CERN Accelerating science

CERN Document Server 2,042 записей найдено  1 - 10следующийконец  перейти к записи: Поиск длился 0.06 секунд. 
1.
Status of the Upgrade of the CERN PS Booster / Hanke, K (CERN) ; Aberle, O (CERN) ; Angoletta, M (CERN) ; Bartmann, W (CERN) ; Bartolome, S (CERN) ; Benedetto, E (CERN) ; Bertone, C (CERN) ; Blas, A (CERN) ; Bonnal, P (CERN) ; Borburgh, J (CERN) et al.
The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. [...]
CERN-ATS-2013-063.- Geneva : CERN, 2013 - 3 p. Fulltext: PDF;
In : 4th International Particle Accelerator Conference, Shanghai, China, 12 - 17 May 2013, pp.3939
2.
Study of a Rapid Cycling Synchrotron to replace the CERN PS Booster / Hanke, K (CERN) ; Aberle, O (CERN) ; Angoletta, M E (CERN) ; Balhan, B (CERN) ; Bartmann, W (CERN) ; Benedikt, M (CERN) ; Borburgh, J (CERN) ; Bozzini, D (CERN) ; Carli, C (CERN) ; Dahlen, P (CERN) et al.
CERN’s proton injector chain is undergoing a massive consolidation and upgrade program in order to deliver beams meeting the needs of the LHC Luminosity Upgrade. As an alternative to the upgrade of the existing Proton Synchrotron Booster (PSB), the construction of a Rapid Cycling Synchrotron (RCS) has been studied. [...]
CERN-ATS-2011-054.- Geneva : CERN, 2011 - 3 p. Fulltext: PDF; External link: Published version from JACoW
In : 2nd International Particle Accelerator Conference, San Sebastian, Spain, 4 - 9 Sep 2011, pp.WEPS019
3.
Study of an energy upgrade of the CERN PS Booster / Hanke, K (CERN) ; Aberle, O (CERN) ; Angoletta, M E (CERN) ; Bartmann, W (CERN) ; Bartolome, S (CERN) ; Bertone, C (CERN) ; Blas, A (CERN) ; Borburgh, J (CERN) ; Bozzini, D (CERN) ; Butterworth, A (CERN) et al.
CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. [...]
CERN-ATS-2011-055.- Geneva : CERN, 2011 - 3 p. Fulltext: PDF; External link: Published version from JACoW
In : 2nd International Particle Accelerator Conference, San Sebastian, Spain, 4 - 9 Sep 2011, pp.WEPS020
4.
Induced Activation in the Future Charge-Exchange Injection System of the PS Booster / Froeschl, R (CERN) ; Bertone, C (CERN) ; Borburgh, J (CERN) ; Burger, S (CERN) ; Dallocchio, A (CERN) ; Dobers, T (CERN) ; Garlasche, M (CERN) ; Hanke, K (CERN) ; Hansen, J (CERN) ; Hourican, M (CERN) et al.
CERN’s Linac2 currently injects protons with a kinetic energy of 50 MeV into the PS Booster (PSB). Linac2 will be replaced by Linac4 which will inject H$^-$ ions with a kinetic energy of 160 MeV into the PSB. [...]
2015 - 6 p. - Published in : (2015) , pp. 77-82 Fulltext: PDF; External link: Fulltext
In : 12th International Topical Meeting on Nuclear Applications of Accelerators, Washington, DC, USA, 10 - 13 Nov 2015, pp.77-82
5.
Possibility of a higher PSB to PS transfer energy / Hanke, K (CERN) ; Aberle, O (CERN) ; Blas, A (CERN) ; Borburgh, J (CERN) ; Bozzini, D (CERN) ; Buzio, M (CERN) ; Capatina, O (CERN) ; Carli, C (CERN) ; Dobers, T (CERN) ; Fernandez, L (CERN) et al.
Following the Chamonix 2010 workshop a task force has been set up to study the feasibility and the impact of an energy upgrade of the PS Booster from the present 1.4 GeV to about 2 GeV. The working group has confirmed the feasibility of such an upgrade, and analysed in detail the impact on the accelerator hardware along with a cost estimate and a tentative planning. [...]
2011 - Published in : 10.5170/CERN-2011-005.344 Published version from CERN: PDF; Slides: PDF;
In : Chamonix 2011 Workshop on LHC Performance, pp.344-348
6.
