CORPORATE OPERATION SERVICES



UNIT / STAGE / STATION WISE PLF NTPC COAL STATIONS UPTO 31MAY14



158
98
7.1
13.2
R
H
S
T
P
S
M
A
U
D
A
LOSS ON COAL SHORTAGE : MAY'14
mu
% Loss Stn
TOTAL LOSS: 257 MU / (1.07%)
Pre.Yr (MAY) :2296 MU / (10%)
244
98
5.5 6.7
R
H
S
T
P
S
M
A
U
D
A
LOSS ON COAL SHORTAGE : 13-14 UPTO MAY'14
mu
% Loss Stn
TOTAL LOSS: 342 MU / (0.72%)
Pre.Yr: 4469 MU / (9.89%)






276
208
179
145
105 100
99
63
49
45
34 29
14 11
15.9 13.3 13.2 19.4 4.7 19.0 4.5 8.0 3.3 2.0 1.1 1.5 0.9 3.3
K
h
S
T
P
S
F
S
T
P
S
N
C
T
P
S
M
A
U
D
A
R
H
S
T
P
S
B
T
P
S
S
p
T
P
S
F
G
U
T
P
S
S
m
T
P
S
T
S
T
P
S
V
S
T
P
S
R
S
T
P
S
S
S
T
P
S
T
A
N
D
A
GRID LOSS (COAL) : MAY'14
GRID LOSS (MU)
% Loss Stn
TOTAL LOSS: 1360 MU / (5.65%)
Pre.Yr (MAY) :809 MU / (3.52%)
420
281
260 257
162
114
95
68.0 57.0 83.2 52.5 60.4 35.7 19.5
DGPS AuGPS AnGPS KwGPS RGCCPS FGPS JGGPS
GRID LOSS (GAS) : MAY'14
GRID LOSS (MU)
% Loss Stn
TOTAL LOSS: 1589 MU / (53.15%)
Pre.Yr (MAY) :1564 MU / (52.34%)
530
359
335
309
221
175
157
137
65 52 50 34 33 23
4
15.5 24.5 11 11.6 21.4 4.0 3.6 8.9 1.0 1.2 1.7 5.2 0.9 0.8 0.1
K
h
S
T
P
S
M
A
U
D
A
F
S
T
P
S
N
C
T
P
S
B
T
P
S
R
H
S
T
P
S
S
p
T
P
S
F
G
U
T
P
S
V
S
T
P
S
T
S
T
P
S
S
m
T
P
S
T
A
N
D
A
R
S
T
P
S
S
S
T
P
S
K
S
T
P
S
GRID LOSS (COAL) : 14-15 UPTO MAY'14
GRID LOSS (MU)
% Loss Stn
TOTAL LOSS: 2483 MU / (5.24%)
Pre.Yr: 1274 MU / (2.82%)
804
640
538
363
352
228
188
66.2 65.9 56.0 37.7 57.3 36.1 35.7
DGPS AuGPS KwGPS JGGPS AnGPS FGPS RGCCPS
GRID LOSS (GAS) : 14-15 UPTO MAY'14
GRID LOSS (MU)
% Loss Stn
TOTAL LOSS: 3113 MU / (52.93%)
Pre.Yr: 2619 MU / (44.54%)
LOSS ON GRID NTPC MAY'14: 2948 (10.9%) LOSS ON GRID NTPC UPTO MAY'14: 5596 (10.51%)
LOSS ON GRID NTPC MAY'13: 2373 (9.15%) LOSS ON GRID NTPC UPTO MAY'13: 3894 (7.63%)


RHSTPS MAUDA
CURR 244 98
PREV 0 0
0
50
100
150
200
250
300
M
U

FUEL LOSS (COAL) CURR VS PREV YR UPTO MAY'14 CURR(342) PREV(0)
KhSTPS MAUDA FSTPS NCTPS BTPS RHSTPS SpTPS FGUTPS VSTPS TSTPS SmTPS TANDA RSTPS SSTPS KSTPS
CURR 530 359 335 309 221 175 157 137 65 52 50 34 33 23 4
PREV 244 0 239 317 132 81 17 73 40 58 9 2 20 12 30
0
100
200
300
400
500
600
M
U
GRID LOSS (COAL) CURR VS PREV YR UPTO MAY'14 CURR(2483) PREV(1274)
DGPS AuGPS KwGPS JGGPS AnGPS FGPS RGCCPS
CURR 804 640 538 363 352 228 188
PREV 669 603 407 287 265 217 171
0
100
200
300
400
500
600
700
800
900
M
U
GRID LOSS (GAS) CURR VS PREV YR UPTO MAY'14 CURR(3113) PREV(2619)
COAL UNITS WITH CONTINUOUS RUNS OF MORE THAN 200 DAYS: Last One Year
SL.
NO
STATION UNIT
CONTINUOUS RUN DETAILS
REMARKS
FROM TO No of Days
1. Ramagundam 2 11July12 16June13 340
2. Vindhyachal 10 30Aug12 30July13 310
3. Talcher Thermal 3 4Sep12 24July13 310
4. TTPS 2 26Aug13 Continuing 279 Unit running without any outage since last Overhaul
5. Ramagundam 7 21Mar13 16Dec13 270
6. Farakka 1 05Dec12 31Aug13 264
7. Ramagundam 2 26Sep13 Continuing 248
8. Korba 3 25Mar13 28Nov13 248
9. Unchahar 2 6May13 31Dec13 239
10. Talcher Kaniha 4 2Oct12 24 May13 233
11. Korba 6 28Sep13 17Apr14 232 First Outage since Last Overhaul
12. Ramagundam 4 04Oct13 09May14 227
13. Kahalgaon 2 6Feb13 18Sep13 224
14. Dadri 2 3Apr13 7Nov13 217
15. Vindhyachal 4 09June13 6Jan14 211
16. Ramagundam 6 20Nov12 18June13 210
RECORD: 210MW : VSTPS U# 3 : 559DAYS (29.05.2005 TO 10.12.2006) 500MW : SIMHADRI U#1 : 441 DAYS (03Oct10 TO 18Dec11)

GAS UNITS WITH CONTINUOUS RUNS OF MORE THAN 200 DAYS (LAST ONE YEAR)
SL.
NO
STATION UNIT
CONTINUOUS RUN DETAILS
REMARKS
FROM TO No of Days
1. Nil











OUTAGE & TRIP DETAILS: NTPC COAL STATIONS (2014-15 UP TO 31.05.14)

NOTE: EVERY DESYNCHRONISATION OF THE UNIT IS CONSIDERED AS AN OUTAGE
NUMBER OF TRIPS INCLUDES THOSE DUE TO EXTERNAL REASONS SUCH AS GRID DISTURBANCE

