1.
|
Assessing the Performance of the New Beam Wire Scanners for the CERN LHC Injectors
/ Di Carlo, Salvatore (CERN) ; Andreazza, William (CERN) ; Belohrad, David (CERN) ; Emery, Jonathan (CERN) ; Esteban Felipe, Jose (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Guerrero, Ana (CERN) ; Jackson, Stephen (CERN) ; Lacarrere, Guillaume (CERN) et al.
Reliably measuring the transverse beam profile in the LHC injector chain is essential for the operation of the CERN accelerator complex. This report aims to assess the reliability, stability, and reproducibility of a new generation of beam wire scanners developed at CERN in the framework of the LHC Injectors Upgrade (LIU). [...]
2022 - 4 p.
- Published in : JACoW IBIC 2022 (2022) 443-446
Fulltext: PDF;
In : 11th International Beam Instrumentation Conference (IBIC 2022), Cracow, Poland, 11 - 15 Sep 2022, pp.443-446
|
|
2.
|
Commissioning of the LHC Injectors BWS Upgrade
/ Emery, Jonathan (CERN) ; Andreazza, William (CERN) ; Belohrad, David (CERN) ; Di Carlo, Salvatore (CERN) ; Esteban Felipe, Jose C (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Guerrero, Ana (CERN) ; Jackson, Stephen (CERN) ; Lacarrere, Guillaume O (CERN) et al.
A novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision motor controller, high resolution wire position monitoring and wide dynamic range secondary particles detectors. [...]
JACoW, 2021 - 5 p.
- Published in : JACoW IBIC 2021 (2021) 239-243
Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.239-243
|
|
3.
|
Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
/ Di Carlo, S (CERN) ; Emery, J (CERN) ; Andreazza, W (CERN) ; Belohrad, D (CERN) ; Esteban Felipe, J C (CERN) ; Goldblatt, A (CERN) ; Gudkov, D (CERN) ; Guerrero, A (CERN) ; Jackson, S (CERN) ; Lacarrere, G O (CERN) et al.
The LHC Injectors Upgrade (LIU) program included new fast beam wire scanners (BWS) to meet the requirements of the higher brightness and intensity High Luminosity LHC (HL-LHC) beams. Seventeen LIU BWS have been installed during the LHC second long shutdown (LS2) and they are currently used in the daily operations of the LHC injectors. [...]
2023 - 14 p.
- Published in : Nucl. Instrum. Methods Phys. Res., A 1053 (2023) 168328
|
|
4.
|
Laboratory and Beam Based Studies for Assessing the Performance of the New Fast Wire Scanners for the CERN Injector Complex
/ Emery, Jonathan (CERN) ; Andersson, Patrik (CERN) ; Andreazza, William (CERN) ; Fernandez Ochoa, Jose Maria (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Roncarolo, Federico (CERN) ; Sirvent, Jose (CERN) ; Tassan-Viol, Jean (CERN) ; Veness, Raymond (CERN)
At CERN, fast beam wire scanners serve as reference transverse profile monitors in all synchrotrons. As part of the LHC Injector Upgrade project, a new generation of scanners has been designed to improve system reliability, precision and accuracy in view of higher brightness beams. [...]
2019 - 5 p.
- Published in : 10.18429/JACoW-IBIC2019-TUPP033
In : 8th International Beam Instrumentation Conference (IBIC 2019), Malmo, Sweden, 8 - 12 Sep 2019, pp.TUPP033
|
|
5.
|
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN
/ Veness, Raymond (CERN) ; Andersson, Patrik (CERN) ; Andreazza, William (CERN) ; Chritin, Nicolas (CERN) ; Dehning, Bernd (CERN) ; Emery, Jonathan (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Roncarolo, Federico (CERN) ; Sirvent, Jose (CERN) et al.
A new generation of fast wire scanners is being developed for the LHC Injectors Upgrade (LIU) project at CERN. These will be essential tools for transverse profile measurement with the higher brightness LIU beams, and are planned for installation in 2019 in all three synchrotrons making up the LHC injector chain. [...]
