Guidelines on survey implementation
These guidelines operate as a portal, and follow the structure of the Generic Statistical Business Process Model (GSBPM v4.0), which describes statistical processes—such as the implementation of a survey—in a coherent way.
The GSBPM contains nine phases, each divided into sub-processes. In this section, we provide a brief description of each phase (adapted from the GSBPM model description), followed by recommended related resources (i.e., documents, tools, and links).
Structure of the Model
The 9 GSBPM phases are the following:
- Specify the data needs
- Design
- Build
- Collect (includes data entry)
- Process (includes data editing)
- Analyse
- Disseminate
- Archive
- Evaluate
In addition to these 9 phases, the GSBPM includes two overarching components: