Intervention Logic Objectively Verifiable Indicators Means of Verification Assumptions/Risks
Intervention Logic Objectively Verifiable Indicators Means of Verification Assumptions/Risks
Intervention Logic Objectively Verifiable Indicators Means of Verification Assumptions/Risks
Objectively
Verifiable
Indicators
Means
verification
of Assumptions/Risks
Goal
To increase the number of -Number
of -Records of HPN
controlled Hypertension by 25% in individuals with cases in the RHU
Alfonso, Cavite by 2018.
HPN & DM
Purpose
To reduce the number of new cases
and of Hypertension in adults
annually in Barangay Kaytitinga 2.
-New cases of
adults ages 25
and
above
diagnosed with
hypertension
Assumption:
-All new hypertensive cases
will be diagnosed by BHWs
Risk:
-Incomplete reporting which
leads to underestimation of
morbidity
-Proportion of
residents
that
received fliers in
HPN
-Proportion of
residents
that
participated in
the
fitness
activities
-List of
residents
Results
OVI
MOV
-Number
-List of barangay
households that residents that received
received fliers in the IEC material
HPN
Assumption:
-At least 1 member of each
household in the barangay will
attend the fitness activities
where IEC materials will be
distributed.
-Number
of -List of participating
participants in barangay residents
the week-long
fitness activity
Assumption:
-The given budget and support
of the barangay officials,
BHWs, and barangay residents
will be sufficient to maintain
this project.
Risk:
-Changing administration, lack
of budget, and lack of
participants may hinder the
continuance of the project.
Activities
Means
Costs
Assumptions/Risks
Equipment
Printing:
5/print x 2 = Php 10
Component Objectives
1. To increase the number of
residents with access to information
regarding the risk factors of HPN.
2.
To increase the number of
residents with adequate physical
activity for the prevention of HPN.
Tasks
1.1.1.1 Collect information on the
risk factors, signs and symptoms
and prevention of HPN
1.1.1.2 Design the IEC material
1.1.1.3 Printing
Personnel
Assumptions/Risks
Assumption:
-One IEC material given per
household will be shared by the
Photocopy:
recipient to the other members
2.00/copy x 300 = Php of the family.
600
Risks:
-The IEC materials will be
Total = P 610.00
ignored/thrown/not
read/not
shared by the recipients;
-The
residents
will
not
comprehend the message of the
IEC material.
1.1.1.4 Pre-testing
1.1.1.5 Final editing
1.1.1.6 Reproducing
1.1.1.7 Distribute the IEC material
Activities
2.1.1 Hold a fitness activity:
Zumba for
Tasks
2.1.1.1 Coordinate with the local
barangay officials & BHU
Subtasks
2.1.1.1.1 Present the proposed
plans, time-line, and budget to the
barangay officials, and BHWs for
their approval, comments and
suggestions
2.1.1.1.2 Reserve the venue and
sound system
2.1.1.1.3 Request BHWs and
Barangay Tanods to inform and
invite the barangay residents to the
activity
2.1.1.2 Select and orient residents
who will lead the Zumba and
Stretching
Means
Costs
Venue
Sound System
Sound System:
P 200.00/day x 5 =
P 1,000
Projector
Projector: c/o Group
Exercise video
Exercise video:
P 50.00
Compilation of
exercise music
Exercise music:
P 50.00
Incentive
for
exercise leaders Incentives:
P 50 x 3 leaders x 5
days = P 750
Registration
sheet
P 2.00
Assumptions/Risks
Assumptions:
-Residents will regularly attend
the fitness activity;
-The residents are free during
the set time for the activity;
-The details of the activity will
be disseminated to all residents
of the barangay.
Risks:
-The residents may be occupied
with work and other activities
during the time set for the
fitness activity.
Water station
2.1.1.3 Remind the barangay
officials and BHWs to inform the
residents about the details of the
activity.
P 100.00
Total = 1,952.00
2.1.1.4 Zumba Proper
Subtasks
2.1.1.4.1 Secure the venue
2.1.1.4.2 Set up the sound system &
lights
2.1.1.4.3 Registration
2.1.1.4.4 Introduction
2.1.1.4.5 Zumba activity
2.1.2 Hold a fitness activity:
Stretching
Tasks
2.1.2.1 Coordinate with the local
barangay officials & BHU
Subtasks
2.1.2.1.1 Present the proposed
plans, time-line, and budget to the
barangay officials, and BHWs for
their approval, comments and
Venue
Sound System
Sound System:
P 200.00/day x 4 =
P 800
Projector
Exercise video
Exercise video:
P 50.00
Assumptions:
-Residents will regularly attend
the fitness activity;
-The residents are free during
the set time for the activity;
-The details of the activity will
be disseminated to all residents
of the barangay.
Risks:
-The residents may be occupied
suggestions
2.1.2.1.2 Reserve the venue and
sound system
2.1.2.1.3 Request BHWs and
Barangay Tanods to inform and
invite the barangay residents to the
activity
2.1.2.2 Select and orient residents
who will lead the and Stretching
P 2.00
P 100.00
Total = 1,602.00
2.1.2.4 Stretching Proper
Subtasks
2.1.1.4.1 Secure the venue
2.1.1.4.2 Set up the sound system &
lights
2.1.1.4.3 Registration
2.1.1.4.4 Introduction
2.1.1.4.5 Stretching activity