CERN Accelerating science

Published Articles
Title The Installation and Commissioning of the AWAKE Stripline BPM
Author(s) Liu, Shengli (TRIUMF) ; Dirksen, Paul (TRIUMF) ; Gessner, Spencer (CERN) ; Guillot-Vignot, Franck (CERN) ; Medina, David (CERN) ; Søby, Lars (CERN) ; Verzilov, Victor (TRIUMF)
Publication JACoW, 2019
Number of pages 4
In: 7th International Beam Instrumentation Conference, Shanghai, China, 9 - 13 Sep, 2018, pp.TUPB01
DOI 10.18429/JACoW-IBIC2018-TUPB01
Subject category Accelerators and Storage Rings ; Detectors and Experimental Techniques
Accelerator/Facility, Experiment CERN AWAKE
Abstract AWAKE (The Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN) stripline BPMs are required to measure the position of the single electron bunch to a position resolution of less than 10 µm rms for electron charge of 100 pC to 1 nC. This paper describes the design, installation and commissioning of a such BPM system developed by TRIUMF (Canada). Total 12 BPMs and electronics had been installed on AWAKE beam lines and started commissioning since Fall of 2017. The calibration and measurement performance are also reviewed.
Copyright/License publication: © 2018-2025 Authors (License: CC-BY-3.0)

Corresponding record in: Inspire


 レコード 生成: 2020-04-26, 最終変更: 2020-05-03


Published fulltext:
Download fulltext
PDF