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9270 X2 11675 1.00 31050.88 -.875 .000 .484
9270 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9270 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9290 X2 11675 1.00 31050.88 -.875 .000 .484
9290 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9290 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9310 X2 11675 1.00 31050.88 -.875 .000 .484
9310 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9310 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9330 X2 11675 1.00 31050.88 -.875 .000 .484
9330 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9330 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9350 X2 11675 1.00 31050.88 -.875 .000 .484
9350 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9350 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9370 X2 11675 1.00 31050.88 -.875 .000 .484
9370 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9370 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9390 X2 11675 1.00 31050.88 -.875 .000 .484
9390 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9390 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9410 X2 11675 1.00 31050.88 -.875 .000 .484
9410 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9410 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9430 X2 11675 1.00 31050.88 -.875 .000 .484
9430 X2 1669147 1.00 4439172.50 -.484 .000 -.875
9430 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9450 X2 10702 1.00 28463.31 -.875 .000 .484
9450 X2 1530051 1.00 4069241.50 -.484 .000 -.875
9450 Y2 1530051 1.00 4069241.50 .000 1.000 .000
9470 X2 9729 1.00 25875.73 -.875 .000 .484
9470 X2 1390956 1.00 3699310.25 -.484 .000 -.875
9470 Y2 1390956 1.00 3699310.25 .000 1.000 .000
9480 X2 5621 1.00 14947.99 -.875 .000 .484
9480 X2 803532 1.00 2137031.50 -.484 .000 -.875
9480 Y2 803532 1.00 2137031.50 .000 1.000 .000
9481 X2 1729 1.00 4598.85 -.875 .000 .484
9481 X2 247212 1.00 657471.94 -.484 .000 -.875
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9481 Y2 247212 1.00 657471.94 .000 1.000 .000
9482 X2 1947 1.00 5177.45 -.398 .000 .917
9482 X2 278315 1.00 740191.06 -.917 .000 -.398
9482 Y2 278315 1.00 740191.06 .000 1.000 .000
9490 X2 1879 1.00 4997.01 .245 .000 .970
9490 X2 268616 1.00 714395.50 -.970 .000 .245
9490 Y2 268616 1.00 714395.50 .000 1.000 .000
9491 X2 1811 1.00 4816.58 .245 .000 .970
9491 X2 258916 1.00 688599.94 -.970 .000 .245
9491 Y2 258916 1.00 688599.94 .000 1.000 .000
9492 X2 1861 1.00 4949.98 .245 .000 .970
9492 X2 266087 1.00 707671.63 -.970 .000 .245
9492 Y2 266087 1.00 707671.63 .000 1.000 .000
9493 X2 1911 1.00 5083.38 .245 .000 .970
9493 X2 273258 1.00 726743.31 -.970 .000 .245
9493 Y2 273258 1.00 726743.31 .000 1.000 .000
9510 X2 6793 1.00 18067.13 .245 .000 .970
9510 X2 971203 1.00 2582958.00 -.970 .000 .245
9510 Y2 971203 1.00 2582958.00 .000 1.000 .000
9530 X2 11675 1.00 31050.88 .245 .000 .970
9530 X2 1669147 1.00 4439172.50 -.970 .000 .245
9530 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9550 X2 11675 1.00 31050.88 .245 .000 .970
9550 X2 1669147 1.00 4439172.50 -.970 .000 .245
9550 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9570 X2 11675 1.00 31050.88 .245 .000 .970
9570 X2 1669147 1.00 4439172.50 -.970 .000 .245
9570 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9590 X2 11675 1.00 31050.88 .245 .000 .970
9590 X2 1669147 1.00 4439172.50 -.970 .000 .245
9590 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9610 X2 11675 1.00 31050.88 .245 .000 .970
9610 X2 1669147 1.00 4439172.50 -.970 .000 .245
9610 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9630 X2 11675 1.00 31050.88 .245 .000 .970
9630 X2 1669147 1.00 4439172.50 -.970 .000 .245
9630 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9650 X2 11675 1.00 31050.88 .245 .000 .970
9650 X2 1669147 1.00 4439172.50 -.970 .000 .245
9650 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9670 X2 11675 1.00 31050.88 .245 .000 .970
9670 X2 1669147 1.00 4439172.50 -.970 .000 .245
9670 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9690 X2 11675 1.00 31050.88 .245 .000 .970
9690 X2 1669147 1.00 4439172.50 -.970 .000 .245
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9690 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9710 X2 11675 1.00 31050.88 .245 .000 .970
9710 X2 1669147 1.00 4439172.50 -.970 .000 .245
9710 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9730 X2 11675 1.00 31050.88 .245 .000 .970
9730 X2 1669147 1.00 4439172.50 -.970 .000 .245
9730 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9750 X2 11675 1.00 31050.88 .245 .000 .970
9750 X2 1669147 1.00 4439172.50 -.970 .000 .245
9750 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9770 X2 11675 1.00 31050.88 .245 .000 .970
9770 X2 1669147 1.00 4439172.50 -.970 .000 .245
9770 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9790 X2 11675 1.00 31050.88 .245 .000 .970
9790 X2 1669147 1.00 4439172.50 -.970 .000 .245
9790 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9810 X2 11675 1.00 31050.88 .245 .000 .970
9810 X2 1669147 1.00 4439172.50 -.970 .000 .245
9810 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9830 X2 11675 1.00 31050.88 .245 .000 .970
9830 X2 1669147 1.00 4439172.50 -.970 .000 .245
9830 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9850 X2 11675 1.00 31050.88 .245 .000 .970
9850 X2 1669147 1.00 4439172.50 -.970 .000 .245
9850 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9870 X2 11675 1.00 31050.88 .245 .000 .970
9870 X2 1669147 1.00 4439172.50 -.970 .000 .245
9870 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9890 X2 11675 1.00 31050.88 .245 .000 .970
9890 X2 1669147 1.00 4439172.50 -.970 .000 .245
9890 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9910 X2 11675 1.00 31050.88 .245 .000 .970
9910 X2 1669147 1.00 4439172.50 -.970 .000 .245
9910 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9930 X2 11675 1.00 31050.88 .245 .000 .970
9930 X2 1669147 1.00 4439172.50 -.970 .000 .245
9930 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9950 X2 11675 1.00 31050.88 .245 .000 .970
9950 X2 1669147 1.00 4439172.50 -.970 .000 .245
9950 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9970 X2 11675 1.00 31050.88 .245 .000 .970
9970 X2 1669147 1.00 4439172.50 -.970 .000 .245
9970 Y2 1669147 1.00 4439172.50 .000 1.000 .000
9990 X2 11675 1.00 31050.88 .245 .000 .970
9990 X2 1669147 1.00 4439172.50 -.970 .000 .245
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9990 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10010 X2 11675 1.00 31050.88 .245 .000 .970
10010 X2 1669147 1.00 4439172.50 -.970 .000 .245
10010 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10030 X2 11675 1.00 31050.88 .245 .000 .970
10030 X2 1669147 1.00 4439172.50 -.970 .000 .245
10030 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10050 X2 11675 1.00 31050.88 .245 .000 .970
10050 X2 1669147 1.00 4439172.50 -.970 .000 .245
10050 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10070 X2 11675 1.00 31050.88 .245 .000 .970
10070 X2 1669147 1.00 4439172.50 -.970 .000 .245
10070 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10090 X2 10702 1.00 28463.31 .245 .000 .970
10090 X2 1530051 1.00 4069241.50 -.970 .000 .245
10090 Y2 1530051 1.00 4069241.50 .000 1.000 .000
10110 X2 9729 1.00 25875.73 .245 .000 .970
10110 X2 1390956 1.00 3699310.25 -.970 .000 .245
10110 Y2 1390956 1.00 3699310.25 .000 1.000 .000
10130 X2 9729 1.00 25875.73 .245 .000 .970
10130 X2 1390956 1.00 3699310.25 -.970 .000 .245
10130 Y2 1390956 1.00 3699310.25 .000 1.000 .000
10150 X2 9729 1.00 25875.73 .245 .000 .970
10150 X2 1390956 1.00 3699310.25 -.970 .000 .245
10150 Y2 1390956 1.00 3699310.25 .000 1.000 .000
10170 X2 5868 1.00 15606.52 .245 .000 .970
10170 X2 838932 1.00 2231177.75 -.970 .000 .245
10170 Y2 838932 1.00 2231177.75 .000 1.000 .000
10171 X2 1909 1.00 5076.94 .245 .000 .970
10171 X2 272912 1.00 725822.63 -.970 .000 .245
10171 Y2 272912 1.00 725822.63 .000 1.000 .000
10172 X2 1822 1.00 4844.58 .245 .000 .970
10172 X2 260421 1.00 692602.06 -.970 .000 .245
10172 Y2 260421 1.00 692602.06 .000 1.000 .000
10173 X2 1832 1.00 4872.57 .200 -.579 .790
10173 X2 261926 1.00 696604.19 -.970 .000 .245
10173 X2 261926 1.00 696604.19 .142 .815 .562
10190 X2 1322 1.00 3515.43 .081 -.944 .319
10190 X2 188973 1.00 502581.19 -.970 .000 .245
10190 X2 188973 1.00 502581.19 .231 .329 .916
10210 X2 984 1.00 2615.76 .081 -.944 .319
10210 X2 140611 1.00 373960.13 -.970 .000 .245
10210 X2 140611 1.00 373960.13 .231 .329 .916
10211 X2 1494 1.00 3972.90 .081 -.944 .319
10211 X2 213564 1.00 567983.13 -.970 .000 .245
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10211 X2 213564 1.00 567983.13 .231 .329 .916
10212 X2 1832 1.00 4872.57 .200 -.579 .790
10212 X2 261926 1.00 696604.19 -.970 .000 .245
10212 X2 261926 1.00 696604.19 .142 .815 .562
10230 X2 1822 1.00 4844.58 .245 .000 .970
10230 X2 260421 1.00 692602.06 -.970 .000 .245
10230 Y2 260421 1.00 692602.06 .000 1.000 .000
10231 X2 1811 1.00 4816.58 .245 .000 .970
10231 X2 258916 1.00 688599.94 -.970 .000 .245
10231 Y2 258916 1.00 688599.94 .000 1.000 .000
10232 X2 2338 1.00 6218.65 .245 .000 .970
10232 X2 334285 1.00 889046.50 -.970 .000 .245
10232 Y2 334285 1.00 889046.50 .000 1.000 .000
10233 X2 2338 1.00 6218.65 .245 .000 .970
10233 X2 334285 1.00 889046.50 -.970 .000 .245
10233 Y2 334285 1.00 889046.50 .000 1.000 .000
10234 X2 1811 1.00 4816.58 .245 .000 .970
10234 X2 258916 1.00 688599.94 -.970 .000 .245
10234 Y2 258916 1.00 688599.94 .000 1.000 .000
10235 X2 1634 1.00 4346.12 .245 .000 .970
10235 X2 233626 1.00 621340.13 -.970 .000 .245
10235 Y2 233626 1.00 621340.13 .000 1.000 .000
10236 X2 1457 1.00 3875.65 .216 .472 .855
10236 X2 208336 1.00 554080.25 -.970 .000 .245
10236 X2 208336 1.00 554080.25 -.116 .882 -.457
10250 X2 1689 1.00 4492.10 .136 .832 .538
10250 X2 241474 1.00 642211.31 -.970 .000 .245
10250 X2 241474 1.00 642211.31 -.204 .555 -.807
10251 X2 1921 1.00 5108.56 .136 .832 .538
10251 X2 274612 1.00 730342.38 -.970 .000 .245
10251 X2 274612 1.00 730342.38 -.204 .555 -.807
10252 X2 1689 1.00 4492.10 .136 .832 .538
10252 X2 241474 1.00 642211.31 -.970 .000 .245
10252 X2 241474 1.00 642211.31 -.204 .555 -.807
10253 X2 1457 1.00 3875.65 .216 .472 .855
10253 X2 208336 1.00 554080.25 -.970 .000 .245
10253 X2 208336 1.00 554080.25 -.116 .882 -.457
10270 X2 1480 1.00 3936.19 .245 .000 .970
10270 X2 211591 1.00 562735.50 -.970 .000 .245
10270 Y2 211591 1.00 562735.50 .000 1.000 .000
10271 X2 1702 1.00 4527.82 .245 .000 .970
10271 X2 243394 1.00 647317.69 -.970 .000 .245
10271 Y2 243394 1.00 647317.69 .000 1.000 .000
10272 X2 1902 1.00 5058.91 .776 .000 .630
10272 X2 271943 1.00 723244.63 -.630 .000 .776
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10272 Y2 271943 1.00 723244.63 .000 1.000 .000
10290 X2 1857 1.00 4937.75 .999 .000 .040
10290 X2 265430 1.00 705922.25 -.040 .000 .999
10290 Y2 265430 1.00 705922.25 .000 1.000 .000
10291 X2 1811 1.00 4816.58 .999 .000 .040
10291 X2 258916 1.00 688599.94 -.040 .000 .999
10291 Y2 258916 1.00 688599.94 .000 1.000 .000
10292 X2 1879 1.00 4996.61 .999 .000 .040
10292 X2 268594 1.00 714337.75 -.040 .000 .999
10292 Y2 268594 1.00 714337.75 .000 1.000 .000
10293 X2 1946 1.00 5176.64 .999 .000 .040
10293 X2 278271 1.00 740075.63 -.040 .000 .999
10293 Y2 278271 1.00 740075.63 .000 1.000 .000
10310 X2 6811 1.00 18113.76 .999 .000 .040
10310 X2 973709 1.00 2589624.00 -.040 .000 .999
10310 Y2 973709 1.00 2589624.00 .000 1.000 .000
10330 X2 9729 1.00 25875.74 .999 .000 .040
10330 X2 1390956 1.00 3699310.50 -.040 .000 .999
10330 Y2 1390956 1.00 3699310.50 .000 1.000 .000
10350 X2 7784 1.00 20700.59 .999 .000 .040
10350 X2 1112765 1.00 2959448.50 -.040 .000 .999
10350 Y2 1112765 1.00 2959448.50 .000 1.000 .000
10370 X2 7784 1.00 20700.59 .999 .000 .040
10370 X2 1112765 1.00 2959448.50 -.040 .000 .999
10370 Y2 1112765 1.00 2959448.50 .000 1.000 .000
10390 X2 7784 1.00 20700.59 .999 .000 .040
10390 X2 1112765 1.00 2959448.50 -.040 .000 .999
10390 Y2 1112765 1.00 2959448.50 .000 1.000 .000
10410 X2 7784 1.00 20700.59 .999 .000 .040
10410 X2 1112765 1.00 2959448.50 -.040 .000 .999
10410 Y2 1112765 1.00 2959448.50 .000 1.000 .000
10430 X2 4542 1.00 12079.18 .999 .000 .040
10430 X2 649319 1.00 1726893.25 -.040 .000 .999
10430 Y2 649319 1.00 1726893.25 .000 1.000 .000
10431 X2 1300 1.00 3457.77 .999 .000 .040
10431 X2 185873 1.00 494338.13 -.040 .000 .999
10431 Y2 185873 1.00 494338.13 .000 1.000 .000
10432 X2 1556 1.00 4137.18 .999 .000 .040
10432 X2 222395 1.00 591469.00 -.040 .000 .999
10432 Y2 222395 1.00 591469.00 .000 1.000 .000
10433 X2 1722 1.00 4580.23 .999 .000 .040
10433 X2 246211 1.00 654810.38 -.040 .000 .999
10433 Y2 246211 1.00 654810.38 .000 1.000 .000
10434 X2 1633 1.00 4343.88 .830 .000 .557
10434 X2 233506 1.00 621020.88 -.557 .000 .830
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10434 Y2 233506 1.00 621020.88 .000 1.000 .000
10450 X2 1722 1.00 4580.23 .416 .000 .909
10450 X2 246211 1.00 654810.38 -.909 .000 .416
10450 Y2 246211 1.00 654810.38 .000 1.000 .000
10451 X2 1811 1.00 4816.58 .416 .000 .909
10451 X2 258916 1.00 688599.94 -.909 .000 .416
10451 Y2 258916 1.00 688599.94 .000 1.000 .000
10452 X2 1977 1.00 5257.63 .416 .000 .909
10452 X2 282625 1.00 751654.88 -.909 .000 .416
10452 Y2 282625 1.00 751654.88 .000 1.000 .000
10453 X2 2143 1.00 5698.69 .416 .000 .909
10453 X2 306334 1.00 814709.88 -.909 .000 .416
10453 Y2 306334 1.00 814709.88 .000 1.000 .000
10470 X2 6909 1.00 18374.79 .416 .000 .909
10470 X2 987741 1.00 2626941.25 -.909 .000 .416
10470 Y2 987741 1.00 2626941.25 .000 1.000 .000
10490 X2 11675 1.00 31050.88 .416 .000 .909
10490 X2 1669147 1.00 4439172.50 -.909 .000 .416
10490 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10510 X2 11675 1.00 31050.88 .416 .000 .909
10510 X2 1669147 1.00 4439172.50 -.909 .000 .416
10510 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10530 X2 11675 1.00 31050.88 .416 .000 .909
10530 X2 1669147 1.00 4439172.50 -.909 .000 .416
10530 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10550 X2 11675 1.00 31050.88 .416 .000 .909
10550 X2 1669147 1.00 4439172.50 -.909 .000 .416
10550 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10570 X2 11675 1.00 31050.88 .416 .000 .909
10570 X2 1669147 1.00 4439172.50 -.909 .000 .416
10570 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10590 X2 11675 1.00 31050.88 .416 .000 .909
10590 X2 1669147 1.00 4439172.50 -.909 .000 .416
10590 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10610 X2 11675 1.00 31050.88 .416 .000 .909
10610 X2 1669147 1.00 4439172.50 -.909 .000 .416
10610 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10630 X2 11675 1.00 31050.88 .416 .000 .909
10630 X2 1669147 1.00 4439172.50 -.909 .000 .416
10630 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10650 X2 11675 1.00 31050.88 .416 .000 .909
10650 X2 1669147 1.00 4439172.50 -.909 .000 .416
10650 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10670 X2 9243 1.00 24581.95 .416 .000 .909
10670 X2 1321408 1.00 3514345.00 -.909 .000 .416
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10670 Y2 1321408 1.00 3514345.00 .000 1.000 .000
10690 X2 4346 1.00 11558.17 .416 .000 .909
10690 X2 621312 1.00 1652407.75 -.909 .000 .416
10690 Y2 621312 1.00 1652407.75 .000 1.000 .000
10691 X2 1848 1.00 4915.94 .416 .000 .909
10691 X2 264257 1.00 702804.44 -.909 .000 .416
10691 Y2 264257 1.00 702804.44 .000 1.000 .000
10692 X2 1816 1.00 4828.55 .863 .000 .505
10692 X2 259560 1.00 690310.94 -.505 .000 .863
10692 Y2 259560 1.00 690310.94 .000 1.000 .000
10710 X2 1813 1.00 4822.57 .997 .000 -.082
10710 X2 259238 1.00 689455.44 .082 .000 .997
10710 Y2 259238 1.00 689455.44 .000 1.000 .000
10711 X2 1811 1.00 4816.58 .997 .000 -.082
10711 X2 258916 1.00 688599.94 .082 .000 .997
10711 Y2 258916 1.00 688599.94 .000 1.000 .000
10712 X2 1912 1.00 5084.33 .997 .000 -.082
10712 X2 273309 1.00 726877.88 .082 .000 .997
10712 Y2 273309 1.00 726877.88 .000 1.000 .000
10713 X2 2012 1.00 5352.07 .997 .000 -.082
10713 X2 287702 1.00 765155.81 .082 .000 .997
10713 Y2 287702 1.00 765155.81 .000 1.000 .000
10730 X2 6844 1.00 18201.48 .997 .000 -.082
10730 X2 978424 1.00 2602164.25 .082 .000 .997
10730 Y2 978424 1.00 2602164.25 .000 1.000 .000
10750 X2 11675 1.00 31050.88 .997 .000 -.082
10750 X2 1669147 1.00 4439172.50 .082 .000 .997
10750 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10770 X2 11675 1.00 31050.88 .997 .000 -.082
10770 X2 1669147 1.00 4439172.50 .082 .000 .997
10770 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10790 X2 11675 1.00 31050.88 .997 .000 -.082
10790 X2 1669147 1.00 4439172.50 .082 .000 .997
10790 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10810 X2 11675 1.00 31050.88 .997 .000 -.082
10810 X2 1669147 1.00 4439172.50 .082 .000 .997
10810 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10830 X2 11675 1.00 31050.88 .997 .000 -.082
10830 X2 1669147 1.00 4439172.50 .082 .000 .997
10830 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10850 X2 11675 1.00 31050.88 .997 .000 -.082
10850 X2 1669147 1.00 4439172.50 .082 .000 .997
10850 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10870 X2 11675 1.00 31050.88 .997 .000 -.082
10870 X2 1669147 1.00 4439172.50 .082 .000 .997
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10870 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10890 X2 11675 1.00 31050.88 .997 .000 -.082
10890 X2 1669147 1.00 4439172.50 .082 .000 .997
10890 Y2 1669147 1.00 4439172.50 .000 1.000 .000
10910 X2 10119 1.00 26910.77 .997 .000 -.082
10910 X2 1446594 1.00 3847282.75 .082 .000 .997
10910 Y2 1446594 1.00 3847282.75 .000 1.000 .000
10930 X2 5107 1.00 13583.30 .997 .000 -.082
10930 X2 730173 1.00 1941929.50 .082 .000 .997
10930 Y2 730173 1.00 1941929.50 .000 1.000 .000
10931 X2 1653 1.00 4395.96 .997 .000 -.082
10931 X2 236306 1.00 628465.94 .082 .000 .997
10931 Y2 236306 1.00 628465.94 .000 1.000 .000
10932 X2 1732 1.00 4606.27 .997 .000 -.082
10932 X2 247611 1.00 658532.94 .082 .000 .997
10932 Y2 247611 1.00 658532.94 .000 1.000 .000
10933 X2 1811 1.00 4816.58 .997 .000 -.082
10933 X2 258916 1.00 688599.94 .082 .000 .997
10933 Y2 258916 1.00 688599.94 .000 1.000 .000
10934 X2 1683 1.00 4476.27 .997 .000 -.082
10934 X2 240623 1.00 639947.38 .082 .000 .997
10934 Y2 240623 1.00 639947.38 .000 1.000 .000
10935 X2 1555 1.00 4135.96 .904 .000 .428
10935 X2 222329 1.00 591294.81 -.428 .000 .904
10935 Y2 222329 1.00 591294.81 .000 1.000 .000
10936 X2 1555 1.00 4135.96 .568 .000 .823
10936 X2 222329 1.00 591294.81 -.823 .000 .568
10936 Y2 222329 1.00 591294.81 .000 1.000 .000
10950 X2 1237 1.00 3290.62 .080 .000 .997
10950 X2 176888 1.00 470441.63 -.997 .000 .080
10950 Y2 176888 1.00 470441.63 .000 1.000 .000
10970 X2 5324 1.00 14160.51 .080 .000 .997
10970 X2 761201 1.00 2024449.37 -.997 .000 .080
10970 Y2 761201 1.00 2024449.37 .000 1.000 .000
10990 X2 10702 1.00 28463.31 .080 .000 .997
10990 X2 1530051 1.00 4069241.50 -.997 .000 .080
10990 Y2 1530051 1.00 4069241.50 .000 1.000 .000
11010 X2 11675 1.00 31050.88 .080 .000 .997
11010 X2 1669147 1.00 4439172.50 -.997 .000 .080
11010 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11030 X2 11675 1.00 31050.88 .080 .000 .997
11030 X2 1669147 1.00 4439172.50 -.997 .000 .080
11030 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11050 X2 11675 1.00 31050.88 .080 .000 .997
11050 X2 1669147 1.00 4439172.50 -.997 .000 .080
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
11050 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11070 X2 11675 1.00 31050.88 .080 .000 .997
11070 X2 1669147 1.00 4439172.50 -.997 .000 .080
11070 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11090 X2 11675 1.00 31050.88 .080 .000 .997
11090 X2 1669147 1.00 4439172.50 -.997 .000 .080
11090 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11110 X2 11675 1.00 31050.88 .080 .000 .997
11110 X2 1669147 1.00 4439172.50 -.997 .000 .080
11110 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11130 X2 11675 1.00 31050.88 .080 .000 .997
11130 X2 1669147 1.00 4439172.50 -.997 .000 .080
11130 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11150 X2 11675 1.00 31050.88 .080 .000 .997
11150 X2 1669147 1.00 4439172.50 -.997 .000 .080
11150 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11170 X2 11675 1.00 31050.88 .080 .000 .997
11170 X2 1669147 1.00 4439172.50 -.997 .000 .080
11170 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11190 X2 11675 1.00 31050.88 .080 .000 .997
11190 X2 1669147 1.00 4439172.50 -.997 .000 .080
11190 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11210 X2 11675 1.00 31050.88 .080 .000 .997
11210 X2 1669147 1.00 4439172.50 -.997 .000 .080
11210 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11230 X2 11675 1.00 31050.88 .080 .000 .997
11230 X2 1669147 1.00 4439172.50 -.997 .000 .080
11230 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11250 X2 11675 1.00 31050.88 .080 .000 .997
11250 X2 1669147 1.00 4439172.50 -.997 .000 .080
