Energy and Petroleum Regulatory Authority Commencement of work notice

NO. CWN/KPLC/532402/2023

COMMENCEMENT OF WORK NOTICE

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

In accordance with Rule 8 of Electric Power (Electrical Installation work) Rules 2006, I/We hereby give
notice that the undermentioned work in connection with the installation at the premises of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

Situation of property KONA MUSA

Longitude: 39.7899 Latitude: 4.87999

Land Office reference No: N/A

Nature of work New Installation No. of Installations: 13

I/We propose to commence the work on 2023-02-01

Proposed situation of meter-board(s) in the case of a new installation or if the site of an existing board is to
changed OUTSIDE

(A plan of the premises indicating the proposed meter position should be attached) I confirm that an
"Enquiry for A Supply of Electricity" form has/has not been completed.

Service Line Ref No: A22702023010001.

Signature (of the Licenced Electrician)........................Electrical Contractor's stamp............................

Electrical Contractor's Name SANJUD CONTRACTORS LIMITED

Licence Class. Class A-1 Licence No. EPRA/EC/03046

Address 80102 - 93781

N:B This Notice should be sent to the above power supplier as soon as work on the installation is started.

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537394/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:32.407

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537395/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:33.253

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537396/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:34.010

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537397/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:34.763

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537398/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:35.513

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537399/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:36.297

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537400/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:37.087

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537401/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:37.860

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537402/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:38.640

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537403/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:39.400

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537404/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:40.187

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537405/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:40.943

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2

Page 2
Energy and Petroleum Regulatory Authority Completion Certificate

NO. CC/KPLC/532402/1537406/2023

THE ELECTRIC POWER (ELECTRICAL INSTALLATION WORK) RULES 2006

Completion Certificate

To:- THE KENYA POWER AND LIGHTING COMPANY P.O BOX 30099 - 00100 NAIROBI

(Name and Address of authorised distributor or Electrical Inspector)

I/We hereby give notice that the undermentioned work in connection with the installation at the premises
of:

Name SAMUEL CHALWA WAKHUNGU

Address P.O BOX 00 - 80400 Ukunda

is now completed and ready for testing and connection.

A service line is/is not required. Service Line Ref No: A22702023010001.

Details of installation (stating if new or additional) This is a New Installation of SAMUEL CHALWA
WAKHUNGU : New installation with 4 lighting points and 4 socket outlets per unit

The work has been carried out and tested strictly in accordance with the Energy Act 2019 and
Rules/Regulations for the time being in force thereunder. An installation Test Certificate to this effect is
attached hereto:-

Name of Licensed Electrician

Name Samuel Njuguna Ngugi Class A-1 Licence No. EPRA/EW/07332


(Signature of Licenced
..............................................
Electrician)
Electrical Contractor SANJUD CONTRACTORS LIMITED Class A-1 Licence No. EPRA/EC/03046
Date: 2023-01-31 22:35:41.727

Electrical Contractor's Stamp and Date

(For office use by Power Utility/Supplier)

Installation Report No. .............................................Date....................................................................

N.B. Any person who submits a Completion Form which is false in a material particular is liable to
prosecution

(Vide Rule 10 of Electric Power (Electrical Installation work) Rules 2006.)

Page 1
Energy and Petroleum Regulatory Authority Completion Certificate

Installation Test Certificate


1 Earth Resistance Test (Ohms) 2
2 Insulation Resistance test between phases (MegaOhms) 0
3 Insulation Resistance test phase to neutral (MegaOhms) 39
4 Insulation Resistance test Neutral to Earth (MegaOhms) 36
5 Insulation Resistance test Earth to phase (MegaOhms) 39
6 Continuity of CPC Conducted? Yes
7 Polarity test conducted? Yes
8 Earth loop impendance test, Zs (Ohms) 0.2