0% found this document useful (0 votes)
15 views40 pages

SE Lec 02 - Software Process Models

Uploaded by

Tahir2 Siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views40 pages

SE Lec 02 - Software Process Models

Uploaded by

Tahir2 Siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 40

SOFTWARE

PROCESS
MODELS
Lecture 02
Overview
◦Different process models
◦ Build-and-fix model
◦ Waterfall model
◦ Incremental model
◦ Evolutionary process models
◦ Rapid prototyping model
◦ Spiral model
◦ Agile process models
◦ Extreme programming
◦ Object-oriented life-cycle models
◦ Unified Process
◦Criteria for deciding on a model
Software Process Models

◦Process model (Life-cycle model) -steps


through which the product progresses
◦ Requirements phase
◦ Specification phase
◦ Design phase
◦ Implementation phase
◦ Integration phase
◦ Maintenance phase
◦ Retirement
Software Process
Models
Build-and-Fix Model
◦Problems
◦ No specifications
◦ No design
◦Totally unsatisfactory
◦ High cost
◦ Difficult maintenance
Waterfall Model
◦ The waterfall model is a sequential design process in
which progress is seen as flowing steadily downwards
(like a waterfall) through the phases of SDLC.
◦ Waterfall model is an example of a Sequential model.
In this model, the software development activity is
divided into different phases and each phase consists of
a series of tasks and has different objectives.
◦ Waterfall model is the pioneer of the SDLC processes.
◦ Characterized by:
◦ Feedback loops
◦ Documentation-driven
Waterfall Model
(contd.)
◦Advantages
◦ Enforces disciplined approach
◦ Documentation for each phase
◦ Products of each phase checked by SQA group
◦ Maintenance is easier
◦ Every change reflected in the relevant
documentation
◦Disadvantages
◦ Working version of the software will not be
available until late in the project time-span
◦ Specifications are long, detailed, written in a
style unfamiliar to the client
◦ “Blocking states” –some project team
members must wait for other team members
to complete dependent tasks
Rapid Prototyping Model
◦Prototyping is defined as the process of
developing a working replication of a product
or system that has to be engineered.
◦It offers a small scale replica of the end
product and is used for obtaining customer
feedback as described below:
Rapid Prototyping Model
Rapid Prototyping
Model
◦Rapid prototype characteristics:
◦Used in the requirements phase
◦Evaluated by the customer/user
◦Then, it is discarded -do not turn into
product
◦Rapid prototyping model is not proven
and has its own problems
◦Possible solution
◦Rapid prototyping for defining
requirements
◦Waterfall model for rest of life cycle
Incremental Model
◦Incremental Model is a process
of software development where
requirements are broken down into
multiple standalone modules
of software development cycle.
◦Each iteration passes through the
requirements, design, coding
and testing phases.
◦Typical product takes from 5 to 25
builds (iterations).
Incremental Model
(contd.)
Incremental Model
(contd.)
◦Waterfall and rapid prototyping models
◦ Deliver complete product at the end
◦Incremental model
◦ Deliver portion of the product at each stage
◦Advantages
◦ The software will be generated quickly during the
software life cycle
◦ It is flexible and less expensive to change
requirements and scope
◦ Throughout the development stages changes can
be done
◦ This model is less costly compared to others
◦ A customer can respond to each building
◦ Errors are easy to be identified
Incremental Model (contd.)
◦Disadvantages:
◦It requires a good planning designing
◦Problems might arise due to system
architecture as not all requirements
collected up front for the entire
software lifecycle
◦Each iteration phase is rigid and does
not overlap each other
◦Correcting a problem in one unit
requires correction in all the units and
consumes a lot of time
When to use
Incremental models?
◦Requirements of the system are clearly
understood
◦When demand for an early release of a
product arises
◦When software engineering team are not very
well skilled or trained
◦When high-risk features and goals are involved
◦Such methodology is more in use for web
application and product based companies
Spiral Model
◦ The spiral model is a risk-driven software
development process model.
◦ Based on the unique risk patterns of a given project, the spiral
model guides a team to adopt elements of one or more process models,
such as incremental, waterfall, or evolutionary prototyping.
◦ Risk Analysis: Identification of potential risk is done while risk
mitigation strategy is planned and finalized
◦Precede each phase by
◦ Alternatives
◦ Risk analysis
◦Follow each phase by
◦ Evaluation
◦ Planning of next phase
Simplified Spiral Model
Full Spiral Model
When to use Spiral
Methodology?
◦When project is large
◦When releases are required to be frequent
◦When creation of a prototype is applicable
◦When risk and costs evaluation is important
◦For medium to high-risk projects
◦When requirements are unclear and complex
◦When changes may require at any time
◦When long term project commitment is not
feasible due to changes in economic priorities
Advantages of Spiral
Model
◦ Additional functionality or changes can be done at a later
stage
◦ Cost estimation becomes easy as the prototype building is
done in small fragments
◦ Continuous or repeated development helps in risk
management
◦ Development is fast and features are added in a systematic
way
◦ There is always a space for customer feedback
Disadvantages of Spiral
Model
◦ Risk of not meeting the schedule or budget
◦ It works best for large projects only also demands risk
assessment expertise
◦ For its smooth operation spiral model protocol needs to be
followed strictly
◦ Documentation is more as it has intermediate phases
◦ It is not advisable for smaller project, it might cost them a lot
Agile Process Models
◦ Agile software engineering combines a philosophy
and a set of development guidelines
◦ Philosophy
◦ Encourages customer satisfaction and early
incremental delivery of the software
◦ Small highly motivated project teams
◦ Informal methods
◦ Minimal software engineering work products
◦ Overall development simplicity
◦ Development guidelines
◦ Stress delivery over analysis and design
◦ Active and continuous communication between
