The document provides a cost breakdown for setting up a concrete batching plant that can produce 25 cubic meters of concrete per hour on site. It estimates the total net cost after 10 years would be approximately 11.2 million taka, or 25 taka per cubic feet of concrete produced based on an estimated annual production of 50,000 cubic feet. The major equipment needed includes a batching plant, generator, wheel loader, pump and accessories.
The document provides a cost breakdown for setting up a concrete batching plant that can produce 25 cubic meters of concrete per hour on site. It estimates the total net cost after 10 years would be approximately 11.2 million taka, or 25 taka per cubic feet of concrete produced based on an estimated annual production of 50,000 cubic feet. The major equipment needed includes a batching plant, generator, wheel loader, pump and accessories.
The document provides a cost breakdown for setting up a concrete batching plant that can produce 25 cubic meters of concrete per hour on site. It estimates the total net cost after 10 years would be approximately 11.2 million taka, or 25 taka per cubic feet of concrete produced based on an estimated annual production of 50,000 cubic feet. The major equipment needed includes a batching plant, generator, wheel loader, pump and accessories.
The document provides a cost breakdown for setting up a concrete batching plant that can produce 25 cubic meters of concrete per hour on site. It estimates the total net cost after 10 years would be approximately 11.2 million taka, or 25 taka per cubic feet of concrete produced based on an estimated annual production of 50,000 cubic feet. The major equipment needed includes a batching plant, generator, wheel loader, pump and accessories.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 1
Cost For Batching Plant on Site
Category 1: OutPut = 25 cumec /hour= 880 cft/hour
Cost of Machineries
A. Concrete batching Plant (25 cumec/hour) = Tk. 5,200,000.00
B. Generator (85 kVa) = Tk. 1,400,000.00 C. Wheel Loader = Tk. 2,700,000.00 D. Pump with Pipe and Accessories = Tk. 4,300,000.00 E. Silo (Free of Cost by Cement Company) = Tk. 0.00 Tk. 13,600,000.00 Considering Period of 10 years, Tk. 2,400,000.00 Maintenance cost for 10 years = Total Tk. 16,000,000.00
Resale Value after 10 years (30% of total cost) Tk. 4,800,000.00
Net Cost= Tk. 11,200,000.00
If the machine uses 50,000 cft concrete per year, then