CERN Accelerating science

CERN Document Server 2,048 record trovati  1 - 10successivofine  salta al record: La ricerca ha impiegato 0.38 secondi. 
1.
360 Degree Panoramic Photographs During the Long Shutdown 2 of the CERN Machines and Facilities / Birtwistle, Thomas (CERN) ; Ansel, Antoine (CERN) ; Bartolomé Jiménez, Sonia (CERN) ; Feral, Bruno (CERN) ; Lacerda, Gil (CERN) ; Perrot, Anne-Laure (CERN) ; Piñera Ovejero, Juan F (CERN)
Studies and preparation of activities are key to the success of short technical stops and longer shutdowns in CERN’s accelerator complex. The ’Panorama’ tool offers a virtual tour of our facilities, and thanks to integration with other CERN tools, further complementary information can be easily retrieved, including layout information, equipment detail, and a history of changes. [...]
Geneva : JACoW, 2021 - 3 p. - Published in : JACoW IPAC '21 (2021) 3410-3412 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3410-3412
2.
CERN Accelerators Topology Configuration: Facing the Next Long Shutdown / Bartolome-Jimenez, Sonia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Gilbert, Nicolas (CERN) ; Perrot, Anne-Laure (CERN) ; Piar, Juraj (CERN) ; Simetka, Vojtech (CERN) ; Vazquez de Prada Planas, Blanca (CERN)
The Configuration and Layout (CL) team at CERN ensures that there is a clear and coherent representation of the status of the CERN underground facilities (about 60 km of equipment) and main accelerator projects at a given point in time. In view of the major equipment changes to be carried out during the extended end of year technical stop (EYETS), the next Long Shutdown (LS2), and to facilitate the associated preparatory work of multiple CERN groups, the CL team has developed an immersive visualisation tool, displaying 360 degree panoramic images of CERN underground facilities. [...]
CERN-ACC-2017-235.- 2017 - 3 p. - Published in : 10.18429/JACoW-IPAC2017-THPAB145 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.THPAB145
3.
Integration, Configuration and Coordination: from Project to Reality, at CERN / Barberan Marin, Maria (CERN) ; Bartolome-Jimenez, Sonia (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Muttoni, Yvon (CERN) et al.
The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. [...]
CERN-ACC-2016-267.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-TUPMW003 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.TUPMW003
4.
New Coordination Tools to Prepare the Programmed Stops in the LHC and its Injectors / Chemli, Samy (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Bolognesi, Andrea (CERN) ; Brito de Palma, Bernardo (CERN) ; Bustamante, Sebastien (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Kleszcz, Emil (CERN) ; Kotsolakos, Nikitas (CERN) et al.
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics delivery to Experiments with a two-year long stop, also known as Long Shutdown (LS). The years of physics delivery are ended by a programmed stop for the immediate preventive and corrective maintenance, also known as (Extended)-Year-End Technical Stop - (E)YETS. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF044
5.
Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex / Vergara Fernandez, Estrella (CERN) ; Ansel, Antoine (CERN) ; Barberan Marin, Maria (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Hay, David (CERN) ; Jimenez, José (CERN) ; Mcfarlane, David (CERN) et al.
The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2048-2051 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2048-2051
6.
Configuration management of the CERN accelerators complex on the road to long shutdown 3 / Perrot, A L (CERN) ; Bartolomé-Jimenez, S (CERN) ; Birtwistle, T (CERN) ; Chemli, S (CERN) ; Feral, B (CERN) ; Garcia Gavela, H (CERN) ; Oliveira, J (CERN) ; Ronfaut, V (CERN)
The Configuration Management of the LHC and its injectors ensures a clear and coherent representation of the CERN accelerators at a given point in time. It has been evolving steadily. [...]
2023 - 3 p. - Published in : JACoW IPAC 2023 (2023) MOPL028 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.MOPL028
7.
Status and Plans for the Upgrade of the CERN PS Booster / Hanke, Klaus (CERN) ; Aguglia, Davide (CERN) ; Angoletta, Maria Elena (CERN) ; Bartmann, Wolfgang (CERN) ; Bedel, Cyrille (CERN) ; Benedetto, Elena (CERN) ; Bertolasi, Stefano (CERN) ; Bertone, Caterina (CERN) ; Betz, Jochen (CERN) ; Birtwistle, Thomas (CERN) et al.
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. [...]
CERN-ACC-2015-011.- 2015 - 3 p. - Published in : (2015) , pp. THPF090 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF090
8.
Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors / Huschauer, Alexander (CERN) ; Coly, Marcel (CERN) ; Cotte, Denis (CERN) ; Damerau, Heiko (CERN) ; Delrieux, Marc (CERN) ; Dumont, Jean-Charles (CERN) ; Dutheil, Yann (CERN) ; Easton, Sandy (CERN) ; Fraser, Matthew (CERN) ; Hans, Oliver (CERN) et al.
The CERN LHC injector chain underwent a major upgrade during the Long Shutdown 2 (LS2) in the framework of the LHC Injectors Upgrade (LIU) project. After 2 years of installation work, the Proton Synchrotron (PS) was restarted in 2021 with the goal to achieve pre-LS2 beam quality by the end of 2021. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 54-57 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.54-57
9.
Configuration Management Best Practices / Feral, Bruno (CERN) ; Bartolome Jimenez, Sonia (CERN) ; Birtwistle, Thomas William (CERN) ; Musso, Andrea (CERN) ; Perrot, Anne-Laure (CERN)
Configuration management (CM) is used for the configuration of complex systems in many fields, such as IT, aeronautics, shipbuilding, space systems, nuclear power plants, etc. [...]
CERN-ACC-NOTE-2022-0033.
- 2022. - 5 p.
Full text
10.
Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign / Apollonio, Andrea (CERN) ; Andreassen, Odd (CERN) ; Antoine, Alain (CERN) ; Argyropoulos, Theodoros (CERN) ; Bastos, Miguel (CERN) ; Bednarek, Mateusz (CERN) ; Bordini, Bernardo (CERN) ; Brodzinski, Krzysztof (CERN) ; Calia, Andrea (CERN) ; Charifoulline, Zinour (CERN) et al.
In this contribution we provide a summary of the LHC hardware commissioning campaign following the second CERN Long Shutdown (LS2), initially targeting the nominal LHC energy of 7 TeV. A summary of the test procedures and tools used for testing the LHC superconducting circuits is given, together with statistics on the successful test execution. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 335-338 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.335-338

Non hai trovato quello che cercavi? Prova la ricerca su altri server:
recid:2810004 in Amazon
recid:2810004 in CERN EDMS
recid:2810004 in CERN Intranet
recid:2810004 in CiteSeer
recid:2810004 in Google Books
recid:2810004 in Google Scholar
recid:2810004 in Google Web
recid:2810004 in IEC
recid:2810004 in IHS
recid:2810004 in INSPIRE
recid:2810004 in ISO
recid:2810004 in KISS Books/Journals
recid:2810004 in KISS Preprints
recid:2810004 in NEBIS
recid:2810004 in SLAC Library Catalog