TO
STATION OUTAGES (No.) TRIPS (No.)
2008 2009 2010 2011 2012 2013 2013 2014 2009 2010 2011 2012 2013 2013 2013 2014
2009 2010 2011 2012 2013 2014 2014 2015 2010 2011 2012 2013 2014 2014 2014 2015
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAY
APR
MAY
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAR
APR
MAY
APR
MAY
SINGRAULI 52 60 45 71 59 64 12 11 20 16 11 27 29 18 3
RIHAND 26 31 29 29 68 55 15 11 9 8 14 13 40 29 9 9
UNCHAHAR 48 28 43 36 41 40 10 7 23 15 24 24 26 23 6 5
TANDA 63 58 49 35 42 37 4 11 42 33 35 17 26 13 2 9
DADRI COAL 25 32 70 61 62 45 14 8 6 21 51 35 38 28 11 5
BADARPUR 47 52 90 89 114 91 10 16 21 15 24 53 65 41 6 11
MAUDA 3 47 14 2 33 5
KORBA 27 40 51 69 39 38 9 9 7 11 23 32 20 17 2 4
VINDHYACHAL 83 70 59 75 67 88 20 27 38 27 23 31 25 36 10 12
SIPAT 24 17 20 17 73 40 8 7 19 8 10 9 38 19 3 3
RAMAGUNDAM 47 29 36 31 51 39 2 6 17 9 11 10 23 17 2
SIMHADRI 4 11 8 20 30 24 1 3 2 15 14 8 1
FARAKKA 56 47 37 57 120 57 10 14 26 23 23 35 90 34 5 8
KAHALGAON 51 43 69 61 49 41 6 8 21 19 24 22 14 14 1 2
TALCHER KANIHA 32 48 55 65 54 49 7 4 16 15 13 17 25 19 2 1
TALCHER THERMAL 44 77 52 43 48 46 6 4 15 36 15 15 20 16 1 2
TOTAL 631 643 713 759 920 801 133 158 280 259 303 357 495 365 58 82
ANTA 48 21 47 35 40 47 8 10 10 4 14 3 7 3 1 2
AURAIYA 50 33 43 73 77 45 10 6 3 8 3 4 16 4
DADRI GAS 82 64 46 72 83 85 11 3 34 18 8 24 21 10
FARIDABAD 32 13 19 34 48 36 6 3 17 8 14 12 23 11 4
KAWAS 84 48 41 63 103 137 21 15 9 11 10 15 16 31 3
GANDHAR 32 32 21 35 49 66 6 3 6 5 7 8 8 12
KAYAMKULAM 16 18 20 23 26 14 3 7 4 3 9 2 3
TOTAL 326 229 237 335 426 430 65 47 83 57 65 68 94 67 8 6
OUTAGE AND TRIP TRENDS : PERIOD 31-May-14
COAL STATIONS
1-Apr-14
GAS STATIONS




ONLY TRIPS DUE TO STATION EQUIPMENT PROBLEM CONSIDERED


SmTPS TTPS TSTPS RSTPS KHSTPS KSTPS DADRI UNCH SIPAT SSTPS
COAL
STN
RHSTPP VSTPP FSTPS TANDA BTPS MAUDA
PREV 0.00 0.75 0.98 0.20 0.77 0.95 1.69 1.53 1.25 1.38 1.11 2.16 1.38 1.40 0.69 1.49 0.00
CURR 0.17 0.46 0.46 0.62 0.85 0.94 0.98 1.00 1.09 1.23 1.24 1.29 1.71 1.78 1.99 3.52 6.36
0.0
1.0
2.0
3.0
4.0
5.0
COAL STATIONS: OUTAGES PER 1000 HRS OF OPERATION PER UNIT: UPTO MAY'14
TSTPS SmTPS RSTPS KHSTPS TTPS SIPAT SSTPS KSTPS FSTPS
COAL
STN
DADRI UNCH VSTPP RHSTPP BTPS TANDA MAUDA
PREV 0.00 0.00 0.00 0.13 0.13 0.47 0.00 0.21 0.70 0.44 1.32 0.92 0.69 1.29 0.30 0.34 0.00
CURR 0.12 0.17 0.21 0.21 0.23 0.31 0.34 0.42 0.51 0.55 0.61 0.71 0.76 0.94 1.10 1.63 2.27
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
COAL STATIONS: TRIPS PER 1000 HRS OF OPERATION PER UNIT: UPTO MAY'14


ONLY TRIPS DUE TO STATION EQUIPMENT PROBLEM CONSIDERED



FARID NCGPP GANDH GAS STN KAYAM ANTA KAW AUR
PREV 2.05 2.46 1.21 2.23 0.95 2.03 3.55 2.65
CURR 0.75 0.81 0.89 2.03 2.23 2.85 3.79 3.87
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
GAS STATIONS: OUTAGES PER 1000 HRS OF OPERATION PER UNIT: UPTO MAY'14
FARID KAYAM GANDH KAW NCGPP GAS STN ANTA AUR
PREV 0.68 0.00 0.00 0.51 0.00 0.21 0.25 0.00
CURR 0.00 0.00 0.00 0.00 0.00 0.22 0.29 2.58
0.0
0.5
1.0
1.5
2.0
2.5
3.0
GAS STATIONS: TRIPS PER 1000 HRS OF OPERATION PER UNIT: UPTO MAY'14



ONLY TRIPS DUE TO STATION EQUIPMENT PROBLEM CONSIDERED

SmTPS TSTPS TTPS RSTPS KHSTPS KSTPS DADRI SIPAT UNCH SSTPS
COAL
STN
RHSTPP VSTPP FSTPS TANDA BTPS MAUDA
PREV 0.00 6.98 5.98 1.71 5.13 7.69 13.96 9.57 11.97 10.26 8.65 17.95 10.88 9.97 5.98 11.97 0.00
CUR 1.50 3.99 3.99 5.13 6.84 7.69 7.98 8.38 8.38 9.40 9.95 10.97 13.46 13.96 16.45 19.15 41.89
0.0
5.0
10.0
15.0
20.0
COAL STATIONS: No OF OUTAGES PER UNIT PER YEAR UPTO MAY'14
TSTPS SmTPS KHSTPS RSTPS TTPS SIPAT SSTPS KSTPS FSTPS
COAL
STN
DADRI UNCH BTPS VSTPP RHSTPP TANDA MAUDA
PREV 0.00 0.00 0.85 0.00 1.00 3.59 0.00 1.71 4.99 3.38 10.97 7.18 2.39 5.44 10.77 2.99 0.00
CUR 1.00 1.50 1.71 1.71 1.99 2.39 2.56 3.42 3.99 4.41 4.99 5.98 5.98 5.98 7.98 13.46 14.96
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
COAL STATIONS: No OF TRIPS PER UNIT PER YEAR UPTO MAY'14


ONLY TRIPS DUE TO STATION EQUIPMENT PROBLEM CONSIDERED
NCGPP GANDH FARID AUR GAS STN KAYAM KAW ANTA
PREV 10.97 8.98 11.97 9.97 12.15 5.98 20.94 11.97
CUR 2.99 4.49 5.98 5.98 8.79 13.96 14.96 14.96
0.0
3.0
6.0
9.0
12.0
15.0
18.0
21.0
24.0
GAS STATIONS: No OF OUTAGES PER UNIT PER YEAR UPTO MAY'14
FARID KAYAM GANDH KAW NCGPP GAS STN FARID AUR
PREV 3.99 0.00 0.00 2.99 0.00 1.12 3.99 0.00
CUR 0.00 0.00 0.00 0.00 0.00 0.93 1.50 3.99
0.0
2.0
4.0
6.0
GAS STATIONS: No OF TRIPS PER UNIT PER YEAR UPTO MAY'14

