1.
Collimation system post-LS1: status and commissioning / Salvachua, B (CERN) ; Valentino, G (CERN) ; Aberle, O (CERN) ; Albertone, J (CERN) ; Athanasiadis, S (CERN) ; Baglin, V (CERN) ; Bertarelli, A (CERN) ; Boccard, C (CERN) ; Bruce, R (CERN) ; Carra, F (CERN) et al.
The LHC collimation system has undergone an important upgrade during LS1. A total of 32 collimator installations are taking place to consolidate and improve the Run 1 system. [...]
Geneva : CERN, 2014 - 6 p. - Published in : (2014) , pp. 111-116 Fulltext: PDF;
In : 5th Evian Workshop on LHC beam operation, Evian-les-Bains, France, 2 - 4 Jun 2014, pp.111-116
2.
Progress with Long-Range Beam-Beam Compensation Studies for High Luminosity LHC / Rossi, Adriana (CERN) ; Aberle, Oliver (CERN) ; Albertone, Joel (CERN) ; Barnyakov, Alexey (Novosibirsk, IYF) ; Bertarelli, Alessandro (CERN) ; Boccard, Christian (CERN) ; Carra, Federico (CERN) ; Cattenoz, Gregory (CERN) ; Delaup, Yorick (CERN) ; Fartoukh, Stephane (CERN) et al.
Long-range beam-beam (LRBB) interactions can be a source of emittance growth and beam losses in the LHC during physics and will become even more relevant with the smaller '* and higher bunch intensities foreseen for the High Luminosity LHC upgrade (HL-LHC), in particular if operated without crab cavities. Both beam losses and emittance growth could be mitigated by compensat-ing the non-linear LRBB kick with a correctly placed current carrying wire. [...]
CERN-ACC-2017-158.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-TUPVA115 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.TUPVA115
3.

CMS-PHO-EVENTS-2015-001
© 2015 CERN, for the benefit of the CMS Collaboration
#RestartLHC: first post-LS1 splash events in CMS
05/04/2015
4.
Acoustic measurements in the collimation region of the LHC / Deboy, D (CERN) ; Assmann, R W (CERN) ; Baccigalupi, C (CERN) ; Burkart, F (CERN) ; Cauchi, M (CERN) ; Derrez, C S (CERN) ; Lendaro, J (CERN) ; Masi, A (CERN) ; Spiezia, G (CERN) ; Wollmann, D (CERN)
The LHC accelerator at CERN has the most advanced collimation system ever being installed. The collimators intercept unavoidable particle losses and therefore are essential to avoid beam induced quenches of the superconducting magnets. [...]
CERN-ATS-2011-116.- Geneva : CERN, 2011 - 3 p. Fulltext: PDF; External link: Published version from JACoW
In : 2nd International Particle Accelerator Conference, San Sebastian, Spain, 4 - 9 Sep 2011, pp.THPZ031
5.

CMS-PHO-GEN-2015-004
© 2015 CERN, for the benefit of the CMS Collaboration
#Restart LHC: Second batch of splashes in CMS
Photos from the CMS Control Room, taken on the eve [...]
09/04/2015
More >>
6.

CMS-PHO-GEN-2015-003
© 2015 CERN, for the benefit of the CMS Collaboration
#RestartLHC: First beams in CMS (batch two)
Photos from the CMS Control Room on the day of the [...]
07/04/2015
More >>
7.

CMS-PHO-GEN-2015-002
© 2015 CERN, for the benefit of the CMS Collaboration
#RestartLHC: First beams in CMS
Photos from the CMS Control Room on the day of the [...]
07/04/2015
More >>
8.
New Generation CERN LHC Injection Dump - Assembly and Installation (TDIS) / Carbajo Perez, David (CERN) ; Berthomé, Emmanuel (CERN) ; Bertone, Caterina (CERN) ; Biancacci, Nicolo (CERN) ; Bracco, Chiara (CERN) ; Bregliozzi, Giuseppe (CERN) ; Bulat, Bartosz (CERN) ; Cadiou, Cyril (CERN) ; Calviani, Marco (CERN) ; Cattenoz, Gregory (CERN) et al.
During CERN’s LS2, several upgrades were performed to beam intercepting devices in the framework of the HL-LHC Project. Upgraded equipment includes two internal beam dumps (TDIS) intended for machine protection located at the injection points from the SPS to the LHC. [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IPAC 2021 (2021) 3548-3551 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3548-3551
9.
Availabilty for post-LS1 operation / Apollonio, A (CERN) ; Ponce, L (CERN) ; Schmidt, R (CERN) ; Todd, B (CERN) ; Wollmann, D (CERN) ; Zerlauth, M (CERN)
Availability is one of the key factors to be taken into account to improve the LHC performance after LS1 and for future LHC upgrades. A comprehensive view of LHC availability in 2012 is given in this paper, based on the analyses of the Availability Working Group. [...]
Geneva : CERN, 2014 - 6 p. - Published in : (2014) , pp. 181-186 Fulltext: PDF;
In : 5th Evian Workshop on LHC beam operation, Evian-les-Bains, France, 2 - 4 Jun 2014, pp.181-186
10.
LHC Status & Plan before HL-LHC   / Zimmermann, F (CERN)
WP: 4: AccNet: Accelerator Science Networks
Task: 4.2: EuroLumi

After reviewing the LHC history and, in particular, the performance and key issues from 2010-12, the plans and expectations for operation close to design energy post-LS1 until about 2022, including possible operation modes with 25 and 50-ns bunch spacing and pertinent open questions, are discussed [...]
EuCARD-PRE-2013-004.
- 2013.
Access to fulltext document

Niste pronašli ono što ste htjeli? Pokušajte pretražiti na ovim serverima:
recid:2295097 u Amazon
recid:2295097 u CERN EDMS
recid:2295097 u CERN Intranet
recid:2295097 u CiteSeer
recid:2295097 u Google Books
recid:2295097 u Google Scholar
recid:2295097 u Google Web
recid:2295097 u IEC
recid:2295097 u IHS
recid:2295097 u INSPIRE
recid:2295097 u ISO
recid:2295097 u KISS Books/Journals
recid:2295097 u KISS Preprints
recid:2295097 u NEBIS
recid:2295097 u SLAC Library Catalog