Title
| Commissioning of the betatron squeeze to 1 m in IR1 and IR5 |
Author(s)
|
Assmann, R (CERN) ; Bruce, R (CERN) ; Giovannozzi, M (CERN) ; Lamont, M (CERN) ; Maclean, E (Oxford U, Particle Physics) ; Miyamoto, R (ESS, Lund) ; Mueller, G ; Papotti, G (CERN) ; Ponce, L (CERN) ; Redaelli, S (CERN) ; Tomas, R (CERN) ; Vanbavinckhove, G (CERN) ; Wenninger, J (CERN) Mostrar todos los 13 autores |
Corporate author(s)
| CERN. Geneva. ATS Department |
Publication
| 2012 |
Imprint
| 18 Jan 2012 |
Number of pages
| mult. |
Subject category
| Accelerators and Storage Rings |
Accelerator/Facility, Experiment
| CERN LHC |
Keywords
| betatron squeeze ; MD3 |
Abstract
| This note summarizes the commissioning of the betatron squeeze from 1.5 m to 1 m performed during MD3. The MD3 work included measurements of the optics, setting up of the collimation system for tight settings, validation of the collimation settings and a test ramp with higher intensity to probe long-range beam-beam effects. |