11250 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11270 X2 11675 1.00 31050.88 .080 .000 .997
11270 X2 1669147 1.00 4439172.50 -.997 .000 .080
11270 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11290 X2 11675 1.00 31050.88 .080 .000 .997
11290 X2 1669147 1.00 4439172.50 -.997 .000 .080
11290 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11310 X2 11675 1.00 31050.88 .080 .000 .997
11310 X2 1669147 1.00 4439172.50 -.997 .000 .080
11310 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11330 X2 11675 1.00 31050.88 .080 .000 .997
11330 X2 1669147 1.00 4439172.50 -.997 .000 .080
11330 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11350 X2 11675 1.00 31050.88 .080 .000 .997
11350 X2 1669147 1.00 4439172.50 -.997 .000 .080
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
11350 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11370 X2 11675 1.00 31050.88 .080 .000 .997
11370 X2 1669147 1.00 4439172.50 -.997 .000 .080
11370 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11390 X2 9729 1.00 25875.74 .080 .000 .997
11390 X2 1390956 1.00 3699310.50 -.997 .000 .080
11390 Y2 1390956 1.00 3699310.50 .000 1.000 .000
11410 X2 4984 1.00 13255.60 .080 .000 .997
11410 X2 712557 1.00 1895079.25 -.997 .000 .080
11410 Y2 712557 1.00 1895079.25 .000 1.000 .000
11411 X2 1868 1.00 4966.82 .080 .000 .997
11411 X2 266993 1.00 710078.88 -.997 .000 .080
11411 Y2 266993 1.00 710078.88 .000 1.000 .000
11412 X2 1550 1.00 4123.04 -.428 .000 .904
11412 X2 221635 1.00 589447.69 -.904 .000 -.428
11412 Y2 221635 1.00 589447.69 .000 1.000 .000
11413 X2 1550 1.00 4123.04 -.822 .000 .569
11413 X2 221635 1.00 589447.69 -.569 .000 -.822
11413 Y2 221635 1.00 589447.69 .000 1.000 .000
11430 X2 1681 1.00 4469.81 -.997 .000 .082
11430 X2 240276 1.00 639023.81 -.082 .000 -.997
11430 Y2 240276 1.00 639023.81 .000 1.000 .000
11431 X2 1811 1.00 4816.58 -.997 .000 .082
11431 X2 258916 1.00 688599.94 -.082 .000 -.997
11431 Y2 258916 1.00 688599.94 .000 1.000 .000
11432 X2 1693 1.00 4502.11 -.997 .000 .082
11432 X2 242012 1.00 643641.25 -.082 .000 -.997
11432 Y2 242012 1.00 643641.25 .000 1.000 .000
11433 X2 1575 1.00 4187.63 -.997 .000 .082
11433 X2 225107 1.00 598682.50 -.082 .000 -.997
11433 Y2 225107 1.00 598682.50 .000 1.000 .000
11450 X2 6625 1.00 17619.26 -.997 .000 .082
11450 X2 947127 1.00 2518927.50 -.082 .000 -.997
11450 Y2 947127 1.00 2518927.50 .000 1.000 .000
11470 X2 11675 1.00 31050.88 -.997 .000 .082
11470 X2 1669147 1.00 4439172.50 -.082 .000 -.997
11470 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11490 X2 11675 1.00 31050.88 -.997 .000 .082
11490 X2 1669147 1.00 4439172.50 -.082 .000 -.997
11490 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11510 X2 11675 1.00 31050.88 -.997 .000 .082
11510 X2 1669147 1.00 4439172.50 -.082 .000 -.997
11510 Y2 1669147 1.00 4439172.50 .000 1.000 .000
11530 X2 10702 1.00 28463.31 -.997 .000 .082
11530 X2 1530051 1.00 4069241.50 -.082 .000 -.997
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
11530 Y2 1530051 1.00 4069241.50 .000 1.000 .000
11550 X2 5550 1.00 14761.18 -.997 .000 .082
11550 X2 793491 1.00 2110324.50 -.082 .000 -.997
11550 Y2 793491 1.00 2110324.50 .000 1.000 .000
11551 X2 1371 1.00 3646.63 -.997 .000 .082
11551 X2 196025 1.00 521338.66 -.082 .000 -.997
11551 Y2 196025 1.00 521338.66 .000 1.000 .000
11552 X2 1591 1.00 4231.61 -.997 .000 .082
11552 X2 227471 1.00 604969.31 -.082 .000 -.997
11552 Y2 227471 1.00 604969.31 .000 1.000 .000
11590 X2 1878 1.00 4995.86 -.997 .000 .082
11590 X2 268554 1.00 714231.00 -.082 .000 -.997
11590 Y2 268554 1.00 714231.00 .000 1.000 .000
11600 X2 973 1.00 2587.57 -.997 .000 .082
11600 X2 139096 1.00 369931.06 -.082 .000 -.997
11600 Y2 139096 1.00 369931.06 .000 1.000 .000
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
TRANSL. STIF lbs./in. x 1.751 = N./cm.
ROTATIONAL STIF in.lb./deg. x 0.113 = N.m./deg
UNIFORM LOAD lb./in. x 1.751 = N./cm.
G LOAD g's x 1.000 = g's
WIND LOAD lbs./sq.in. x 6.895 = KPa
ELEVATION inches x 0.025 = m.
COMPOUND LENGTH inches x 25.400 = mm.
DIAMETER inches x 25.400 = mm.
WALL THICKNESS inches x 25.400 = mm.
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
INCLUDE SPRG STIF IN HGR OPE = NO
INCLUDE INSULATION IN HYDROTEST = NO
REDUCED INTERSECTION = B31.1(POST1980)
USE WRC329 NO
NO REDUCED SIF FOR RFT AND WLT NO
B31.1 REDUCED Z FIX = YES
CLASS 1 BRANCH FLEX NO
ALL STRESS CASES CORRODED = NO
ADD TORSION IN SL STRESS = DEFAULT
ADD F/A IN STRESS = DEFAULT
OCCASIONAL LOAD FACTOR = 0.000000
DEFAULT CODE = B31.3
B31.3 SUS CASE SIF FACTOR = 1.00000
ALLOW USERS BEND SIF = NO
USE SCHNEIDER NO
YIELD CRITERION STRESS = MAX 3D SHEAR
USE PD/4T NO
BASE HOOP STRESS ON ? = ID
EN13480 USE IN OUTPLANE SIFS= NO
LIBERAL EXPANSION ALLOWABLE= YES
B31.3 SEC 319.2.3C SAXIAL= NO
B31.3 WELDING/CONTOUR TEE ISB16.9 FALSE
PRESSURE VARIATION IN EXP CASE= DEFAULT
IMPLEMENT B313 APP-P NO
IMPLEMENT B313 CODE CASE 178 YES
IGNORE B31.1/B31.3 Wc FACTOR= YES
USE FRP SIF = YES
USE FRP FLEX = YES
BS 7159 Pressure Stiffening= Design Strain
FRP Property Data File= CAESAR.FRP
FRP Emod (axial) = 0.220627E+08 KPa
FRP Ratio Gmod/Emod (axial) = 0.250000
FRP Ea/Eh*Vh/a = 0.152730
FRP Laminate Type = THREE
FRP Alpha = 21.5983 C
FRP Density = 0.166080E-02 kg./cu.cm.
EXCLUDE f2 FROM UKOOA BENDING = NO
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Thermal Bowing Delta Temp .. .000 C
Liberal Allowable Flag ..... 1.000
Uniform Load Option ........ 1.000
COORDINATE REPORT
/--------------------(mm.)----------------------/
NODE X Y Z
10 .000 .000 .000
30 4950.946 .000 -698.665
50 6980.000 .000 -985.000
70 7453.937 .000 1977.327
90 8243.831 .000 6914.540
110 8561.001 .000 8897.000
130 10533.890 .000 8568.806
150 15959.336 .000 7666.271
170 20720.971 .000 6874.587
190 26590.398 .000 5898.719
210 32556.434 .000 4906.384
230 38417.906 .000 3931.438
250 44359.906 .000 2956.438
270 50213.906 .000 1982.438
290 53151.906 .000 1493.438
310 59145.906 .000 496.438
330 65130.906 .000 -498.562
350 71057.906 .000 -1484.562
370 76941.773 .000 -2463.203
390 82988.695 .000 -3469.007
410 85928.367 .000 -3957.609
430 91845.055 .000 -4941.894
450 97748.055 .000 -5923.894
470 103587.906 .000 -6894.721
490 109489.633 .000 -7876.001
510 115434.930 .000 -8865.016
530 120367.148 .000 -9685.503
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
550 122322.039 .000 -10010.703
570 121940.039 .000 -12247.703
590 122927.023 -1497.706 -12398.473
591 123469.797 -2321.344 -12481.386
592 123679.352 -2639.333 -12513.396
610 124345.492 -3000.000 -12615.382
611 125643.219 -3000.000 -12814.309
612 126563.187 -3000.000 -12955.329
613 127483.156 -3000.000 -13096.350
614 128863.109 -3000.000 -13307.880
615 129993.477 -3000.000 -13481.152
616 131373.422 -3000.000 -13692.683
617 132293.391 -3000.000 -13833.703
618 133213.359 -3000.000 -13974.724
619 134133.328 -3000.000 -14115.744
620 134511.094 -3000.000 -14173.650
630 135177.234 -2639.333 -14275.635
649 135551.891 -2070.813 -14332.866
650 135926.547 -1502.294 -14390.098
670 136916.562 -.000 -14541.328
690 139882.156 -.000 -14994.356
710 142544.547 -.000 -15401.065
730 143926.687 -.000 -11413.510
750 145891.672 -.000 -5744.396
770 147856.656 -.000 -75.282
790 149821.641 -.000 5593.832
810 151570.469 -.000 10639.343
830 152159.766 -.000 11447.256
850 155106.266 -.000 15486.822
870 156982.266 -.000 18058.748
890 157575.266 -.000 20118.748
910 159206.000 -.000 25783.703
930 160865.781 -.000 31549.562
950 162525.562 -.000 37315.422
970 164185.344 -.000 43081.281
990 165845.125 -.000 48847.141
1010 167504.906 -.000 54613.000
1030 169164.687 -.000 60378.859
1050 170824.469 -.000 66144.719
1070 172484.250 -.000 71910.578
1090 174144.031 -.000 77676.437
1110 175803.812 -.000 83442.297
1130 177463.594 -.000 89208.156
1150 179123.375 -.000 94974.016
1170 180783.156 -.000 100739.875
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1190 182442.937 -.000 106505.734
1210 184102.719 -.000 112271.594
1230 185762.500 -.000 118037.453
1250 187422.281 -.000 123803.312
1270 189082.062 -.000 129569.172
1290 190741.844 -.000 135335.031
1310 191592.766 -.000 138291.000
1330 192668.922 -.000 141091.344
1350 194462.516 -.000 145758.578
1370 195457.203 -.000 148346.906
1390 195817.344 -1494.003 149284.062
1391 196017.906 -2326.028 149805.969
1392 196094.078 -2641.988 150004.156
1410 196335.094 -3000.000 150631.359
1411 196805.469 -3000.000 151855.484
1412 197247.594 -3000.000 153006.109
1413 197581.422 -3000.000 153874.891
1414 197717.969 -3000.000 154230.234
1430 197958.984 -2641.988 154857.437
1449 198095.906 -2073.993 155213.734
1450 198232.828 -1505.997 155570.031
1470 198595.859 .000 156514.703
1490 200389.219 .000 161182.031
1510 202541.250 .000 166782.812
1530 203961.578 .000 170479.328
1550 204796.047 .000 172940.187
1570 206915.047 .000 179189.187
1590 209034.047 .000 185438.187
1610 210716.781 .000 190400.641
1630 211243.437 .000 191953.781
1650 212115.641 .000 194525.922
1670 212541.687 -1482.785 195798.641
1671 212833.594 -2498.713 196670.641
1672 212902.375 -2738.105 196876.125
1690 213089.750 -3000.000 197435.891
1691 213487.672 -3000.000 198624.672
1692 213783.094 -3000.000 199507.250
1693 214232.828 -3000.000 200850.812
1694 214528.250 -3000.000 201733.391
1695 214823.672 -3000.000 202615.969
1696 214945.469 -3000.000 202979.828
1710 215156.422 -2636.623 203622.000
1729 215273.984 -2048.845 203992.500
1730 215391.547 -1461.067 204363.000
1750 215683.766 .000 205283.953
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1770 216318.109 .000 207180.687
1790 217345.422 .000 210252.453
1810 219248.437 .000 215942.672
1830 221063.922 .000 221372.187
1850 223063.594 .000 220856.875
1870 228873.578 .000 219358.875
1890 234683.562 .000 217860.875
1910 240493.547 .000 216362.875
1930 246303.531 .000 214864.875
1950 252113.516 .000 213366.875
1970 257923.500 .000 211868.875
1990 263733.500 .000 210370.875
2010 269543.500 .000 208872.875
2030 275353.500 .000 207374.875
2050 281047.094 .000 205906.078
2070 286305.938 .000 204549.437
2090 287373.813 .000 205740.937
2110 290550.031 .000 209284.906
2130 291604.281 .000 210473.797
2150 295585.125 .000 214962.984
2170 299565.969 .000 219452.172
2190 303546.813 .000 223941.359
2210 307527.656 .000 228430.547
2230 311508.500 .000 232919.734
2250 315489.344 .000 237408.922
2270 318288.563 .000 240565.562
2290 322269.406 .000 245054.750
2310 326824.844 .000 250191.875
2330 330989.469 .000 254888.312
2340 334970.313 .000 259377.500
2350 337813.313 .000 262583.531
2370 336712.406 .000 263872.344
2390 332540.719 .000 268756.188
2410 328643.781 .000 273318.406
2530 324746.844 .000 277880.625
2550 320849.906 .000 282442.844
2570 316952.969 .000 287005.063
2590 313056.031 .000 291567.281
2610 311757.063 .000 293088.031
2630 309808.594 .000 295369.156
2650 308453.125 .000 296956.063
2670 307809.719 -1499.784 297715.469
2671 307458.406 -2318.698 298130.125
2672 307321.500 -2637.832 298291.719
2690 306885.250 -3000.000 298806.813
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
2691 306273.063 -3000.000 299529.813
2692 306025.563 -3000.000 299822.125
2710 305589.313 -2637.832 300337.219
2729 305345.281 -2069.023 300625.219
2730 305101.250 -1500.215 300913.219
2750 304457.656 .001 301672.813
2770 303169.750 .001 303202.938
2790 300593.906 .001 306263.188
2930 296730.156 .001 310853.531
2950 292866.406 .001 315443.875
2970 289002.656 .001 320034.219
2990 285138.906 .001 324624.563
3010 281275.156 .001 329214.906
3030 277636.781 .001 333537.500
3040 276522.719 .001 334861.063
3050 272570.688 .001 335278.375
3060 266603.875 .001 335908.469
3070 260637.047 .001 336538.563
3090 255028.234 .001 337130.844
3110 253799.234 .001 338654.844
3130 250032.781 .001 343325.375
3150 246266.328 .001 347995.906
3170 242499.875 .001 352666.438
3190 238733.422 .001 357336.969
3210 234966.969 .001 362007.500
3230 231200.516 .001 366678.031
3250 227434.062 .001 371348.563
3270 223667.609 .001 376019.094
3290 221941.937 .001 378158.969
3310 219911.937 .001 380697.969
3320 216165.125 .001 385384.250
3323 212418.312 .001 390070.531
3326 208671.500 .001 394756.813
3329 204924.687 .001 399443.094
3332 201177.875 .001 404129.375
3335 197431.062 .001 408815.656
3338 193684.250 .001 413501.938
3341 189937.437 .001 418188.219
3344 186190.625 .001 422874.500
3350 182443.812 .001 427560.781
3370 178697.000 .001 432247.063
3390 174950.187 .001 436933.344
3410 171203.375 .001 441619.625
3430 167456.562 .001 446305.906
3450 163709.750 .001 450992.188
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
3470 159962.937 .001 455678.469
3490 156216.125 .001 460364.750
3510 152469.312 .001 465051.031
3530 148722.500 .001 469737.313
3550 144975.687 .001 474423.594
3570 141228.875 .001 479109.875
3590 137482.062 .001 483796.156
3610 135605.531 .001 486143.219
3630 134982.016 -1497.690 486923.063
3631 134639.109 -2321.362 487351.938
3632 134506.734 -2639.343 487517.500
3650 134085.906 -2999.999 488043.844
3651 133266.047 -2999.999 489069.281
3652 132684.844 -2999.999 489796.219
3653 132079.844 -2999.999 490552.906
3654 131498.641 -2999.999 491279.844
3655 130917.437 -2999.999 492006.781
3656 130720.844 -2999.999 492252.656
3670 130359.844 -2750.517 492704.188
3689 130069.164 -2256.792 493067.750
3690 129778.484 -1763.067 493431.313
3710 128826.141 -145.521 494622.438
3730 126952.734 -145.521 496965.594
3750 123202.789 -145.521 501655.781
3770 120888.500 -145.521 504550.344
3790 117138.555 -145.521 509240.531
3810 115000.367 -145.521 511914.844
3830 113433.367 -145.521 513964.844
3850 109789.617 -145.521 518731.719
3870 106145.867 -145.521 523498.594
3890 102502.117 -145.521 528265.437
3910 99836.109 -145.521 531753.187
3930 98896.109 -145.521 533062.187
3950 95396.367 -145.521 537935.750
3952 91896.625 -145.521 542809.312
3968 88396.883 -145.521 547682.875
3970 84897.141 -145.521 552556.437
3990 81397.398 -145.521 557430.000
4010 77897.656 -145.521 562303.562
4030 74397.914 -145.521 567177.125
4050 70898.172 -145.521 572050.687
4070 67398.430 -145.521 576924.250
4080 65076.934 -145.521 580157.062
4090 63898.688 -145.521 581797.812
4110 59955.641 -145.521 587288.687
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4130 59276.184 -1892.827 588234.875
4131 59052.957 -2466.884 588545.750
4132 58929.309 -2784.865 588717.937
4150 58536.234 -3145.521 589265.312
4151 57770.445 -3145.521 590331.687
4152 57227.570 -3145.521 591087.687
4153 56684.695 -3145.521 591843.687
4154 55870.379 -3145.521 592977.687
4155 50879.547 -3145.521 599927.687
4156 50065.230 -3145.521 601061.687
4157 49522.355 -3145.521 601817.687
4158 48979.480 -3145.521 602573.687
4159 48436.605 -3145.521 603329.687
4160 48213.691 -3145.521 603640.125
4170 47820.617 -2784.865 604187.500
4190 47378.469 -1647.830 604803.187
4191 47058.176 -824.158 605249.187
4192 46934.527 -506.177 605421.375
4210 46541.453 -145.521 605968.750
4230 45669.699 -145.521 607182.687
4250 42169.953 -145.521 612056.250
4270 38670.207 -145.521 616929.812
4290 35170.461 -145.521 621803.375
4310 31670.717 -145.521 626676.937
4330 28891.336 -145.521 630547.375
4350 28311.518 -145.521 631362.125
4370 24832.605 -145.521 636250.625
4390 21353.691 -145.521 641139.125
4410 17874.777 -145.521 646027.625
4430 14395.864 -145.521 650916.125
4450 11496.770 -145.521 654989.875
4451 11374.021 -145.521 655162.375
4452 11341.508 -145.521 655208.062
4470 11283.374 -145.521 655303.937
4471 10835.241 -145.521 656183.125
4472 10412.573 -145.521 657012.312
4473 9989.905 -145.521 657841.500
4474 9286.906 -145.521 659220.687
4490 8583.907 -145.521 660599.875
4510 5858.907 -145.521 665945.875
4530 3133.907 -145.521 671291.875
4550 408.907 -145.521 676637.875
4570 -2316.093 -145.521 681983.875
4590 -5041.093 -145.521 687329.875
4610 -7766.093 -145.521 692675.875
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
4630 -10491.093 -145.521 698021.875
4650 -13216.093 -145.521 703367.875
4670 -15941.093 -145.521 708713.875
4690 -18666.094 -145.521 714059.875
4691 -19320.914 -145.521 715344.500
4692 -19743.582 -145.521 716173.687
4693 -20166.250 -145.521 717002.875
4694 -20588.918 -145.521 717832.062
4695 -20597.760 -145.521 717849.437
4710 -20616.322 -145.521 717883.687
4711 -21090.506 -145.521 718707.125
4730 -21604.691 -145.521 719600.000
4750 -24598.957 -145.521 724799.437
4751 -25151.311 -145.521 725758.562
4752 -25615.777 -145.521 726565.125
4753 -26080.244 -145.521 727371.687
4754 -26302.855 -145.521 727758.250
4770 -26677.811 -626.576 728409.375
4790 -26901.355 -1598.658 728797.562
4791 -27053.287 -2259.334 729061.375
4792 -27146.453 -2664.466 729223.125
4810 -27521.408 -3145.521 729874.250
4811 -28208.488 -3145.521 731067.375
4812 -28672.955 -3145.521 731873.937
4813 -29137.422 -3145.521 732680.500
4814 -29834.123 -3145.521 733890.312
4815 -31578.920 -3145.521 736920.125
4816 -32275.621 -3145.521 738129.937
4817 -32740.088 -3145.521 738936.500
4818 -33204.555 -3145.521 739743.062
4819 -33669.023 -3145.521 740549.625
4820 -33859.727 -3145.521 740880.750
4830 -34196.098 -2784.918 741464.625
4849 -34385.410 -2216.412 741793.062
4850 -34574.723 -1647.905 742121.500
4870 -35133.199 29.201 743090.312
4890 -37629.297 29.201 747420.375
4910 -38095.754 29.201 748229.562
4930 -40181.590 29.201 752773.750
4950 -42684.590 29.201 758226.750
4970 -45187.582 29.201 763679.750
4990 -46856.242 29.201 767315.062
5010 -48942.070 29.201 771859.187
5030 -51027.898 29.201 776403.312
5050 -51966.102 29.201 778447.250
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
5070 -53005.102 29.201 780329.250
5090 -55904.969 29.201 785581.937
5110 -58804.836 29.201 790834.625
5130 -61704.703 29.201 796087.312
5150 -64604.570 29.201 801340.000
5170 -67504.437 29.201 806592.687
5190 -70404.305 29.201 811845.375
5210 -73304.172 29.201 817098.062
5220 -75720.727 29.201 821475.312
5225 -76687.352 29.201 823226.187
5250 -78620.594 29.201 826728.000
5270 -81037.148 29.201 831105.250
5290 -83937.016 29.201 836357.937
5310 -86836.883 29.201 841610.625
5330 -89736.750 29.201 846863.312
5350 -92636.617 29.201 852116.000
5370 -95536.484 29.201 857368.687
5390 -97009.617 29.201 860037.062
5410 -97883.695 29.201 862906.875
5430 -99631.414 29.201 868645.125
5450 -101379.133 29.201 874383.375
5470 -103126.852 29.201 880121.625
5490 -104874.570 29.201 885859.875
5510 -106622.289 29.201 891598.125
5530 -108370.008 29.201 897336.375
5550 -108650.008 29.201 898255.687
5570 -110045.008 29.201 903096.687
5590 -111706.383 29.201 908862.062
5610 -113367.758 29.201 914627.437
5630 -115029.133 29.201 920392.812
5635 -115582.922 29.201 922314.625
5640 -116136.711 -1470.799 924236.437
5650 -116690.500 -1470.799 926158.250
5670 -118351.875 -1470.799 931923.625
5690 -120013.250 -1470.799 937689.000
5710 -121674.625 -1470.799 943454.375
5730 -123336.000 -1470.799 949219.750
5750 -123545.055 -1470.799 949945.250
5770 -124842.055 -1470.799 955028.250
5790 -126325.508 -1470.799 960842.000
5810 -127808.961 -1470.799 966655.750
5830 -129292.414 -1470.799 972469.500
5850 -130444.070 -1470.799 976982.875
5870 -130788.070 -1470.799 978280.875
5890 -132069.172 -1470.799 983114.812
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
5895 -132581.531 -1470.799 985048.062
5920 -133606.250 -1470.799 988914.562
5930 -134887.141 -1470.799 993747.687
5950 -136424.219 -1470.799 999547.437
5970 -137961.297 -1470.799 1005347.187
5990 -139320.297 -1470.799 1011191.187
6010 -140679.312 -1470.799 1017035.250
6030 -142038.328 -1470.799 1022879.312
6050 -143397.344 -1470.799 1028723.375
6070 -144756.359 -1470.799 1034567.437
6170 -146115.375 -1470.799 1040411.500
6190 -147474.391 -1470.799 1046255.562
6210 -148833.406 -1470.799 1052099.625
6220 -149965.922 -1470.799 1056969.625
6225 -150418.922 -1470.799 1058917.625
6250 -151324.937 -1470.799 1062813.625
6270 -152280.766 -1470.799 1067721.125
6290 -153427.828 -1470.799 1073610.500
6310 -154574.891 -1470.799 1079499.875
6330 -155721.953 -1470.799 1085389.250
6350 -156869.016 -1470.799 1091278.625
6370 -158016.078 -1470.799 1097168.000
6390 -159163.141 -1470.799 1103057.375
6410 -160119.031 -1470.799 1107965.125
6430 -160176.031 -1470.799 1108260.125
6450 -161258.906 -1470.799 1113864.500
6470 -162311.812 -1470.799 1119313.750
6490 -162431.703 -1470.799 1119934.250
6510 -162990.937 -1470.799 1125575.875
6530 -163421.937 -1470.799 1129923.875
6550 -164013.797 -1470.799 1135894.625
6570 -164365.953 -1470.799 1139447.250
6590 -164510.953 -1470.799 1141875.250
6610 -164868.641 -1470.799 1147864.625
6630 -165047.594 -1470.799 1150861.250
6640 -165083.594 -1470.799 1153864.250
6645 -165155.516 -1470.799 1159863.875
6650 -165227.437 -1470.799 1165863.500
6655 -165299.359 -1470.799 1171863.125
6660 -165371.281 -1470.799 1177862.750
6665 -165443.203 -1470.799 1183862.375
6670 -165515.125 -1470.799 1189862.000
6690 -165588.125 -1470.799 1195894.000
6700 -165642.578 -1470.799 1200393.625
6710 -165665.781 -1470.799 1202311.500
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
6730 -165485.781 -1470.799 1205311.500
6810 -164970.844 -1470.799 1211289.375
6830 -164425.844 -1470.799 1217293.375
6850 -163655.844 -1470.799 1223276.375
6870 -162659.844 -1470.799 1229228.375
