Chapter 1
Chapter 1
IntroductionONE
Adama Wind Park is located in the
middle of Ethiopia, about 95km from
Addis Ababa and 3kmfrom Nazret, with
altitude elevation of 1824-1976m.
Adama wind park is located in a strip
of land, stretching fromnortheast to
southwest, 400~600m wide and 5km
long.
The total installed capacity of Adama I
wind farm is 51MW,and 34 Gold wind
GW77 wind turbines with unit capacity of
1.5MW are installed, the annual energy
output is 162.7Gwh,The average
equivalent full load operation hours is
3189h.
The investment of the project amounts to
117Million USD and the interest incurred in
the construction period amounts to 0.9945
Million USD, The total investment of the
project amounts to 117.9945 Million USD.
The project was financed by the
government of China through Exim Bank
Of china, covering 85%and the rest of 15
% was covered by the Government of
Ethiopia.
N items Total USD
o.
1 Construction Cost 117,000,000.00