0% found this document useful (0 votes)
20 views15 pages

Level 4 Lucy

The document outlines a project proposal for configuring a LAN connection for a company, detailing the planning, activities, schedule, and required resources. It includes specifications for internet connection, hardware and software needs, server types, manpower requirements, and associated costs. Additionally, it emphasizes the importance of user support and provides a logical design for the network setup.

Uploaded by

Jemal Seid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views15 pages

Level 4 Lucy

The document outlines a project proposal for configuring a LAN connection for a company, detailing the planning, activities, schedule, and required resources. It includes specifications for internet connection, hardware and software needs, server types, manpower requirements, and associated costs. Additionally, it emphasizes the importance of user support and provides a logical design for the network setup.

Uploaded by

Jemal Seid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 15

Project proposal for Lucy

company

.
Content
1 Introduction
2 organized and plan the project
3 activities to be done during the project work
4 schedule how to run the project
5 type of internet connection
6 needs of equipment (hardware & software)
7 server
8 man power
9 price of resources
10 user support logical design
11 summary
Introduction
• Below we will see steps how to configure
LAN connection for a specific company as
requested
Organize and plan the project
• first plan the project
• analyze the organizations requirement
• analyze the governments requirement
• prepare training for IT staffs
Activities to be done during the project
work
• 1st week planning
• 1st week survey the project site
• 1st week contact ISP’s to provide internet
connection
• 2nd week buy resources needed for the
project
• 3rd week cabling
• 4th week crimping
• 5th week configure server and client
computers
• Then test computers and other devices
Schedule
Activity Week 1 Week 2 Week 3 Week 4 Week 5

Planning
1
Survey the project
2 site

Contact ISP to
3 provide internet
connection
Buy resources
4
Cabling
5
Crimping
6
Configure server
Type of internet connection
• EPON (Ethernet passive optical network)
4MB as requested
• use fiber cable to connect the EPON to ISP
Hardware
No Item Quantity
1 Computer (dell 3010) 144
2 Server 3
3 Router 1
4 Switch (24 port) 11
5 Printer (laser jet) 12
6 UTP cat 6 cable 3 role
7 RJ-45 700 pieces
8 Crimper 9
9 Drill 3
10 UPS (info sec) 150
11 Multi meter 9
Software
No Item

1 Windows server 2008 for server computer

2 Windows server exchange 2010 for


centralized messaging
3 Windows 7 operating system for the client
computer
4 Kaspersky antivirus for protection of virus for
server and client computers
5 Microsoft office 2007 for client and server
computer
Server
No Type of server Capacity Quantity

1 Active directory 8GB RAM 1


Server
2 Mail server 8GB RAM 1

3 File server 8GB RAM 1


Man power
• 1 IT manager for controlling all the project
• 1 network engineer for the network
architecture control
• 1 IT officer for managing the IT technical
• 3 IT technicians for crimping and cabling
• 1 network administrator for the network
configuration
• 20 labor
Price of hardware and software
resources
No Item Quantity Price
1 Computer 144 1,296,000
birr
2 Server 3 18,000 birr
3 Router 1 9,000 birr
4 Switch 11 22,000 birr
5 Printer 12 72,000 birr
6 UTP cat 6 cable 3 role 39,000 birr
7 RJ- 11 700 pices 2,400 birr
8 Crimper 9 2,700 birr
9 Drill 7 1,500 birr
User support
• there should be permanent employee
for hardware and software
maintenance
• preventive maintenance clean the
computer every week or month
• improvement work update software,
upgrade hardware and repair
computers of the computers
• repair – repair device to their
previous version
Logical design
Utp cat 6 Utp cat 6
ISP Fiber obtics straight straight
through through
.

EPON
Router Utp cat 6firewell
Utp cat 6
straight
Utp cat 6 straight
through
straight Utp cat 6 through
.
through straight
. through
Active directory .
Utp cat 6
server straight Cross over
through
.

.
Multi distributer
. switch . Multi
. distributer switch
File server . .
. .

`Straight Straight througn


` througn
Straight Straight througn
througn Straight
Straight througn
` througn
Straight Straight througn
Straight `
through Straight through Straight througnStraight througn througn
Switch Switch Switch
Straight througn
Email server ` ` `
Floor
Cross over 1
`Floor
Cross over3
Floor
` 3
Cross over
16 pc 16 pc 16 pc

BUILDIN
Straight
` througn
BUILDIN

BUILDIN
througn Straight througn Straight
Straight througn `

G2
` Straight througn
Straight througn
G1

G3
Straight througn `
Straight througn ` Straight througn
Switch
Straight througn Switch
` Switch
` Floor 2
Cross over
through
Straight
Floor
Cross over
3 `
Floor 3
` 16 pc
Straight
16 Straight
pc througn Straight througn 16 pc v
througn Straight
Straight througn
Straight througn
Straight througn througn Straight `
` Switch ` Switch througn
` ` SwitchStraight
` ` througn
Floor 3 ` Floor 3 Floor` 3
16 pc 16 pc 16 pc

Cross over
Summary
we have seen how to configure LAN for a company
1 how to organizing and plan
2 what activities should be done during the project work
3 how the schedule goes to run the project
4 what kind of internet connection should be used for the
project
5 what kind of equipments hardware and software needed
6 types of server
7 man power for crimping, cabling and configuring
8 provide prices of all resource used for the project
9 user support like IT technicians are needed after all the
project is finished (there have to be permanent employees
10 logical design for the network