MAUDA SSTPS BTPS VSTPP KHSTPS COAL STN FSTPS TANDA TSTPS TTPS KSTPS SIPAT RHSTPP RSTPS
BTL Pre 0.00 1.03 0.15 0.48 0.26 0.38 0.28 0.34 0.14 0.50 0.63 0.16 0.72 0.20
BTL Cur 2.27 0.67 0.66 0.63 0.42 0.39 0.38 0.36 0.35 0.34 0.31 0.31 0.23 0.21
0
.
0
0
1
.
0
3
0
.
1
5
0
.
4
8
0
.
2
6
0
.
3
8
0
.
2
8
0
.
3
4
0
.
1
4
0
.
5
0
0
.
6
3
0
.
1
6
0
.
7
2
0
.
2
0
2
.
2
7
0
.
6
7
0
.
6
6
0
.
6
3
0
.
4
2
0
.
3
9
0
.
3
8
0
.
3
6
0
.
3
5
0
.
3
4
0
.
3
1
0
.
3
1
0
.
2
3
0
.
2
1
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
COAL STATIONS: BTL PER 1000 HRS OF OPERATION PER UNIT: UPTO MAY'14



1.16
1.09
1.03
0.97
1.03
1
1.12
1.17
1.30
1.10
1.24
0.59
0.48
0.429 0.424
0.46
0.41
0.46
0.53
0.55
0.48
0.55
0
0.2
0.4
0.6
0.8
1
1.2
1.4
04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15
COAL STATIONS : OUTAGES PER 1000 HOURS PER UNIT
OUT/1000Hr TRIP/1000Hr
1.17
1.1
1.58 1.59
1.45
0.88
0.95
1.5
2.18
3.3
2.03
0.42
0.32
0.26
0.47
0.35
0.22 0.22
0.28
0.32
0.5
0.22
0
1
2
3
4
04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15
GAS STATIONS : OUTAGES PER 1000 HOURS PER UNIT
OUT/1000Hr TRIP/1000Hr





08-09 09-10 10-11 11-12 12-13 13-14
14-15 TILL
MAY
BTL 2.9 3.2 3.2 2.8 2.8 2.7 3.1
TG 0.5 0.7 0.7 0.4 0.8 0.6 0.6
C&I 0.6 0.7 0.7 0.6 1.0 0.7 1.3
ELEC 1.5 1.2 1.4 1.5 1.4 1.6 1.1
OPN 0.3 0.3 0.4 0.5 0.5 0.3 0.3
SG 1.1 0.8 0.8 1.2 1.2 1.0 1.4
SG AUX(SG+BTL) 4.0 4.0 4.0 4.0 4.0 3.7 4.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
NO OF OUTAGES PER UNIT PER YEAR TREND : COAL STATIONS
SG AUX
+BTL
BTL
OPN
ELE
SG
C&I
TG

YEARLY OUTAGE DETAILS OF NTPC UNITS UPTO 31MAY14 (SAP DATA AS ON 01JUN14)




TO
COAL STATION
NR 0.00 0.28 2.61 1.58 3.32 0.41 0.29 0.08 0.40 0.09 0.34 0.15 6.62 2.93
NCR COAL 0.00 0.65 0.91 0.58 0.04 0.56 1.32 0.07 0.10 0.05 0.01 2.37 1.93
WR-1 COAL 2.30 7.99 100.00 1.10 0.20 0.08 6.40 100.00 18.07
WR-2 0.02 0.38 1.42 1.02 0.01 0.36 0.39 0.60 0.07 0.07 0.17 0.01 0.01 0.21 2.29 2.44
SR COAL 0.03 0.32 0.30 0.07 0.32 0.40
ER-1 0.02 1.12 1.16 0.94 0.21 0.02 0.05 0.11 0.26 0.01 0.19 0.26 1.71 2.64
ER-2 0.06 0.33 1.01 0.04 0.37 1.07
COAL 0.01 0.46 1.26 1.20 2.30 0.273 0.29 0.23 0.11 0.089 0.053 0.097 0.04 0.200 0.06 0.031 4.13 2.57
GAS STATION
NCR GAS 0.01 0.03 2.56 0.01 0.01 2.57 0.05
WR-1 GAS 0.03 0.00 0.16 0.04 0.16
SR GAS
GAS 0.01 0.004 0.001 0.073 1.493 0.004 0.008 1.51 0.08
WHRB GT TG ELEC C&I OPN OFFSITE OTHERS
F.O (W/O FUEL &
GRID)
SG TUBE LEAKAGE TG ELEC C&I OPN OFFSITE
F.O (W/O FUEL &
GRID)
FORCED OUTAGE % BREAK UP - REGION 1-Apr-14 31-May-14
STATIONS 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15
OTHERS
13-14 14-15
OUTAGE % BREAK UP
NR 3.17 3.40 0.03 6.62 2.96 9.79 6.35 90.21 93.65 90.21 93.68
NCR
0.04 0.08 1.16 11.07 3.05 3.00 5.46 5.00 6.61 16.07 93.39 83.93 96.47 87.00
WR-1
6.71 100.00 24.78 100.00 24.78 75.22 75.22
WR-2 3.24 0.02 4.31 7.67 5.54 2.46 9.85 10.14 90.16 89.87 90.16 89.89
SR 3.91 0.32 0.40 0.32 4.32 99.68 95.68 99.68 95.68
ER-1 18.06 0.08 8.03 7.49 19.77 2.72 27.80 10.21 72.20 89.79 72.20 89.87
ER-2 14.51 0.07 2.61 14.95 1.07 17.56 1.07 82.44 98.94 82.51 98.94
COAL 5.21 0.21 0.01 0.02 3.46 5.46 0.25 0.24 9.60 3.04 13.06 8.51 86.94 91.49 87.20 91.76
NCR
0.04 0.01 0.25 3.77 41.76 47.64 44.37 47.70 44.62 51.47 55.38 48.53 97.18 96.18
WR-1 0.17 3.79 22.71 33.51 22.74 33.67 22.91 37.46 77.09 62.54 99.80 96.05
SR 1.05 2.98 27.22 25.28 27.22 25.28 28.27 28.26 71.73 71.74 99.0 97.02
NTPC GAS 0.02 0.006 0.29 3.705 34.23 41.02 35.76 41.11 36.06 44.81 63.94 55.19 98.20 96.21
13-14 14-15 14-15
TOTA AV.LOSS
13-14 14-15 13-14 13-14 14-15
PLANNED GRID RESERVE FO+EXT
13-14 14-15 13-14 14-15 13-14 14-15 13-14 14-15 STATIONS
FUEL PRIMARY GRID FORCED % AVAIL ON BAR % M/C AVAIL
FUEL PRIMARY GRID FORCED PLANNED GRID RESERVE FO+EXT TOTA AV.LOSS % AVAIL ON BAR % M/C AVAIL




