CERN Accelerating science

CERN Document Server 2,043 registres trobats  1 - 10següentfinal  anar al registre: La cerca s'ha fet en 0.36 segons. 
1.
Automating beam dump failure detection using computer vision / Huhn, Francisco (CERN) ; Goddard, Brennan (CERN) ; Velotti, Francesco (CERN) ; Bencini, Vittorio (CERN)
The CERN SPS Beam Dump System (SBDS) is responsible for disposing the beam in the SPS in case of any machine malfunctioning or end of cycled operation.This is achieved by the actuation of kicker magnets with predefined pulses, which aim to: i) deviate the beam towards the absorber block (TIDVG); ii) dilute the particle density. Evidently, a malfunction of this system may have negative consequences, such as the absorber block degrading if the beam is not sufficiently diluted, unwanted activation of the surroundings or even damage to the vacuum chamber in case of complete failure.By leveraging a combination of real images from a beam screen device and data from simulations, we train an online monitoring system to identify potential failures of the SBDS from real-time images. [...]
2023 - 4 p. - Published in : JACoW IPAC 2023 (2023) THPL017 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.THPL017
2.
Beam Profile Measurements as Part of the Safe and Efficient Operation of the New SPS Beam Dump System / Topaloudis, Athanasios (CERN) ; Bravin, Enrico (CERN) ; Burger, Stephane (CERN) ; Jackson, Stephen (CERN) ; Velotti, Francesco (CERN) ; Veyrunes, Eric (CERN)
In the framework of the LHC Injectors Upgrade (LIU) project, the Super Proton Synchrotron (SPS) accelerator at CERN is undergoing a profound upgrade including a new high-energy beam dump. The new Target Internal Dump Vertical Graphite (TIDVG#5) is designed to withstand an average dumped beam power as high as 235 kW to cope with the increased intensity and brightness of the LIU beams whose energies in the SPS range from 14 to 450 GeV. [...]
2022 - 4 p. - Published in : JACoW ICALEPCS2021 (2022) 764-767 Fulltext: PDF;
In : 18th International Conference on Accelerator and Large Experimental Physics Control Systems, Online, 18 - 22 Oct 2021, pp.764-767
3.

CERN-PHOTO-201909-258
© 2019-2022 CERN
The SPS beam dump, TIDVG
TIDVG
20-09-2019
More >>
4.
Analysis and Operational Feedback of the New High-Energy Beam Dump in the CERN SPS / Perillo-Marcone, Antonio (CERN) ; Calviani, Marco (CERN) ; Illan Fiastre, Ricardo (CERN) ; Rios Rodriguez, Paula (CERN) ; Romagnoli, Giulia (CERN)
The CERN Super Proton Synchrotron (SPS) high-energy internal dump (TIDVG) is used to intercept beam dumps from 10².2 to 450 GeV. An inspection in 2013 revealed significant beam induced damage to the aluminium absorbing block, resulting in operational limitations to minimize the risk of reproducing this phenomenon. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-WEPMG003 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPMG003
5.
CERN SPS Dilution Kicker Vacuum Pressure Behaviour under Unprecedented Beam Brightness / Velotti, Francesco (CERN) ; Barnes, Michael (CERN) ; Bartmann, Wolfgang (CERN) ; Bartosik, Hannes (CERN) ; Carlier, Etienne (CERN) ; Favia, Giorgia (CERN) ; Karpov, Ivan (CERN) ; Li, Kevin (CERN) ; Magnin, Nicolas (CERN) ; Mether, Lotta (CERN) et al.
The Super Proton Synchrotron (SPS) is the second largest synchrotron at CERN and produces high-brightness beams for the Large Hadron Collider (LHC). Recently, the dilution kicker (MKDH) of the SPS beam dump system (SBDS) has demonstrated unanticipated behaviour under high beam brightness conditions. [...]
2024 - 4 p. - Published in : JACoW HB 2023 (2024) 447-450 Fulltext: PDF;
In : 68th ICFA Advanced Beam Dynamics workshop on high-Intensity and High-Brightness Hadron Beams (HB 2023), CERN, Geneva, Switzerland, 9 - 13 Oct 2023, pp.447-450
6.
New CERN SPS Beam Dump Imaging System / Burger, Stephane (CERN) ; Bravin, Enrico (CERN) ; Roncarolo, Federico (CERN) ; Topaloudis, Athanasios (CERN) ; Velotti, Francesco (CERN) ; Veyrunes, Eric (CERN)
As part of the LHC injector Upgrade (LIU), the CERN SPS is now equipped with a new Beam Dumping System (SBDS) designed to cope with the high power beams foreseen for the High Luminosity LHC (HL-LHC) era. Before reaching the dump, the proton beam (from 26 to 450 GeV) is vertically kicked and then diluted passing through a series of horizontal and vertical bumps. [...]
JACoW, 2021 - 5 p. - Published in : JACoW IBIC 2021 (2021) 254-258 Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.254-258
7.

CERN-PHOTO-202008-109
© 2020-2022 CERN
SPS beam dump shielding (TIDVG5) installation
Transport to BB5 of the TIDVG5 SPS beam dump and t [...]
26-08-2020
More >>
8.
Absorber blocks for internal and external beam dumping at the SPS
CERN-LabII-BT-74-4 - 1974. - 56 p.
9.
SPS Beam Dump Enhancements on Tracking and Synchronization / Voumard, Nicolas (CERN) ; Magnin, Nicolas (CERN) ; Van Trappen, Pieter (CERN)
During Long Shutdown 2 (LS2) at CERN, the SPS Beam Dumping System (SBDS) was completely renovated and relocated to SPS Point 5. This allowed to deploy at the SPS the Beam Energy Tracking System (BETS) and the Trigger Synchronization Unit (TSU), initially designed for and operational at the LHC Beam Dumping System (LBDS). [...]
2023 - 5 p. - Published in : JACoW ICALEPCS 2023 (2023) 1444-1448 Fulltext: PDF;
In : 19th International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS 2023), Cape Town, South Africa, 7 - 13 Oct 2023, pp.1444-1448
10.
SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade / Van Trappen, Pieter (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Namora, Vasco (CERN) ; Senaj, Viliam (CERN) ; Velotti, Francesco (CERN) ; Voumard, Nicolas (CERN)
In order to overcome several machine limitations, the SBDS has been relocated from LSS1 (Long Straight Section 1) to LSS5 during LS2 (Long Shutdown 2) with an important upgrade of the extraction kicker installation. An additional vertical deflection kicker magnet (MKDV) was produced and installed while the high voltage (HV) pulse generators have been upgraded by changing gas-discharge switches (thyratrons and ignitrons) to semiconductor stacks operating in oil. [...]
2022 - 3 p. - Published in : JACoW IPAC 2022 (2022) 2530-2532 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2530-2532

No heu trobat el que estaveu cercant? Proveu la vostra cerca a:
recid:2886719 dins Amazon
recid:2886719 dins CERN EDMS
recid:2886719 dins CERN Intranet
recid:2886719 dins CiteSeer
recid:2886719 dins Google Books
recid:2886719 dins Google Scholar
recid:2886719 dins Google Web
recid:2886719 dins IEC
recid:2886719 dins IHS
recid:2886719 dins INSPIRE
recid:2886719 dins ISO
recid:2886719 dins KISS Books/Journals
recid:2886719 dins KISS Preprints
recid:2886719 dins NEBIS
recid:2886719 dins SLAC Library Catalog