A possible scheme to deliver 2 Gev Beams from the CERN PS Booster to the ISOLDE Facility / Hanke, K (CERN) ; Bartmann, W (CERN) ; Cole, J (CERN) ; Newborough, A (CERN) ; Pittet, S (CERN) ; Stora, T (CERN) ; Voulot, D (CERN) ; Fernandes Luis, R (ITN, Lisbon, Portugal)
The CERN PS Booster (PSB) is presently undergoing an upgrade program to increase its beam energy from 1.4 GeV to 2 GeV. While this energy upgrade is targeted at LHC-type beams, the option of delivering 2 GeV beams to the ISOLDE facility has also been investigated. [...]
CERN-ACC-2013-0024.- Geneva : CERN, 2013 - 3 p. Fulltext: PDF;
In : 4th International Particle Accelerator Conference, Shanghai, China, 12 - 17 May 2013, pp.3942
7.
CERN PSB to PS Transfer Modifications for the 2 GeV Upgrade / Bartmann, W (CERN) ; Borburgh, J (CERN) ; Gilardoni, S (CERN) ; Goddard, B (CERN) ; Newborough, A (CERN) ; Pittet, S (CERN) ; Steerenberg, R (CERN) ; Yu, C (Beijing, Inst. High Energy Phys.)
Within the framework of the CERN PS Booster (PSB) energy upgrade from 1.4 to 2 GeV, the PSB-to-PS transfer line will be adapted for pulse-to-pulse modulated operation. A modified lattice is presented including a redesign of the switching dipole between ISOLDE and PS together with a changed focussing structure. [...]
CERN-ATS-2012-214.- Geneva : CERN, 2012 - 4 p. - Published in : Conf. Proc.: C1205201 (2012) , pp. MOPPD057
Fulltext: PDF; External link: Published version from JaCoW
In : 3rd International Particle Accelerator Conference, New Orleans, LA, USA, 20 - 25 May 2012, pp.493
8.
Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN / Delonca, M (CERN) ; Maglioni, C (CERN) ; Patapenka, A (CERN) ; Sarrio Martinez, A (CERN)
In the frame of the LHC Injectors Upgrade Project at CERN (LIU), the new 160MeV H- Linac4 will inject into the four existing PS Booster rings after the conversion of H- into H+ in a stripping foil. Given a limited stripping efficiency and possible foil failures, a certain percentage of the beam is foreseen to remain partially (H0) or completely (H-) unstripped. [...]
CERN-ATS-2012-263.- Geneva : CERN, 2012 - 4 p. - Published in : Conf. Proc.: C1205201 (2012) , pp. TUPPR054
Fulltext: PDF; External link: Published version from JaCoW
In : 3rd International Particle Accelerator Conference, New Orleans, LA, USA, 20 - 25 May 2012, pp.1942
9.
Status and Plans for the Upgrade of the CERN PS Booster / Hanke, Klaus (CERN) ; Aguglia, Davide (CERN) ; Angoletta, Maria Elena (CERN) ; Bartmann, Wolfgang (CERN) ; Bedel, Cyrille (CERN) ; Benedetto, Elena (CERN) ; Bertolasi, Stefano (CERN) ; Bertone, Caterina (CERN) ; Betz, Jochen (CERN) ; Birtwistle, Thomas (CERN) et al.
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. [...]
CERN-ACC-2015-011.- 2015 - 3 p. - Published in : (2015) , pp. THPF090 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF090
10.
LHC and the ST / Faugeras, P (CERN) ; Proudlock, P ; Bonnal, P ; Saban, R
2002
In : 5th ST Workshop, Echenevex, France, 28 - 30 Jan 2002, pp.74-82

не нашли то, что искали? Попробуйте поискать на других серверах
recid:1566649 в Amazon
recid:1566649 в CERN EDMS
recid:1566649 в CERN Intranet
recid:1566649 в CiteSeer
recid:1566649 в Google Books
recid:1566649 в Google Scholar
recid:1566649 в Google Web
recid:1566649 в IEC
recid:1566649 в IHS
recid:1566649 в INSPIRE
recid:1566649 в ISO
recid:1566649 в KISS Books/Journals
recid:1566649 в KISS Preprints
recid:1566649 в NEBIS
recid:1566649 в SLAC Library Catalog