TO
COAL STATION
NR COAL 1 6 17 11 3 6 12 3 4 8 1 2 37 37
NCR COAL 4 3 3 1 1 11 3 2 2 1 17 14
WR-1 COAL 1 5 2 2 1 2 13
WR-2 COAL 2 6 14 15 1 4 8 4 3 4 3 1 1 30 36
SR COAL 1 2 2 3 2 6
ER-1 COAL 2 2 4 7 1 1 2 2 2 1 1 11 14
ER-2 COAL 2 5 6 1 6 8
NTPC COAL 5 22 45 49 6 10 30 18 10 19 5 4 1 3 1 3 103 128
GAS STATION
NCR GAS 1 3 2 1 1 3 5
WR-1 GAS 2 1 1 3 1
SR GAS
NTPC GAS 2 1 1 4 2 1 1 6 6
WHRB GT TG ELEC C&I OPN OFFSITE OTHERS
F.O (W/O FUEL &
GRID)
FORCED OUTAGE NO BREAK UP - REGIONS 1-Apr-14 31-May-14
13-14 14-15 14-15 13-14 14-15 13-14 14-15 STATIONS 13-14 14-15 13-14 14-15 13-14
F.O (W/O FUEL &
GRID)
SG TUBE LEAKAGE TG ELEC C&I OTHERS OPN OFFSITE
14-15 13-14 14-15 13-14 14-15 13-14
OUTAGE NO BREAK UP
NR COAL
4 3 41 40
NCR COAL
4 6 1 2 2 2 24 24
WR-1 COAL
1 14
WR-2 COAL 3 1 4 6 37 43
SR COAL 1 2 7
ER-1 COAL 4 4 1 4 16 22
ER-2 COAL 3 3 1 13 8
COAL 10 1 7 11 11 16 2 2 133 158
NCR GAS
2 1 1 29 16 35 22
WR-1 GAS
1 23 17 27 18
SR GAS 1 3 6 3 7
NTPC GAS 2 2 2 55 39 65 47
FUEL PRIMARY GRID FORCED PLANNED GRID RESERVE FO+EXT TOTAL
13-14 14-15 13-14 13-14 14-15 13-14 14-15 13-14 14-15 14-15 13-14 14-15
GRID FORCED PLANNED GRID RESERVE TOTAL FUEL PRIMARY
STATIONS

TO
SINGRAULI 0.00 3.85 2.15 8.88 0.17 0.08 1.10 12.73 3.50
RIHAND 0.55 2.68 1.53 0.80 0.36 0.48 0.06 0.95 0.10 0.32 4.91 2.92
UNCHAHAR 0.02 0.08 0.79 0.84 0.11 0.52 0.07 1.44 1.00
TANDA 0.27 0.88 1.09 3.57 0.03 0.04 0.04 0.00 0.03 0.92 5.04
DADRI COAL 0.07 1.18 0.06 1.64 0.11 0.07 0.02 2.99 0.158
BADARPUR 2.15 0.22 2.07 2.01 0.49 0.27 0.08 0.79 6.495
MAUDA 2.30 7.99 100.00 1.10 0.20 0.08 6.40 100.00 18.07
KORBA 0.73 1.46 0.61 0.02 1.37 0.01 0.10 0.07 0.03 1.58 2.82
VINDHYACHAL 0.06 0.40 2.12 1.69 0.05 1.39 0.05 0.38 0.02 2.66 3.50
SIPAT 0.04 0.50 0.41 1.16 0.08 0.16 0.05 0.67 2.45 0.61
RAMAGUNDAM 0.00 0.06 0.56 0.54 0.07 0.56 0.67
SIMHADRI 0.06 0.06
FARAKKA 0.01 1.33 1.73 1.00 0.06 0.04 0.10 0.16 0.54 0.02 0.396 0.56 2.48 3.48
KAHALGAON 0.02 0.94 0.64 0.89 0.35 0.06 1.01 1.89
TALCHER KANIHA 0.06 0.22 0.99 0.22 1.04
TALCHER THERMAL 0.07 1.05 1.15 0.32 1.36 1.21
NTPC COAL 0.01 0.46 1.26 1.20 2.30 0.27 0.29 0.23 0.11 0.09 0.05 0.10 0.04 0.20 0.06 0.03 4.13 2.573
GAS STATIONS
GAS STN
ANTA 0.04 0.08 0.08 0.036
AURAIYA 0.12 0.03 0.15
DADRI GAS
FARIDABAD 13.89 13.89
KAWAS 0.06 0.01 0.32 0.07 0.32
GANDHAR
KAYAMKULAM
NTPC GAS 0.01 0.004 0.001 0.073 1.493 0.004 0.008 1.51 0.08
SG
14-15
OPN OFFSITE
14-15 14-15 13-14 14-15 13-14 14-15 13-14
TUBE LEAKAGE TG ELEC
FORCED OUTAGE % BREAK UP - COAL STATIONS 1-Apr-14 31-May-14
STATIONS 13-14 14-15 13-14 13-14
ST ELEC OPN OFFSITE
C&I
F.O (W/O FUEL &
GRID)
F.O (W/O FUEL &
GRID)
C&I
14-15 13-14 14-15 13-14
WHRB GT
COAL STATIONS
13-14 14-15
OTHER
OTHER


OUTAGE % BREAK UP
COAL STATIONS
SINGRAULI 4.73 7.02 12.73 3.50 17.45 10.52 82.55 89.48 82.55 89.48
RIHAND 4.91 2.92 4.91 2.92 95.09 97.09 95.09 97.09
UNCHAHAR 9.10 7.62 1.44 1.00 10.54 8.62 89.46 91.38 89.46 91.38
TANDA 0.41 0.92 5.45 0.92 5.45 99.08 94.55 99.08 94.96
DADRI COAL 0.04 11.46 3.65 6.64 0.19 6.64 11.65 93.36 88.35 97.01 88.38
BADARPUR 0.13 0.18 4.14 10.08 1.49 10.73 2.41 17.40 6.55 27.480 93.45 72.52 95.07 83.43
MAUDA 6.71 100.00 24.78 100.00 24.78 75.22 75.22
KORBA 8.20 7.90 1.58 2.82 9.78 10.72 90.22 89.28 90.22 89.28
VINDHYACHAL 5.04 4.31 2.66 3.50 7.70 7.81 92.30 92.19 92.30 92.19
SIPAT 10.16 0.07 12.28 12.61 0.68 12.61 12.95 87.39 87.05 87.39 87.12
RAMAGUNDAM 6.92 0.56 0.67 0.56 7.59 99.44 92.41 99.44 92.41
SIMHADRI 0.06 0.06 100.00 99.94 100.00 99.94
FARAKKA 8.55 0.17 13.33 11.57 11.02 3.65 24.36 15.22 75.64 84.78 75.64 84.95
KAHALGAON 26.61 3.28 3.82 27.62 1.89 30.90 5.72 69.10 94.28 69.10 94.28
TALCHER KANIHA 16.74 0.08 1.37 17.03 1.04 18.40 1.04 81.60 98.96 81.68 98.96
TALCHER THERMAL 10.73 1.36 1.21 12.09 1.21 87.91 98.79 87.91 98.79
COAL 5.208 0.21 0.010 0.02 3.46 5.46 0.25 0.24 9.60 3.04 13.06 8.51 86.94 91.49 87.20 91.76
GAS STATIONS
ANTA 0.87 4.03 28.20 46.43 28.28 46.47 29.15 50.50 70.85 49.50 99.06 95.93
AURAIYA 0.03 9.26 57.11 57.36 57.11 57.54 57.11 66.81 42.89 33.20 100.00 90.59
DADRI GAS 0.26 0.39 48.70 57.21 48.70 57.21 48.96 57.60 51.04 42.40 99.74 99.61
FARIDABAD 0.21 1.57 18.00 15.49 32.11 15.49 32.11 17.06 67.89 82.94 86.11 98.43
KAWAS 0.33 32.14 47.69 32.21 48.02 32.54 48.02 67.46 51.98 99.60 99.68
GANDHAR 7.58 13.29 19.35 13.29 19.35 13.29 26.92 86.71 73.08 100.00 92.43
KAYAMKULAM 1.05 2.98 27.22 25.28 27.22 25.28 28.27 28.26 71.73 71.74 99.0 97.02
NTPC GAS 0.02 0.01 0.29 3.70 34.23 41.02 35.76 41.11 36.06 44.81 63.94 55.19 98.20 96.21
14-15 13-14 14-15
% M/C AVAIL
% M/C AVAIL
13-14 13-14 14-15
FO+EXT % AVAIL ON BAR
13-14 14-15
TOTAL AV.LOSS
PLANNED TOTA AV.LOSS % AVAIL ON BAR FO+EXT
14-15
GRID RESERVE
13-14 14-15
FUEL PRIMARY GRID FORCED
PLANNED GRID RESERVE
13-14 14-15
FUEL PRIMARY GRID FORCED
STATIONS 13-14 14-15 13-14

