CERN Accelerating science

CERN Document Server 2,049 のレコードが見つかりました。  1 - 10次最後  レコードへジャンプ: 検索にかかった時間: 0.49 秒 
1.
Improvements on the LHC Interlock BPM system / Bozzolan, Michele (CERN) ; Boccardi, Andrea (CERN) ; Guillot-Vignot, Franck (CERN) ; Degl'Innocenti, Irene (CERN) ; Daricou, Joel (CERN) ; Wendt, Manfred (CERN) ; Barros Marin, Manoel (CERN)
The LHC interlock BPM system is used as part of the beam abort system to insure that beam trajectories in those regions are conform with a safe extraction of the beams from the main ring to the dump lines. After more than 10 years of operation, the system has shown some limitations in bandwidth and dynamic range and a study was initiated to look for improvements. [...]
2023 - 4 p. - Published in : JACoW IPAC 2023 (2023) THPL090 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.THPL090
2.
The Installation and Commissioning of the AWAKE Stripline BPM / Liu, Shengli (TRIUMF) ; Dirksen, Paul (TRIUMF) ; Gessner, Spencer (CERN) ; Guillot-Vignot, Franck (CERN) ; Medina, David (CERN) ; Søby, Lars (CERN) ; Verzilov, Victor (TRIUMF)
AWAKE (The Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN) stripline BPMs are required to measure the position of the single electron bunch to a position resolution of less than 10 µm rms for electron charge of 100 pC to 1 nC. This paper describes the design, installation and commissioning of a such BPM system developed by TRIUMF (Canada). [...]
JACoW, 2019 - 4 p. - Published in : 10.18429/JACoW-IBIC2018-TUPB01 Published fulltext: PDF;
In : 7th International Beam Instrumentation Conference, Shanghai, China, 9 - 13 Sep, 2018, pp.TUPB01
3.
Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron / Boccardi, Andrea (CERN) ; Albertone, Joel (CERN) ; Barros Marin, Manoel (CERN) ; Bogey, Thierry (CERN) ; Kain, Verena (CERN) ; Li, Kevin S B (CERN) ; Malinowska, Patrycja A (CERN ; AGH-UST, Cracow) ; Topaloudis, Athanasios (CERN) ; Wendt, Manfred (CERN)
The Super Proton Synchrotron (SPS) is both, the final machine in the pre-accelerator chain of the Large Hadron Collider (LHC) at CERN, and a machine providing several experiments with proton and ion beams. In the framework of CERN’s LHC Injectors Upgrade (LIU) project, aimed at improving the performances of the pre-accelerators in view of the high-luminosity upgrade of the LHC, the Beam Position Monitor (BPM) system of the SPS was redesigned during Run 2 of the LHC and deployed during the subsequent Long Shutdown 2 (LS2). [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IBIC 2021 (2021) 96-99 Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.96-99
4.
Technology and First Beam Tests of the New CERN-SPS Beam Position System / Wendt, Manfred (CERN) ; Barros Marin, Manoel (CERN) ; Boccardi, Andrea (CERN) ; Bogey, Thierry (CERN) ; Degl'Innocenti, Irene (CERN) ; Topaloudis, Athanasios (CERN)
The CERN Super Proton Synchrotron (SPS) uses 215 beam position monitors (BPMs) to observe the beam orbit when accelerating protons or ions on a fast ramp cycle to beam energies of up to 450 GeV/c. In the frame of the CERN LHC Injector Upgrade (LIU) initiative the aged, and difficult to maintain homodyne-receiver based BPM read-out system is currently being upgraded with A Logarithmic Position System - ALPS. [...]
2019 - 5 p. - Published in : 10.18429/JACoW-IBIC2019-WEPP046 Fulltext: PDF;
In : 8th International Beam Instrumentation Conference (IBIC 2019), Malmo, Sweden, 8 - 12 Sep 2019, pp.WEPP046
5.
A Modular Approach to Acquisition Systems for Future CERN Beam Instrumentation Developments / Boccardi, Andrea (CERN) ; Barros Marin, Manoel (CERN) ; Levens, Thomas (CERN) ; Szuk, Balint (CERN) ; Viganò, William (CERN) ; Zamantzas, Christos (CERN)
This paper will present the new modular architecture adopted as a baseline by the CERN Beam Instrumentation Group for its future acquisition system developments. The main blocks of this architecture are: radiation tolerant digital front-ends; a latency deterministic multi gigabit optical link; a high pin count FMC carrier used as a VME-based back-end for data concentration and processing. [...]