developers and customers
Agile Process Models
(contd.)
Agile Process Models
(contd.)
Agile vs. Waterfall
Method
Agile Model Waterfall Model
Agile method proposes Development of the software
incremental and iterative flows sequentially from start
approach to software design point to end point.
The agile process is broken The design process is not
into individual models that broken into an individual
designers work on models
The customer has early and The customer can only see the
frequent opportunities to look product at the end of the
at the product and make project
decision and changes to the
project
Agile model is considered Waterfall model are more
unstructured compared to the secure because they are so
waterfall model plan oriented
Agile vs. Waterfall Method
(contd.)
Agile Model Waterfall Model
Small projects can be All sorts of project can be
implemented very quickly. For estimated and completed.
large projects, it is difficult to
estimate the development
time.
Error can be fixed in the Only at the end, the whole
middle of the project. product is tested. If the
requirement error is found or
any changes have to be made,
the project has to start from
the beginning
Development process is The development process is
iterative, and the project is phased, and the phase is much
executed in short (2-4) weeks bigger than iteration. Every
iterations. Planning is very phase ends with the detailed
less. description of the next phase.
Documentation attends less Documentation is a top
priority than software priority and can even use for
development training staff and upgrade the
Agile vs. Waterfall
Method (contd.)
Agile Model Waterfall Model
In agile testing when an All features developed are
iteration end, shippable delivered at once after the
features of the product is long implementation phase.
delivered to the customer. New
features are usable right after
shipment. It is useful when you
have good contact with
customers.
Testers and developers work Testers work separately from
together developers
At the end of every sprint, user User acceptance
acceptance is performed is performed at the end of the
project.
It requires close Developer does not involve in
communication with requirement and planning
developers and together process. Usually, time delays
analyze requirements and between tests and coding
Extreme Programming
(XP)
◦Somewhat controversial new approach; variation
of the incremental model
◦First step
◦Determine features that client wants (stories)
◦Estimate duration and cost of each feature
◦Client selects stories for each successive build
◦Each build is divided into tasks
◦Test cases for a task are drawn up
◦Pair programming –working with a partner on
one screen
◦Continuous integration of tasks
Extreme Programming
(contd.)
Features of XP
◦Computers are put in center of large room
lined with cubicles
◦Client representative works with the XP
team at all the times
◦Individual cannot work overtime for 2
successive weeks
◦There is no specialization
◦ all members of the XP team work on specification,
design, code, and testing
◦There is no overall design phase before
various builds are constructed – Refactoring
Advantages of Agile
Model
◦ Customer satisfaction by rapid, continuous delivery of useful
software.
◦ People and interactions are emphasized rather than process
and tools. Customers, developers and testers constantly
interact with each other.
◦ Working software is delivered frequently (weeks rather than
months).
◦ Face-to-face conversation is the best form of communication.
◦ Close, daily cooperation between business people and
developers.
◦ Regular adaptation to changing circumstances.
◦ Even late changes in requirements are welcomed
Disadvantages of Agile
model
◦ In case of some software deliverables, especially the large
ones, it is difficult to assess the effort required at the
beginning of the software development life cycle.
◦ There is lack of emphasis on necessary designing and
documentation.
◦ The project can easily get taken off track if the customer
representative is not clear what final outcome that they want.
◦ Only senior programmers are capable of taking the kind of
decisions required during the development process. Hence it
has no place for newbie programmers, unless combined with
experienced resources.
When to use Agile
model
◦ When new changes need to be implemented. The freedom
agile gives to change is very important. New changes can be
implemented at very little cost because of the frequency of new
increments that are produced.
◦ To implement a new feature the developers need to lose only the
work of a few days, or even only hours, to roll back and implement
it.
◦ Both system developers and stakeholders alike, find they also get
more freedom of time and options than if the software was
developed in a more rigid sequential way.
◦ Having options gives them the ability to leave important decisions
until more or better data or even entire hosting programs are
available; meaning the project can continue to move forward
without fear of reaching a sudden standstill.
How to Choose between
SDLC Methods?
How to Choose between
SDLC Methods?
◦ To know which is the best model out of all the different types
of SDLC models, it is important to understand that each
of these approaches are suitable for different projects,
environments, and requirements.
◦ For example, if your project is simple and straightforward
with set requirements that do not need to be changed, then
Waterfall is best suited for it.
◦ However, if your project is large-scale and consists of multiple
components and segments, then choosing Iterative or Spiral
methodology would suit your project better.
How to Choose between
SDLC Methods?
◦ To answer the question simply, there is no ONE model is
best from all the SDLC models discussed.
◦ A preference of one method over the others cannot be
determined.
◦ However, to select the right SDLC methodologies, you should
know all the types of SDLC models, assess the requirements
of all the stakeholders and then decide on a method that best
fits your needs.
Criteria for deciding on
a model include
◦ Criteria for deciding on a model include
◦ Product Complexity
◦ Product Size
◦ Magnitude of Changes
◦ Frequency of Changes
◦ Skills of the Dev Team
◦ Time constraints
◦ Access to Users
QUESTIONS??