TO
SINGRAULI 9 6 1 1 2 10 9
RIHAND 1 5 2 1 3 5 1 4 3 1 15 11
UNCHAHAR 1 3 1 1 1 5 2 8 6
TANDA 2 2 2 3 2 1 1 1 1 4 11
DADRI COAL 2 2 1 9 1 2 1 13 5
BADARPUR 2 1 3 1 2 3 1 4 9
MAUDA 1 5 2 2 1 2 13
KORBA 1 6 3 1 1 1 2 1 8 8
VINDHYACHAL 2 4 7 10 3 7 2 3 3 17 24
SIPAT 1 1 2 1 1 1 1 1 5 4
RAMAGUNDAM 1 2 2 2 2 5
SIMHADRI 1 1
FARAKKA 1 2 3 1 1 2 1 2 1 1 8 7
KAHALGAON 1 2 2 4 1 3 7
TALCHER KANIHA 1 1 3 1 4
TALCHER THERMAL 1 4 3 1 5 4
NTPC COAL 5 22 45 49 6 10 30 18 10 19 5 4 1 3 1 3 103 128
GAS STATIONS
GAS STN
ANTA 1 1 1 1
AURAIYA 3 1 4
DADRI GAS
FARIDABAD 2 2
KAWAS 2 1 1 3 1
GANDHAR
KAYAMKULAM
NTPC GAS 2 1 1 4 2 1 1 6 6
14-15 13-14
FORCED OUTAGE NO BREAK UP - COAL STATIONS 1-Apr-14 31-May-14
14-15 13-14 14-15 13-14 STATIONS 13-14 14-15 13-14 14-15 13-14 14-15 13-14
WHRB GT ST ELEC
14-15
COAL STATIONS
ELEC C&I SG TUBE LEAKAGE TG
F.O (W/O FUEL &
GRID)
C&I OPN OFFSITE
F.O (W/O FUEL &
GRID)
OPN OFFSITE
13-14 14-15 14-15
OTHERS
OTHERS
13-14



