Ademv
Ademv
First of all we would like to thanks and have a great respect, Love and
prosperity to our almighty Allah who helps me in every aspect in our
life.
Next to this we would like to thanks
Ambo University.
University –Industry –Linkage Office program.
Saylem Construction PLC.
our advisor Solomon.
our friends those came from another University for this internship.
And others site engineers.
INTRODUCTION
• Engineering is the profession in which knowledge of the
mathematical and natural sciences, gained by experience and practice.
• Engineering is central to understand the challenges and the solution
facing in the world.
But Saylem General Construction plc accepted our request and gave us
confirmation.
After the completion of second semester of fourth year we have started our
internship practice by attending in Saylem General Construction.
Good project management has many advantages. Some of them are the following
In general the workflow in the section we have been working in can be described
as follow using hierarchy diagram.
Project
manager
office Engineer
Site
engineer
General
Forman
Head Carpenter
Head Mason
Finance
Department
Store
Keeper
Administration
Site works
* Substructure Constructions
Substructure is the structure that found below ground level.
Work tasks that have been executed in the site are the following:
Grade beams
Grade beams are a type of beam which constructed over
compacted earth or foundation walls. In our case it is constructed
over foundation walls.
The main purposes for the construction of grade beams are:-
To avoid slenderness of footing columns and elevation columns
together.
To carry and transfer loads of hollow concrete blocks to the
footing columns.
To support super structure and etc.
Fig 1.Grade beams
Hard core filling
Next form work of required width, length and height are painted by oils and
erected around reinforcement bars with spacers tied to them.
After proper formwork wood or steel panel is placed, checking its alignment
distance from adjacent columns it will be casted with required concrete grade
c-25 and well vibrate.
After 16 hr, the formwork should be dismantled or taken off from
the column for watering schedule at morning and afternoons.
It must be noted that covering the concrete columns with cloth type
material will reduce evaporation of water. Each column should be
well aligned with beam.
Beams
Beams are horizontal load bearing members which transfer floor loads
to the columns.
Intermediate beams
• Intermediate beams are type of beam constructed to brace long
elevation columns.
• It is also used to carry and transfer load of hollow concrete blocks to
elevation columns.
Fig.4. Intermediate beams
Uppers Floor Slab construction
Slabs are categorized in to two, Ground floor slab that we see under sub
structure and upper floor slab
Finally after necessary checks are done, concrete of required grade was
casted monolithically with beams which supporting it.
For our case concrete grade of C-25 is used to cast 15cm thick slab.
Fig.5.Reinforcement of Upper floor
slabs
Top tie beam
*As its name indicates that, it is a beam constructed at the top of
elevation columns.
* It is proposed to carry and transfer loads acting on the roof and self
weight of the roof.
* Its construction is in the same way as that of intermediate beams.
Fig.8. mixer
Vibrator - is an electronic machine which is used to vibrate casting
concrete, in order to avoid the vapor or air which is found in the voids
spaces of concrete.
The presence of air voids in the concrete reduces the strength of concrete
and when dry it will create cracks.
Formwork- are materials used as temporary mould for concrete until it
hardens.
It used to avoids or checks dimensional errors that occur during cast.
Good formworks have the following characteristics:
Cheap and reusable as long as possible.
Practically water proof, so that it is not absorb water from concrete.
Strong enough to withstand all loads from concrete and live load
during pouring and compaction.
Stiff enough so that deflection is minimum.
As light as possible.
Have smooth surface and afford easy removal or stripping
The minimum time to remove formworks for different structural elements:
• Footing pad and footing column …………………………………………16 hours
• Grade beam and elevation column ………………………………………..16 hours
• Side formworks of intermediate beam, top tie beam and slab……16 hours
Soffit, slab and beam ………………………………………………………………..21 days
Plastering- is the process of covering various surface of the structure with plastic material
such as Cement mortar, Lime mortar or composite mortar, to obtain an even, smooth, regular,
clean and durable surface.
Concrete surfaces are plastered for the following reasons:-
This internship program makes us being familiar with site work as well as office
work and to inform their behaviors of each work.
In overall within these four months we had the opportunity to improve our
practical skills
theoretical knowledge.
interpersonal communication skills.
team playing skills.
leadership skills.
entrepreneurship skills and etc.
CONCLUSION
The internship program indicates us the difference between theoretical and practical
knowledge.
So it is good to give real practical skills and make the students familiar to the outside
world.
Finally, we would like to point out some measures the university–industry linkage
coordination office should take that to help this program to achieve its goal, because
Recommendation
Recommendation for the Company
What we want to recommend Salem Construction PLC is that, the
company is huge and has a good coordination on its work flow as we
seen from its profile.
Although this Company has good coordination there are different
problems that we faced when we joined the Company.
Problems we faced are:
As we joined to the Company’s site, Site Engineer left the site after
some days, but we didn’t know the reason behind.
After site Engineer left the site, Forman of the site worked as site
Engineer without enough experience. So we didn’t get the chance to
do with site Engineer
In order to have enough experience we been asking Forman, gang
leader, skilled labors and other site Engineer.
Although we gained the experience that related with site work by
Generally the absence of site Engineer did affect not only us but also
Company’s site by itself.
So in order to solve the problems mentioned above, the Company should
have the professional site Engineer.
Recommendation for our University
We would like to recommend our university–industry linkage coordination
office should take measure that to help this program to achieve its goal,
because the university has not a close interaction with the industries.