6890 -161464.844 -1470.799 1235028.375
6910 -160021.844 -1470.799 1240890.375
6930 -158356.844 -1470.799 1246698.375
6950 -156472.844 -1470.799 1252433.375
6970 -154388.844 -1470.799 1258069.375
6990 -152195.844 -1470.799 1263665.375
7010 -150002.844 -1470.799 1269261.375
7030 -147809.844 -1470.799 1274857.375
7040 -146167.937 -1470.799 1279047.125
7050 -145616.844 -1470.799 1280453.375
7070 -143001.734 -1470.799 1284715.000
7090 -140674.422 -1470.799 1288507.625
7100 -140227.172 -2956.663 1289202.000
7101 -140007.266 -3687.249 1289543.375
7102 -139898.078 -4049.973 1289712.875
7110 -139510.703 -4470.800 1290314.375
7111 -138782.016 -4470.800 1291445.750
7112 -138278.047 -4470.800 1292228.250
7113 -137774.078 -4470.800 1293010.750
7114 -137018.125 -4470.800 1294184.500
7115 -133984.953 -4470.800 1298893.750
7116 -133229.000 -4470.800 1300067.500
7117 -132725.031 -4470.800 1300850.000
7118 -132221.062 -4470.800 1301632.500
7119 -131717.094 -4470.800 1302415.000
7120 -131526.062 -4470.800 1302711.625
7130 -131182.875 -4160.753 1303244.500
7139 -130932.398 -3565.794 1303633.375
7140 -130681.922 -2970.836 1304022.250
7150 -130050.406 -1470.800 1305002.750
7170 -127884.516 -1470.800 1308365.625
7210 -125718.625 -1470.800 1311728.500
7230 -125261.078 -1470.800 1312438.875
7250 -121147.078 -1470.800 1315280.875
7270 -116210.469 -1470.800 1318691.125
7290 -111273.859 -1470.800 1322101.375
7310 -110764.562 -1470.800 1322453.250
7330 -107997.758 -1470.800 1326618.000
7350 -104677.594 -1470.800 1331615.625
7370 -101357.430 -1470.800 1336613.250
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7390 -98037.266 -1470.800 1341610.875
7410 -94717.102 -1470.800 1346608.500
7430 -91396.937 -1470.800 1351606.125
7450 -88076.773 -1470.800 1356603.750
7470 -84756.609 -1470.800 1361601.375
7490 -81436.445 -1470.800 1366599.000
7510 -78116.281 -1470.800 1371596.625
7530 -74796.117 -1470.800 1376594.250
7550 -71475.953 -1470.800 1381591.875
7570 -68155.789 -1470.800 1386589.500
7590 -67977.055 -1470.800 1386858.500
7610 -65326.055 -1470.800 1392240.500
7630 -62675.055 -1470.800 1397622.500
7650 -60024.055 -1470.800 1403004.500
7670 -57373.055 -1470.800 1408386.500
7690 -54722.055 -1470.800 1413768.500
7710 -52071.055 -1470.800 1419150.500
7730 -51565.113 -1470.800 1420177.625
7750 -49111.039 -1470.800 1421903.125
7770 -46521.992 -1470.800 1423723.625
7780 -46048.195 -2962.287 1424056.750
7781 -45877.863 -3498.482 1424176.500
7782 -45738.215 -3938.089 1424274.750
7790 -45101.516 -4470.800 1424722.375
7791 -43954.398 -4470.800 1425529.000
7792 -43193.051 -4470.800 1426064.375
7793 -42431.703 -4470.800 1426599.750
7794 -40247.484 -4470.800 1428135.500
7795 -39486.137 -4470.800 1428670.875
7796 -38724.789 -4470.800 1429206.250
7797 -37963.441 -4470.800 1429741.625
7798 -37650.844 -4470.800 1429961.375
7810 -37099.656 -4110.198 1430349.000
7820 -36479.605 -2973.184 1430785.250
7821 -36030.336 -2149.342 1431101.375
7822 -35856.953 -1831.402 1431223.375
7830 -35305.832 -1470.800 1431611.125
7850 -34024.570 -1470.800 1432512.500
7851 -33297.367 -1470.800 1433024.125
7852 -32570.164 -1470.800 1433535.750
7853 -31808.963 -1470.800 1434071.250
7854 -31800.377 -1470.800 1434077.250
7870 -31783.375 -1470.800 1434089.625
7871 -31028.799 -1470.800 1434652.250
7872 -30282.639 -1470.800 1435208.500
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
7873 -29433.715 -1470.800 1435841.375
7890 -28584.791 -1470.800 1436474.250
7910 -23774.551 -1470.800 1440060.500
7930 -18964.311 -1470.800 1443646.750
7950 -14154.070 -1470.800 1447233.000
7970 -9343.830 -1470.800 1450819.250
7990 -4533.590 -1470.800 1454405.500
8010 276.650 -1470.800 1457991.750
8030 5086.891 -1470.800 1461578.000
8050 9897.131 -1470.800 1465164.250
8051 10629.344 -1470.800 1465710.125
8052 11361.557 -1470.800 1466256.000
8053 12107.716 -1470.800 1466812.250
8054 12357.974 -1470.800 1466998.875
8070 12671.471 -1470.800 1467538.750
8071 12822.745 -1470.800 1468772.375
8072 12936.025 -1470.800 1469696.125
8090 13056.149 -1470.800 1470675.750
8110 13786.431 -1470.800 1476631.125
8130 14516.712 -1470.800 1482586.500
8131 14631.189 -1470.800 1483520.000
8132 14744.470 -1470.800 1484443.750
8133 14800.390 -1470.800 1484899.750
8150 15397.686 -1470.800 1485598.000
8151 16734.629 -1470.800 1485978.875
8170 17752.490 -1470.800 1486268.875
8190 23522.840 -1470.800 1487913.000
8210 29293.189 -1470.800 1489557.125
8230 35063.539 -1470.800 1491201.250
8250 40833.891 -1470.800 1492845.375
8270 46604.242 -1470.800 1494489.500
8290 52374.594 -1470.800 1496133.625
8310 58144.945 -1470.800 1497777.750
8330 63915.297 -1470.800 1499421.875
8350 69685.648 -1470.800 1501066.000
8370 75456.000 -1470.800 1502710.125
8390 79636.617 -1470.800 1503901.250
8410 82521.812 -1470.800 1504723.250
8411 83365.562 -1470.800 1504963.625
8412 84209.312 -1470.800 1505204.000
8413 85104.406 -1470.800 1505459.000
8414 85649.227 -1470.800 1505614.250
8430 86271.531 -1470.800 1506561.000
8450 86108.805 -1470.800 1507802.750
8470 85459.117 -1470.800 1512760.375
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
8490 84679.492 -1470.800 1518709.500
8510 83899.867 -1470.800 1524658.625
8530 83120.242 -1470.800 1530607.750
8550 82340.617 -1470.800 1536556.875
8570 81560.992 -1470.800 1542506.000
8590 80781.367 -1470.800 1548455.125
8610 80001.742 -1470.800 1554404.250
8630 79222.117 -1470.800 1560353.375
8650 78442.492 -1470.800 1566302.500
8670 77662.867 -1470.800 1572251.625
8690 76883.242 -1470.800 1578200.750
8710 76103.617 -1470.800 1584149.875
8730 75323.992 -1470.800 1590099.000
8750 74544.367 -1470.800 1596048.125
8770 73764.742 -1470.800 1601997.250
8790 72985.117 -1470.800 1607946.375
8810 72205.492 -1470.800 1613895.500
8830 71425.867 -1470.800 1619844.625
8831 71360.531 -1470.800 1620343.125
8832 71360.195 -1470.800 1620345.750
8850 71359.508 -1470.800 1620350.875
8851 71231.937 -1470.800 1621275.375
8852 71104.727 -1470.800 1622197.375
8853 70977.516 -1470.800 1623119.375
8854 70758.687 -1470.800 1624705.375
8870 70539.859 -1470.800 1626291.375
8871 70363.078 -1470.800 1627572.625
8872 70235.867 -1470.800 1628494.625
8873 70183.562 -1470.800 1628873.750
8890 69733.164 -1470.800 1629492.625
8891 68550.281 -1470.800 1630063.375
8892 67761.250 -1470.800 1630444.125
8910 66972.219 -1470.800 1630824.875
8930 61568.469 -1470.800 1633432.500
8950 56164.719 -1470.800 1636040.125
8970 50760.969 -1470.800 1638647.750
8990 45357.219 -1470.800 1641255.375
9010 39953.469 -1470.800 1643863.000
9030 34549.719 -1470.800 1646470.625
9050 29145.969 -1470.800 1649078.250
9070 23742.219 -1470.800 1651685.875
9090 18338.469 -1470.800 1654293.500
9110 12934.719 -1470.800 1656901.125
9111 12091.555 -1470.800 1657308.000
9112 11253.330 -1470.800 1657712.500
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9113 10415.105 -1470.800 1658117.000
9114 10396.028 -1470.800 1658126.250
9130 10358.400 -1470.800 1658145.750
9131 9525.408 -1470.800 1658606.500
9132 8710.954 -1470.800 1659056.875
9133 8012.449 -1470.800 1659443.125
9150 7313.944 -1470.800 1659829.375
9170 2063.431 -1470.800 1662733.125
9190 -3187.082 -1470.800 1665636.875
9210 -8437.596 -1470.800 1668540.625
9230 -13688.109 -1470.800 1671444.375
9250 -18938.623 -1470.800 1674348.125
9270 -24189.137 -1470.800 1677251.875
9290 -29439.650 -1470.800 1680155.625
9310 -34690.164 -1470.800 1683059.375
9330 -39940.676 -1470.800 1685963.125
9350 -45191.188 -1470.800 1688866.875
9370 -50441.699 -1470.800 1691770.625
9390 -55692.211 -1470.800 1694674.375
9410 -60942.723 -1470.800 1697578.125
9430 -66193.234 -1470.800 1700481.875
9450 -71443.750 -1470.800 1703385.625
9470 -75819.180 -1470.800 1705805.500
9480 -80194.609 -1470.800 1708225.375
9481 -80874.406 -1470.800 1708601.375
9482 -81328.570 -1470.800 1708852.500
9490 -81741.516 -1470.800 1709804.875
9491 -81386.633 -1470.800 1711210.500
9492 -81158.797 -1470.800 1712112.875
9493 -80918.344 -1470.800 1713065.250
9510 -80677.891 -1470.800 1714017.625
9530 -79209.125 -1470.800 1719835.125
9550 -77740.359 -1470.800 1725652.625
9570 -76271.594 -1470.800 1731470.125
9590 -74802.828 -1470.800 1737287.625
9610 -73334.062 -1470.800 1743105.125
9630 -71865.297 -1470.800 1748922.625
9650 -70396.531 -1470.800 1754740.125
9670 -68927.766 -1470.800 1760557.625
9690 -67459.000 -1470.800 1766375.125
9710 -65990.234 -1470.800 1772192.625
9730 -64521.473 -1470.800 1778010.125
9750 -63052.711 -1470.800 1783827.625
9770 -61583.949 -1470.800 1789645.125
9790 -60115.188 -1470.800 1795462.625
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
9810 -58646.426 -1470.800 1801280.125
9830 -57177.664 -1470.800 1807097.625
9850 -55708.902 -1470.800 1812915.125
9870 -54240.141 -1470.800 1818732.625
9890 -52771.379 -1470.800 1824550.125
9910 -51302.617 -1470.800 1830367.625
9930 -49833.855 -1470.800 1836185.125
9950 -48365.094 -1470.800 1842002.625
9970 -46896.332 -1470.800 1847820.125
9990 -45427.570 -1470.800 1853637.625
10010 -43958.809 -1470.800 1859455.125
10030 -42490.047 -1470.800 1865272.625
10050 -41021.285 -1470.800 1871090.125
10070 -39552.523 -1470.800 1876907.625
10090 -38083.762 -1470.800 1882725.125
10110 -36859.793 -1470.800 1887573.000
10130 -35635.824 -1470.800 1892420.875
10150 -34411.855 -1470.800 1897268.750
10170 -33187.887 -1470.800 1902116.625
10171 -32935.422 -1470.800 1903116.625
10172 -32707.590 -1470.800 1904019.000
10173 -32588.539 -1470.800 1904490.500
10190 -32394.449 -2034.214 1905259.250
10210 -32321.705 -2887.322 1905547.375
10211 -32273.887 -3448.117 1905736.750
10212 -32234.725 -3907.385 1905891.875
10230 -32040.635 -4470.800 1906660.625
10231 -31693.750 -4470.800 1908034.500
10232 -31465.918 -4470.800 1908936.875
10233 -31105.443 -4470.800 1910364.625
10234 -30877.611 -4470.800 1911267.000
10235 -30649.779 -4470.800 1912169.375
10236 -30556.227 -4470.800 1912539.875
10250 -30391.209 -4110.137 1913193.250
10251 -30205.117 -2970.800 1913929.625
10252 -30070.963 -2149.450 1914460.500
10253 -30019.025 -1831.463 1914666.000
10270 -29853.916 -1470.800 1915319.375
10271 -29571.066 -1470.800 1916438.625
10272 -29447.033 -1470.800 1916929.500
10290 -28660.918 -1470.800 1917567.625
10291 -27225.129 -1470.800 1917625.625
10292 -26295.176 -1470.800 1917663.250
10293 -25295.703 -1470.800 1917703.625
10310 -24296.230 -1470.800 1917744.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10330 -18301.129 -1470.800 1917986.375
10350 -14304.395 -1470.800 1918148.000
10370 -10307.660 -1470.800 1918309.625
10390 -6310.926 -1470.800 1918471.250
10410 -2314.191 -1470.800 1918632.875
10430 1682.543 -1470.800 1918794.500
10431 2350.147 -1470.800 1918821.500
10432 3017.750 -1470.800 1918848.500
10433 3947.705 -1470.800 1918886.125
10434 4377.981 -1470.800 1918903.500
10450 5093.068 -1470.800 1919383.500
10451 5659.144 -1470.800 1920621.625
10452 6046.154 -1470.800 1921468.000
10453 6504.042 -1470.800 1922469.500
10470 6961.930 -1470.800 1923471.000
10490 9456.857 -1470.800 1928927.625
10510 11951.785 -1470.800 1934384.250
10530 14446.713 -1470.800 1939840.875
10550 16941.641 -1470.800 1945297.500
10570 19436.568 -1470.800 1950754.125
10590 21931.496 -1470.800 1956210.750
10610 24426.424 -1470.800 1961667.375
10630 26921.352 -1470.800 1967124.000
10650 29416.279 -1470.800 1972580.625
10670 31911.207 -1470.800 1978037.250
10690 33366.582 -1470.800 1981220.250
10691 33768.598 -1470.800 1982099.500
10692 33968.879 -1470.800 1982537.500
10710 34800.156 -1470.800 1983024.250
10711 36207.719 -1470.800 1982907.875
10712 37135.270 -1470.800 1982831.125
10713 38165.941 -1470.800 1982745.875
10730 39196.613 -1470.800 1982660.625
10750 45176.211 -1470.800 1982166.250
10770 51155.809 -1470.800 1981671.875
10790 57135.406 -1470.800 1981177.500
10810 63115.004 -1470.800 1980683.125
10830 69094.602 -1470.800 1980188.750
10850 75074.195 -1470.800 1979694.375
10870 81053.789 -1470.800 1979200.000
10890 87033.383 -1470.800 1978705.625
10910 93012.977 -1470.800 1978211.250
10930 97398.016 -1470.800 1977848.750
10931 98244.562 -1470.800 1977778.750
10932 99091.109 -1470.800 1977708.750
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
10933 100018.656 -1470.800 1977632.000
10934 100946.203 -1470.800 1977555.250
10935 101353.828 -1470.800 1977521.500
10936 102093.273 -1470.800 1977871.375
10950 102558.187 -1470.800 1978544.500
10970 102628.695 -1470.800 1979423.250
10990 103028.617 -1470.800 1984407.250
11010 103508.516 -1470.800 1990388.000
11030 103988.414 -1470.800 1996368.750
11050 104468.312 -1470.800 2002349.500
11070 104948.211 -1470.800 2008330.250
11090 105428.109 -1470.800 2014311.000
11110 105908.008 -1470.800 2020291.750
11130 106387.906 -1470.800 2026272.500
11150 106867.805 -1470.800 2032253.250
11170 107347.703 -1470.800 2038234.000
11190 107827.602 -1470.800 2044214.750
11210 108307.500 -1470.800 2050195.500
11230 108787.398 -1470.800 2056176.250
11250 109267.297 -1470.800 2062157.000
11270 109747.195 -1470.800 2068137.750
11290 110227.094 -1470.800 2074118.500
11310 110706.992 -1470.800 2080099.250
11330 111186.891 -1470.800 2086080.000
11350 111666.789 -1470.800 2092060.750
11370 112146.687 -1470.800 2098041.500
11390 112626.586 -1470.800 2104022.250
11410 112946.523 -1470.800 2108009.500
11411 113036.328 -1470.800 2109128.750
11412 113068.937 -1470.800 2109535.000
11413 112719.656 -1470.800 2110271.750
11430 112049.180 -1470.800 2110735.750
11431 110715.352 -1470.800 2110846.000
11432 109787.805 -1470.800 2110922.750
11433 108981.383 -1470.800 2110989.500
11450 108174.961 -1470.800 2111056.250
11470 102195.398 -1470.800 2111551.000
11490 96215.836 -1470.800 2112045.750
11510 90236.273 -1470.800 2112540.500
11530 84256.711 -1470.800 2113035.250
11550 79273.742 -1470.800 2113447.500
11551 78571.500 -1470.800 2113505.500
11552 77869.258 -1470.800 2113563.500
11590 76941.711 -1470.800 2113640.250
11599 76443.414 -1470.800 2113681.500
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
11600 75945.117 -1470.800 2113722.750
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Table of Contents
LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS ..................................................................................... 328
Stress Summary : Multiple ......................................................................................................................................... 329
Restraint Summary Extended : Multiple ................................................................................................... 334
Displacements : 2 (OPE) W+T1+P1 ................................................................................................................ 838
Displacements : 3 (SUS) W+P1....................................................................................................................... 860
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
1 (HYD) WW+HP
2 (OPE) W+T1+P1
3 (SUS) W+P1
4 (OPE) W+T1+P1+U1
5 (OPE) W+T1+P1-U1
6 (OPE) W+T1+P1+U2
7 (OPE) W+T1+P1-U2
8 (OCC) L8=L4-L3
9 (OCC) L9=L5-L3
10 (OCC) L10=L6-L3
11 (OCC) L11=L7-L3
12 (OCC) L12=L3+L8
13 (OCC) L13=L3+L9
14 (OCC) L14=L3+L10
15 (OCC) L15=L3+L11
16 (EXP) L16=L2-L3
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
LOAD CASE DEFINITION KEY
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Hoop Stress: 23238.2 @Node 30
Max Stress Intensity: 221072.7 @Node 7100
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Bending Stress: 129099.0 @Node 7100
Torsion Stress: 19249.3 @Node 7090
Hoop Stress: 0.0 @Node 30
Max Stress Intensity: 202970.0 @Node 7100
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Code Stress: 146646.4 Allowable Stress:
193048.8
Axial Stress: 21311.6 @Node 9190
Bending Stress: 129974.4 @Node 7100
Torsion Stress: 19447.3 @Node 7090
Hoop Stress: 23238.2 @Node 30
Max Stress Intensity: 241909.9 @Node 7100
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
10
ANC
2(OPE -715 -2761 -272 -357 1323 -2305 -0.000 -0.000 -0.000
)
4(OPE -237 -2762 -104 -355 871 -2306 -0.000 -0.000 -0.000
)
5(OPE -3694 -2761 -580 -358 2689 -2304 -0.000 -0.000 -0.000
)
6(OPE -827 -2761 652 -357 -1992 -2305 -0.000 -0.000 0.000
)
7(OPE -1088 -2761 -2008 -356 6405 -2305 -0.000 -0.000 -0.000
)
- - - - - - -
-
2762/L 2008/L 361/L 6405/ 2306/ 0.000/L 0.000/L 0.000/L
MAX 3694/L5
4 7 3 L7 L4 5 4 7
Rigid
30
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
70
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
1674/L4 5612/L 1600/L 3.014/L 0.000/L 4.029/L
MAX
3 7 5 3 6
Rigid
90
+Y
Rigid
130
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
150
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
170
Rigid
GUI
Rigid
190
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
+Y;
210
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
230
+Y
Rigid
+Y;
250
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
270
+Y
Rigid
290 +Y;
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
GUI
Rigid
310
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
330
Rigid
GUI
Rigid
350
+Y
-0 -6424 0 0 0 0 -0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
+Y;
370
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Rigid
390
+Y
Rigid
+Y;
410
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
430
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - -
-
2040/L4 6843/L 9.416/L 0.000/L 1.167/L
MAX 654/L7
5 4 5 7
Rigid
+Y;
450
Rigid
GUI
Rigid
470
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
490
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
2576/L6 6723/L 3240/L 12.453/ 0.000/L 2.071/L
MAX
4 6 L4 4 4
Rigid
510
+Y
Rigid
530
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
590
X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
10596/L 7219/L 4412/L 0.537/L 1.137/L 0.253/L
MAX
4 4 7 5 5 7
Bi-linear
X2; Bi-
linear
591
X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
592
X2; Bi-
linear
X2
-272 -627 226 0 0 0 0.156 -0.122 -0.015
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
610
X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
611
X2; Bi-
linear
Y2
612 Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
613
X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
614
X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
-
93/L4 222/L4 50/L4 0.337/L 0.006/L 0.050/L
MAX
4 4 4
Bi-linear
X2; Bi-
linear
615
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
616
X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
617
X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
618
X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
619
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
620
X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
630
X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
650
X2; Bi-
linear
X2
Rigid
690
+Y
493 -6800 -288 0 0 0 0.003 -0.000 -0.002
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
730
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
750
Rigid
GUI
Rigid
770
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
+Y;
790
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - - -
-
7034/L 1896/L 7.214/L 0.000/L 20.814/
MAX 6205/L5
7 4 7 7 L7
Rigid
830
+Y
Rigid
850
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
890
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
910
Rigid
GUI
Rigid
930
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
+Y;
950
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
970
+Y
Rigid
+Y;
990
Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
1010 +Y
Rigid
+Y;
1030
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
GUI
Rigid
1050 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
1070 Rigid
GUI
Rigid
1090 +Y
-0 -6533 -0 0 0 0 -0.000 -0.000 -0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
+Y;
1110 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Rigid
1130 +Y
Rigid
+Y;
1150 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
1170 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
-934/L5 6535/L 1924/L 1.782/L 0.000/L 6.936/L
MAX
6 6 7 6 7
Rigid
+Y;
1190 Rigid
GUI
Rigid
1210 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
1230 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
2733/L4 6531/L 2067/L 1.678/L 0.000/L 5.830/L
MAX
3 7 6 3 6
Rigid
1250 +Y
Rigid
+Y;
1270 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
1290 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6 6 5 6 6
Rigid
+Y;
1330 Rigid
GUI
Rigid
1350 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
1390 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 14151/L 25895/ 36011/ 1.192/L 1.240/L 3.042/L
6 L6 L6 6 7 6
Bi-linear
X2; Bi-
linear
1391 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
1392 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
1410 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
1411 X2; Bi-
linear
Y2
Bi-linear
1412 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
1413 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
1414 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- -
2296/L5 8371/L 4203/L 0.452/L 0.558/L 1.134/L
MAX
7 7 6 7 6
Bi-linear
X2; Bi-
linear
1430 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
1450 X2; Bi-
linear
X2