OUTAGE NO BREAK UP
COAL STATIONS
SINGRAULI 2 2 12 11
RIHAND 15 11
UNCHAHAR 2 1 10 7
TANDA 4 11
DADRI COAL 1 2 1 14 8
BADARPUR 4 5 1 1 2 10 16
MAUDA 1 14
KORBA 1 1 9 9
VINDHYACHAL 3 3 20 27
SIPAT 3 1 2 8 7
RAMAGUNDAM 1 2 6
SIMHADRI 1
FARAKKA 2 4 3 10 14
KAHALGAON 2 1 1 6 8
TALCHER KANIHA 3 3 7 4
TALCHER THERMAL 1 6 4
COAL 10 1 7 11 11 16 2 2 133 158
GAS STATIONS
ANTA 1 6 9 8 10
AURAIYA 10 2 10 6
DADRI GAS 11 3 11 3
FARIDABAD 2 1 2 2 6 3
KAWAS 1 17 14 21 15
GANDHAR 6 3 6 3
KAYAMKULAM 1 3 6 3 7
NTPC GAS 2 2 2 55 39 65 47
TOTAL
TOTAL
13-14 14-15 13-14 14-15 13-14
PLANNED
14-15 13-14 14-15
STATIONS
GRID FORCED FUEL PRIMARY
FUEL PRIMARY GRID FORCED GRID RESERVE
14-15 13-14 14-15 13-14
PLANNED GRID RESERVE
BRIEF OUTAGE DETAILS - MAY14: COAL STATIONS
Sl STATION UNIT DATE DURATION BRIEF DESCRIPTION OF OUTAGE AREA
1. BADARPUR 1 14-May-14 111:59:00 LOW SCHEDULE GR
2. BADARPUR 1 30-May-14 2:09:00
EVACUATION PROBLEM. Tripping of All out going lines due to heavy
storm/Winds in NCR region
GF
3. BADARPUR 2 03-May-14 1:17:00
TRANMISSION LINES / GRID DISTURBANCE. Unit tripped due to a
jerk in grid voltage.
GF
4. BADARPUR 2 04-May-14 3:25:00
Unit was running with excitation in ECR mode since 04:45 pm with Ch-II.
At 20:51 hrs, after a heavy jerk in the grid , Channel changeover took
place and unit tripped on Loss of field. On analysis it was found that
channel II had developed F030 fault .This is simoreg overloading
condition . Since unit was in ECR mode , it could not manage the
demand for increasing MVAR and hence this fault appeared. Channel I
could not supply the field current as the Firing card had gone faulty. So,
this card was replaced and the unit restored.
ELE
5. BADARPUR 2 22-May-14 218:46:00 Unit stopped for CW pit cleaning. TG
6. BADARPUR 3 03-May-14 2:02:00
TRANMISSION LINES / GRID DISTURBANCE. Unit tripped due to a
jerk in grid voltage.
GF
7. BADARPUR 3 10-May-14 25:27:00 BTL- LEAKAGE AT OTHER PLACE TL
8. BADARPUR 3 30-May-14 2:57:00
EVACUATION PROBLEM. Tripping of All out going lines due to heavy
storm/Winds in NCR region
GF
9. BADARPUR 3 30-May-14 1:19:00 ELE
10. BADARPUR 3 30-May-14 24:07:00 ELE
11. BADARPUR 4 25-May-14 59:29:00 BTL RH TL
12. BADARPUR 4 30-May-14 5:00:00
EVACUATION PROBLEM. Tripping of All out going lines due to heavy
storm/Winds in NCR region
GF
13. BADARPUR 5 12-May-14 52:25:00 APH PROBLEM, APH-A O/L Deflector broken. SG
14. DADRI COAL 1 01-May-14 1:47:00 C& I SYSTEM ATRS PROBLEM C&I
15. DADRI COAL 1 10-May-14 26:33:00 BLR CERTIFICATE RENEWAL P
16. DADRI COAL 5 14-May-14 2:04:00 FURNACE DISTURBANCE. Unit Tripped on Flame failure SG
17. DADRI COAL 6 15-May-14 1:48:00 BOILER & AUXILARIES.15-FURNACE DISTURBANCE SG
18. FARAKKA 1 11-May-14 4:21:00
TRANMISSION LINES / GRID DISTURBANCE, During charging
Durgapur line, Heavy voltage dip occurred. Leading to Excitation
disturbance and units tripped.
GF/OPN
19. FARAKKA 2 11-May-14 7:54:00 GF/OPN
20. FARAKKA 4 11-May-14 10:24:00 GF/OPN
21. FARAKKA 6 11-May-14 19:34:00 GF/OPN
22. FARAKKA 1 25-May-14 161:45:00 PLANNED OVERHAUL( ONLY BOILER ) P
23. FARAKKA 6 29-May-14 24:45:00 BTL WW TL
24. KAHALGAON 3 06-May-14 623:50:00 PLANNED OVERHAUL( BLR,TURB&GEN ) P
25. KAHALGAON 4 15-May-14 19:54:00 BTL SH TL
26. KAHALGAON 6 17-May-14 23:18:00 BTL WW TL
27. KAHALGAON 7 28-May-14 4:24:00 GT PROBLEM. GT PRV malfunctioning due water ingress during rains. ELE
28. KORBA 1 16-May-14 31:08:00 BTL RH TL
29. KORBA 1 28-May-14 6:43:00 Unit tripped during carrying out ATT protective devices. C&I
30. KORBA 3 31-May-14 1:57:00
AVR & EXCITATION SYSTEM, Wrong sensing of Excitation system
Pulse failure during line fault.
ELE
31. KORBA 4 13-May-14 21:23:00 BTL - STEAM COOLED WALL TL
32. KORBA 6 03-May-14 55:28:00 Unit stopped due to APH choking. SG
33. MAUDA 1 10-May-14 35:12:00 BTL LTSH TL
34. MAUDA 1 24-May-14 83:30:00
CHP PROBLEM, Unit was running at 245 MW load with Mill group
D,F,H&J I/S without any oil support .Coal Feeder-F tripped on No coal
Flow due to poor coal bunker level. Survived mills D,H&I flame could
not be sustained at 49%MCR as there was three elevation gap between
survived mills D&H.Coal Feeder-F tripped on No coal Flow due to poor
coal bunker level. Survived mills D, H&I flame could not be sustained at
49%MCR as there was three elevation gap between survived mills
D&H.Unit shut down was extended due to bunkering problem.
BOP
35. MAUDA 2 02-May-14 53:24:00 BTL - ECO, Barring Gear problem TL/TG
36. MAUDA 2 04-May-14 1:23:00 GEN, AUXLIARIES - GEN./FIELD BREAKER PROBLEM ELE
37. MAUDA 2 13-May-14 196:35:00 COAL SHORTAGE - MINE PROBLEM FP
38. MAUDA 2 24-May-14 5:14:00
Unit was running at 225 MW with Mill group B, C & D I/S without any oil
support. TDBFP-A & MDBFP-C were I/S and TDBFP-B was being taken
in to service and during opening of its exhaust v/vs bypass v/v partially
after charging of its gland sealing, condenser vacuum dropped. After
observing the deterioration of condenser vacuum, the bypass v/v closed
immediately but condenser vacuum did not improve. Meanwhile
condenser back pressure increased up to 0.3 kg/cm2 and unit tripped on
High condenser back pressure.
After referring the condenser back pressure and running vacuum pumps
inlet v/vs pressure recorded trend, the following observations were
made :-At 02:50 hrs Condenser Back Pr :0.0857/0.0948 Kg/cm2,
Vacuum PP-1/2 Pr :0.0817/0.91 Kg/cm2,-At 04:14 hrs Condenser Back
Pr: 0.1/0.109 Kg/cm2 ,Vacuum PP-1/2 Pr :0.158/0.141Kg/cm2,At 04:52
hrs Condenser Back Pr: 0.291/0.298 Kg/cm2, Vacuum PP-1/2 Pr
:0.337/0.332 Kg/cm2,(Just before tripping).It is clearly evident that at
high condenser vacuum or low back pressure below 0.0857Kg/cm2,
vacuum pumps seal ring had become unstable it might be due to low
NPSH of seal water recirculation pump at such high condenser vacuum,
therefore air ingress started from vacuum During condenser vacuum
deterioration process, TDBFP-B exhaust line by pass v/v was opened as
a result condenser vacuum dropped sharply and unit tripped on low
condenser vacuum.
TG
39. MAUDA 2 27-May-14 103:50:00 COAL HANDLING PLANT PROBLEM BOP
40. RAMAGUNDAM 4 19-May-14 4:08:00
FSSS supply failure took place due to DC solenoid fault in scanner air
fan.
C&I
41. RAMAGUNDAM 5 10-May-14 526:46:00 PLANNED OVERHAUL( BLR,TURB&GEN ) P
42. RAMAGUNDAM 6 02-May-14 29:31:00 BTL - WW TL
43. RAMAGUNDAM 6 08-May-14 4:34:00 APH PROBLEM, Unit withdrawn as SAPH-A Bracing fallen. SG
44. RAMAGUNDAM 6 09-May-14 1:30:00
Unit shifted to speed controller due to card problem and unloaded the
unit. Control valves got closed.
C&I
45. RIHAND 5 10-May-14 22:55:00 TURBINE & AUXILARIES,TURBINE TESTING TG
46. RIHAND 6 13-May-14 27:39:00 Primary Water flow low due to choking of conical filter. OTH
47. RIHAND 6 16-May-14 84:54:00 BTL- LEAKAGE AT OTHER PLACE TL
48. RIHAND 6 21-May-14 3:48:00 TURBINE & AUXILARIES-TDBFP PROBLEM, Both TDBFPs tripped TG
49. RIHAND 6 21-May-14 2:42:00
RTD / THERMOCOUPLE PROBLEM. False sensing of Bearing 1
temperature high
C&I
50. SINGRAULI 1 10-May-14 527:25:00 PLANNED OVERHAUL( ONLY BOILER ) P
51. SINGRAULI 3 06-May-14 40:45:00 BTL - WW TL
52. SINGRAULI 4 29-May-14 2:21:00 FSSS PROBLEM, FSSS supply faillure C&I
53. SINGRAULI 5 11-May-14 34:43:00 BTL - SH TL
54. SINGRAULI 6 17-May-14 67:38:00
PROTECTION/INTERLOCK/RELAY MALFUNCTION, R phase
differential protection relay malfunction.
ELE /
OPN
55. SINGRAULI 7 07-May-14 43:05:00 BTL - RH TL
56. SINGRAULI 7 10-May-14 3:44:00
Unit was running at a load of 510 MW with seven mills in service and
boiler tripped at 03:43 hrs all of a sudden. SIM Trip appeared as first
up.On checking it was found that even though the first out is persisting
with SIM Mode, Operation Mode LED is glowing in the card . As SIM
Mode command was not persisting at card level, it was concluded that
the cards which could generate SIM Mode trip might have malfunctioned
momentarily. As trip command was not persisting all possible cards ( 2
nos. C2 & G26. ) which could have been involved in the trip have been
replaced and clearance was given for light up. Later while checking the
card healthiness at lab it was confirmed that G26 card failed.
C&I
57. SIPAT 1 01-May-14 56:43:00 BTL WW TL / P
58. SIPAT 2 03-May-14 680:48:00 PLANNED OVERHAUL( BLR,TURB&GEN ) P
59. SIPAT 5 24-May-14 3:14:00 PA FAN PROBLEM, Blade pitch got delinked. SG
60.
TALCHER
KANIHA
6 13-May-14 38:13:00 BTL - WW TL
61.
TALCHER
THERMAL
6 31-May-14 4:01:00
FURNACE DISTURBANCE, Unit tripped on Flame loss. Bottom ashing
was in progress.
SG
62. TANDA 3 19-May-14 2:15:00
C& I SYSTEM,EHC PROBLEM. EHC governor malfunction led to
reduction of Sec Oil pressure & control valves got closed.
C&I
63. TANDA 3 19-May-14 1:54:00
TURBINE & AUXILARIES,LUB OIL SYSTEM PROB. Unit tripped post
synchronisation while stopping SOP. Standby SOP came in service
following the dip in oil pressure but unit tripped.
TG
64. TANDA 3 22-May-14 25:58:00
TG BEARING VIBRATION HIGH. LPT 4A Blade suspected broken. Unit
came back after balancing.
TG
65. TANDA 3 31-May-14 13:56:00 APH PROBLEM. Bracing fallen. SG
66. TANDA 4 16-May-14 31:23:00 BTL - LTSH TL
67. TANDA 4 18-May-14 0:15:00 MPT turbine Top/Bottom dT high due to fast loading. OPN
68. TANDA 4 26-May-14 1:39:00 FURNACE DISTURBANCE. Unit tripped on Flame failure SG
69. UNCHAHAR 3 14-May-14 0:59:00 TRANSMITTER/SWITCHES PROBLEM, All BFPs tripped C&I
70. UNCHAHAR 3 14-May-14 4:24:00 MAL OPERATION CARDS/PROTECTION, All BFPs tripped. C&I
71. UNCHAHAR 4 19-May-14 28:53:00 BTL - WW TL
72. VINDHYACHAL 1 31-May-14 11:53:00 BTL - ECO TL
73. VINDHYACHAL 2 05-May-14 4:01:00
Unit tripped on Loss of excitation. Channel changeover took place from
channel 1 to 2 but voltage could not be built up and unit tripped.
ELE
74. VINDHYACHAL 3 22-May-14 167:53:00 PLANNED OVERHAUL( ONLY BOILER ) P
75. VINDHYACHAL 6 01-May-14 24:28:00 BTL - ECO TL
76. VINDHYACHAL 7 10-May-14 2:14:00
Unit was running at 500 MW load with Milling system AB, CD,EF, JK in
service ( mill-GH u/p for PM) and tripped on Furnace Pressure V High
Protection at 10:05 Hrs. At the time of tripping bottom ash hopper was
filled up with clinkers with the history of continuous falling of slag.
Analysis revealed that the furnace pressure reached the tripping value
after a small ripple of Furnace Pressure High to the tune of 40 mmwc
indicating sudden dislodging of clinkers from furnace wall. The slagging
tendency of the furnace is collaborated further with high SH spray (Left
& right both) totaling about 120 T/hr.Slagging tendency may be due to
combustion of high ash content in coal with the requirement of higher
primary air flow and comparatively low secondary air in the furnace for
maintaining full load.
SG
77. VINDHYACHAL 8 13-May-14 32:44:00 BTL - WW TL
78. VINDHYACHAL 8 14-May-14 1:10:00
Unit was synchronized at 2314 Hrs and running at 120 MW load
with Milling system AB, CD in service after attending BTL from S
panel. It tripped at 2336 Hrs on Low Forward power protection.It
was observed that the set pressure for HPBP opening was in manual
mode and its set point was at about 55 ksc. As soon as the main
steam pressure reached more than 65 ksc,( 10 ksc more than
set pressure) fast opening of HPBP valves occurred. The machine
shifted from Load Controller to Speed Controller and load reduced to
zero leading to tripping of unit on Low Forward power protection.
Root cause: - Set pressure of HPBP valve opening kept inadvertently
in manual mode with the set point at 55 ksc.
OPN
79. VINDHYACHAL 9 30-May-14 2:50:00
ELECTRICAL SYSTEM,MISCELLANEOUS, Turbine Starting Device
motor got close command and turbine got unloaded and tripped.
ELE
80. VINDHYACHAL 10 10-May-14 140:07:00
GT B phase HV failure took place. Transformer caught fire during the
failure.
ELE
81. VINDHYACHAL 10 23-May-14 3:37:00
Unit tripped on tap changer discrepancy protection due to cable fault in
Off load tap changer.
ELE
82. VINDHYACHAL 11 01-May-14 47:16:00 BTL - WW TL
83. VINDHYACHAL 11 07-May-14 2:11:00
Unit tripped on Loss of fuel when one running PA fan tripped due to local
EPB pressing. PA header pressure collapsed and all mills tripped.
SG
BRIEF OUTAGE DETAILS -FEB14: GAS STATIONS
S.
N
STATION UNIT DATE DURATION BRIEF DESCRIPTRION OF OUTAGE AREA
1. ANTA GT-3 7-May-14 531:23:00 LOW SCHEDULE GR
2. ANTA ST-1 7-May-14 533:30:00 LOW SCHEDULE GR
3. ANTA GT-1 8-May-14 529:22:00 LOW SCHEDULE GR
4. AURAIYA GT-3 1-May-14 3:41:00
GT#3 was running normal at 94.4 MW load. At 11:19 Hrs GT#3
tripped on Reverse Power (Power to trip) protection / Electrical
Fault.On detailed checking it was found that just prior to GT#3
tripping, there was load fluctuation with hunting of gas control valves
CV#165 (pressure control valve) and CV#174 (flow control valve).
Fluctuation increased and gas control valve closed. Interruption of
gas fuel supply, resulted in initiation of reverse power protection thus
tripping the unit.After tripping of GT#3, operation checking of PCV #
165 and FCV # 174 was carried out and observed to be sluggish.
Suspecting problem in the control oil system, the following were
checked: NAS value of control oil of GT#3 was checked and found to
be 8 (on higher side). The control oil quality of GT # 3 was last
checked on 26th APR 2014 with NAS Value normal (< 7). The PQI
(particle quantifier index) of GT # 3 also was last checked (sample
dated 22nd April) in NETRA and found to be normal (value 4, normal
not > 10). As during functional checking of control valve operation, C
& I observed that both control valves, PCV (CV#165) and FCV
(CV#174) were sluggish in operation, they replaced the E/H Servo
valves of both control valves. Subsequently, the functional operation
of both control valves after replacement of servo valves were checked
and found OK. Further Control Valves line filter of CV#165 and supply
filter of GT#3 control oil system were replaced with new ones.
Thereafter control oil system was put in polishing. 10.0 Root cause :
Choking of line filters of Control Valve CV#165 and Servo valve filter
(subsequent to oil top up) caused restricted oil flow in Electro
Hydraulic gas control valve. This caused improper operation of
control valves & load fluctuation. Further closing of control valve
caused Reverse power protection to operate.
TG
5. AURAIYA ST-2 1-May-14 3:41:00
ST#2 was in service with GT#3 only as GT#4 was already under
reserve shutdown. Upon tripping of GT#3 on REVERSE POWER
(POWER TO TRIP)/ Electrical fault protection at 11:19 hrs of
01/05/2014, ST#2 tripped on GT No Load ST Trip protection as per
logic. After normalization, ST#2 rolling started and synchronized at
15.16 hrs of 01.05.2014 with GT#4. Root cause: ST#2 tripped on GT
No Load ST Trip due to tripping of GT#3 (GT#4 already under
shutdown).
TG
6. AURAIYA GT-4 4-May-14 209:15:00 LOW SCHEDULE GR
7. AURAIYA GT-3 12-May-14 2:15:00
ST#2 was in service with GT#3 only as GT#4 was already under
reserve shutdown. GT#3 and ST#2 tripped on generator transformer
HV neutral E/F protection.Heavy spark was observed on the 220 KV
Auraiya Agra 1 circuit near Auraiya switchyard. Just before the
incident, heavy storm started in the area. The sequence of events at
AuGPS are as below.At 17.22.04.33 hrs. Agra 1 Main 1 & Main 2,
zone-1 protection on B-Ph operated opening the B-Phase of the CB.
At 17.22.04.99 B-Ph auto reclosed. At 17.22.05.69 Agra 1, Main 1
and Main 2 protection operated on R phase earth fault. R and Y Ph
of the CB opened but B- Ph did not open.At 17.22.13.84 B phase
earth fault appeared once again.At 17 .22.14.24 GT #3 tripped on
Transformer HV neutral E/F.At 17 .22.14.24 ST #2 tripped on
Transformer HV neutral E/F.Auto transformer 1 & 2 tripped on neutral
E/F protection. During the incident it is noted that fault was changing
from B Ph to R Ph. Initially when single phase fault appeared on
the B phase of the Agra line 1, B- Phase pole opened and closed
successfully on auto reclose. Again R phase earth fault appeared
within the reclaimed time ( 2 seconds ) resulting into the initiation of
three phase trip command. Only R & Y phase pole got opened & B
phase pole did not open. For approx. 8 second, 0.135 Amp (CT Sec.)
current was recorded in B Phase. Thereafter earth fault again
appeared on B phase with approx . 8 Amp (CT Sec). GT #3 tripped
on Transformer HV neutral E/F. ST #2 tripped on Transformer HV
neutral E/F. While checking the Agra line 1 circuit breaker, trip coil of
B Phase was found burnt and body was found cracked. (Both the
trip coil i.e. TC 1 & 2 is mounted on the same moulding.Maintenance
activities carried out earlier on the 220 KV Auraiya Agra 1 circuit at
Auraiya are as: 1. OH of breaker mechanism with OEM : 02.06.2012
2. Annual maintenance and timing test of breaker : 22.06.2013
3. Annual protection testing : 22.06.2013
4. LBB test : 07.11.2013
Following investigations were carried out to ensure the healthiness of
the system prior to restoration.
1. Testing of LBB relay : Found normal.
2. Scheme checking of LBB relay Operation as per scheme
checked and found OK.
3. Inspection of control valve of B- Phase of breaker Found healthy.
4. Replacement of trip coil assembly of B phase.
5. Timing test of circuit breaker Found normal.
Sustained fault in 220 KV Auraiya Agra circuit#1. During clearance of
fault, GT # 3, ST # 2 and Autotransformers tripped at Auraiya end.



