0% found this document useful (0 votes)
6 views11 pages

ASIC II OpenSPARC Final Presentation

The presentation details the completion of the ICC Compiler part for both 90NM and FPU Array, following the earlier completion of the DC Compiler. It includes results on power, area, timing, and cell density, with a total power consumption of 1.4894e4 uW. Future work includes Primetime testing and potential projects at 32NM and 45NM if time permits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views11 pages

ASIC II OpenSPARC Final Presentation

The presentation details the completion of the ICC Compiler part for both 90NM and FPU Array, following the earlier completion of the DC Compiler. It includes results on power, area, timing, and cell density, with a total power consumption of 1.4894e4 uW. Future work includes Primetime testing and potential projects at 32NM and 45NM if time permits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 11

ASIC II OpenSPARC

Final Presentation
Presented By Sean Zarzycki, Abesh Dhuka, David Herbert
INTRODUCTION

• Last time…
• Finished DC complier part for 90NM
• Started to work on bonus part of the project
• This time…
• Finished ICC Complier part for 90NM
• Finished ICC Complier part for FPU Array
90NM ICC Complier Scripts

FIGURE 1: Run Single FPU Script


• Divided Into 3 parts
• Defining the files
• Testing the design using the following parameters
• 333.333 MHZ Clock
• .1 Transition
• .1 derate
• .2 latency
• Writing the necessary files
90NM ICC COMPLIER SCRIPTS (Contd)

FIGURE 2: FPU Floorplanning Script


Also divided into 3 parts
• Setup
• Floorplanning
• Routing
90NM Results

FIGURE 3 (LEFT): PRE ROUTING FIGURE 4(RIGHT): AFTER


ROUTING
90NM Results

FIGURE 3 (LEFT): CLOCK TREE FIGURE 4(RIGHT): CELL


DENSITY
90NM Results

• FIGURE 5: Power Results. Main takeaway is that total power


is 1.4894e4 uW
90NM Results

• FIGURE 6 (LEFT): Area FIGURE 7(RIGHT):Timing


FPU Array Results

FIGURE 8 (LEFT): Clock Tree FIGURE 9 (RIGHT): Global Con


Map
FPU Array Results

• From Left to Right


• Hierarchy (Figure 10)
• Voltage Drop (Figure 11)
• Cell Density (Figure 12)
Conclusion

• Pretty Content with ICC Results


• Things left to do
• Primetime testing
• 32NM and 45NM work (If time is
available!)
• QUESTIONS?
THANK YOU FOR PAYING ATTENTION
TO THIS PRESENTATION!

You might also like