239 -435 563 0 0 0 -0.024 -0.204 -0.067
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Rigid
1490 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
+Y;
1510 Rigid
GUI
Rigid
1550 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Rigid
+Y;
1570 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
1590 +Y
Rigid
+Y;
1610 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
1670 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
1671 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
1672 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2
Bi-linear
X2; Bi-
linear
1690 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
1691 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 4140/L 0.449/L 0.160/L 1.344/L
6 6 6 6
Bi-linear
X2; Bi-
linear
1692 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
1693 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
1694 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
1695 X2; Bi-
linear
Y2
Bi-linear
1696 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
1710 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
1730 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
-
-
3515/L 4798/L 0.441/L 2.022/L 1.422/L
MAX 1434/L7
7 7 6 6 6
Rigid
+Y;
1790 Rigid
GUI
Rigid
1810 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
1850 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3 4 5 3 6
Rigid
1870 +Y
Rigid
+Y;
1890 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Rigid
1910 +Y
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1930 +Y;
Rigid
GUI
Rigid
1950 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Rigid
+Y;
1970 Rigid
GUI
Rigid
1990 +Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
2010 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
2030 +Y
Rigid
2050 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
2090 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
1257/L4 7403/L 2216/L 6.251/L 0.000/L 16.273/
MAX
3 5 4 3 L7
Rigid
+Y;
Rigid
GUI
2130
w/gap;
Rigid
GUI
Rigid
2150 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
2170 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
2190 +Y
Rigid
GUI;
2210 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Rigid
2230 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
-
6764/L 1769/L 3.352/L 0.000/L 3.835/L
MAX 1679/L5
3 7 4 3 6
Rigid
GUI;
2250 Rigid
+Y
Rigid
2270 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
GUI;
2290 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- -
2801/L4 7342/L 2914/L 4.847/L 0.000/L 5.466/L
MAX
4 6 6 4 6
Rigid
2310 +Y
Rigid
GUI
w/gap;
2330
Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
2340 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5 L4 5 6
Rigid
2370 +Y
Rigid
2390 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
2410 Rigid
+Y
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2530 GUI;
Rigid
+Y
Rigid
2550 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Rigid
GUI;
2570 Rigid
+Y
Rigid
2590 +Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
2670 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
2671 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
2672 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
2690 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
2691 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
2692 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
2710 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2
Bi-linear
X2; Bi-
linear
2730 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Rigid
GUI;
2790 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
2930 +Y
Rigid
GUI;
2950 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
2970 +Y
Rigid
2990 GUI;
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y
Rigid
3010 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
3030 +Y
Rigid
3050 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3060 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
1839/L4 6201/L 1837/L 15.217/ 0.000/L 20.399/
MAX
5 7 L4 5 L7
Rigid
3070 +Y
Rigid
3110 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI
w/gap;
3130
Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - - -
-
5927/L 4634/L 15.744/ 0.000/L 25.853/
MAX 2960/L7
4 7 L4 4 L7
Rigid
3150 +Y
Rigid
GUI;
3170 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
3190 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
3210 Rigid
+Y
Rigid
3230 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
3250 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3270 +Y
Rigid
GUI;
3310 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3320 +Y
Rigid
GUI;
3323
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
+Y
Rigid
3326 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
3329 Rigid
+Y
Rigid
3332 +Y
0 -6533 -0 0 0 0 0.000 -0.000 -0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
GUI;
3335 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Rigid
3338 +Y
Rigid
GUI;
3341 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3344 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
1582/L6 6534/L 1794/L 6.859/L 0.000/L 8.703/L
MAX
3 5 7 3 7
Rigid
GUI;
3350 Rigid
+Y
Rigid
3370 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
3390 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - - -
2776/L4 6534/L 2548/L 4.986/L 0.000/L 6.236/L
MAX
6 7 7 6 7
Rigid
3410 +Y
Rigid
GUI;
3430 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
3450 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3 6 4 3 7
Rigid
GUI;
3470 Rigid
+Y
Rigid
3490 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Rigid
GUI;
3510 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3530 +Y
Rigid
GUI;
3550 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
3570 +Y
Rigid
3590 +Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
3630 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
3631 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
3632 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
3650 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
3651 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
3652 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
3653 linear
Y2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2
Bi-linear
X2; Bi-
linear
3654 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
3655 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 18077/ 411/L4 0.732/L 0.838/L 0.884/L
L7 7 7 7
Bi-linear
X2; Bi-
linear
3656 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
3670 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
3690 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3730 +Y
Rigid
GUI;
3750 Rigid
+Y
-201 -5216 261 0 0 0 -0.001 -0.000 0.001
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
3770 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
3790 Rigid
+Y
Rigid
3830 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
3850 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
2587/L4 6553/L 2813/L 2.262/L 0.000/L 2.959/L
MAX
3 5 7 3 7
Rigid
3870 +Y
Rigid
GUI;
3890 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
3930 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 6549/L 1959/L 0.509/L 0.000/L 1.437/L
5 2 5 5 5
Rigid
GUI;
Rigid
3950 LIM;
Rigid
+Y
Rigid
3952 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
GUI;
3968 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
-
6534/L 2612/L 1.110/L 0.000/L 1.545/L
MAX 2570/L5
3 4 6 3 6
Rigid
3970 +Y
Rigid
GUI;
3990 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
4010 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
4030 Rigid
+Y
Rigid
4050 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI
w/gap;
4070
Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
4090 +Y
Bi-linear
X2; Bi-
linear
4130 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4131 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
10216/L 9525/L 13522/ 2.703/L 5.174/L 3.735/L
MAX
4 7 L7 4 7 7
Bi-linear
X2; Bi-
linear
4132 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4150 Y2; Bi-
linear
X2
-24 -3094 44 0 0 0 -0.177 -0.132 0.247
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
4151 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4152 Y2; Bi-
linear
X2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4153 X2; Bi-
linear
Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4154 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
4155 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- -
3024/L7 1712/L 4205/L 3.120/L 0.012/L 4.345/L
MAX
7 7 7 7 7
Bi-linear
X2; Bi-
linear
4156 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4157 Y2; Bi-
linear
X2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4158 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4159 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4160 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4170 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4190 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4191 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
4192 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2
Bi-linear
X2; Bi-
linear
4210 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
4230 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 17177/ 3698/L 3.839/L 0.174/L 5.346/L
L7 4 7 7 7
Bi-linear
X2; Bi-
linear
4250 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4270 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4290 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4310 Y2; Bi-
linear
X2
Bi-linear
4330 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4350 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4370 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
2061/L7 -0/L7 2884/L 1.760/L 0.000/L 2.473/L
MAX
7 7 7 7
Bi-linear
X2; Bi-
linear
4390 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4410 Y2; Bi-
linear
X2
-34 0 49 0 0 0 -0.030 0.000 0.042
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
4430 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
4450 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4451 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4452 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4470 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4471 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4472
Y2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2
Bi-linear
X2; Bi-
linear
4473 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4474 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7 5 7
Bi-linear
X2; Bi-
linear
4490 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4510 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
linear
4530 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
linear
4550 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
4570
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4590 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4610 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- -
-
-0/L5 2734/L 1.193/L 0.000/L 2.341/L
MAX 1393/L6
6 6 5 6
Bi-linear
X2; Bi-
linear
4630 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4650 Y2; Bi-
linear
X2
14 0 -27 0 0 0 0.012 0.000 -0.023
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
4670 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4690 Y2; Bi-
linear
X2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4691 X2; Bi-
linear
Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4692 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
4693 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
-
103/L7 31/L6 1069/L 2.351/L 0.001/L 4.654/L
MAX
7 6 6 6
Bi-linear
X2; Bi-
linear
4694 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4695 Y2; Bi-
linear
X2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4710 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4711 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4730 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4750 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4751 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4752 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
4753 linear
Y2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2
Bi-linear
X2; Bi-
linear
4754 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
4770 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 20473/L 18173/ 35481/ 1.969/L 3.409/L 3.419/L
7 L7 L4 6 6 6
Bi-linear
X2; Bi-
linear
4790 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4791 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4792 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4810 Y2; Bi-
linear
X2
Bi-linear
4811 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4812 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
4813 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
-
-444/L6 4782/L 767/L6 1.953/L 0.148/L 3.391/L
MAX
6 6 6 6
Bi-linear
X2; Bi-
linear
4814 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4815 Y2; Bi-
linear
X2
45 93 -83 0 0 0 0.099 0.001 -0.172
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
4816 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
4817 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4818 Y2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4819 Y2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4820 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
4830 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
4850
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2
Rigid -
Y; Rigid
GUI
4890 w/gap;
Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
Rigid -
4930
Y; Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
4950 +Y
Rigid
GUI;
Rigid -
4970
Y; Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Rigid
4990 +Y
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5010 GUI;
Rigid
+Y
Rigid
5030 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Rigid
GUI;
5070 Rigid
+Y
Rigid
5090 +Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
5110 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
5130 +Y
Rigid
GUI;
5150 Rigid
+Y
-0 -6541 1 0 0 0 -0.000 -0.000 0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Rigid
5170 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
5190 Rigid
+Y
Rigid
5210 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Rigid
GUI;
5220 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
5250 +Y
Rigid
GUI;
5270 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
5290 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - - -
-
6705/L 1896/L 1.755/L 0.000/L 4.955/L
MAX 1707/L5
4 7 7 4 7
Rigid
GUI;
5310 Rigid
+Y
Rigid
5330 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
5350 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 8198/L5 6431/L 5092/L 2.794/L 0.000/L 5.060/L
3 7 6 3 6
Rigid
5370 +Y
Rigid
GUI
w/gap;
5410
Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
5430 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
5450 Rigid
+Y
Rigid
5470 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
5490 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
5510 +Y
Rigid
GUI;
5530 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
5570 +Y
Rigid
GUI;
5590
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
+Y
Rigid
5610 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
5630 Rigid
+Y
Rigid -
Y; Rigid
5650 GUI;
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
+Y
Rigid
GUI;
5670 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Rigid
5690 +Y
Rigid
GUI;
5710 Rigid
+Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
5730 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Rigid
GUI;
5770 Rigid
+Y
Rigid
5790 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
5810 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
5830 +Y
Rigid
GUI;
5870 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Rigid
5890 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - - -
504/L4 6028/L 1802/L 3.091/L 0.000/L 13.553/
MAX
4 5 7 4 L7
Rigid
GUI;
5920 Rigid
+Y
Rigid
5930 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
GUI;
5950 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - - -
-
6770/L 3009/L 3.082/L 0.000/L 11.628/
MAX 3426/L5
5 5 7 5 L7
Rigid
5970 +Y
Rigid
GUI;
5990 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
6010 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
6030 Rigid
+Y
Rigid
6050 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
6070 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6170 +Y
Rigid
GUI;
6190 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6210 +Y
Rigid
GUI;
6220
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
+Y
Rigid
6250 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
6270 Rigid
+Y
Rigid
6290 +Y
-0 -6676 0 0 0 0 -0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
GUI;
6310 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Rigid
6330 +Y
Rigid
GUI;
6350 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6370 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
-714/L5 6640/L 1990/L 3.380/L 0.000/L 16.301/
MAX
4 7 6 4 L6
Rigid
GUI;
6390 Rigid
+Y
Rigid
6430 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
6450 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - - -
-
6268/L 3190/L 3.566/L 0.000/L 18.456/
MAX 7952/L5
3 7 6 3 L6
Rigid
6470 +Y
Rigid
GUI;
6510 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
6530 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4 6 7 4 L6
Rigid
GUI;
6550 Rigid
+Y
Rigid
GUI;
6590 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
6610 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI;
6640 Rigid
+Y
Rigid
6645 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
GUI;
6650 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6655 +Y
Rigid
GUI;
6660 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6665 +Y
Rigid
6670 +Y
-0 -6694 -0 0 0 0 -0.000 -0.000 -0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Rigid
GUI;
6690 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6700 +Y
Rigid
6730 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Rigid
6810 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
-
6905/L 1961/L 19.004/ 0.000/L 29.097/
MAX 1648/L7
3 4 L5 3 L6
Rigid
GUI;
6830 Rigid
+Y
Rigid
6850 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Rigid
GUI;
6870 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- -
-
6489/L 3047/L 4.976/L 0.000/L 29.739/
MAX 6413/L5
6 5 6 6 L6
Rigid
6890 +Y
Rigid
GUI;
6910 Rigid
+Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
6930 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
6950 +Y
Rigid
+Y;
6970 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
6990 +Y
Rigid
7010 +Y;
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
GUI
Rigid
7030 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
7040 +Y
Rigid
7070 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7100 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7101 X2; Bi-
linear
X2
Bi-linear
7102 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
7110 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7111 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - - - -
4690/L6 8909/L 3106/L 0.492/L 0.344/L 0.935/L
MAX
6 6 7 6 7
Bi-linear
X2; Bi-
linear
7112 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7113 X2; Bi-
linear
Y2
20 73 -27 0 0 0 -0.027 0.002 -0.043
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
7114 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
7115 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7116 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7117 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7118 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7119 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7120
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2
Bi-linear
X2; Bi-
linear
7130 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7140 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7 7 6 6 6
Rigid
7170 +Y
Rigid
7210 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
7250 +Y
Rigid
+Y;
7270
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
GUI
Rigid
7290 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
7330 +Y
Rigid
+Y;
7350 Rigid
GUI
1 -6569 5 0 0 0 0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Rigid
7370 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
7390 Rigid
GUI
Rigid
7410 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Rigid
+Y;
7430 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - - -
-
6534/L 2554/L 4.704/L 0.000/L 7.080/L
MAX 2656/L5
4 4 7 4 7
Rigid
7450 +Y
Rigid
+Y;
7470 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
7490 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 6533/L 1759/L 2.832/L 0.000/L 4.877/L
3 6 5 3 7
Rigid
+Y;
7510 Rigid
GUI
Rigid
7530 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
+Y;
7550 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6 7 6 6 6
Rigid
7570 +Y
Rigid
+Y;
7610 Rigid
GUI
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Rigid
7630 +Y
Rigid
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7650 +Y;
Rigid
GUI
Rigid
7670 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Rigid
+Y;
7690 Rigid
GUI
Rigid
7710 +Y