ELE
8. AURAIYA ST-2 12-May-14 3:15:00
ST#2 was in service with GT#3 only as GT#4 was already under
reserve shutdown. GT#3 and ST#2 tripped on generator transformer
HV neutral E/F protection
Heavy spark was observed on the 220 KV Auraiya Agra 1 circuit
near Auraiya switchyard. Just before the incident, heavy storm started
in the area. The sequence of events at AuGPS are as below.
1. At 17.22.04.33 hrs. Agra 1 Main 1 & Main 2, zone-1 protection on
B-Ph operated opening the B-Phase of the CB.
2. At 17.22.04.99 B-Ph auto reclosed.
3. At 17.22.05.69 Agra 1, Main 1 and Main 2 protection operated on R
phase earth fault. R and Y Ph of the CB opened but B- Ph did not
open.
4. At 17.22.13.84 B phase earth fault appeared once again.
5. At 17 .22.14.24 GT #3 tripped on Transformer HV neutral E/F
6. At 17 .22.14.24 ST #2 tripped on Transformer HV neutral E/F
7. Auto transformer 1 & 2 tripped on neutral E/F protection.
During the incident it is noted that fault was changing from B Ph to R
Ph. Initially when single phase fault appeared on the B phase of
the Agra line 1, B- Phase pole opened and closed successfully on
auto reclose. Again R phase earth fault appeared within the reclaimed
time ( 2 seconds ) resulting into the initiation of three phase trip
command. Only R & Y phase pole got opened & B phase pole did
not open. For approx. 8 second, 0.135 Amp (CT Sec.) current was
recorded in B Phase. Thereafter earth fault again appeared on B
phase with approx . 8 Amp (CT Sec). GT #3 tripped on Transformer
HV neutral E/F. ST #2 tripped on Transformer HV neutral E/F. While
checking the Agra line 1 circuit breaker, trip coil of B Phase was
found burnt and body was found cracked. (Both the trip coil i.e. TC 1
& 2 is mounted on the same moulding.
Maintenance activities carried out earlier on the 220 KV Auraiya
Agra 1 circuit at Auraiya are as:
1. OH of breaker mechanism with OEM : 02.06.2012
2. Annual maintenance and timing test of breaker : 22.06.2013
3. Annual protection testing : 22.06.2013
4. LBB test : 07.11.2013
Following investigations were carried out to ensure the healthiness of
the system prior to restoration.
1. Testing of LBB relay : Found normal.
2. Scheme checking of LBB relay Operation as per scheme
checked and found OK.
3. Inspection of control valve of B- Phase of breaker Found healthy.
4. Replacement of trip coil assembly of B phase.
5. Timing test of circuit breaker Found normal.
TG
9. DADRI GAS GT-4 4-May-14 90:57:00 LOW SCHEDULE GR

