7 Scor
7 Scor
7 Scor
Plan
Deliver Source Make Deliver Source Make Deliver Source Make Deliver Source
2
A company’s supply chain can be “configured-
Configuration Level to-order” at Level 2 from the core “process
(Process categories.” Companies implement their
Categories) operations strategy through the configuration
they choose for their supply chain.
Cost Assets
Performance Attributes
Delivery performance
Fill rate
Perfect order fulfillment
Order fulfillment lead time
Supply Chain Response Time
Production flexibility
Total SCM cost
Cost of Goods Sold
Value-added productivity
Warranty cost or returns processing cost
Cash-to-cash cycle time
Inventory days of supply
Asset turns
Level Metrics Facts
Level 1 Metrics are primary, high level measures that may cross multiple
SCOR processes.
They do not necessarily relate to a SCOR Level 1 process (Plan-Source-
Make-Deliver-Return).
There is hierarchy among the metrics in different levels.
Level 1 Metrics are created from lower level calculations (Level 2 metrics)
Level 2 Metrics:
Associated with a narrower subset of processes.
Example:
Metric related with Delivery Performance: Total number of
products delivered on time and in full based on a commit date.
Metric related with Production: Ratio Of Actual To Theoretical
Cycle Time
Level 2 Process Types and Definitions
Planning: A process that aligns expected resources to meet expected
demand requirements.
Balance aggregated demand and supply
Consider consistent planning horizon
(Generally) occur at regular, periodic intervals
Execution: A process triggered by planned or actual demand that
changes the state of material goods.
Scheduling/sequencing
Transforming product
Moving product to the next process
Enable: A process that prepares, maintains, or manages information or
relationships on which planning and execution processes rely
P1: Plan Supply Chain
P2-P5: Plan SCOR Process
S1: Source Stocked Product
S3: Source Engineer-to-Order Product Level 2 Process Categories
S2: Source Make-to-Order Product
M1: Make-to-Stock
M2: Make-to-Order
M3: Engineer-to-Order
D1: Deliver Stocked Product
D2: Deliver Make-to-Order Product
D3: Deliver Engineer-to-Order Product
D4: Deliver Retail Product (New in Version 6.0)
SR1/DR1: Return Defective Product (Source
Return/Deliver Return)
SR2: Source Return MRO Product (Maintenance,
Repair and Overhaul)
DR2: Deliver Return MRO Product
SR3/DR3: Return Excess Product (Source
Return/Deliver Return)
EP, ES, EM, ED, ER: Enable corresponding SCOR
Processes
Example Continued
Process Number: S1