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Rigid
7750 +Y
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
linear
7780 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
7781
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
7782 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7790 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
1182/L6 20376/ 3754/L 5.385/L 0.794/L 3.939/L
MAX
L5 6 7 5 6
Bi-linear
X2; Bi-
linear
7791 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7792 X2; Bi-
linear
Y2
17 108 15 0 0 0 0.102 0.004 0.072
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
7793 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7794 X2; Bi-
linear
Y2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7795 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7796 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
7797 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
-
-765/L4 43893/ 4.345/L 1.879/L 3.050/L
MAX 480/L5
L6 6 6 6
Bi-linear
X2; Bi-
linear
7798 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
7810 X2; Bi-
linear
X2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7820 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7821 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7822 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
linear
7830 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7850 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7851 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
7852 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
linear
7853 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
7854 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 5.155/L 0.004/L 3.793/L
6 6 6
Bi-linear
X2; Bi-
linear
7870 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7871 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7872 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
7873 X2; Bi-
linear
Y2
Bi-linear
7890 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7910 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
7930 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - - -
-
-1/L6 3232/L 3.712/L 0.000/L 2.767/L
MAX 4332/L6
6 6 6 6
Bi-linear
X2; Bi-
linear
7950 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
7970 X2; Bi-
linear
Y2
42 0 31 0 0 0 0.036 0.000 0.027
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
7990 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
8010 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8030 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8050 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8051 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8052 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8053
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
linear
8054 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8070 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7 7 7 4 6
Bi-linear
X2; Bi-
linear
8071 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8072 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
linear
8090 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
linear
8110 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
8130
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8131 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8132 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
60308/L 0/L4 7256/L 2.473/L 0.000/L 0.484/L
MAX
6 7 6 4 6
Bi-linear
X2; Bi-
linear
8133 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8150 X2; Bi-
linear
Y2
-51 -0 189 0 0 0 0.014 -0.000 0.012
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
8151 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8170 X2; Bi-
linear
Y2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
8190 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8210 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
8230 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- -
- -
0/L4 2.338/L 0.000/L 0.667/L
MAX 2712/L6 838/L6
6 4 6
Bi-linear
X2; Bi-
linear
8250 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8270 X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8290 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8310 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8330 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8350 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8370 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8390 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
8410 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
linear
8411 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
8412 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 18484/ 1.146/L 0.000/L 0.470/L
L7 7 4 6
Bi-linear
X2; Bi-
linear
8413 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8414 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8430 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8450 X2; Bi-
linear
Y2
Bi-linear
8470 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8490 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8510 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
281/L6 -0/L3 3739/L 0.415/L 0.000/L 3.179/L
MAX
6 6 3 6
Bi-linear
X2; Bi-
linear
8530 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8550 X2; Bi-
linear
Y2
-1 -0 4 0 0 0 -0.000 -0.000 0.003
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
8570 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
8590 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8610 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8630 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8650 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8670 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8690
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
linear
8710 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8730 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6 3 6
Bi-linear
X2; Bi-
linear
8750 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8770 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
linear
8790 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
linear
8810 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
8830
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8831 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8832 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- -
3/L7 -0/L4 1/L7 0.077/L 0.000/L 0.710/L
MAX
7 4 7
Bi-linear
X2; Bi-
linear
8850 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8851 X2; Bi-
linear
Y2
0 -0 0 0 0 0 -0.000 -0.000 0.001
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
8852 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8853 X2; Bi-
linear
Y2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
8854 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8870 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
8871 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
Bi-linear
X2; Bi-
linear
8872 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8873 X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8890 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8891 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
8892 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
8910 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8930 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
8950 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
8970 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
linear
8990 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
9010 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 617/L6 1.093/L 0.000/L 0.527/L
6 3 6
Bi-linear
X2; Bi-
linear
9030 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9050 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9070 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9090 X2; Bi-
linear
Y2
Bi-linear
9110 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9111 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9112 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
-
-0/L4 3101/L 0.234/L 0.000/L 0.259/L
MAX 1431/L7
6 6 4 6
Bi-linear
X2; Bi-
linear
9113 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9114 X2; Bi-
linear
Y2
-0 -0 -0 0 0 0 -0.000 -0.000 0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
9130 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
9131 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9132 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9133 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9150 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9170 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9190
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
linear
9210 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9230 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7 4 7
Bi-linear
X2; Bi-
linear
9250 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9270 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
linear
9290 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
linear
9310 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
9330
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9350 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9370 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- -
-
-0/L3 920/L7 1.431/L 0.000/L 0.792/L
MAX 1673/L7
7 3 7
Bi-linear
X2; Bi-
linear
9390 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9410 X2; Bi-
linear
Y2
-0 -0 0 0 0 0 -0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
linear
9430 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9450 X2; Bi-
linear
Y2
Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
9470 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9480 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
linear
9481 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - - -
28526/L 0/L4 50541/ 3.679/L 0.000/L 0.648/L
MAX
5 L4 7 4 6
Bi-linear
X2; Bi-
linear
9482 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9490 X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9491 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9492 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9493 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9510 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9530 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9550 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
9570 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
linear
9590 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
linear
9610 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 1233/L 0.267/L 0.000/L 1.056/L
6 6 3 6
Bi-linear
X2; Bi-
linear
9630 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9650 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9670 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9690 X2; Bi-
linear
Y2
Bi-linear
9710 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9730 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9750 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
-
113/L7 -0/L2 448/L7 0.097/L 0.000/L 0.384/L
MAX
7 2 7
Bi-linear
X2; Bi-
linear
9770 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9790 X2; Bi-
linear
Y2
0 -0 0 0 0 0 0.000 -0.000 0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
linear
9810 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
linear
9830 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9850 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9870 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9890 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
linear
9910 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
linear
9930
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
linear
9950 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
linear
9970 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7 5 2 7
Bi-linear
X2; Bi-
linear
9990 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1001 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
1003 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
1005 linear
0 X2; Bi-
linear
Y2
Bi-linear
1007
X2; Bi-
0
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1009 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1011 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
-
1293/L5 -67/L5 5121/L 1.329/L 0.000/L 5.263/L
MAX
5 5 2 7
Bi-linear
X2; Bi-
1013 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1015 linear
0 X2; Bi-
linear
Y2
0 -0 0 0 0 0 0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
1017 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1017 linear
1 X2; Bi-
linear
Y2
1017 Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1017 linear
3 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
1019 linear
0 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
-
10857/L 14759/ 42415/ 0.856/L 2.516/L 3.358/L
MAX
5 L5 L7 7 5 5
Bi-linear
X2; Bi-
1021 linear
0 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
1021 linear
1 X2; Bi-
linear
X2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1021 linear
2 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1023 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1023 linear
1 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1023 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1023 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1023 linear
4 X2; Bi-
linear
Y2
Bi-linear
1023 X2; Bi-
5 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
1023 linear
6 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
1025 linear
0 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 19030/ 27865/ 0.213/L 0.988/L 1.025/L
L7 L5 7 4 5
Bi-linear
X2; Bi-
1025 linear
1 X2; Bi-
linear
X2
Bi-linear
X2; Bi-
1025 linear
2 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1025 linear
3 X2; Bi-
linear
X2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1027 linear
0 X2; Bi-
linear
Y2
1027 Bi-linear
1 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1027 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1029 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- - -
-
2176/L 25200/ 4.364/L 0.082/L 0.776/L
MAX 1823/L2
5 L5 2 5 7
Bi-linear
X2; Bi-
1029 linear
1 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1029 linear
2 X2; Bi-
linear
Y2
0 0 -0 0 0 0 0.000 0.000 -0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
1029 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
1031 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1033 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1035 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1037 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1039 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1041
linear
0
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
1043 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1043 linear
1 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2 2 5 2
Bi-linear
X2; Bi-
1043 linear
2 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1043 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
1043 linear
4 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
1045 linear
0 X2; Bi-
linear
Y2
Bi-linear
1045
X2; Bi-
1
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1045 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1045 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
- - -
- -
-7/L5 1.516/L 0.000/L 3.212/L
MAX 1516/L2 144/L6
2 7 2
Bi-linear
X2; Bi-
1047 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1049 linear
0 X2; Bi-
linear
Y2
0 -0 0 0 0 0 0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
1051 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1053 linear
0 X2; Bi-
linear
Y2
1055 Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
0 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1057 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
1059 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
- - -
-
-314/L5 -0/L3 0.278/L 0.000/L 0.607/L
MAX 714/L4
2 3 2
Bi-linear
X2; Bi-
1061 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1063 linear
0 X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1065 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1067 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1069 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1069 linear
1 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1069 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1071 linear
0 X2; Bi-
linear
Y2
Bi-linear
1071 X2; Bi-
1 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
1071 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
1071 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 2832/L 1.930/L 0.000/L 0.059/L
2 2 5 2
Bi-linear
X2; Bi-
1073 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1075 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1077 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1079 linear
0 X2; Bi-
linear
Y2
1081 Bi-linear
0 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1083 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1085 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- -
840/L2 -0/L3 -69/L7 0.719/L 0.000/L 0.059/L
MAX
4 3 2
Bi-linear
X2; Bi-
1087 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1089 linear
0 X2; Bi-
linear
Y2
0 -0 -0 0 0 0 0.000 -0.000 -0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
1091 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
1093 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1093 linear
1 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1093 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1093 linear
3 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1093 linear
4 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1093
linear
5
X2; Bi-
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Y2
Bi-linear
X2; Bi-
1093 linear
6 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1095 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2 2 2 5 2
Bi-linear
X2; Bi-
1097 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1099 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
2(OPE
)
Bi-linear
X2; Bi-
1101 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
6(OPE
)
Bi-linear
X2; Bi-
1103 linear
0 X2; Bi-
linear
Y2
Bi-linear
1105
X2; Bi-
0
linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1107 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1109 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
-
28/L4 -0/L3 298/L6 0.021/L 0.000/L 0.255/L
MAX
6 3 6
Bi-linear
X2; Bi-
1111 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1113 linear
0 X2; Bi-
linear
Y2
0 -0 0 0 0 0 0.000 -0.000 0.000
1(HY
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
D)
Bi-linear
X2; Bi-
1115 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1117 linear
0 X2; Bi-
linear
Y2
1119 Bi-linear
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
0 X2; Bi-
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1121 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
3(SUS
)
Bi-linear
X2; Bi-
1123 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
7(OPE
)
-
318/L4 -0/L2 3961/L 0.272/L 0.000/L 3.392/L
MAX
2 2 2 2
Bi-linear
X2; Bi-
1125 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1127 linear
0 X2; Bi-
linear
Y2
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1129 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1131 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1133 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1135 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1137 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1139 linear
0 X2; Bi-
linear
Y2
Bi-linear
1141 X2; Bi-
0 linear
X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
Y2
Bi-linear
X2; Bi-
1141 linear
1 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
4(OPE
)
Bi-linear
X2; Bi-
1141 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
MAX 33788/L 17427/ 1.968/L 0.000/L 8.154/L
2 L2 2 5 2
Bi-linear
X2; Bi-
1141 linear
3 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1143 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1143 linear
1 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1143 linear
2 X2; Bi-
linear
Y2
1143 Bi-linear
3 X2; Bi-
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
linear
X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1145 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
Bi-linear
X2; Bi-
1147 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
)
- -
-
-0/L3 1081/L 7.751/L 0.000/L 0.643/L
MAX 9022/L2
2 2 3 2
Bi-linear
X2; Bi-
1149 linear
0 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1151 linear
0 X2; Bi-
linear
Y2
-0 -0 0 0 0 0 -0.000 -0.000 0.000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
1(HY
D)
Bi-linear
X2; Bi-
1153 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
5(OPE
)
Bi-linear
X2; Bi-
1155 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1155 linear
1 X2; Bi-
linear
Y2
Bi-linear
X2; Bi-
1155 linear
2 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1159 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Nod Load MX MY MZ
FX N. FY N. FZ N. DX mm. DY mm. DZ mm.
e Case N.m. N.m. N.m.
