CERN Accelerating science

CERN Document Server 2,019 registres trobats  1 - 10següentfinal  anar al registre: La cerca s'ha fet en 0.45 segons. 
1.
CERN Yellow Report Front Cover CERN Proton Synchrotron East Area Facility : Upgrades and renovation during Long Shutdown 2 / Bernhard, J ; Carvalho, F (ed.) ; Evrard, S (ed.) ; Harrouch, E (ed.) ; Romagnoli, G (ed.)
In this document, we present the upgrade of the East Experimental Area facility which took place during the Long Shutdown 2 (2019–2021) [...]
CERN-2021-004. - Geneva : CERN, 2021. - 123 p. (CERN Yellow Reports: Monographs ; 4/2021)


ebook
2.
Chapter 5 Infrastructure consolidation / Burdelski, P (CERN) ; Dragoni, F (CERN) ; Grau, Silvia (CERN) ; Guillaume, J-C (CERN) ; Jaillet, D (CERN) ; Mcilwraith, S (CERN) ; Polenghi, M (CERN) ; Sanchez, E (CERN)
Constructed in 1963, Building 157 is 113 m long and 43 m wide at ground level. The roof is 21.8 m high at the central point above a skylight running longitudinally down its centre; it has a slope of 20% running down to the longitudinal façade summits at 15.6 m [...]
2021 - 27 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.89-115
3.
Design & optimization of the alignment supports for the new laminated magnets for the CERN East Area consolidation project / Vanhoutte, Robin (CERN) ; Brethoux, Damien (CERN) ; Ebn Rahmoun, Aboubakr (CERN) ; Evrard, Sebastien (CERN) ; Harden, Fiona (CERN) ; Harrouch, Erwan (CERN) ; Lazzaroni, Michael (CERN) ; Lino Diogo dos Santos, Miguel (CERN) ; Lopez, Roberto (CERN) ; Nogtikov, Denis (CERN) et al.
The East Area is one of CERNs experimental area, running since its foundation in 1958. Extracting a 24GeV proton beam from the Proton Synchrotron accelerator, the primary beam is divided into different secondary beams, serving various experiments and user’s facilities such as CLOUD, CHARM, IRRAD. [...]
CERN-ACC-2019-258.- 2019 - 3 p. - Published in : 10.18429/JACoW-IPAC2019-THPRB086 Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.THPRB086
4.
The CERN East Area Renovation / Montbarbon, E (CERN) ; Bernhard, J (CERN) ; Brethoux, D (CERN) ; Brugger, M (CERN) ; Carlsen, B D (CERN) ; Ebn Rahmoun, A (CERN) ; Evrard, S (CERN) ; Gatignon, L (CERN) ; Harrouch, E (CERN) ; Lazzaroni, M et al.
The East Area at CERN’s Proton Synchrotron delivers since over 56 years primary proton and ion beams as well as mixed secondary beams of hadrons, electrons and muons in a range of 0.5 GeV/c to 12 GeV/c. The CERN Management approved in 2016 a full renovation of this intensively used facility. [...]
2019 - 4 p. - Published in : Nucl. Instrum. Methods Phys. Res., B 461 (2019) 98-101
5.
The Beamlines of the CERN East Area Renovation Project / Bernhard, Johannes (CERN) ; Bonnet, Michel (CERN) ; Bouirek, Quentin (CERN) ; Brethoux, Damien (CERN) ; Carlsen, Bard (CERN) ; Ebn Rahmoun, Aboubakr (CERN) ; Etheridge, John (CERN) ; Evrard, Sebastien (CERN) ; Gatignon, Laurent (CERN) ; Harrouch, Erwan (CERN) et al.
The East Area at the Proton Synchrotron is one of CERN’s longest running facilities for experiments, beam tests, and irradiations with a successful history of over 55 years. The facility serves more than 20 user teams for about 200 days of running each year and offers mixed secondary hadron, electron and muon beams of 0.5 GeV/c to 10 GeV/c. [...]
2018 - 3 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF023 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF023
6.
The new CERN East Area primary and secondary beams / Montbarbon, Eva (CERN) ; Banerjee, Dipanwita (CERN) ; Bernhard, Johannes (CERN) ; Brethoux, Damien (CERN) ; Brugger, Markus (CERN) ; Carlsen, Bard (CERN) ; Charitonidis, Nikolaos (CERN) ; Ebn Rahmoun, Aboubakr (CERN) ; Evrard, Sebastien (CERN) ; Gatignon, Laurent (CERN) et al. /CERN East Area Renovation project team
The East Area at the Proton Synchrotron is one of the intensely used facilities at CERN, serving for over 56 years beams nowadays to more than 20 user teams and experiments for about 200 days of running each year. Besides primary proton and ion beams for the irradiation facilities IRRAD and CHARM, mixed secondary beams of hadrons, electrons and muons within a range of 0.5 GeV/c to 12 GeV/c are provided. [...]
CERN-ACC-2019-234.- 2019 - 4 p. - Published in : 10.18429/JACoW-IPAC2019-THPGW062 Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.THPGW062
7.
Chapter 2: East Area renovationMotivations and general description / Bernhard, Johannes Benedikt (CERN) ; Evrard, Sebastien (CERN) ; Gatignon, Lau (CERN) ; Harrouch, E (CERN) ; Wilkens, Henric (CERN)
This chapter gives a general description of the East Area before and after Long Shutdown 2 (LS2)..
2021 - 10 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.7-16
8.
Study of the energy savings resulting from the East Area renovation / Lamaille, Brieuc (CERN) ; Dragoni, Francesco (CERN) ; Evrard, Sebastien (CERN) ; Harden, Fiona (CERN) ; Harrouch, Erwan (CERN) ; Lazzaroni, Michael (CERN) ; Lopez, Roberto (CERN) ; Papastergiou, Konstantinos (CERN)
CERN’s East Experimental Area, situated on the Swiss side of the Meyrin site, with its four beamlines, has served physics for more than 40 years. As the building and equipment are reaching their end of life, a thorough consolidation project has been initiated in order to provide many more years of reliable operation. [...]
CERN-ACC-2019-257.- 2019 - 3 p. - Published in : 10.18429/JACoW-IPAC2019-THPRB087 Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.THPRB087
9.
Chapter 4: Beamline – main components / Carlsen, B (CERN) ; Carvalho, F (CERN) ; De Jesus, V (CERN) ; De La Gama, J (CERN) ; Ebn Rahmoun, A (CERN) ; Froeschl, Robert (CERN) ; Gourber-Pace, Marine (CERN) ; Grenier-Boley, Edouard (CERN) ; Lopez, R (CERN) ; Mompo, Richard (CERN) et al.
The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. [...]
2021 - 45 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.43-87
10.
A high-power target system for radioisotope production / Burgerjon, J J ; Gelbart, Z ; Hendry, G O ; Lofvendahl, J C ; McIlwraith, L ; Pinto, G A
TRI-PP-86-97.
- 1986. - 4 p.
Fulltext - CERN library copies

No heu trobat el que estaveu cercant? Proveu la vostra cerca a:
recid:2792490 dins Amazon
recid:2792490 dins CERN EDMS
recid:2792490 dins CERN Intranet
recid:2792490 dins CiteSeer
recid:2792490 dins Google Books
recid:2792490 dins Google Scholar
recid:2792490 dins Google Web
recid:2792490 dins IEC
recid:2792490 dins IHS
recid:2792490 dins INSPIRE
recid:2792490 dins ISO
recid:2792490 dins KISS Books/Journals
recid:2792490 dins KISS Preprints
recid:2792490 dins NEBIS
recid:2792490 dins SLAC Library Catalog