0% found this document useful (0 votes)
8 views2 pages

Life Cycle Assessment

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views2 pages

Life Cycle Assessment

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INTRODUCTION

INTRODUCTION FACTFILE MASTER PLAN


The project is assumed to be a brownfield • Location : Anand Nagar ,Pimpri
development considering the plot being vacant and Chinchwad
with private ownership at Anand Nagar, PCMC. The • Area : 181 Sq km
proposed design project aims to be housing that can • Altitiude : 530m (above sea
help strengthen the social and physical level)
characteristics of PCMC communities, and make it • Site area : 6.1 Hectares
inclusive, safe and resilient. Objective of studio (6.1204.4 Sqkm
formulating typologies of housing in urban areas in • Perimeter : 1264.69 m
master plan, proposal developing a program based • Coordinates : 18.63 N , 73.79 E
on user aspirations & user affordability identifying • Slope : 579 to 571 m .
and creating sustainable technological solutions,
financial feasibility report SITE AREA: 68,000 Sq.m
AREA PROGRAM FLOOR PLANS
1 BHK & 2 BHK &
2BHK 3BHK

MATERIAL PROCUREMENT CHART COSTING (overall project)

AY - 2024-25 | LIFE CYCLE ASSESSMENT RUTUJA , SAHIL , ANUSHKA


INTRODUCTION
PROCUREMENT MAP

AY - 2024-25 | LIFE CYCLE ASSESSMENT RUTUJA , SAHIL , ANUSHKA

You might also like