L1 - 2 - Introduction of Project

Uploaded by

Samir Stha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 41

Project Engineering

Introduction of Project and


Chapter 1 Project Management

Anita Prajapati, Ph.D.


Assistant Professor

07 December 2023 1
What is a project ?

• A project is simply a cluster of activities that is relatively separate and clear


cut and has a distinct mission and a clear termination point
• Eg. building a plant, designing a new package, new structure, plant,
process, system or software, replacement, refurbishment, renewal or
removal of existing one

• “A project is a temporary endeavor undertaken to create a unique product


or service” as per PMI. It is specific, timely, usually multidisciplinary, and
always conflict ridden.

2
*PMI: Project Management Institute, USA
Project
• Project is something that converts idea, design or a plan into something
concrete entity such as every new design of car, ship, refrigerator,
power station, control system, buildings, road, bridge dam, software
package etc.

• Every project has


• an investment of resources for an objective
• a cause of irreversible change
• novel to some degree
• concerned with the future 3
• related to expected result
Characteristics of Project
• Specific objectives
• Life span
• Constraints
• Unique
• Team work
• Flexibility
• Resource integration
• Planning and control
• Risk and Uncertainty 4

• Beneficiaries
Classification of Project
• According to Funding
• Private sector project
• Government sector project
• Grant projects
• Loan projects
• According to Foreign aid
• Joint venture project
• Bilateral project (USAID, KOICA, DANIDA, JICA, GIZ,…)
• Multilateral project (WHO, UNICEF, WB, UNDP, FAO,…)
• According to Techniques
5
• Labor intensive project: size, cost, product
• Capital intensive project
Classification of Project
• According to Functions
• Development projects
• Disaster prevention projects
• Service sector projects
• Environmentally friendly projects
• According to the orientation
• Product oriented
• Process oriented
• According to scale and sizes
• Mega
• Major 6
• Medium
• Small
Classification of Project

• According to nature of projects


• Simple
• Complex
• Innovative
• Emergency
• According to time frame and speed
• Normal
• Crash
7
Setting project objective and goal: SMART
• Specific
• Clear and well defined goal (who, what, when, where, which and how)
• Measureable
• Project outcome should be measurable and comparable (how much?, how
many?, how will I know when it is accomplished?)
• Track the progress
• Achievable
• Agreed by all, attainable at the present moment,
• Maintain standard performance
• Realistic
• Possible under limited set of resources 8
• Time framed
• Set time to complete the project
Project life cycle and phases

• Formulation phase
• Define the project
• Planning phase Termina Formul
tion ation
• Design the project process Phase Phase
• Implementation phase
• Deliver the project (Do it!) Implem
Plannin
entatio
• Termination phase g Phase
n Phase
• Close the project 9
Phase I : Project Formulation Phase
• Initiation phase
• Project identification
• Situation survey: demand for goods/services the project will produce
• Internal sources: use internal records, experiences
• External sources: new possibilities, alternative ideas

• Project formulation
• Statement of Work : objective, scope, purpose, deliverables
• Project proposal – Technical and Financial; Feasibility study

10
Phase I : Project Formulation Phase
• Feasibility study:
• Predicts demand and cost that could affect the project and its useful
life
• Identifies whether the project is viable or not (high risk should have
higher return)
• Repetitive process with revised ideas, better information
• Takes time but give specific outcome: sanction or reject the proposed
project
• Once selected the activities changes from whether to proceed to
deciding how best it should be realized of what needs to be done
11
Phase I : Project Formulation Phase
• Steps
• Create document outlining the project
• Develop project feasibility report
• Once feasible, hire project manager and assign the team for the
project
• Outline deliverables ( what will be done, how it will be done and
why it will be done)

12
Phase ii: Project Planning and design
(Development) Phase
• Design ideas are usually the start of the possible project
• Alternatives are investigated before estimating cost
• Evaluation and selection of material to be used
• Decision at design stage determines the cost and quality and
ultimately the success of a project
• Scale and specialization increase rapidly as design proceeds
• Involves both experimental and analytical work to test the means of
achieving a predicted performance
• Research ascertains the properties and potential performance of the
materials used 13
Phase ii: Project Planning and Design
(Development) Phase
• Preliminary design
• Design all structural component and mechanical processes

• Final design
• Detailed architectural and engineering design of all physical components
• Resolve design problems
• Estimates construction and operation cost as well as construction
schedule
• Prepare final report with updated design, estimates, schedule and
14
specification
Phase ii: Project Planning and design
(Development) Phase
• Develop plans that guide team in the implementation and
termination phase
• Helps to manage time, cost, quality, changes, resources, risk and
uncertainty
• Creates comprehensive project plan
• Feasibility study - Technical, Financial, Management, Marketing,
Economic, Environment analysis
• Project appraisal – Appraisal and Approval
• Detailed design – Detailed design, Implementation Plan and Work
Schedule 15
Phase ii: Project Planning and design (Development) Phase

• STEPS
• Review project scope and statement of works
• Complete project decomposition using work breakdown
structure
• Develop organizational structure
• Resource allocation
• Create project schedule
• Plan project budget
• Perform risk assessment
16
• Conduct stakeholder analysis
• Finalize project plan
Phase iii : Project implementation phase
• Follows large scale activities like manufacturing equipment,
construction works
• Employs contractor and sub-contractors from this stage
• Proceeds in different speeds but should meet specific objectives

