-
Notifications
You must be signed in to change notification settings - Fork 29
Callback reporting usefulness
Ivan edited this page Nov 22, 2019
·
1 revision
In some cases during test method execution different additional long-running actions may be required (video recording/downloading for example) that are executed asynchronously to not interfere with test execution. In 'After' methods results of those actions should be attached to the TestItem. To provide access to the stored TestItems structure from the test context TestItemTree is used and to use it's content for reporting ItemTreeReporter is used.
- Callback reporting
- Nested steps
- Test item attributes
- Test case ID
- Multi-poccess execution