Bi-linear
X2; Bi-
1160 linear
0 X2; Bi-
linear
Y2
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
611 0.168 -0.010 -0.027 -0.0031 0.0002 0.0023
612 0.167 0.005 -0.027 -0.0034 -0.0000 0.0009
613 0.165 0.005 -0.026 -0.0036 -0.0000 0.0004
614 0.163 0.002 -0.025 -0.0037 -0.0000 0.0004
615 0.162 0.000 -0.025 -0.0038 0.0000 0.0005
616 0.159 -0.002 -0.025 -0.0039 0.0001 0.0005
617 0.158 -0.004 -0.027 -0.0039 0.0001 0.0005
618 0.156 -0.005 -0.026 -0.0040 -0.0002 0.0008
619 0.156 0.004 -0.020 -0.0039 -0.0008 0.0018
620 0.147 0.034 -0.011 -0.0035 -0.0024 0.0039
630 0.115 0.068 -0.011 -0.0035 -0.0036 0.0037
649 0.101 0.076 -0.016 -0.0038 -0.0039 0.0033
650 0.074 0.091 -0.030 -0.0047 -0.0042 0.0031
668 0.032 0.114 -0.069 -0.0064 -0.0044 0.0038
669 0.000 0.145 -0.094 -0.0085 -0.0037 0.0047
670 -0.009 0.184 -0.082 -0.0107 -0.0029 0.0038
690 0.003 -0.000 -0.002 -0.0196 -0.0010 -0.0170
708 0.004 -0.778 0.007 -0.0260 0.0001 -0.0345
709 0.005 -1.339 0.001 -0.0302 0.0004 -0.0375
710 0.008 -1.267 -0.002 -0.0381 0.0000 -0.0339
730 0.000 -0.000 0.000 -0.0253 -0.0002 -0.0380
750 0.000 -0.000 0.000 -0.0112 0.0000 -0.0422
770 0.000 -0.000 0.000 -0.0156 -0.0000 -0.0399
790 0.000 -0.000 0.000 -0.0104 0.0000 -0.0410
808 -0.000 -0.155 0.000 -0.0295 0.0000 -0.0338
809 -0.000 -0.097 0.000 -0.0306 0.0000 -0.0334
810 -0.000 -0.062 0.000 -0.0309 0.0000 -0.0333
830 0.000 -0.000 0.000 -0.0281 0.0000 -0.0359
850 0.000 -0.000 0.000 -0.0260 -0.0000 -0.0406
868 0.000 -0.408 -0.000 -0.0245 0.0000 -0.0435
869 0.000 -0.412 -0.000 -0.0256 -0.0000 -0.0429
870 0.000 -0.369 -0.000 -0.0264 -0.0000 -0.0425
890 0.000 -0.000 0.000 -0.0161 -0.0000 -0.0447
910 0.000 -0.000 0.000 -0.0112 0.0000 -0.0434
930 0.000 -0.000 0.000 -0.0120 -0.0000 -0.0405
950 0.000 -0.000 0.000 -0.0109 0.0000 -0.0381
970 0.000 -0.000 0.000 -0.0103 -0.0000 -0.0356
990 0.000 -0.000 0.000 -0.0095 0.0000 -0.0332
1010 -0.000 -0.000 -0.000 -0.0088 -0.0000 -0.0307
1030 -0.000 -0.000 -0.000 -0.0081 0.0000 -0.0282
1050 -0.000 -0.000 -0.000 -0.0074 -0.0000 -0.0257
1070 -0.000 -0.000 -0.000 -0.0067 0.0000 -0.0232
1090 -0.000 -0.000 -0.000 -0.0060 -0.0000 -0.0207
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
1110 -0.000 -0.000 -0.000 -0.0053 0.0000 -0.0183
1130 -0.000 -0.000 -0.000 -0.0045 -0.0000 -0.0158
1150 -0.000 -0.000 -0.000 -0.0038 0.0000 -0.0133
1170 -0.000 -0.000 -0.000 -0.0031 -0.0000 -0.0108
1190 -0.000 -0.000 -0.000 -0.0024 0.0000 -0.0083
1210 -0.000 -0.000 -0.000 -0.0017 -0.0000 -0.0058
1230 -0.000 -0.000 -0.000 -0.0010 0.0000 -0.0033
1250 -0.000 -0.000 -0.000 -0.0002 -0.0000 -0.0009
1270 -0.000 -0.000 -0.000 0.0002 0.0000 0.0017
1290 -0.000 -0.000 -0.001 0.0022 -0.0001 0.0038
1308 -0.007 -0.366 0.000 0.0027 -0.0000 0.0050
1309 -0.007 -0.366 0.000 0.0018 -0.0000 0.0053
1310 -0.007 -0.366 0.000 0.0009 0.0000 0.0056
1330 -0.001 -0.000 -0.003 -0.0007 0.0002 0.0050
1350 -0.002 -0.000 -0.005 -0.0030 -0.0002 0.0037
1368 -0.014 0.065 -0.003 -0.0009 -0.0004 0.0021
1369 -0.014 0.079 -0.001 0.0002 -0.0005 0.0013
1370 -0.013 0.072 -0.011 0.0021 -0.0006 0.0002
1390 -0.020 0.052 -0.046 0.0027 -0.0005 -0.0003
1391 -0.033 0.024 -0.090 0.0034 -0.0004 -0.0008
1392 -0.044 -0.005 -0.118 0.0023 -0.0003 -0.0005
1410 -0.047 -0.017 -0.124 -0.0002 -0.0001 0.0004
1411 -0.049 -0.007 -0.126 -0.0003 -0.0000 0.0003
1412 -0.050 -0.021 -0.129 0.0021 0.0000 -0.0007
1413 -0.051 -0.078 -0.131 0.0043 -0.0000 -0.0017
1414 -0.046 -0.145 -0.118 0.0044 -0.0001 -0.0018
1430 -0.036 -0.182 -0.091 0.0021 -0.0002 -0.0010
1449 -0.032 -0.189 -0.083 0.0018 -0.0002 -0.0010
1450 -0.024 -0.204 -0.067 0.0019 -0.0002 -0.0011
1468 -0.007 -0.232 -0.035 0.0027 -0.0002 -0.0016
1469 0.009 -0.274 -0.004 0.0044 -0.0002 -0.0025
1470 0.014 -0.337 0.010 0.0032 -0.0002 -0.0023
1490 0.003 -0.000 0.007 -0.0019 -0.0001 -0.0014
1510 0.001 -0.000 0.003 0.0013 0.0001 -0.0041
1528 0.006 -0.428 -0.000 -0.0068 -0.0000 -0.0020
1529 0.006 -0.425 -0.000 -0.0072 -0.0000 -0.0018
1530 0.006 -0.422 -0.000 -0.0076 -0.0000 -0.0017
1550 0.000 -0.000 0.001 -0.0021 -0.0001 -0.0031
1570 -0.000 -0.000 -0.001 0.0006 0.0000 -0.0030
1590 -0.001 -0.000 -0.004 -0.0055 -0.0000 0.0001
1610 -0.003 -0.000 -0.009 0.0008 0.0001 -0.0012
1630 -0.002 -0.142 -0.013 0.0042 0.0001 -0.0021
1648 -0.001 -0.157 -0.017 -0.0032 0.0000 0.0007
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
1649 0.000 -0.117 -0.010 -0.0031 -0.0001 0.0008
1650 0.003 -0.094 0.003 -0.0014 -0.0001 0.0004
1670 0.005 -0.077 0.016 -0.0002 -0.0002 0.0002
1671 0.002 -0.080 0.007 0.0007 -0.0003 0.0002
1672 0.002 -0.078 0.005 -0.0007 -0.0002 0.0009
1690 0.003 -0.056 0.006 -0.0021 -0.0001 0.0015
1691 0.001 -0.018 0.004 -0.0015 -0.0000 0.0016
1692 -0.000 0.003 0.001 -0.0003 -0.0000 0.0015
1693 -0.003 0.004 -0.003 0.0013 -0.0000 0.0014
1694 -0.003 -0.019 -0.006 0.0027 0.0001 0.0013
1695 0.001 -0.066 -0.011 0.0037 0.0006 0.0012
1696 0.007 -0.099 -0.008 0.0020 0.0016 0.0020
1710 0.002 -0.101 -0.011 -0.0002 0.0022 0.0031
1729 -0.006 -0.098 -0.015 -0.0002 0.0023 0.0033
1730 -0.028 -0.092 -0.021 0.0006 0.0024 0.0040
1748 -0.068 -0.096 -0.008 0.0029 0.0024 0.0047
1749 -0.091 -0.134 0.029 0.0078 0.0020 0.0049
1750 -0.085 -0.225 0.049 0.0093 0.0017 0.0058
1770 -0.055 -0.328 0.036 0.0049 0.0015 0.0095
1790 0.003 -0.000 0.010 0.0026 0.0006 0.0163
1810 0.002 -0.000 0.006 0.0187 -0.0002 0.0221
1828 -0.002 -1.312 0.007 0.0131 0.0001 0.0319
1829 0.000 -0.936 0.006 -0.0007 0.0002 0.0389
1830 0.000 -0.237 0.002 -0.0053 0.0002 0.0275
1850 0.000 -0.000 0.000 -0.0081 0.0001 0.0169
1870 -0.000 -0.000 -0.000 -0.0132 -0.0000 -0.0005
1890 0.000 -0.000 -0.000 -0.0125 0.0000 0.0043
1910 -0.000 -0.000 -0.000 -0.0133 -0.0000 0.0032
1930 0.000 -0.000 -0.000 -0.0137 0.0000 0.0036
1950 -0.000 -0.000 -0.000 -0.0143 -0.0000 0.0037
1970 0.000 -0.000 -0.000 -0.0148 0.0000 0.0038
1990 0.000 -0.000 -0.000 -0.0153 -0.0000 0.0041
2010 0.000 -0.000 -0.000 -0.0159 0.0000 0.0035
2030 0.000 -0.000 -0.000 -0.0158 -0.0000 0.0062
2050 0.000 -0.000 0.000 -0.0183 0.0000 -0.0015
2068 0.000 -0.668 -0.000 -0.0153 -0.0000 0.0115
2069 0.000 -0.435 -0.000 -0.0136 -0.0000 0.0182
2070 -0.000 -0.136 -0.000 -0.0080 -0.0000 0.0137
2090 -0.000 -0.000 -0.000 -0.0010 -0.0000 0.0073
2110 -0.000 -0.173 -0.000 -0.0028 0.0000 0.0079
2130 -0.000 -0.000 -0.000 0.0026 0.0000 0.0028
2150 -0.000 -0.000 -0.000 0.0019 0.0000 0.0022
2170 -0.000 -0.000 -0.000 0.0014 -0.0000 0.0016
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
2190 -0.000 -0.000 -0.000 0.0009 0.0000 0.0008
2210 -0.000 -0.000 -0.000 -0.0001 -0.0000 0.0005
2230 -0.000 -0.000 -0.000 0.0009 0.0000 -0.0015
2250 -0.000 -0.000 -0.000 -0.0057 -0.0000 0.0031
2270 -0.000 -0.000 -0.000 0.0029 0.0000 -0.0053
2290 -0.000 -0.000 -0.000 0.0000 -0.0000 -0.0040
2310 -0.000 -0.000 -0.000 -0.0049 0.0000 -0.0009
2330 -0.000 -0.000 -0.000 -0.0032 -0.0000 -0.0036
2340 0.000 -0.000 -0.000 -0.0046 0.0000 -0.0036
2348 0.000 -0.236 -0.000 -0.0037 0.0000 -0.0049
2349 0.000 -0.118 -0.000 -0.0103 0.0000 0.0004
2350 0.000 0.018 -0.000 -0.0040 -0.0000 0.0067
2370 0.000 -0.000 -0.000 -0.0008 -0.0000 0.0094
2390 0.000 -0.000 -0.000 -0.0067 0.0000 0.0031
2410 0.000 -0.000 -0.000 -0.0030 -0.0000 0.0049
2530 0.001 -0.000 -0.001 -0.0034 0.0000 0.0033
2550 0.002 -0.000 -0.002 -0.0019 -0.0000 0.0034
2570 0.004 -0.000 -0.005 -0.0040 0.0000 0.0003
2590 0.009 -0.000 -0.011 0.0069 -0.0001 0.0084
2610 0.010 -0.735 -0.017 0.0154 -0.0001 0.0152
2630 0.009 -1.019 -0.028 -0.0107 -0.0001 -0.0076
2648 0.009 -0.618 -0.033 -0.0159 -0.0001 -0.0124
2649 -0.025 -0.382 0.008 -0.0118 -0.0001 -0.0090
2650 -0.073 -0.282 0.072 -0.0042 -0.0001 -0.0028
2670 -0.090 -0.255 0.101 -0.0010 -0.0002 -0.0003
2671 -0.089 -0.249 0.105 -0.0007 -0.0002 -0.0002
2672 -0.100 -0.220 0.120 -0.0035 -0.0001 -0.0026
2690 -0.109 -0.150 0.129 -0.0043 -0.0000 -0.0034
2691 -0.108 -0.101 0.127 -0.0036 -0.0000 -0.0029
2692 -0.096 -0.043 0.113 -0.0041 0.0000 -0.0033
2710 -0.061 0.010 0.072 -0.0045 0.0000 -0.0038
2729 -0.045 0.025 0.052 -0.0042 0.0000 -0.0035
2730 -0.012 0.056 0.013 -0.0033 -0.0000 -0.0028
2748 0.016 0.082 -0.022 -0.0007 -0.0000 -0.0006
2749 0.002 0.046 -0.005 0.0057 -0.0000 0.0048
2750 -0.017 -0.090 0.018 0.0094 0.0000 0.0078
2770 -0.015 -0.316 0.016 0.0059 0.0000 0.0048
2790 -0.008 -0.000 0.009 -0.0011 0.0000 -0.0013
2930 -0.004 -0.000 0.004 0.0007 -0.0000 -0.0002
2950 -0.002 -0.000 0.002 0.0005 0.0000 -0.0007
2970 -0.001 -0.000 0.001 0.0007 -0.0000 -0.0009
2990 -0.000 -0.000 0.000 0.0013 0.0000 -0.0008
3010 -0.000 -0.000 0.000 -0.0001 -0.0000 -0.0024
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
3030 -0.000 -0.000 0.000 0.0025 0.0000 -0.0005
3038 -0.000 -0.130 0.000 0.0081 0.0000 0.0041
3039 0.000 -0.216 0.000 0.0076 0.0000 0.0033
3040 0.000 -0.254 0.000 0.0059 -0.0000 -0.0003
3050 -0.000 -0.000 0.000 -0.0009 -0.0000 0.0017
3060 -0.000 -0.000 -0.000 -0.0139 0.0000 -0.0014
3070 -0.000 -0.000 0.000 -0.0249 -0.0000 0.0128
3088 -0.000 -1.157 -0.000 -0.0370 0.0000 -0.0022
3089 -0.000 -0.983 -0.000 -0.0389 0.0000 -0.0075
3090 -0.000 -0.657 -0.000 -0.0381 0.0000 -0.0073
3110 -0.000 -0.000 -0.000 -0.0246 0.0000 0.0035
3130 0.000 -0.000 -0.000 -0.0076 -0.0000 0.0166
3150 0.000 -0.000 -0.000 -0.0118 0.0000 0.0127
3170 0.000 -0.000 -0.000 -0.0104 -0.0000 0.0134
3190 0.000 -0.000 -0.000 -0.0104 0.0000 0.0128
3210 0.000 -0.000 -0.000 -0.0101 -0.0000 0.0126
3230 0.000 -0.000 -0.000 -0.0099 0.0000 0.0122
3250 0.000 -0.000 -0.000 -0.0096 -0.0000 0.0119
3270 0.000 -0.000 -0.000 -0.0094 0.0000 0.0116
3290 0.000 -0.283 -0.000 -0.0079 -0.0000 0.0126
3310 0.000 -0.000 -0.000 -0.0090 -0.0000 0.0113
3320 0.000 -0.000 -0.000 -0.0086 0.0000 0.0108
3323 0.000 -0.000 -0.000 -0.0082 -0.0000 0.0103
3326 0.000 -0.000 -0.000 -0.0078 0.0000 0.0098
3329 0.000 -0.000 -0.000 -0.0074 -0.0000 0.0093
3332 0.000 -0.000 -0.000 -0.0071 0.0000 0.0088
3335 0.000 -0.000 -0.000 -0.0067 -0.0000 0.0083
3338 0.000 -0.000 -0.000 -0.0063 0.0000 0.0079
3341 0.000 -0.000 -0.000 -0.0059 -0.0000 0.0074
3344 0.000 -0.000 -0.000 -0.0055 0.0000 0.0069
3350 0.000 -0.000 -0.000 -0.0051 -0.0000 0.0064
3370 0.000 -0.000 -0.000 -0.0047 0.0000 0.0059
3390 0.000 -0.000 -0.000 -0.0043 -0.0000 0.0054
3410 0.000 -0.000 -0.000 -0.0040 0.0000 0.0050
3430 0.000 -0.000 -0.000 -0.0036 -0.0000 0.0045
3450 0.000 -0.000 -0.000 -0.0032 0.0000 0.0040
3470 0.000 -0.000 -0.000 -0.0028 -0.0000 0.0035
3490 0.000 -0.000 -0.000 -0.0024 0.0000 0.0030
3510 0.000 -0.000 -0.000 -0.0020 -0.0000 0.0025
3530 0.000 -0.000 -0.000 -0.0016 0.0000 0.0021
3550 0.000 -0.000 -0.001 -0.0015 -0.0000 0.0013
3570 0.001 -0.000 -0.001 0.0003 0.0000 0.0020
3590 0.002 -0.000 -0.003 -0.0047 -0.0001 -0.0028
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
3608 0.000 -0.014 -0.007 0.0009 -0.0001 0.0014
3609 0.002 -0.029 -0.010 0.0003 -0.0002 0.0008
3610 0.006 -0.034 -0.014 0.0001 -0.0002 0.0005
3630 0.011 -0.035 -0.016 0.0000 -0.0002 0.0004
3631 0.017 -0.037 -0.021 0.0003 -0.0002 0.0006
3632 0.020 -0.040 -0.024 -0.0003 -0.0001 0.0001
3650 0.020 -0.029 -0.024 -0.0012 -0.0001 -0.0006
3651 0.021 -0.009 -0.026 -0.0010 -0.0000 -0.0004
3652 0.022 0.002 -0.027 -0.0005 -0.0000 0.0000
3653 0.023 0.003 -0.029 0.0000 -0.0000 0.0005
3654 0.024 -0.010 -0.030 0.0008 0.0000 0.0011
3655 0.026 -0.039 -0.031 0.0014 0.0001 0.0017
3656 0.024 -0.063 -0.028 0.0013 0.0002 0.0016
3670 0.017 -0.079 -0.021 0.0010 0.0003 0.0014
3689 0.012 -0.087 -0.016 0.0011 0.0003 0.0015
3690 0.002 -0.103 -0.005 0.0012 0.0004 0.0017
3708 -0.018 -0.130 0.011 -0.0006 0.0004 0.0005
3709 -0.016 -0.120 0.004 -0.0022 0.0003 -0.0006
3710 -0.011 -0.089 -0.000 -0.0035 0.0003 -0.0015
3730 -0.003 -0.000 0.003 0.0032 0.0001 0.0045
3750 -0.001 -0.000 0.001 -0.0082 -0.0000 -0.0032
3770 -0.001 -0.000 0.001 0.0041 0.0000 0.0075
3790 -0.000 -0.000 0.000 -0.0044 -0.0000 0.0022
3810 -0.000 -0.247 0.000 -0.0050 0.0000 0.0026
3830 -0.000 -0.000 0.000 -0.0027 0.0000 0.0044
3850 -0.000 -0.000 0.000 -0.0033 -0.0000 0.0041
3870 -0.000 -0.000 0.000 -0.0033 0.0000 0.0043
3890 -0.000 -0.000 0.000 -0.0034 -0.0000 0.0044
3910 -0.000 -0.182 0.000 -0.0093 0.0000 -0.0000
3930 -0.000 -0.000 0.000 -0.0031 0.0000 0.0043
3950 0.000 -0.000 -0.000 -0.0028 -0.0000 0.0039
3952 0.000 -0.000 -0.000 -0.0026 0.0000 0.0036
3968 0.000 -0.000 -0.000 -0.0023 -0.0000 0.0032
3970 0.000 -0.000 -0.000 -0.0020 -0.0000 0.0029
3990 0.000 -0.000 -0.000 -0.0018 0.0000 0.0025
4010 0.000 -0.000 -0.000 -0.0015 -0.0000 0.0022
4030 0.001 -0.000 -0.001 -0.0014 0.0000 0.0017
4050 0.002 -0.000 -0.002 -0.0005 -0.0000 0.0018
4070 0.003 -0.000 -0.005 -0.0028 0.0000 -0.0004
4080 0.007 -0.061 -0.008 -0.0048 -0.0000 -0.0022
4090 0.008 -0.000 -0.011 0.0073 -0.0000 0.0063
4108 0.012 -0.717 -0.027 -0.0134 -0.0001 -0.0091
4109 -0.014 -0.520 0.010 -0.0108 -0.0001 -0.0073
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
4110 -0.059 -0.424 0.074 -0.0051 -0.0001 -0.0033
4130 -0.102 -0.365 0.141 -0.0034 -0.0001 -0.0022
4131 -0.125 -0.334 0.174 -0.0043 -0.0001 -0.0028
4132 -0.161 -0.257 0.225 -0.0077 -0.0001 -0.0054
4150 -0.177 -0.132 0.247 -0.0069 -0.0000 -0.0048
4151 -0.176 -0.029 0.245 -0.0035 -0.0000 -0.0023
4152 -0.174 0.008 0.242 -0.0009 0.0000 -0.0005
4153 -0.172 0.011 0.239 0.0001 0.0000 0.0002
4154 -0.169 0.001 0.236 0.0002 0.0000 0.0003
4155 -0.153 0.000 0.213 -0.0000 -0.0000 0.0000
4156 -0.150 -0.002 0.210 0.0002 -0.0000 0.0002
4157 -0.149 -0.007 0.207 0.0003 -0.0000 0.0003
4158 -0.147 -0.013 0.205 0.0000 0.0000 0.0000
4159 -0.146 -0.003 0.203 -0.0015 0.0000 -0.0010
4160 -0.135 0.047 0.189 -0.0047 0.0000 -0.0034
4170 -0.101 0.108 0.141 -0.0047 0.0000 -0.0034
4190 -0.064 0.149 0.089 -0.0023 0.0000 -0.0017
4191 -0.053 0.158 0.074 0.0003 0.0000 0.0002
4192 -0.065 0.130 0.090 0.0034 0.0000 0.0025
4210 -0.073 0.068 0.101 0.0036 0.0000 0.0026
4230 -0.071 0.000 0.099 0.0021 0.0000 0.0015
4250 -0.065 -0.001 0.091 -0.0006 -0.0000 -0.0004
4270 -0.060 0.000 0.083 0.0001 0.0000 0.0001
4290 -0.054 -0.000 0.075 -0.0000 -0.0000 -0.0000
4310 -0.049 0.000 0.068 0.0000 0.0000 0.0000
4330 -0.045 -0.000 0.062 -0.0000 0.0000 0.0000
4350 -0.044 0.000 0.061 -0.0000 0.0000 0.0000
4370 -0.039 0.000 0.055 -0.0000 -0.0000 0.0000
4390 -0.034 -0.000 0.048 0.0000 -0.0000 -0.0000
4410 -0.030 0.000 0.042 0.0000 0.0000 -0.0000
4430 -0.025 -0.000 0.035 0.0000 -0.0000 -0.0000
4450 -0.023 0.000 0.030 0.0000 0.0001 -0.0000
4451 -0.023 0.000 0.030 0.0000 0.0001 -0.0000
4452 -0.022 0.000 0.030 0.0000 0.0001 -0.0000
4470 -0.022 0.000 0.030 0.0000 0.0002 -0.0000
4471 -0.018 -0.000 0.030 0.0000 0.0002 -0.0000
4472 -0.016 -0.000 0.030 0.0000 0.0001 -0.0000