17
Phase iii : Project implementation phase
• Implementation
• Allocate task to team members
• Perform the actual task
• Deals with the procurement of equipment, resources and services
• Observe and analyze the work in progress as per the schedule
• Necessary adjustment in plans

18
Phase iii : Project implementation phase
• Monitoring and Control
• Supervision and control of project performance
• Various controlling techniques like CPM, PERT
• Monitor project performance
• Identify corrective actions

19
Phase iv: Project Termination Phase
• Settlement of claims
• Final presentation and acceptance of the project results
• Handover the project
• Close all the project controlling tools, reports and documents
• Release resources
• Close all accounts

20
Project Life Cycle
Formulation Planning Implementation
Resources (Efforts) Termination

Co
st
Re
du
cti
on
Po
ssi
bil
itie
s

21
Time
22

Construction project life cycle


Pharmaceuticals project life cycle
23
Software development
project life cycle

24
Project Environment

• A project is environment specific which consists of forces that affects


projects' ability to achieve the objective.
• Project environment is dynamic and has high probability to change
project life cycle
• The changes in the environment should be identified, analyzed and
understand as they occur

25
Political legal
Project Environment

Client Constrain Contr


t actors

Objective
Project structure
s
Financi Economic
Technological Supplier ers
s

Resources

Governme Competiti
nt ors 26

Socio-cultural
Project environment

• Project environment can be classified as:


• Internal environment
• Task environment
• External environment

27
Project environment

• Internal environment
• Elements whose change directly influence the project,
controllable by the project
• Objective
• Constraints
• Structure
• Resources
28
Project environment
• Task environment:
• Any business or consumer with direct involvement with the project, made
up of stakeholders, their interests affect oroject activities
• Elements of task environment are:
• client,
• contractors,
• consultants,
• suppliers,
• government,
• financiers,
29
• competitors,
• unions
Project environment
• External environment
• Entities that exist outside the boundary but have significant
influence on its growth and survival, cannot be controlled by the
project
• External factors affecting project environment
• Political-legal :
• Political environment: political system, political institutions, political philosophy
• Legal environment: Employment regulation, product regulation, health and safety
regulation, laws and court decisions, imports, exports, taxation
30
Project environment
• Economic environment :
• Economic system: free market, centrally controlled, mixed economy
• Economic policies: monetary policy, fiscal policy, industrial policy
• Economic conditions: income, business cycle, inflation
• Regional economic groups: SAARC, ASEAN, EU

31
Project environment
• Socio-cultural environment :
• Social environment:
• Demographics: size distribution and growth of population, age mix,
urbanization
• Social institutions: reference groups like sports, musical,
• Pressure group: human rights, women rights,
• Social change : life style, product choice
• Cultural environment:
• Influencing the type of project
32
• Creating attitude towards work and leisure
Project environment
• Technological environment:
• Level of technology: labour based, capital based,
• Pace of technological change:
• Technology transfer: globalization, trade, technical assistance, training and
publications
• Research and development:

33
Project Management
• New way of thinking about management, manages complexity and
change in a dynamic environment, makes efficient use of resources for
better client satisfaction
• Systemic approach for efficient and effective achievement of project
objectives through:
• Assignment of total project responsibility and accountability a single
project manager
• Coordination across functional lines
• Proper utilization of planning and control tools for better resource use
within the constraint of time, cost and quality
34
Project Management
• “Application of knowledge, skills, tools and techniques to project
activities to meet project requirement”

• “The art of directing and coordinating human and material resources


throughout the life of a project by using modern management
techniques to achieve predetermined objectives of scope, cost, time,
quality and participant satisfaction.” PMI

• “Management of change” but explicitly planned change such that the


change is directed towards unique creation of a functioning system 35
Project Management
• Identify project requirement
• Establish clearly defined project objectives
• Communicate plans and priorities
• Anticipate problems and assess progress and trends
• Manage project stakeholders
• Balance scope, schedule, costs, risk and quality
• Depends upon relative size, complexity, urgency, importance and
novelty of a projects

36
Characteristics of Project Management
• Objectives-oriented
• Change-oriented
• Single responsibility center
• Team based
• Functional co-ordination
• Planning and control
• Constraints
• Body of knowledge

37
Body of Project Integration Management (plan): Project plan development, Plan Execution, Overall change control,
Knowledge
Project Scope Management: Initiation, Scope planning, definition, verification, Scope change control

Project Time Management: Activity definition, sequencing, duration estimation, schedule development,
schedule control

Project Cost Management: Resource planning: Cost estimation, budgeting, cost control

Project
Management
Project Risk Management: Risk identification, quantification, Risk response development, risk response control

Project Quality Management: Quality planning, assurance, quality control

Project Human Resources Management : Organizational planning, staff acquisition, team development

Project Communication Management: Communication planning, administrative closure


38
Project Procurement Management : Procurement planning, source selection, contract administration,
contract close out
Benefits of Project Management
• Manage change
Change management • Introduce new technology
• flexibility
Environmental adaptation • Management of complexity related to resources,
• Continuous improvement
Results-orientation • Achieves objectives within constraints
• Coordinates across functional lines
Co-ordination • Manages conflict

Team development • Multi-disciplinary team

Reengineering • Minimizes management gaps functional gaps

• Problems are soled as and when they arise 39


Timely correction

Customer satisfaction • Customer focused


Limitations of Project Management
• Lack of long range planning
• Organizational disruption
• Constrained human resource development
• Reluctance for authority delegation
• Organizational restructuring
• Team related problems
• Conflicts
• Unsuitable

40
THANK YOU 41