0% found this document useful (0 votes)
39 views10 pages

Designs & Drawings Structure Kitchen Bathroom Doors & Windows Painting Flooring Electrical

ppt

Uploaded by

storagedatas90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views10 pages

Designs & Drawings Structure Kitchen Bathroom Doors & Windows Painting Flooring Electrical

ppt

Uploaded by

storagedatas90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 10

*Designs & Drawings

*Structure
*Kitchen
*Bathroom
*Doors & Windows
*Painting
*Flooring
*Electrical
*Designs &
Drawings

Architectural Layout
| Basic Elevation | Structural Design |
| Structural Design | 3D Elevation |

*All the designs will be provided in non


editable PDF format

* Only External 3D views as visible from the


adjacent roads will be provided
*Structure
*Rcc Framed Structure
*M20/M25 Concrete As per the structural
designer recommendation Aggregates -
20mm & 40mm.
* Kitchen Counter top
* Ceramic wall tiles will be provided upto 7'-0" above the Kitchen Counter top of - upto 45
per Sft
* Kitchen counter top of width, 2'-0" in 18mm Granite of - upto 160 per Sft is included.
Double layer nosing at the edge in the front has been included along with polishing
* Single bowl Stainless Steel Kitchen Sink of Franke make or Equivalent of - upto 3000 shall
be provided. Kitchen faucet of upto 1500 along with accessories of
Parryware/Hindware/Jaquar or equivalent make shall be provided
* Provision shall be made for One inlet near Kitchen Sink for the Water Purifier or as per
Design
* Provision shall be made for One inlet and One Outlet for Washing Machine in the
Utility/Dry Balcony or as per Design
* A Bib Cock of Jaquar or equivalent make of INR 500 shall be provided in the Utility Area -
Provision of Exhaust Fan is included. The Exhaust fan fixture is not included.
* Provision of Exhaust Fan is included. Exhaust fan fixture is not included.
* Ceramic Wall Tiles ( 2 feet above kitchen slab ) - Upto 45 per Sqft
* Main Sink Faucet - Upto 1500
* Any Other Faucet & Accessories - Jaquar/Parryware/Hindware
* Kitchen Sink - Stainless Steel Single Sink worth 3000
* One bathroom is included per 500 sft of package built up area. Additional
bathrooms will be charged on a Pro-rata basis
* Bathroom Ceramic wall tiles will be provided upto 7'-0" above the Finished Floor
Level of - upto 45 per Sft
* Bathroom Flooring - Anti-skid Tiles of value upto 45/- per sqft
* Two nos. of 4 inches rainwater discharge pipes shall be provided per 1000 sqft of
plot area. Additional Rain Water Pipes will be charged on a Pro-rata basis
* Sanitary ware & CP Fittings - Upto 40000 for all 3 bathroom – Brand can be
Parryware or equivalent makeOne number floor mount EWC, Health Faucet,
Wash Basin, Basin Mixer, Overhead Showerwith 2 in 1 Shower wall Mixer of
Jaquar/Hindware/Parryware make is included.
* Additional Sanitary Ware and CP Fittings will be charged on a Pro-Rata Basis.
* Concealed Plumbing works shall be carried out with CPVC Pipe –
Ashirwad/Supreme/Finolex
* Provision of Exhaust Fan is included. Exhaust fan fixture is not included
* Doors & Windows
* The total area of opening for windows and ventilators including frames is taken as 10% of the
package built up area. Windows and Ventilators for any area over and above this shall be
chargeable.
* Windows - UPVC Windows with glass of Venestha or equivalent make worth 400/- per sft
* Window Grills of upto 220 per sft shall be provided of 10mm thick MS rods with maximum spacing
125mm between rods in either direction finished with enamel paint
* - The timber used for doors/door frames shall be well seasoned and free from knots, warps, sap,
cracks, and other defects. All joints should be strong, accurately fitted, and glued and shall be
provided with two coats of paint
* Chajjas shall be provided for all Windows with 1 feet outward projection and 6 inch bearing on each
side of the window
* Main Door - Teak Door with teak frame of 5inch by 3 inch, worth 30000 including fixtures
* 1 Main door shall be provided per dwelling unit. The main door shall be 32mm thick of Size 3'6"X7' of
