EPC PROGRAM ACADEMY, BARODA
Larsen & Toubro Limited
Five Days Programme on
Piping Flexibility Analysis
PRDH Auditorium, R&D Bidg.
Powai
EPC Centre, B P Estate, Chhani, BARODA, TEL: 776206, 774409 FAX:776211, E-MAIL: rajesh-patelaene.tindia.com |
LINTENSIVE COURSE ON PIPING ENGINEERING
Conducted by
MATHIMITATION TECHNOLOGIES PRIVATE LIMITED
MUMBAI
For
LARSEN & TOUBRO LIMITED
MUMBAI
PROGRAMME
MODULE Il ~ FLEXIBILITY ANALYSIS
MONDAY, 22.07.2002
‘0930 - 1100 Stresses ASM
1115 — 1245 Suresses ‘ASM
1330-1515 Pipe Supports "TING
1515 ~ 1645 Pipe (contd) NG ]
1515 — 1645,
WEDNESDAY, 24.07.2002
(0930 - 1100,
TUESDAY, 23.07.2002
[0930 — 1100. “Thermal Suess is TING.
1115 ~ 1245, Thermal Stress Analysis TNG
13301515 “Thermal Suess Analysis, ING. =
[Thermal Suess Analysis | TING
‘Siw Demo ‘ASP
ALS ~ 1245, Sfw Demo. ASP”
1330-1515. Joints TNG.
Se 1645 ‘Expansion Joints “ENG:
1515 — 1645
FRIDAY, 26.07.2002
(0930 — 1100 Problem Solving cB
11S 1245, Problem Solvi GB
1330— 1515 (Case Studies ‘ASP/ASM.
1515 — 1645 (Case Studies [ASP/ASM.
Coffee — 11.00 - 11.15
‘Lunch - 12.45 - 13.30 Tea - 14.15 -14.30
ASM: ASMOHARIR ASP: ASPATIL GB: GBALASUBRAHMANYAM TNO : TNGOPINATH
i
iPIPE UNDER STRESS
INTRODUCTION
Pipes are the most delicate components in any
process plant. They are also the most busy
entities. They are subjected to almost all kinds
of loads, intentional or unintentional. It is very
important to take note of all potential loads
that a piping system would encounter during
operation as well as during other stages in the
life cycle of a process plant. Ignoring any such
loud while designing, ering, hyo esting,
start-up, shutdown, ‘operation,
Inantanoe eon ead nadequas design
and engineering of a piping system. The
‘rystem may fail on the first occurrence of this
overlooked load. (Eailure of a piping system
do 99 right things and 1 wrong thing while
designing 2 piping system. The end result
‘would be disastrous. One must score a perfect
100 in piping system design.
“The idea of this paper is to discuss all possible
‘guidelines to minimize the effect of such loads
and keep the resultant stresses under limits
specified by the codes are then given. Final
design and engineering of a piping system
may have to go through rigorous calculations,
either manual or on computer, of the collective
effect of all such loads and sound analytical
skills to take engineering decisions to mitigate
this effeet.
stress. analysis and safe design normally
‘require appreciation of several related
concepts. An approximate list of the steps that
‘would be involved is as follows.
PIPE UNDER STRESS
PROF. A. S. MOHARIR
1, Identify potential loads that would come
‘on to the pipe or piping system during its
entire life
2. Relate each one of these loads to the
stresses and strains that would be
developed in the crystalsgrains of the
Material of Construction (MoC) of the
3. Decide the worst three-dimensional stress
state that the MoC can withstand without
failure
4, Get the cumulative effect of all the
potential loads on the 3-D stress scenario
in the piping system under consideration.
5. Alter piping system design to ensure thet
the stress patter is within failure limits.
‘The goal of quantification and analysis of pipe
stresses is to provide safe design through the
above steps. Of course, there could be several
designs, which could be safe. A piping
‘would still have a lof of scope to
choose from such alternatives the one which is
most economical, or most suitable etc. Good
viping atm denen ie alway a rise of
‘base in the basics and a lot
of ingemay Tas pape aepes to create the
necessary base.
CLASSIFICATION OF LOADS AND
FAILURE MODES
Cranes deo of ng o pant os
one criteria for design. (Ur steady
tovlcaton of load (ea, prem) it entres
‘against failure of the system as perceived by
‘one of the failure theories) If pipe designed
for a certain pressure experiences a much
higher pressure, the pipe would rupture even if
such Toad (rea it splid only one, The
failure ov rupture is sudden and
Such a failure is called catastrophic failure. It
takes place only when the load exceeds far
Ueygpd the lod fo which design was arid
‘the years, it has been realized that