0% found this document useful (0 votes)
8 views16 pages

Team 5

The document outlines a maintenance schedule for CNC machines, detailing tasks to be performed daily, weekly, every three months, and every six months or 1000 hours. Key maintenance activities include checking hydraulic pressure, lubrication levels, and cleaning various components to ensure optimal operation. The conclusion emphasizes the importance of regular maintenance to prevent breakdowns and extend equipment lifespan.

Uploaded by

tranvietthanh04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views16 pages

Team 5

The document outlines a maintenance schedule for CNC machines, detailing tasks to be performed daily, weekly, every three months, and every six months or 1000 hours. Key maintenance activities include checking hydraulic pressure, lubrication levels, and cleaning various components to ensure optimal operation. The conclusion emphasizes the importance of regular maintenance to prevent breakdowns and extend equipment lifespan.

Uploaded by

tranvietthanh04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 16

ENGLISH

FOR MECHANICAL ENGINEERING 5


Group 5
GROUP 5
group members

Trần Bá Anh Lại Tuấn Anh Phạm Như Đức

Nguyễn Hải Long Nguyễn Duy Vũ


Group 5 2 3 4 5 6
1

Presentation content
CNC Machine Maintenance schedule
Group 5 2 3 4 5 6
1
I : Daily
Ghi chú nội dung 1
WORKS THAT
NEED TO BE Ghi chúII nội
: Weekly
dung 2
DONE
Ghithree
III : Every chú nội dung or
months 3 500 hours

Ghi chú nội dung 4


IV: Every six months or 1000 hours
Group 5 1 3 4 5 6
2

I: MAINTENANCE WORK THAT


NEEDS TO BE DONE EVERY DAY
Group 5 1 3 4 5 6
2

MAINTENANCE
- Check the hydraulic pressure,
WORK THAT making sure they’re operating at the
NEEDS TO BE right levels

DONE EVERY DAY


- Check lubrication operating levels,
and replenish if necessary
Group 5 1 3 4 5 6
2

- Make sure the cooling unit is


operating correctly

- Clean off the window, door, and


light of the machine so you can see
clearly inside
Group 5 1 3 4 5 6
2

II: MAINTENANCE WORK THAT


NEEDS TO BE DONE WEEKLY
Group 5 1 2 4 5 6
3

MAINTENANCE
WORK NEEDS TO
BE DONE WEEKLY
- Take the filter of the control
cabinet and clean it to allow
air to flow through for
cooling
Group 5 1 2 3 5 6
4

III :MAINTENANCE WORK THAT


NEEDS TO BE DONE EVERY
THREE MOTHS OR 500 HOURS
Group 5 1 2 3 5 6
4

MAINTENANCE WORK - Check and clean the


coolant filters.
THAT NEEDS TO BE
DONE EVERY THREE - Grease the chains
MOTHS OR 500
HOURS
Group 5 1 2 3 4 6
5

IV: MAINTENANCE WORK


THAT NEEDS TO BE DONE
EVERY SIX MONTHS OR
1000 HOURS
Group 5 1 2 3 4 6
5

MAINTENANCE WORK - Clean the coolant tank and the


radiator.
THAT NEEDS TO BE - Drain and clean the hydraulic
DONE EVERY SIX tank, and replace filters
MONTHS OR 1000
HOURS
- Drain and clean the
lubrication unit.
- Check and adjust the levelin
of your machine
Group 5 1 2 3 4 5 6
6

V: CONCLUSION
Group 5 1 2 3 4 5 6
6

CONCLUSION
Maintenance is an important action
taken to keep machinery, equipment,
or systems functioning optimally and
to prevent breakdowns. It involves
inspections, repairs, replacements,
and regular servicing to extend the
lifespan of equipment and ensure
operational safety.
NỘI DUNG 4
Ghi chú nội dung 4

THANKS FOR WATCHING!


Group 5

You might also like