CERN-ACC-2017-199.-
2017 - 3 p.
- Published in : 10.18429/JACoW-IPAC2017-MOPAB121
Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.MOPAB121
|
|
6.
|
Performance Assessment of Pre-Series Fast Beam Wire Scanner Prototypes for the Upgrade of the CERN LHC Injector Complex
/ Sirvent, Jose (CERN) ; Andersson, Patrik (CERN) ; Andreazza, William (CERN) ; Dehning, Bernd (CERN) ; Emery, Jonathan (CERN) ; Garcia, Lionel (CERN) ; Gudkov, Dmitry (CERN) ; Roncarolo, Federico (CERN) ; Tassan-Viol, Jean (CERN) ; Trad, Georges (CERN) et al.
A new generation of beam wire scanner (BWS), for transversal beam profile monitoring, is under development on the framework of the LHC Injector Upgrade project at CERN. Two pre-series prototypes have been built and installed in the Super Proton Synchrotron and Proton Synchrotron Booster, to assess the performance of the upgraded BWS concept. [...]
2018 - 4 p.
- Published in : 10.18429/JACoW-IBIC2017-WEPCC03
Fulltext: PDF;
In : 6th International Beam Instrumentation Conference, Grand Rapids, MI, USA, 20 -24 Aug 2017, pp.WEPCC03
|
|
7.
|
The Digital Signal Processing Chain of the CERN LIU BWS
/ Belohrad, David (CERN) ; Emery, Jonathan (CERN) ; Esteban Felipe, Jose (CERN) ; Goldblatt, Aurélie (CERN) ; Guerrero, Ana (CERN) ; Martin Nieto, Miguel (CERN) ; Roncarolo, Federico (CERN)
Between 2019 and 2023, as part of the LHC Injectors Upgrade (LIU), a major renovation of the CERN wire scanners (BWS) was performed. The main driving force was to prepare the wire scanners for the High-Luminosity LHC (HL-LHC), during which the instantaneous luminosity is expected to double, to around 5× 10³⁴cm⁻²s⁻¹. [...]
2023 - 5 p.
- Published in : JACoW IBIC 2023 (2023) 288-292
Fulltext: PDF;
In : 12th International Beam Instrumentation Conference (IBIC 2023), Saskatoon, Canada, 10 - 14 Sep 2023, pp.288-292
|
|
8.
|
|
9.
|
Experience from the Construction of a New Fast Wire Scanner Prototype for the CERN- SPS and its Optimisation for Installation in the CERN-PS Booster
/ Veness, Raymond (CERN) ; Andreazza, William (CERN) ; Chritin, Nicolas (CERN) ; Dehning, Bernd (CERN) ; Emery, Jonathan (CERN) ; Gudkov, Dmitry (CERN) ; Herranz, Juan (CERN) ; Magagnin, Paolo (CERN) ; Piselli, Emiliano (CERN) ; Samuelsson, Sebastian (CERN)
A new design of wire scanner is under development for the LHC Injector Upgrade project at CERN. A prototype has been designed, built and installed in the SPS accelerator to test the concept in an operational accelerator environment. [...]
2016 - 4 p.
- Published in : 10.18429/JACoW-IBIC2015-TUPB061
Fulltext: PDF;
In : International Beam Instrumentation Conference , Melbourne, Australia, 13 - 17 Sep 2015, pp.TUPB061
|
|
10.
|
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain
/ Roncarolo, Federico (CERN) ; Bart Pedersen, Stephane (CERN) ; Belleman, Jeroen (CERN) ; Belohrad, David (CERN) ; Bozzolan, Michele (CERN) ; Bracco, Chiara (CERN) ; Di Carlo, Salvatore (CERN) ; Emery, Jonathan (CERN) ; Goldblatt, Aurélie (CERN) ; Guerrero, Ana (CERN) et al.
The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. [...]
Geneva : JACoW, 2021 - 4 p.
- Published in : JACoW IPAC 2021 (2021) 976-979
Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.976-979
|
|