Abstract
| Muon colliders offer enormous potential for research of the particle physics frontier. Leptons can be accelerated without suffering large synchrotron radiation losses. The International Muon Collider Collaboration is considering 3 and 10 TeV (CM) machines for a conceptual stage. In the core of the Muon Collider facility lays a MW class production target, which will absorb a high power (1 and 3 MW) proton beam to produce muons via pion decay. The target must withstand high dynamic thermal loads induced by 2 ns pulses at 5-50 Hz. Also, operational reliability must be guaranteed to reduce target exchanges to a minimum. Several technologies for these systems are being studied in different laboratories. We present in this paper the results of a preliminary feasibility study of a graphite-based target, and the different layouts under study for a demonstrator target complex at CERN. Synergies with advanced nuclear systems are being explored for the development of a liquid metal target. |