CERN Accelerating science

CERN Document Server Encontrados 2,051 registros  1 - 10siguientefinal  ir al registro: La búsqueda tardó 0.37 segundos. 
1.
Construction and test of the final CMS barrel drift tube muon chamber prototype / Aguilar-Benítez, M ; Alberdi, J ; Arneodo, M ; Banicz, K ; Benettoni, M ; Benvenuti, Alberto C ; Bethke, Siegfried ; Cerrada, M ; Cirio, R ; Colino, N et al.
A prototype of the CMS Barrel Muon Detector incorporating all the features of the final chambers was built using the mass production assembly procedures and tools. The performance of this prototype was studied in a muon test beam at CERN and the results obtained are presented in this paper. [...]
2002 - Published in : Nucl. Instrum. Methods Phys. Res., A 480 (2002) 658-69
2.
Study of magnetic field effects in drift tubes for the barrel muon chambers of the CMS detector at the LHC / Aguilar-Benítez, M ; Arneodo, M ; Benettoni, M ; Benvenuti, A C ; Bergudo, J ; Bethke, Siegfried ; Cerrada, M ; Cirio, R ; Colino, N ; Conti, F et al.
1998 - Published in : Nucl. Instrum. Methods Phys. Res., A 416 (1998) 243-252
3.
Performance of the drift tubes for the barrel muon chambers of the CMS detector at LHC / Benettoni, M ; Benvenuti, Alberto C ; Berdugo, J ; Bethke, Siegfried ; Cerrada-Canales, M ; Colino, N ; De Giorgi, M ; De Min, A ; Dosselli, U ; Fanin, C et al.
1998 - Published in : Nucl. Instrum. Methods Phys. Res., A 410 (1998) 133-147
4.
Simulations in the development of the barrel muon chambers for the CMS detector at LHC / Benvenuti, Alberto C ; Berdugo, J ; Bethke, Siegfried ; Cerrada-Canales, M ; Colino, N ; Fehr, B ; Gasparini, F ; Giordano, V ; Guaita, P ; Ladrón de Guevara, P et al.
1998 - Published in : Nucl. Instrum. Methods Phys. Res., A 405 (1998) 20-29
5.
CMS MAB prototype-deformation test under load and humidity -measurements from deformation test under load and humidity planarity of the MAB measurements from 29th July until 31st Octobre 2002 at CERN (ISR/14) / Carneiro, C
CMS-MA-UR-0001. - Geneva : CERN, 2002. - 34 p.

Fulltext
6.
Performance and Mechanical Tolerances Achieved with a Full Size Prototype of a CMS Barrel Muon Drift Tubes Chamber / Bethke, Siegfried (ACHEN-3A, RWTH, III. Physik. Inst. , Aachen, Germany) ; Aguilar-Benítez, Manuel (CIEMAT, Centro de Investigaciones Energeticas Medioambientales y Tecnologicas, Madrid, Spain) ; Benettoni, Massimo ; Benvenuti, Alberto (INFN, Bologna ; CERN) ; Berdugo, Javier (CIEMAT, Centro de Investigaciones Energeticas Medioambientales y Tecnologicas, Madrid, Spain) ; Cerrada, Marcos (CIEMAT, Centro de Investigaciones Energeticas Medioambientales y Tecnologicas, Madrid, Spain) ; Colino, Nicanor (CIEMAT, Centro de Investigaciones Energeticas Medioambientales y Tecnologicas, Madrid, Spain) ; Conti, Enrico ; Dallavalle, Gaetano-Marco (Univ. di Bologna e Sez. dell' INFN, Bologna, Italy) ; Daniel, Manuel (CIEMAT, Centro de Investigaciones Energeticas Medioambientales y Tecnologicas, Madrid, Spain) et al.
The barrel muon chambers of the CMS experiment are made assembling 3 independent modules ( SuperLayers) which together measure the impact point and the angles theta and phi. Each SuperLayer consists of four layers of rectangular Drift Tubes. [...]
CMS-NOTE-1998-064.- Geneva : CERN, 1998 Fulltext: PDF PS.Z;
7.
Diseño y estudio de cámaras de deriva para el detector CMS de LHC / Mocholí-Mocholí, J
Madrid : Madrid Univ., 1998.

Access to fulltext document
8.
Double Camera Test for the CMS Muon Barrel Position Monitoring System. / Bencze, Gyorgy (CERN ; KFKI Institute for Particle and Nuclear Physics, Budapest, Hungary) ; Brunel, Laurent ; Gibson, S M ; Mocholí-Mocholí, J
This note describes the preliminary tests for the Compact Muon Solenoid Position Monitoring System and in particular, the testing of a crucial optical component called the double camera. We focus on the computer simulation of this device using the Simulgeo language and the examination of the performance of this model in the laboratory. [...]
CMS-NOTE-2000-049.- Geneva : CERN, 2000 Fulltext: PDF PS.Z;
9.
Test beam analysis of the first CMS drift tube muon chamber / Albajar, C ; Amapane, N ; Arce, P ; Autermann, C ; Bellato, M ; Benettoni, M ; Benvenuti, Alberto C (CERN ; INFN, Bologna) ; Bontenackels, M ; Caballero, J ; Cavallo, F R et al.
In October 2001 the first produced CMS Barrel Drift Tube (DT) Muon Chamber was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A Resistive Plate Chamber (RPC) was attached to the top of the DT chamber, and, for the first time, both detectors were operated coupled together. [...]
2004 - Published in : Nucl. Instrum. Methods Phys. Res., A 525 (2004) 465-484
10.
CMS TriDAS project : Technical Design Report, Volume 1: The Trigger Systems
CERN-LHCC-2000-038 CMS-TDR-6-1. - 599 p. (Technical design report. CMS ; 6.1)


¿No ha encontrado lo que estaba buscando? Intente su búsqueda en:
recid:567321 en Amazon
recid:567321 en CERN EDMS
recid:567321 en CERN Intranet
recid:567321 en CiteSeer
recid:567321 en Google Books
recid:567321 en Google Scholar
recid:567321 en Google Web
recid:567321 en IEC
recid:567321 en IHS
recid:567321 en INSPIRE
recid:567321 en ISO
recid:567321 en KISS Books/Journals
recid:567321 en KISS Preprints
recid:567321 en NEBIS
recid:567321 en SLAC Library Catalog