10. DADRI GAS GT-4 15-May-14 276:03:00 LOW SCHEDULE GR
11. FARIDABAD GT-1 27-May-14 25:11:00 RLDC/SLDC MESSAGE GR
12. GANDHAR GT-2 3-May-14 69:47:00 NO SCHEDULE FOR GEN.ON GAS GR
13. GANDHAR GT-1 12-May-14 64:20:00 NO SCHEDULE FOR GEN.ON GAS GR
14. KAWAS ST-2 1-May-14 147:05:00 NO SCHEDULE FOR GEN.ON GAS GR
15. KAWAS GT-4 1-May-14 141:00:00 NO SCHEDULE FOR GEN.ON GAS GR
16. KAWAS GT-3 8-May-14 184:12:00 NO SCHEDULE FOR GEN.ON GAS GR
17. KAWAS ST-2 10-May-14 126:14:00 NO SCHEDULE FOR GEN.ON GAS GR
18. KAWAS GT-4 10-May-14 117:15:00 NO SCHEDULE FOR GEN.ON GAS GR
19. KAWAS GT-1 15-May-14 37:47:00 LOW SCHEDULE GR
20. KAWAS GT-4 15-May-14 17:28:00 NO SCHEDULE FOR GEN.ON GAS GR
21. KAWAS ST-2 16-May-14 26:44:00 Turbine bearing temperature high TG
22. KAWAS GT-4 16-May-14 367:41:00 NO SCHEDULE FOR GEN.ON GAS GR
23. KAWAS GT-3 16-May-14 19:30:00 LOW SCHEDULE GR
24. KAWAS ST-2 17-May-14 343:17:00 NO SCHEDULE FOR GEN.ON GAS GR
25. KAWAS GT-3 17-May-14 55:13:00 LOW SCHEDULE GR
26. KAYAMKULAM GT-2 1-May-14 135:59:00 MANDATORY INSPECTION/OTHERS P
27. KAYAMKULAM GT-1 6-May-14 312:38:00 RLDC/SLDC MESSAGE GR
28. KAYAMKULAM ST-1 7-May-14 305:46:00 RLDC/SLDC MESSAGE GR
29. KAYAMKULAM GT-2 7-May-14 302:42:00 RLDC/SLDC MESSAGE GR
30. KAYAMKULAM GT-1 23-May-14 63:28:00 RLDC/SLDC MESSAGE GR
31. KAYAMKULAM ST-1 23-May-14 65:27:00 RLDC/SLDC MESSAGE GR
32. KAYAMKULAM GT-2 24-May-14 60:19:00 RLDC/SLDC MESSAGE GR