Aatir Hassan - Electrical Engineer

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

AATIR HASSAN

(Electrical Engineer – Electrical Power Systems)

Profile: Pakistani, 26, Single


Current Position: Execution Engineer
Mobile: +92 333 7162922
Email: [email protected]

CAREER SUMMERY / STRENGTH & SKILLS

An Electrical Engineer having more than three years of professional experience as Electrical Site Engineer
(Construction),(Maintenance & commissioning) , with sound knowledge of testing & commissioning,
maintenance & project management. Other areas of knowledge are Calibration & measurement of various
equipment’s, different controllers, drawings & PLC’s

KEY SKILLS:
Project Coordinator  Supervision services for Installation, Startup, handover of Electrical Network
Technical Evaluation  LV Switchgears, Transformers, LV Motors
Plant Maintenance  Planning, Execution, and Preventive / Predictive maintenance
Documentation & Drawings  BOQs, Cable schedules, Equipment Placement Layouts, schematics, Wiring
Interconnections, SLDs, HSE SOPs.
Software  Electrical Designing, Configuration, Engineering, C Language & MS office.

WORK EXPERIENCE

CURRENT PROJECT:

Job Title: Electrical Engineer at PEPSICO (GREENFIELD PEPSICO) project(May~ 2017 to Feb~2018)
Company: MEP SOLUTIONS (Sister concern of Izhar group, ICPL)- Industrial state (Multan)

 ROLES AND RESPONSIBILITIES:

 Cable size calculation cable scheduling & its route selection ,over head or underground.
 Proper protection system for all electrical installation.
 Generally responsible for implementations and monitoring of all electrical related works at site.
 Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools,
etc., required for all electrical and related works prior to execution.
 Plans and analyses all possible construction methodologies and recommends the best options to the Asst.
Project Manager for approval prior to execution at site.
 Interprets construction drawings and studies the contract documents and applicable standards or
specifications prior to execution of any jobs.
 Manages directly and provide engineering and technical supports to all the electrical work groups at site.
 Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
 Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
 Assign targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.
 Supports the Project Manager in accomplishing all the goals and targets for the electrical groups at site.
 Ensures that all site works are done according to all applicable quality standards.
 Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project
execution will be done according to all applicable health, safety, sanitary and environmental standards.
 Performs other related duties as may be required by the Project Manager.
 To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
 To provide the entire electrical solutions as per requirement.
 Handling of electrical load as per requirement.
 ·Cable size calculation cables scheduling &its route selection, over head or underground.
 Review Inspection and Test Plans in order to perform all required inspections and witnessing all required tests
and add witness and hold points for the Client’s Inspection.
 Drawing submission and get Approval from consultants
 Site issues highlighting and send to consultant
 Site Additional work Preparation and send the Quotation
 Every two week once attend the site technical coordination meeting
 Monthly once attend the site safety coordination meeting
 Detail engineering with safety factor in the design
 Updating the Drawing depends on site condition
 Daily & Weekly work Progress Report Preparation and Keep the Record
 Preparation of Project Report for correct and Timely information for the Progress of work
 Responsible to do surveys including site measurements
 Responsible for Highlighting foreseen Problem & Delays in advance Escalating to the Project Manager.
 Client communication and correspondence.
 Quality Assurance
 Coordination with workers
 Weekly Material Requirement to be send by email to office
 Final Documentation & Billing Works

PREVIOUS PROJECT:

Job Title: Electrical Engineer at LOTTE KOLSON (Chocopai) project(May~ 2017 to Feb~2018)
Company: MEP SOLUTIONS (Sister concern of Izhar group, ICPL)- Lotte Kolson (Lahore)

 ROLES AND RESPONSIBILITIES:

 Supervision of Installation of Electrical Equipment which includes Low Voltage Switchgears, Motor Control
Panels, Lighting Distribution Boards & cable trays
 Installation of T/F, LV panels, MDP, Electro mechanical equipments
 Installation & Termination of LV, MV Panels, Conduting, wiring, Lights, and electrical devices.
 Coordinating meeting with client and consultant.
 Coordination between Electrical and Mechanical .
 Weekly progress reports generation.
 To repair, overhaul and service a wide range of industrial rotating equipment including AC & DC electric
motors, pumps, gearbox's, fans, VRF, Air cooled and Water cooled system , Hot water generators.
 Preparing Load schedule and cable schedule.
 Control and maintain the design standard of the products.
 Providing design support at all stages of the design process.
 Visiting clients to conduct trial installations & offer technical expertise/solutions.
 Improving the design, performance and efficiency of existing products.
 Coordinating with other departments, customers and suppliers to resolve design issues.
 Checking drawings for accuracy and errors.
 Comprehensive knowledge of low voltage electrical equipments, protection selectivity, electrical
transformers, motors and accessories, heaters, sensors, starters and feeders for any electrical consumer
 Expertise in installing, testing, commissioning and Maintenance of electrical equipments.

 ELV / IT SECTION (Fire Alarm & IT)


 Ensuring proper procedure is followed for installation of equipment and supervising the testing of each
network before handover to plant team.
 Supervision services for installation of server panels, patch panels, switches, laying of fiber optic cables,
communication checks, installation of UPS and ensuring proper startup and handover..
 Supervision services for installation, testing of loop, continuity check and communication with Fire Alarm
Panel for plant.

PREVIOUS PROJECT:

Job Title: Electrical Engineer-Power System Project (P&G) Hair Care Plant (July~ 2015 to April~2017)
Company: MEP SOLUTIONS (Sister concern of Izhar group, ICPL)- Port Qasim Plant (Karachi)

 ELECTRICAL SECTION (Reporting to Construction Manager-Electrical)


 Supervision of Installation of Electrical Equipment which includes Low Voltage Switchgears, Motor Control
Panels, Air Handling Units, Lighting Distribution Boards & cable trays.
 Supervision of Startup of Substation (Transformers, Ring Main Unit, Low Voltage Panel)
 Design review for Lighting Distribution boards, MCCs and low voltage equipment
 Installation supervision for plant equipments such as Lighting Protection Equipment, Grounding systems.
 Ensuring installation of complete Electrical Works as per provided drawings and making changes as per site
requirements.
 Supervision of proper installation, energization of Lighting & Power system related to Office, Production,
Warehouse & Outdoor area as per provided drawings.
 Providing support to plant team for proper and safe startup of all equipment.
 Planning and supervision for on time handover of electrical network for plant startup.
 Planning for meeting deadlines with regards to plant handover.
 Coordinating with contractor for meeting targets as per plan, closure of punch list items and timely handover
to client.

 ELV / IT SECTION (Fire Alarm & IT) (Reporting to Manager- Control & Instrument)
 Supervision of Installation of related equipment on field on basis of provided drawings.
 Ensuring proper procedure is followed for installation of equipment and supervising the testing of each
network before handover to plant team.
 Supervision services for installation of server panels, patch panels, switches, laying of fiber optic cables,
communication checks, installation of UPS and ensuring proper startup and handover for IT Room.
 Supervision services for installation, testing of loop, continuity check and communication with Fire Alarm
Panel for plant. (Siemens Fire Control Panel)

PROJECTS

Final Year Project:


• Pakistan Energy Crisis & Integrated Modeling tools.

QUALIFICATION

2014 BE (Electrical Engineering)


Mehran University of Engineering & Technology SZAB Khairpur Mirs

REFERENCES
Will be furnished on demand

You might also like