- upto 30,000 including frame in African Teak or equivalent. The frame thickness will be 3"X5". The
Main door price includes 2 numbers brass tower bolts, 3 brass hinges, Lock of upto 2000 of
Europa/Godrej make and 1 Wall mounted Magnetic Door Stopper
* 1 Main door shall be provided per 1000 sft - 1500 sft package built up area.
* Internal Doors shall be 32mm thick Membrane/Flush doors of Size 3'0"X7' of - upto 7000 including
frame in Sal Wood. The frame thickness will be 2.5"X4". The price includes 2 numbers MS/Aluminium
tower bolts, 3 MS hinges and 1 Wall mounted Magnetic Door Stopper
* Bathroom Doors shall be 32mm thick Waterproof Flush doors / WPC doors of Size 2'6"X7' of - upto
6000 including frame in Sal wood. The frame thickness will be 2.5"X4". The price includes 2 numbers
MS/Aluminium tower bolts, 3 MS hinges and 1 Wall mounted Magnetic Door Stopper
* Maximum 1 Bedroom door and 1 Bathroom door shall be provided for 500 sft of package built up
area. Additional doors shall be provided only in the incremental step of 500 sft of package built up
area. No intermediate doors are included.
* Flooring
* Living and Dining room flooring shall be in 4'X2' Vitrified Tiles - upto 60 per sft
* Other Rooms and Kitchen flooring shall be in 4'X2' Vitrified Tiles - upto 60 per sft
* Staircase flooring shall be - upto 50 per sft
* Parking area flooring shall be in Anti-skid tiles of - upto 50 per sft
* Balconies and open areas shall be in Anti-skid tiles of - upto 50 per sft.
* Skirting shall be of matching Vitrified Tiles or Granite not less than 100mm high
* Wall dado will be in 18"X12" ceramic tiles of - upto 60 per sft
* The following Quality standards and inclusions/exclusions shall be made note of
and must be taken care of at the time of execution
* Wall tiles shall be fixed with tile adhesive. Joints shall be cleaned thoroughly and
grouted with site made white cement grout of Roff/ Weber/ equivalent brands
* Ceramic tiles for walls shall be free from cracks, spots, grazes, chipped edges and
corners. Variation in size shall be limited to +/- 1.5 mm. Thickness shall be as
specified, but in no case shall they be less than 6 mm.
* Wiring and Electricals
* All wiring shall be done with Orb it or equivalent.
* Switches & Sockets - Anchor or equivalent
* The electrical points shall be provided as per the following distribution
* Living/Dining/Family Room shall be provided with 2 numbers fan Point, 4
numbers Light Point, 4 numbers 5Amp Switch and Sockets and 1 number TV
Cable Point
* Other Rooms shall be provided with 3 numbers of light points, 1 number of
fan point, 4 numbers of 5Amp switch and socket in the TV/Study or dresser
area as the case may be as per design and 1 number 16Ampswitch and
socket for air conditioning
* Kitchen shall be provided with 2 numbers of light points, 5 numbers of
5/15Amp (as the case may be based on Appliance Specifications) switch and
socket one each for refrigerator, mixer/grinder, oven, water purifier and one
above the Kitchen platform
* 1 number calling bell shall be provided. More call bell points per dwelling
Unit shall be charged additionally
* Customisation Costs
* SSM below plinth is not part of package
* External Drain cover (100mm) cost 300 per sq.ft using Natural
Stone
* In case of external staircase, headroom is not part of the standard
package. Headroom is chargeable at par with package built-up area
* Italian Marble chemical treatment cost at 30 per sq.ft (Excluding
laying cost)
* Additional capacity for RCC underground sump at 24/Ltrs.
* Additional capacity for overhead tank at 12 per Ltrs.
* Additional capacity for blockwork underground sump is 14/Ltrs.
* Additional cost of laying Indian marble laying is 70 per sq.ft extra
* Blockwork septic tank cost is 20/Ltrs. and concrete septic tank cost
is 22/Ltrs.
*Additional Works
*Below work cost may varry based on
requirement
*No service charges applicable for
EB/Bore/approval work. One TV unit at the
size of 10*7
*Accessories value upto 15000/- RS.