4473 -0.015 -0.000 0.029 0.0000 0.0000 -0.0000
4474 -0.014 -0.000 0.028 0.0000 -0.0000 -0.0000
4490 -0.013 0.000 0.026 0.0000 -0.0000 -0.0000
4510 -0.010 -0.000 0.020 0.0000 0.0000 -0.0000
4530 -0.007 -0.000 0.014 0.0000 -0.0000 -0.0000
4550 -0.004 -0.000 0.007 0.0000 0.0000 -0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
4570 -0.001 -0.000 0.001 0.0000 -0.0000 -0.0000
4590 0.002 -0.000 -0.005 0.0000 0.0000 -0.0000
4610 0.006 -0.000 -0.011 0.0000 -0.0000 -0.0000
4630 0.009 -0.000 -0.017 0.0000 0.0000 -0.0000
4650 0.012 0.000 -0.023 0.0000 -0.0000 -0.0000
4670 0.015 -0.000 -0.030 0.0000 0.0000 -0.0000
4690 0.018 0.000 -0.036 0.0000 -0.0000 -0.0000
4691 0.019 0.000 -0.038 0.0000 0.0000 -0.0000
4692 0.020 0.000 -0.039 0.0000 0.0000 -0.0000
4693 0.022 -0.000 -0.039 0.0000 0.0001 -0.0000
4694 0.023 -0.000 -0.040 0.0000 0.0001 -0.0000
4695 0.023 -0.000 -0.040 0.0000 0.0000 -0.0000
4710 0.023 -0.000 -0.040 0.0000 0.0000 -0.0000
4711 0.024 -0.000 -0.041 0.0000 -0.0000 -0.0000
4730 0.024 0.000 -0.042 0.0000 -0.0000 -0.0000
4750 0.028 -0.002 -0.049 0.0001 0.0000 0.0000
4751 0.029 -0.002 -0.050 -0.0003 -0.0000 -0.0002
4752 0.029 0.012 -0.051 -0.0013 -0.0000 -0.0008
4753 0.030 0.048 -0.052 -0.0025 0.0000 -0.0015
4754 0.024 0.095 -0.042 -0.0023 0.0000 -0.0013
4770 0.019 0.110 -0.034 0.0011 0.0000 0.0006
4790 0.030 0.101 -0.052 0.0025 0.0000 0.0014
4791 0.052 0.082 -0.091 0.0040 0.0000 0.0023
4792 0.082 0.033 -0.142 0.0040 0.0000 0.0022
4810 0.090 -0.008 -0.157 0.0009 0.0000 0.0004
4811 0.092 -0.011 -0.159 -0.0001 0.0000 -0.0002
4812 0.093 -0.005 -0.161 -0.0002 -0.0000 -0.0003
4813 0.094 -0.001 -0.163 -0.0001 -0.0000 -0.0002
4814 0.095 0.000 -0.165 0.0001 -0.0000 -0.0002
4815 0.099 0.001 -0.173 -0.0000 -0.0000 -0.0004
4816 0.101 0.007 -0.175 0.0000 0.0000 -0.0004
4817 0.102 0.005 -0.177 0.0008 0.0000 0.0000
4818 0.104 -0.020 -0.179 0.0027 0.0000 0.0011
4819 0.106 -0.090 -0.181 0.0052 -0.0000 0.0025
4820 0.096 -0.177 -0.164 0.0060 -0.0003 0.0030
4830 0.071 -0.234 -0.124 0.0038 -0.0008 0.0020
4849 0.061 -0.246 -0.111 0.0035 -0.0010 0.0019
4850 0.036 -0.273 -0.083 0.0035 -0.0015 0.0021
4868 -0.026 -0.327 -0.031 0.0039 -0.0022 0.0027
4869 -0.072 -0.379 -0.007 0.0044 -0.0027 0.0032
4870 -0.112 -0.439 -0.013 0.0023 -0.0029 0.0019
4890 -0.242 -0.000 -0.094 -0.0018 -0.0003 -0.0010
4908 -0.237 -0.047 -0.093 0.0050 0.0009 0.0029
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
4909 -0.236 -0.055 -0.093 0.0055 0.0011 0.0031
4910 -0.235 -0.064 -0.092 0.0059 0.0014 0.0033
4930 -0.003 -0.000 0.006 -0.0006 0.0022 0.0021
4950 -0.001 -0.000 0.003 -0.0004 -0.0006 0.0042
4970 -0.001 -0.000 0.001 -0.0079 0.0001 0.0029
4990 -0.000 -0.000 0.001 0.0003 -0.0000 0.0081
5010 -0.000 -0.000 0.000 -0.0039 0.0000 0.0079
5030 -0.000 -0.000 0.000 -0.0068 0.0000 0.0083
5048 0.000 -0.005 0.000 -0.0054 0.0000 0.0097
5049 0.000 -0.004 0.000 -0.0056 -0.0000 0.0096
5050 0.000 -0.004 0.000 -0.0058 -0.0000 0.0095
5070 -0.000 -0.000 0.000 -0.0013 -0.0000 0.0132
5090 -0.000 -0.000 0.000 -0.0086 0.0000 0.0127
5110 -0.000 -0.000 0.000 -0.0085 -0.0000 0.0162
5130 -0.000 -0.000 0.000 -0.0104 0.0000 0.0187
5150 -0.000 -0.000 0.000 -0.0117 -0.0000 0.0214
5170 -0.000 -0.000 0.000 -0.0136 0.0000 0.0239
5190 -0.000 -0.000 0.000 -0.0137 -0.0000 0.0273
5210 -0.000 -0.000 0.000 -0.0203 0.0000 0.0272
5220 -0.000 -0.000 0.000 -0.0128 -0.0000 0.0342
5225 -0.000 -0.352 0.000 -0.0110 -0.0000 0.0363
5250 -0.000 -0.000 0.000 -0.0236 0.0000 0.0317
5270 -0.000 -0.000 0.000 -0.0161 -0.0000 0.0387
5290 -0.000 -0.000 0.000 -0.0227 -0.0000 0.0386
5310 -0.000 -0.000 0.000 -0.0229 0.0000 0.0420
5330 -0.000 -0.000 0.000 -0.0245 -0.0000 0.0446
5350 -0.000 -0.000 0.000 -0.0267 0.0000 0.0468
5370 -0.000 -0.000 0.000 -0.0251 -0.0000 0.0512
5388 -0.000 -0.532 -0.000 -0.0216 -0.0000 0.0548
5389 -0.000 -0.542 -0.000 -0.0231 -0.0000 0.0541
5390 -0.000 -0.531 -0.000 -0.0247 -0.0000 0.0534
5410 0.000 -0.000 -0.000 -0.0188 0.0000 0.0522
5430 -0.000 -0.000 -0.000 -0.0137 -0.0000 0.0475
5450 0.000 -0.000 -0.000 -0.0128 0.0000 0.0415
5470 -0.000 -0.000 -0.000 -0.0108 -0.0000 0.0358
5490 0.000 -0.000 -0.000 -0.0091 0.0000 0.0300
5510 -0.000 -0.000 -0.000 -0.0074 -0.0000 0.0242
5530 0.000 -0.000 -0.000 -0.0055 0.0000 0.0185
5548 0.000 -0.087 0.000 0.0020 0.0000 0.0198
5549 0.000 -0.089 0.000 0.0020 0.0000 0.0198
5550 0.000 -0.091 0.000 0.0021 0.0000 0.0198
5570 -0.000 -0.000 -0.000 -0.0038 -0.0000 0.0131
5590 -0.000 -0.000 0.000 -0.0020 0.0001 0.0077
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
5610 -0.000 -0.000 -0.000 -0.0015 -0.0003 0.0019
5630 -0.000 -0.000 0.000 0.0043 0.0010 -0.0024
5633 0.035 -0.284 0.010 0.0140 0.0017 -0.0011
5634 0.047 -0.388 -0.003 0.0115 0.0019 -0.0023
5635 0.049 -0.450 -0.035 0.0067 0.0019 -0.0042
5638 -0.009 -0.450 -0.052 -0.0030 0.0021 -0.0086
5639 -0.033 -0.388 -0.026 -0.0078 0.0019 -0.0107
5640 -0.034 -0.284 -0.010 -0.0102 0.0016 -0.0121
5650 0.000 -0.000 -0.000 -0.0004 0.0010 -0.0113
5670 0.000 -0.000 -0.000 0.0061 -0.0003 -0.0177
5690 -0.000 -0.000 -0.000 0.0071 0.0001 -0.0257
5710 0.000 -0.000 -0.000 0.0098 -0.0000 -0.0332
5730 -0.000 -0.000 -0.000 0.0112 0.0000 -0.0411
5750 0.000 -0.050 0.000 0.0178 0.0000 -0.0402
5770 -0.000 -0.000 0.000 0.0121 -0.0000 -0.0479
5790 -0.000 -0.000 0.000 0.0140 0.0000 -0.0545
5810 -0.000 -0.000 0.000 0.0153 -0.0000 -0.0613
5830 -0.000 -0.000 0.000 0.0185 0.0000 -0.0676
5848 0.000 -0.221 0.000 0.0098 -0.0000 -0.0754
5849 0.000 -0.219 0.000 0.0097 -0.0000 -0.0754
5850 0.000 -0.218 0.000 0.0097 -0.0000 -0.0754
5870 -0.000 -0.000 0.000 0.0150 -0.0000 -0.0755
5890 -0.000 -0.000 0.000 0.0263 0.0000 -0.0783
5895 0.000 -0.353 0.000 0.0293 0.0000 -0.0799
5920 -0.000 -0.000 0.000 0.0177 -0.0000 -0.0876
5930 -0.000 -0.000 0.000 0.0286 0.0000 -0.0905
5950 -0.000 -0.000 0.000 0.0253 -0.0000 -0.0983
5970 -0.000 -0.000 0.000 0.0264 0.0000 -0.1050
5990 -0.000 -0.000 0.000 0.0249 -0.0000 -0.1092
6010 -0.000 -0.000 0.000 0.0263 0.0000 -0.1127
6030 -0.000 -0.000 0.000 0.0270 -0.0000 -0.1163
6050 -0.000 -0.000 0.000 0.0279 0.0000 -0.1200
6070 -0.000 -0.000 0.000 0.0288 -0.0000 -0.1236
6170 -0.000 -0.000 0.000 0.0293 0.0000 -0.1273
6190 -0.000 -0.000 0.000 0.0317 -0.0000 -0.1306
6210 -0.000 -0.000 0.000 0.0266 0.0000 -0.1356
6220 -0.000 -0.000 0.000 0.0379 -0.0000 -0.1362
6225 -0.000 -0.385 0.000 0.0409 -0.0000 -0.1368
6250 -0.000 -0.000 0.000 0.0249 0.0000 -0.1431
6270 -0.000 -0.000 0.000 0.0317 0.0000 -0.1424
6290 -0.000 -0.000 0.000 0.0270 -0.0000 -0.1442
6310 -0.000 -0.000 0.000 0.0285 0.0000 -0.1448
6330 -0.000 -0.000 0.000 0.0283 -0.0000 -0.1456
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
6350 0.000 -0.000 -0.000 0.0284 0.0000 -0.1465
6370 0.000 -0.000 -0.000 0.0294 -0.0000 -0.1471
6390 0.000 -0.000 -0.000 0.0260 0.0000 -0.1487
6410 0.000 0.001 -0.000 0.0282 -0.0000 -0.1490
6430 0.000 -0.000 -0.000 0.0309 -0.0000 -0.1485
6450 0.000 -0.000 -0.000 0.0281 0.0000 -0.1497
6470 0.000 -0.000 -0.000 0.0282 -0.0000 -0.1504
6488 -0.000 -0.020 -0.000 0.0321 -0.0000 -0.1497
6489 -0.000 -0.029 -0.000 0.0325 -0.0000 -0.1497
6490 -0.000 -0.047 -0.000 0.0328 -0.0000 -0.1496
6510 0.000 -0.000 -0.000 0.0058 -0.0000 -0.1511
6530 0.000 -0.000 -0.000 0.0220 0.0000 -0.1486
6550 0.000 -0.000 -0.000 0.0121 -0.0000 -0.1483
6568 -0.000 -0.145 -0.000 0.0091 0.0000 -0.1479
6569 -0.000 -0.143 -0.000 0.0087 0.0000 -0.1479
6570 -0.000 -0.142 -0.000 0.0084 0.0000 -0.1480
6590 0.000 -0.000 -0.000 0.0110 0.0000 -0.1481
6610 0.000 -0.000 -0.000 0.0072 -0.0000 -0.1490
6628 -0.000 -0.163 -0.000 0.0060 -0.0000 -0.1494
6629 -0.000 -0.162 -0.000 0.0054 0.0000 -0.1495
6630 -0.000 -0.163 -0.000 0.0049 0.0000 -0.1495
6640 0.000 -0.000 -0.000 0.0031 0.0000 -0.1512
6645 0.000 -0.000 -0.000 0.0015 -0.0000 -0.1547
6650 0.000 -0.000 -0.000 0.0020 -0.0000 -0.1582
6655 0.000 -0.000 -0.000 0.0019 0.0000 -0.1616
6660 0.000 -0.000 -0.000 0.0021 -0.0000 -0.1651
6665 0.000 -0.000 -0.000 0.0017 0.0000 -0.1686
6670 -0.000 -0.000 -0.000 0.0033 -0.0000 -0.1720
6690 0.000 -0.000 -0.000 -0.0019 0.0000 -0.1756
6700 -0.000 -0.000 -0.000 0.0011 -0.0000 -0.1781
6708 -0.000 0.023 -0.000 -0.0023 -0.0000 -0.1793
6709 -0.000 0.025 -0.000 -0.0030 -0.0000 -0.1793
6710 -0.000 0.021 -0.000 -0.0037 -0.0000 -0.1793
6730 -0.000 -0.000 -0.000 -0.0088 0.0000 -0.1825
6808 -0.000 -0.000 -0.000 -0.0175 -0.0000 -0.1868
6809 -0.000 -0.000 -0.000 -0.0174 -0.0000 -0.1868
6810 -0.000 -0.000 -0.000 -0.0173 -0.0000 -0.1868
6828 -0.000 0.000 -0.000 -0.0210 -0.0000 -0.1910
6829 -0.000 0.001 -0.000 -0.0203 -0.0000 -0.1911
6830 -0.000 -0.000 -0.000 -0.0197 -0.0000 -0.1912
6848 -0.000 -0.001 -0.000 -0.0295 -0.0000 -0.1911
6849 -0.000 0.001 -0.000 -0.0288 -0.0000 -0.1911
6850 -0.000 -0.000 -0.000 -0.0281 -0.0000 -0.1912
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
6868 -0.000 -0.002 -0.000 -0.0365 0.0000 -0.1873
6869 -0.000 0.000 -0.000 -0.0359 0.0000 -0.1874
6870 -0.000 -0.000 -0.000 -0.0353 0.0000 -0.1875
6888 -0.000 -0.000 -0.000 -0.0413 -0.0000 -0.1803
6889 -0.000 0.001 -0.000 -0.0406 -0.0000 -0.1804
6890 -0.000 -0.000 -0.000 -0.0399 -0.0000 -0.1806
6908 -0.000 -0.001 -0.000 -0.0464 0.0000 -0.1693
6909 -0.000 0.000 -0.000 -0.0457 0.0000 -0.1694
6910 -0.000 -0.000 -0.000 -0.0450 0.0000 -0.1695
6928 -0.000 -0.001 -0.000 -0.0487 -0.0000 -0.1549
6929 -0.000 0.000 -0.000 -0.0480 -0.0000 -0.1550
6930 -0.000 -0.000 -0.000 -0.0473 -0.0000 -0.1551
6948 -0.000 -0.001 -0.000 -0.0494 0.0000 -0.1369
6949 -0.000 0.000 -0.000 -0.0487 0.0000 -0.1370
6950 -0.000 -0.000 -0.000 -0.0481 0.0000 -0.1371
6968 -0.000 -0.001 -0.000 -0.0454 -0.0000 -0.1166
6969 -0.000 -0.000 -0.000 -0.0451 -0.0000 -0.1166
6970 -0.000 -0.000 -0.000 -0.0447 -0.0000 -0.1167
6990 -0.000 -0.000 -0.000 -0.0381 0.0000 -0.0954
7010 -0.000 -0.000 -0.000 -0.0277 -0.0000 -0.0755
7030 -0.000 -0.000 -0.001 -0.0273 0.0002 -0.0517
7040 -0.001 -0.000 -0.001 -0.0079 -0.0005 -0.0414
7048 -0.017 -0.296 0.005 -0.0018 -0.0007 -0.0383
7049 -0.019 -0.328 0.005 -0.0026 -0.0006 -0.0374
7050 -0.020 -0.364 0.006 -0.0037 -0.0006 -0.0364
7070 -0.004 -0.000 -0.006 -0.0167 0.0012 -0.0137
7088 0.091 -0.069 -0.069 -0.0067 0.0024 -0.0091
7089 0.094 -0.045 -0.064 -0.0062 0.0030 -0.0068
7090 0.059 -0.036 -0.036 -0.0031 0.0037 -0.0057
7100 0.015 -0.040 -0.022 -0.0016 0.0036 -0.0048
7101 -0.021 -0.049 -0.024 -0.0006 0.0032 -0.0041
7102 -0.034 -0.057 -0.031 -0.0018 0.0023 -0.0029
7110 -0.027 -0.043 -0.035 -0.0033 0.0008 -0.0018
7111 -0.023 -0.015 -0.040 -0.0028 0.0002 -0.0019
7112 -0.024 -0.001 -0.042 -0.0020 -0.0001 -0.0021
7113 -0.027 0.002 -0.043 -0.0014 -0.0001 -0.0022
7114 -0.030 0.000 -0.046 -0.0011 -0.0000 -0.0019
7115 -0.037 0.001 -0.058 -0.0006 0.0000 -0.0006
7116 -0.039 0.004 -0.061 -0.0002 -0.0000 -0.0003
7117 -0.041 0.001 -0.063 0.0004 -0.0000 -0.0005
7118 -0.042 -0.018 -0.065 0.0017 0.0000 -0.0010
7119 -0.043 -0.063 -0.067 0.0030 0.0001 -0.0016
7120 -0.038 -0.105 -0.062 0.0027 0.0004 -0.0012
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
7130 -0.031 -0.126 -0.051 0.0015 0.0006 -0.0002
7139 -0.028 -0.132 -0.045 0.0015 0.0007 -0.0001
7140 -0.024 -0.145 -0.032 0.0022 0.0008 -0.0001
7148 -0.013 -0.177 0.004 0.0031 0.0009 -0.0001
7149 -0.006 -0.207 0.026 0.0039 0.0008 0.0000
7150 0.001 -0.240 0.030 0.0026 0.0007 0.0013
7170 0.025 -0.000 0.009 -0.0012 0.0003 0.0062
7210 0.005 -0.000 0.015 0.0096 -0.0010 0.0023
7228 -0.004 -0.091 0.020 0.0131 -0.0011 0.0004
7229 -0.008 -0.151 0.023 0.0146 -0.0008 -0.0004
7230 -0.010 -0.204 0.026 0.0150 -0.0005 -0.0001
7250 0.002 -0.000 0.002 0.0146 0.0004 0.0118
7270 0.002 -0.000 0.001 0.0235 -0.0001 0.0132
7290 0.004 -0.000 -0.002 0.0239 0.0000 0.0270
7308 0.004 0.039 -0.002 0.0256 0.0000 0.0254
7309 0.004 0.046 -0.002 0.0271 0.0000 0.0240
7310 0.004 0.012 -0.002 0.0276 -0.0000 0.0236
7330 0.000 -0.000 0.000 0.0206 -0.0000 0.0292
7350 0.000 -0.000 0.000 0.0201 0.0000 0.0307
7370 0.000 -0.000 0.000 0.0209 -0.0000 0.0313
7390 0.000 -0.000 0.000 0.0214 0.0000 0.0322
7410 0.000 -0.000 0.000 0.0219 -0.0000 0.0330
7430 0.000 -0.000 0.000 0.0225 0.0000 0.0338
7450 0.000 -0.000 0.000 0.0230 -0.0000 0.0346
7470 0.000 -0.000 0.000 0.0236 0.0000 0.0355
7490 -0.000 -0.000 -0.000 0.0241 -0.0000 0.0363
7510 -0.000 -0.000 -0.000 0.0247 -0.0000 0.0371
7530 -0.000 -0.000 -0.000 0.0251 0.0000 0.0380
7550 -0.000 -0.000 -0.000 0.0261 -0.0000 0.0385
7570 -0.000 -0.000 -0.000 0.0248 0.0000 0.0405
7589 -0.000 -0.007 -0.000 0.0284 0.0000 0.0382
7590 -0.000 -0.022 -0.000 0.0297 0.0000 0.0374
7610 -0.000 -0.000 -0.000 0.0152 0.0000 0.0364
7630 -0.000 -0.000 -0.000 0.0147 -0.0000 0.0284
7650 -0.000 -0.000 -0.000 0.0108 0.0000 0.0220
7670 -0.000 -0.000 -0.000 0.0072 -0.0000 0.0154
7690 -0.000 -0.000 -0.000 0.0056 0.0001 0.0079
7710 -0.001 -0.000 -0.000 -0.0044 -0.0003 0.0046
7728 -0.004 0.034 0.001 -0.0002 -0.0003 0.0015
7729 -0.006 0.032 0.002 0.0013 -0.0002 0.0002
7730 -0.006 0.023 0.002 0.0016 -0.0000 -0.0003
7750 -0.003 -0.000 -0.002 0.0023 0.0001 -0.0020
7768 -0.005 -0.189 -0.002 0.0024 -0.0001 -0.0026
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
7769 -0.009 -0.211 -0.004 0.0001 -0.0002 0.0005
7770 0.006 -0.197 0.005 -0.0010 -0.0002 0.0018
7780 0.023 -0.189 0.016 -0.0013 -0.0002 0.0021
7781 0.044 -0.178 0.030 -0.0017 -0.0002 0.0026
7782 0.086 -0.132 0.060 -0.0029 -0.0001 0.0043
7790 0.104 -0.056 0.073 -0.0022 -0.0000 0.0033
7791 0.103 -0.010 0.073 -0.0009 -0.0000 0.0015
7792 0.102 0.004 0.072 -0.0001 0.0000 0.0003
7793 0.101 0.005 0.071 0.0001 0.0000 -0.0000
7794 0.098 -0.000 0.069 0.0001 -0.0000 -0.0001
7795 0.097 -0.003 0.068 0.0001 -0.0000 -0.0001
7796 0.096 -0.005 0.067 0.0000 0.0000 0.0001
7797 0.095 0.001 0.067 -0.0005 0.0000 0.0008
7798 0.088 0.025 0.062 -0.0016 0.0000 0.0023
7810 0.066 0.053 0.047 -0.0015 0.0000 0.0021
7820 0.043 0.071 0.030 -0.0007 0.0000 0.0010
7821 0.038 0.074 0.027 0.0002 0.0000 -0.0003
7822 0.047 0.059 0.033 0.0012 0.0000 -0.0017
7830 0.052 0.030 0.037 0.0011 0.0000 -0.0015
7850 0.052 0.004 0.036 0.0004 0.0000 -0.0006
7851 0.051 -0.002 0.036 0.0001 -0.0000 -0.0001
7852 0.051 -0.002 0.036 -0.0000 -0.0000 0.0001
7853 0.050 -0.001 0.036 -0.0000 -0.0000 0.0001
7854 0.050 -0.001 0.036 -0.0000 -0.0000 0.0001
7870 0.050 -0.001 0.036 -0.0000 -0.0000 0.0001
7871 0.049 -0.000 0.036 -0.0000 -0.0000 0.0000
7872 0.048 0.000 0.036 0.0000 -0.0000 0.0000
7873 0.048 0.000 0.036 0.0000 -0.0000 0.0000
7890 0.047 0.000 0.035 0.0000 0.0000 0.0000
7910 0.044 -0.000 0.033 0.0000 -0.0000 0.0000
7930 0.041 0.000 0.031 0.0000 0.0000 0.0000
7950 0.039 -0.000 0.029 0.0000 -0.0000 0.0000
7970 0.036 0.000 0.027 0.0000 0.0000 0.0000
