Level 4 Lucy
Level 4 Lucy
company
.
Content
1 Introduction
2 organized and plan the project
3 activities to be done during the project work
4 schedule how to run the project
5 type of internet connection
6 needs of equipment (hardware & software)
7 server
8 man power
9 price of resources
10 user support logical design
11 summary
Introduction
• Below we will see steps how to configure
LAN connection for a specific company as
requested
Organize and plan the project
• first plan the project
• analyze the organizations requirement
• analyze the governments requirement
• prepare training for IT staffs
Activities to be done during the project
work
• 1st week planning
• 1st week survey the project site
• 1st week contact ISP’s to provide internet
connection
• 2nd week buy resources needed for the
project
• 3rd week cabling
• 4th week crimping
• 5th week configure server and client
computers
• Then test computers and other devices
Schedule
Activity Week 1 Week 2 Week 3 Week 4 Week 5
Planning
1
Survey the project
2 site
Contact ISP to
3 provide internet
connection
Buy resources
4
Cabling
5
Crimping
6
Configure server
Type of internet connection
• EPON (Ethernet passive optical network)
4MB as requested
• use fiber cable to connect the EPON to ISP
Hardware
No Item Quantity
1 Computer (dell 3010) 144
2 Server 3
3 Router 1
4 Switch (24 port) 11
5 Printer (laser jet) 12
6 UTP cat 6 cable 3 role
7 RJ-45 700 pieces
8 Crimper 9
9 Drill 3
10 UPS (info sec) 150
11 Multi meter 9
Software
No Item
EPON
Router Utp cat 6firewell
Utp cat 6
straight
Utp cat 6 straight
through
straight Utp cat 6 through
.
through straight
. through
Active directory .
Utp cat 6
server straight Cross over
through
.
.
Multi distributer
. switch . Multi
. distributer switch
File server . .
. .
BUILDIN
Straight
` througn
BUILDIN
BUILDIN
througn Straight througn Straight
Straight througn `
G2
` Straight througn
Straight througn
G1
G3
Straight througn `
Straight througn ` Straight througn
Switch
Straight througn Switch
` Switch
` Floor 2
Cross over
through
Straight
Floor
Cross over
3 `
Floor 3
` 16 pc
Straight
16 Straight
pc througn Straight througn 16 pc v
througn Straight
Straight througn
Straight througn
Straight througn througn Straight `
` Switch ` Switch througn
` ` SwitchStraight
` ` througn
Floor 3 ` Floor 3 Floor` 3
16 pc 16 pc 16 pc
Cross over
Summary
we have seen how to configure LAN for a company
1 how to organizing and plan
2 what activities should be done during the project work
3 how the schedule goes to run the project
4 what kind of internet connection should be used for the
project
5 what kind of equipments hardware and software needed
6 types of server
7 man power for crimping, cabling and configuring
8 provide prices of all resource used for the project
9 user support like IT technicians are needed after all the
project is finished (there have to be permanent employees
10 logical design for the network