0% found this document useful (0 votes)
19 views30 pages

Gym Management Presentation PHP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views30 pages

Gym Management Presentation PHP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 30

Gym Management System

A PROJECT
ON
GYM MANAGEMENT SYSTEM

SUBMITTED TO:
SUBMITTED BY:
AAAAAAAAAAAA
SHANTANU TYAGI
AAAAAAAAAAAAA
AKSHAY GOYAL

DEPARTMENT OF COMPUTER APPLICATIONS,


KIET GROUP OF INSTITUTIONS,
DELHI-NCR, GHAZIABAD
OBJECTIVE:

 This Gym Management project deals with an


online system designed for management of
customers , enquiries , equipments and payment.
 The current system is manual and it is time-
consuming. It is also cost-ineffective, and the
average return is low and diminishing
 This software helps to easy management of gym
such as management of customers , equipments,
plans , enquiries etc.
ADMIN MODULES

 Manage Plans
 Manage Registration
 Manage Equipment
 Manage Customer Enquiry
1. Administrative module

Administrative module is provided for the sake of


administrators to manage the software and update
the content at regular intervals, The major
operations included in this module are:

 Manage plans, Registration, Equipment, Enquiry.


2. Plan Module

 Plan module show different plans.


 Plan module also include the price and duration of
the plan.
3. Equipment module

• This module is meant Adding and Replacing of


machines or equipments.
4. Customer Enquiry

 This module is meant for managing customers


enquiry details.
PURPOSE

The purpose of this project is to provide online way


to manage the gym , and also provide a easy
interface for management.
SCOPE

 The project has a wide scope, as it is not intended to a particular


organization. This project is going to develop generic software,
which can be applied by any businesses organization. More over it
provides facility to its customer. Also the software is going to
provide a huge amount of summary data.
PROPOSED SYSTEM:

The Gym Management system is available in the


market that can serve gym owners to easily
manage our gym from anywhere at anytime.
Hardware and Software
Specification
 Software Requirements:
 Operating System: Windows 8/10, Linux etc.
 Xampp

 Hardware Requirements:
 Intel Processor 2.0 GHz or above.
 2 GB RAM or more.
 160 GB or more Hard Disk Drive.
Technology Used :

 FrontEnd(Language Used) :
 HTML
 CSS
 Javascript

 BackEnd(Database Used) :
 MYSQL
 PHP
SYSTEM DESIGN

Unified Modeling Language:


 UML stands for Unified Modeling Language. It is a
third generation method for specifying, visualizing
and documenting the artifacts of an object
oriented system under development. Object
modeling is the process by which the logical
objects in the real world (problem space) are
represented (mapped) by the actual objects in the
program (logical or a mini world). This visual
representation of the objects, their relationships
and their structures is for the ease of
understanding. This is a step while developing any
product after analysis.
 The Unified Modeling Language encompasses a
number of models.
 Use case diagrams
 Data Flow diagrams
 Sequence diagrams
Use Case Diagram:

 Use case diagram consists of use cases and actors


and shows the interaction between them. The key
points are:
 The main purpose is to show the interaction
between the use cases and the actor.
 To represent the system requirement from user’s
perspective.
 The use cases are the functions that are to be
performed in the module.
 An actor could be the end-user of the system or an
external system.
DFD(Data Flow Diagram)
Sequence Diagram:

The purpose of sequence diagram is to show the


flow of functionality through a use case. In other
words, we call it a mapping process in terms of
data transfers from the actor through the
corresponding objects.
SEQUENCE DIAGRAM
Sequence Diagram For Administrator:-

Login Application Database


Login
:Request

:Validate()
:executeQuery()

Response
Show Result

Failed:show()
ER DIAGRAM
HOME PAGE
SCREEN SHOTS
CUSTOMER ENQUIRY PAGE
VIEW EQUIPMENT DETAIL PAGE
ADD EQUIPMENT DETAIL PAGE
ADD NEW PLAN
CONCLUSION & FUTURE SCOPE

FUTURE SCOPE
 This web application involves almost all the features of the
online management. The future implementation will be
online help for the customers and chatting with website
administrator.

CONCLUSION
 The project entitled “Gym Management System” is
developed using HTML,CSS and JavaScript as front end and
PHP , MYSQL database in back end to computerize the
process of gym management. This project covers only the
basic features required.
THANKYOU

You might also like