7990 0.034 -0.000 0.025 0.0000 -0.0000 0.0000
8010 0.032 -0.000 0.024 0.0000 0.0000 0.0000
8030 0.030 0.000 0.022 0.0000 -0.0000 0.0000
8050 0.028 -0.000 0.021 0.0000 0.0000 0.0000
8051 0.028 -0.000 0.020 0.0000 0.0000 0.0000
8052 0.028 -0.000 0.019 0.0000 -0.0000 0.0000
8053 0.026 0.000 0.021 0.0000 -0.0003 0.0000
8054 0.022 0.000 0.024 0.0000 -0.0007 0.0000
8070 0.015 0.000 0.026 0.0000 -0.0007 0.0000
8071 0.006 -0.000 0.027 0.0000 -0.0004 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
8072 0.003 -0.000 0.027 0.0000 -0.0001 0.0000
8090 0.003 -0.000 0.027 0.0000 0.0000 0.0000
8110 0.003 0.000 0.025 0.0000 0.0000 0.0000
8130 0.003 0.000 0.024 0.0000 -0.0000 0.0000
8131 0.002 0.000 0.024 0.0000 -0.0000 0.0000
8132 0.003 -0.000 0.023 0.0000 0.0002 0.0000
8133 0.009 -0.000 0.020 0.0000 0.0006 0.0000
8150 0.014 -0.000 0.012 0.0000 0.0005 0.0000
8151 0.015 0.000 0.006 0.0000 0.0002 0.0000
8170 0.016 0.000 0.004 0.0000 0.0001 0.0000
8190 0.015 -0.000 0.004 0.0000 -0.0000 0.0000
8210 0.014 -0.000 0.004 0.0000 0.0000 0.0000
8230 0.013 -0.000 0.004 0.0000 -0.0000 0.0000
8250 0.012 -0.000 0.003 0.0000 0.0000 0.0000
8270 0.011 -0.000 0.003 0.0000 -0.0000 0.0000
8290 0.011 -0.000 0.003 0.0000 0.0000 0.0000
8310 0.010 -0.000 0.003 0.0000 -0.0000 0.0000
8330 0.009 -0.000 0.003 0.0000 0.0000 0.0000
8350 0.009 -0.000 0.003 0.0000 -0.0000 0.0000
8370 0.008 -0.000 0.002 0.0000 0.0000 0.0000
8390 0.008 -0.000 0.002 0.0000 -0.0000 0.0000
8410 0.008 -0.000 0.002 0.0000 0.0000 0.0000
8411 0.008 -0.000 0.002 0.0000 0.0000 0.0000
8412 0.008 -0.000 0.002 0.0000 0.0000 0.0000
8413 0.008 0.000 0.002 0.0000 -0.0001 0.0000
8414 0.006 0.000 0.004 0.0000 -0.0002 0.0000
8430 0.001 -0.000 0.005 0.0000 -0.0002 0.0000
8450 -0.001 -0.000 0.005 0.0000 -0.0001 0.0000
8470 -0.001 -0.000 0.005 -0.0000 0.0000 0.0000
8490 -0.001 -0.000 0.004 -0.0000 -0.0000 0.0000
8510 -0.001 -0.000 0.004 -0.0000 0.0000 0.0000
8530 -0.000 -0.000 0.004 -0.0000 -0.0000 0.0000
8550 -0.000 -0.000 0.003 -0.0000 0.0000 0.0000
8570 -0.000 -0.000 0.003 -0.0000 -0.0000 0.0000
8590 -0.000 -0.000 0.003 -0.0000 0.0000 0.0000
8610 -0.000 -0.000 0.003 -0.0000 -0.0000 0.0000
8630 -0.000 -0.000 0.003 -0.0000 0.0000 0.0000
8650 -0.000 -0.000 0.002 -0.0000 -0.0000 0.0000
8670 -0.000 -0.000 0.002 -0.0000 0.0000 0.0000
8690 -0.000 -0.000 0.002 -0.0000 0.0000 0.0000
8710 -0.000 -0.000 0.002 -0.0000 -0.0000 0.0000
8730 -0.000 -0.000 0.002 -0.0000 0.0000 0.0000
8750 -0.000 -0.000 0.002 -0.0000 -0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
8770 -0.000 -0.000 0.002 -0.0000 0.0000 0.0000
8790 -0.000 -0.000 0.002 -0.0000 -0.0000 0.0000
8810 -0.000 -0.000 0.001 0.0000 0.0000 0.0000
8830 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8831 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8832 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8850 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8851 -0.000 -0.000 0.001 0.0000 -0.0000 0.0000
8852 -0.000 -0.000 0.001 0.0000 -0.0000 0.0000
8853 -0.000 -0.000 0.001 0.0000 -0.0000 0.0000
8854 -0.000 -0.000 0.001 -0.0000 0.0000 0.0000
8870 -0.000 -0.000 0.001 -0.0000 0.0000 0.0000
8871 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8872 -0.000 -0.000 0.001 -0.0000 -0.0000 0.0000
8873 -0.000 -0.000 0.001 -0.0000 -0.0000 -0.0000
8890 -0.001 -0.000 0.001 -0.0000 -0.0000 -0.0000
8891 -0.001 -0.000 0.001 -0.0000 -0.0000 -0.0000
8892 -0.001 -0.000 0.000 0.0000 -0.0000 0.0000
8910 -0.001 -0.000 0.000 0.0000 -0.0000 0.0000
8930 -0.001 -0.000 0.000 -0.0000 0.0000 -0.0000
8950 -0.001 -0.000 0.000 -0.0000 -0.0000 0.0000
8970 -0.001 -0.000 0.000 -0.0000 0.0000 0.0000
8990 -0.001 -0.000 0.000 -0.0000 -0.0000 0.0000
9010 -0.001 -0.000 0.000 -0.0000 0.0000 0.0000
9030 -0.001 -0.000 0.000 -0.0000 -0.0000 0.0000
9050 -0.001 -0.000 0.000 -0.0000 0.0000 0.0000
9070 -0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
9090 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9110 -0.000 -0.000 0.000 -0.0000 -0.0000 -0.0000
9111 -0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
9112 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9113 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9114 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9130 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9131 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9132 -0.000 -0.000 0.000 -0.0000 0.0000 -0.0000
9133 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9150 -0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9170 -0.000 -0.000 0.000 -0.0000 -0.0000 -0.0000
9190 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9210 -0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
9230 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9250 -0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
9270 -0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9290 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9310 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9330 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9350 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9370 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9390 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9410 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9430 -0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9450 -0.000 -0.000 0.000 -0.0000 0.0000 -0.0000
9470 -0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9480 -0.000 -0.000 0.000 -0.0000 0.0000 -0.0000
9481 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9482 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9490 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
9491 0.000 -0.000 0.000 -0.0000 0.0000 -0.0000
9492 0.000 -0.000 0.000 -0.0000 0.0000 -0.0000
9493 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9510 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
9530 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9550 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9570 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
9590 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9610 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9630 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9650 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9670 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9690 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9710 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
9730 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9750 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9770 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9790 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9810 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9830 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9850 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9870 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9890 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9910 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9930 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9950 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9970 0.000 -0.000 0.000 0.0000 0.0000 0.0000
9990 0.000 -0.000 0.000 0.0000 0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
10010 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10030 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10050 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10070 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10090 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
10110 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10130 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
10150 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
10170 0.000 0.000 0.000 -0.0000 0.0000 0.0000
10171 0.000 0.000 0.000 -0.0000 -0.0000 0.0000
10172 0.000 0.000 0.000 0.0000 -0.0000 -0.0000
10173 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
10190 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
10210 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
10211 0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
10212 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
10230 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
10231 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
10232 0.000 0.000 0.000 -0.0000 -0.0000 0.0000
10233 0.000 0.000 0.000 0.0000 -0.0000 0.0000
10234 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10235 0.000 0.000 0.000 -0.0000 0.0000 0.0000
10236 0.000 0.000 0.000 -0.0000 0.0000 0.0000
10250 0.000 0.000 0.000 -0.0000 0.0000 0.0000
10251 0.000 0.000 0.000 -0.0000 0.0000 0.0000
10252 0.000 0.000 0.000 0.0000 0.0000 0.0000
10253 0.000 0.000 0.000 0.0000 0.0000 0.0000
10270 0.000 0.000 0.000 0.0000 0.0000 0.0000
10271 0.000 0.000 0.000 0.0000 0.0000 0.0000
10272 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10290 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10291 0.000 0.000 0.000 0.0000 0.0000 0.0000
10292 0.000 0.000 -0.000 0.0000 0.0000 0.0000
10293 0.000 0.000 0.000 0.0000 -0.0000 0.0000
10310 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10330 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10350 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10370 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10390 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10410 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10430 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10431 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10432 0.000 -0.000 -0.000 0.0000 -0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
10433 0.000 0.000 0.000 0.0000 -0.0000 0.0000
10434 0.000 0.000 0.000 0.0000 -0.0000 0.0000
10450 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10451 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10452 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10453 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10470 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10490 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10510 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10530 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10550 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10570 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10590 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10610 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10630 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10650 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10670 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
10690 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10691 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10692 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10710 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10711 0.000 -0.000 0.000 0.0000 0.0000 0.0000
10712 0.000 -0.000 -0.000 0.0000 0.0000 0.0000
10713 0.000 -0.000 -0.000 0.0000 -0.0000 -0.0000
10730 0.000 -0.000 -0.000 0.0000 -0.0000 -0.0000
10750 0.000 -0.000 -0.000 0.0000 0.0000 0.0000
10770 0.000 -0.000 -0.000 0.0000 -0.0000 -0.0000
10790 0.000 -0.000 -0.000 0.0000 0.0000 -0.0000
10810 0.000 -0.000 -0.000 0.0000 -0.0000 -0.0000
10830 0.000 -0.000 -0.000 0.0000 0.0000 -0.0000
10850 0.000 -0.000 -0.000 0.0000 0.0000 -0.0000
10870 0.000 -0.000 -0.000 0.0000 -0.0000 0.0000
10890 0.000 -0.000 -0.000 0.0000 0.0000 -0.0000
10910 0.000 -0.000 -0.000 0.0000 -0.0000 0.0000
10930 0.000 -0.000 -0.000 0.0000 0.0000 0.0000
10931 0.000 -0.000 -0.000 0.0000 0.0000 0.0000
10932 0.000 -0.000 -0.000 0.0000 0.0000 -0.0000
10933 0.000 -0.000 -0.000 0.0000 -0.0000 -0.0000
10934 0.000 -0.000 -0.000 0.0000 -0.0000 0.0000
10935 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10936 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10950 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
10970 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0
Node DX mm. DY mm. DZ mm. RX deg. RY deg. RZ deg.
10990 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11010 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
11030 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11050 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11070 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11090 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11110 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11130 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11150 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11170 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11190 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11210 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11230 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11250 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11270 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11290 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11310 0.000 -0.000 0.000 0.0000 0.0000 0.0000
11330 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11350 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
11370 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11390 0.000 -0.000 0.000 -0.0000 0.0000 0.0000
11410 0.000 -0.000 0.000 -0.0000 -0.0000 0.0000
11411 0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11412 -0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11413 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11430 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11431 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11432 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11433 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11450 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11470 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11490 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11510 -0.000 -0.000 0.000 0.0000 -0.0000 0.0000
11530 -0.000 -0.000 0.000 0.0000 0.0000 -0.0000
11550 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11551 -0.000 -0.000 0.000 0.0000 -0.0000 -0.0000
11552 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11590 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11599 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
11600 -0.000 -0.000 0.000 0.0000 0.0000 0.0000
PROJECT- Pipeline project from Jetty end to pig receiving station
STRESS ANALYSIS REPORT & FLEXIBILITY ANALYSIS REPORT & ITS PROCEDURE
Doc No :6PRFT-AA-F1-PP-STR-R-001 Rev :0