2015 - 4 p. - Published in : 10.18429/JACoW-ICALEPCS2015-THHB2O02 Fulltext: PDF; External link: JACoW
In : 15th International Conference on Accelerator and Large Experimental Physics Control Systems, Melbourne, Australia, 17 - 23 Oct 2015, pp.THHB2O02
6.
Harmonic Based Beam Position Measurements on Debunched Beams / Bozzolan, Michele (CERN)
In some accelerator environments, e.g. in linear accelerator (LINAC), the beam position is measured with a BPM operating at one particular strong harmonic component present in the beam signal. [...]
JACoW, 2021 - 4 p. - Published in : JACoW IBIC 2021 (2021) 104-107 Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.104-107
7.
A prototype cavity beam position monitor for the CLIC Main Beam / Cullinany , F (CERN) ; Boogert, S T (Oxford U., JAI) ; Joshi, N (Oxford U., JAI) ; Lyapin, A (Oxford U., JAI) ; Bastard, D (CERN) ; Calvo, E (CERN) ; Chritin, N (CERN) ; Guillot-Vignot, F (CERN) ; Lefevre, T (CERN) ; Søby, L (CERN) et al.
The Compact Linear Collider (CLIC) places unprecedented demands on its diagnostics systems. [...]
CERN-ATS-2012-282.
- 2012. - 3 p.
Full text
8.
Performance of the AWAKE Proton Beam Line Beam Position Measurement System at CERN / Barros Marin, Manoel (CERN) ; Boccardi, Andrea (CERN) ; Bogey, Thierry (CERN) ; Boix Gargallo, Juan (ICREA, Barcelona) ; Gonzalez, Jose (CERN) ; Jensen, Lars (CERN) ; Lefèvre, Thibaut (CERN) ; Medina, David (CERN) ; Wendt, Manfred (CERN)
The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE), based at CERN, explores the use of a proton driven plasma wake-field to accelerate electrons at high energies over short distances. This paper introduces the Beam Position Measurement (BPM) system of the proton beamline and its performance. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IBIC2017-TUPCF06 Fulltext: PDF;
In : 6th International Beam Instrumentation Conference, Grand Rapids, MI, USA, 20 -24 Aug 2017, pp.TUPCF06
9.
BPM Time of Flight Measurements for Setting-up the RF Cavities of the CERN Linac4 / Bozzolan, Michele (CERN)
The newly constructed H$^-$ LINAC4 at CERN has recently completed its first extended reliability run. It is equipped with Beam Position Monitors (BPMs) based on shorted-stripline pick-up electrodes to measure both position and Time of Flight (ToF). [...]
CERN-ACC-2018-191.- 2018 - 3 p. - Published in : 10.18429/JACoW-LINAC2018-THPO084 Fulltext: thpo084 - PDF; thpo084_2 - PDF;
In : 29th International Linear Accelerator Conference, Beijing, China, 16 - 21 Sep 2018, pp.THPO084
10.
New Beam Position Monitors for the CERN LINAC3 to LEIR Ion Beam Transfer Line / Søby, Lars (CERN) ; Baud, Guillaume (CERN) ; Bozzolan, Michele (CERN) ; Scrivens, Richard (CERN)
The ion injection line into the CERN Low Energy Ion Ring (LEIR) has recently been equipped with nine, new, electrostatic Beam Position Monitors (BPMs) in order to measure and optimize the trajectory of the low intensity ion beams coming from LINAC3. In this paper, we describe the design of the BPM, the low noise charge amplifier mounted directly on the BPM, and the digital acquisition system. [...]
JACoW, 2019 - 4 p. - Published in : 10.18429/JACoW-IBIC2018-TUPB14 Published fulltext: PDF;
In : 7th International Beam Instrumentation Conference, Shanghai, China, 9 - 13 Sep, 2018, pp.TUPB14

捜していたものを見つけなかったならば、他のサーバーもお試しください:
recid:2886623 中の Amazon
recid:2886623 中の CERN EDMS
recid:2886623 中の CERN Intranet
recid:2886623 中の CiteSeer
recid:2886623 中の Google Books
recid:2886623 中の Google Scholar
recid:2886623 中の Google Web
recid:2886623 中の IEC
recid:2886623 中の IHS
recid:2886623 中の INSPIRE
recid:2886623 中の ISO
recid:2886623 中の KISS Books/Journals
recid:2886623 中の KISS Preprints
recid:2886623 中の NEBIS
recid:2886623 中の SLAC Library Catalog