St-1 Boiler Hydrotest Checklist During Short Shutdown Location: Turbine Side
St-1 Boiler Hydrotest Checklist During Short Shutdown Location: Turbine Side
St-1 Boiler Hydrotest Checklist During Short Shutdown Location: Turbine Side
UNIT: DT:
Sl no Status for Location Dept Normalisation
LOCATION: TURBINE SIDE Hydrotest required for BLU
1. CRH line manual drain before and after NRV (Atm drain) Open 0m ME NR
4NOS
2. MS line manual drains (Atm drain). 4NOS Open 0m ME NR
8. MDBFP C R/C CV air line disconnection (Air fail to open) 1+1 Open 8.5m ME CI Normalize
9. TDBFP A&B warm up isolation valves 2 + 2 Close 17.5m ME EL Open for BLU
BMD TMD
MANUAL V/V 78 29
ME-MECHANICAL
EL-ELECTRICAL
CI-C&I