0% found this document useful (0 votes)
23 views15 pages

Group A

Uploaded by

nurhazli ibrahim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views15 pages

Group A

Uploaded by

nurhazli ibrahim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 15

COMPANY PROFILE

ONE HYDRO HOLDINGS,


WISMA ONE HYDRO,
52000 JALAN AMPANG,
KUALA LUMPUR.

CONTACT NO: 03-55442000


FAX: 03-55443000
EMEL: [email protected]
WEBSITE: www.onehydro.com

PROJECT MANAGER: NUROSHIMA BT MAD RASID


HYDROGRAPHER: MOHD ARIF B.ZAMRI
SITE SURVEYOR: MOHD ZHARIF B.MOHD ZOHDI

TEAM:
MOHD ROSMANIZAM B.IDRIS
NURHARYANI BT YAHYA
SARIAH BT ROZEMI
PROJECT BACKGROUND

CLIENT: SR SAIFUL AMAN HJ SULAIMAN

PROJECT : BATHYMETRIC MEASUREMENT


OBJECTIVE: TO GET DEPTH FOR PREPARING BATHYMETRIC PLAN
DATE OF SURVEY: 7, 10 & 12 JUN 2010
STATUS: 100% COMPLETED

SITE LOCATION

Image from google


Image from maps
maps
GEODETIC PARAMETERS

WGS84 COORDINATE SYSTEM:


Name: Zone 05 North Perak
Group: Malaysian Cassini State Plane

MRT

DATUM
TRANSFORMATION:
MRSO Name: MRT 1994
Method: Seven
Parameters
CASSINI
Parameters:
ELLIPSOID: MODIFIED Direction: WGS84 to
EVEREST 1948 Local
Translation X: 379.78
GEODETIC PARAMETER m
Semi Major Axis: 6377304.063 Translation Y: -775.38
Semi Minor Axis : 6356103.039 m
Flattening: 0.003324449295589 Translation Z: 86.61
m
SURVEY PLANNING

3 KM

1.5 KM

SHORELINE 200 M

Scale 1: 10000 Line spacing 10 mm Fix Interval 5


mm

LINE SPACING = 100 m


FIX INTERVAL= 50 m
SOUNDING LINE = 31
SOUNDING DISTANCE = 46.5 km
CROSS LINE= 4
CROSSLINE DISTANCE= 12 km
TOTAL DISTANCE AFTER CONSIDER TURNING DISTANCE 10% =
64.35 km

If velocity of speedboat is 3 knots and working hours is 6 hours per


day, so WORKING DAY is 2 DAYS
QUOTATION

ONSHORE WORK
ITEM UNIT RATE QUANTITY PRICE (RM)
PREPATORY WORK PARTY DAY 743 1 743
PLANIMETRIC WORK m 2.50 3000 7500
HEIGHT CONTROL km 743 6 4458
TOPOGRAPHIC SURVEY per 20 m 6 3000 18000
MOBILIZATION & DEMOBILIZATION <50 -150 km 743 - 743
MONUMENTING TBM NUMBER 185 5 925
TOTAL 41327

OFFSHORE
WORK
DAY USE RATE/DAY QUANTITY PRICE (RM)
SET GPS WITH RADIO LINK 2 500 2 2000
SET ECHO SOUNDER INCLUDE PC 2 1000 1 2000
CONNECTION
BOAT 2 1000 1 2000
AUTOMATIC TIDE GAUGE 2 300 1 600
TOUGHBOOK 2 500 2 1000
CURRENT METER 2 1000 2 4000
TOTAL 9600
QUOTATION
STAFF & OTHERS
ITEM DAY USE RATE/DAY QUANTITY PRICE (RM)
OFFSHORE
PROJECT MANAGER 5 1000 1 5000
HYDROGRAPHER 3 800 1 2400
TECHNICIAN 2 500 2 2000
BOATMAN 2 300 1 600
TOTAL 10000
ONSHORE
SITE SURVEYOR 3 400 1 1200
LABOURERS 3 150 3 1350
2550

ITEM UNIT RATE QUANTITY PRICE (RM)


CURRENT METER
INSTALLATION 2 5000 1 10000
CURRENT OBSERVATION 2 10000 3 60000
SAMPLINGS
SAMPLINGS 2 250 10 5000
OFFICE WORKS
DRAUGHTMANS 2 1000 3 6000
REPORT & PRESENTATION
TIDAL ANALYSIS 1 14000 1 14000 TOTAL = RM 182477
HYDROGRAPHY ANALYSIS 1 14000 1 14000
GOVERNMENT TAX =
ACCOMODATION
FOOD LUMP SUM 10000 15%
FUEL TOTAL = RM209848.55
TOTAL 119000
EQUIPMENTS & SOFTWARE
LEVELLING,
TIDE
TRAVERSING & TRACKING
READING
DETAILING
EQUIPMENTS & SOFTWARE
BASE ROVER
STATION STATION
EQUIPMENTS &
SOFTWARE

SURVEY
&
BOOKING NAV EDIT
HYDROPRO NAV

T-COM
CDS TERRA MODEL AutoCAD

PLOTTER
EQUIPMENTS
CALIBRATION

RESULT

DIFFERENTIAL FIELD TEST (TOTAL STATION) After we compare the distance, we get
0.001m, which is less than 10 mm.

RESULT
TWO PEG TEST (AUTOMATIC
Difference = 0.001 which is less than 5 mm.
LEVEL)

BAR CHECK (CALIBRATION FOR ECHO


SOUNDER
PROCEDURE OF
WORK

TRAVERSING
RECOINNAISANCE
ONSHORE LEVELLING

FIELDWORK DETAILING

OFFSHORE TIDE READING


DATA PROCESSING
TRACKING

SOUNDING
PLAN PREPARATION

REPORT &
PRESENTATION
ONSHORE
WORK
TRAVERSING LINEAR MISCLOSE = 1: 58245

LEVELLING

TRANSFER LEVEL FROM TBM 1 TO STATION 4 (TBM


TRANSFER LEVEL FROM STATION 4 (TBM 2) TO GPS 3
2)
Misclosure = 12√k k = distance in km Misclosure =12√0.14 =0.004 m
12√6 =0.029 m Error = 1.748-1.746
Error = 6.605 - 6.584 = 0.002 m which is < ± 0.002m
= 0.021 m which is < ± 0.029 m

TRANSFER LEVEL FROM STATION 4 (TBM 2) TO GPS1 TRANSFER LEVEL FROM STATION 4 (TBM 2) TO TBM3
Misclosure =12√1.250 =0.013 m Misclosure =12√0.182 =0.005 m
Error = 1.752-1.746 Error = 1.744-1.746
= 0.006 m which is < ± 0.013m =- 0.002 m which is < ± 0.002m
BATHYMETRIC PLAN
(MANUAL)
BATHYMETRIC PLAN
(AUTO)
THANK YOU!!