0% found this document useful (0 votes)
34 views33 pages

Ch-5 Addtional

Ffy7

Uploaded by

johnkinfe20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views33 pages

Ch-5 Addtional

Ffy7

Uploaded by

johnkinfe20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 33

Chapter 5

Elements of Maintenance Technology

1
Equipment Malfunctions
• Equipment malfunctions have a direct impact on:
Production capacity

Production costs

Product and service quality

Employee or customer safety

Customer satisfaction

2
Maintenance Activities
 Repairs
– Repair activities are reactive.

– Breakdowns and malfunctions typically occur when


equipment is in use.
– Standby machines and parts can speed repairs.
 Preventive Maintenance (PM)

– Regularly scheduled inspections are performed.

– PM activities are performed before equipment fails.


3
– PM is usually performed during idle periods.
Tradeoff Between Repairs and PM
 At minimum level of PM, it is a remedial policy

– fix machines only when they break


– the cost of breakdowns, interruptions to production,
and repairs is high
 As the PM effort is increased, breakdown and repair cost
is reduced
 At some point, the total maintenance cost (PM,
breakdown, and repair) reach a minimum
4
Tradeoff Between Repairs and PM
Annual Cost ($)

Minimum Total
Maintenance Cost
Total
Maintenance
Costs
Minimum
Level of Preventive
Preventive Maintenance
Maintenance Cost
Breakdown
and Repair
Cost
Degree of Preventive Maintenance

5
Repair Programs
 Objectives
 Get equipment back into operation as quickly as possible.

 Control cost of repairs crews.

 Control cost of the operation of repair shops.

 Control the investment in replacement spare parts.

 Control the investment in standby or backup machines.

 Perform the appropriate amount of repairs at each


malfunction.
6
Repair Crews and Standby Machines
 Repairs often performed on an emergency basis to:
 Minimize interruptions to production

 Correct unsafe working conditions

 Improve product/service quality

 In emergency situations:
 Specialists may work overtime

 Supervisor/engineers are nearby to collaborate

 Standby machines may be quickly put in operation


7
How Speedy Should Repairs Be?
Cost ($)

Minimum
Total Cost
of Repairs Total Costs
of Repairs
Cost of Repair
Crews & Shops,
Spare Parts, and
Standby Machines
Cost of
Interruptions to
Production
0
Slow Speed of Making Repairs Fast

8
Breakdowns Trigger
Repairs and Corrective Actions

 An equipment breakdown should trigger two actions:


– Fast repair of the malfunction equipment

– Development of a program to eliminate cause of the


malfunction and need for such repairs in the future
 Modification/redesign of malfunctioning machine

 Modification/redesign of part or product being processed

 Training of operators to improve machine care

 More frequent preventive maintenance/inspection


9
Extent of Repairs
Do just enough repairs to get equipment running
again.
Repair the malfunction and replace some parts
that are worn.
Perform a major overhaul of the equipment.
Replace the old equipment with new.

10
Decision Analysis in Repair Programs
Determining the size of repair crews
– This is one repair-capacity decision

– Queuing analysis is often used

– Computer simulation is used when the assumptions of


queuing formulas do not apply

 Determining the number of standby machines to have


– Trade-off between cost of lost production time and cost
of machine storage, handling, ….
11
Advantages of Letting Workers
Repair Their Own Machines
 Greater variety may make job more satisfying

 May be more sensitive to potential malfunctions

 Increase flexibility

 Can make minor repairs faster

 Can avoid minor repairs by cleaning, lubricating,


adjusting and servicing machines
 Operate machines more carefully
12
Reasons for a PM Program
Reduce the frequency and severity of interruptions
due to malfunctions
Extend the useful life of equipment

Reduce the total cost of maintenance by substituting


PM costs for repair costs
Provide a safe working environment

Improve product quality by keeping equipment in


proper adjustment 13
PM and Operations Strategies
• PM program is essential to the success of a
product-focused positioning strategy
• On production lines, there are little if any in-
process inventories between adjacent operations
• If a machine breaks down, all downstream
operations will soon run out of parts to work on

14
Automation and the Prominence of PM
• Many operations are slowly moving toward
workerless production
• We are seeing a shift from large to smaller
production workforces
• Along with this, we are seeing a shift from small to
larger PM workforces
• Production workers displaced by automation will
need to be retrained to become PM workers
15
Scheduling PM Activities
• PM and production are increasingly viewed as
being equally important
• In some plants, two 8-hour shifts are devoted to
production and one 4-hour mini shift is devoted to
PM
• In other plants, three shifts are used for
production, but time allowances are factored into
production schedules for PM activities 16
PM Database Requirements
• Detailed records, or an ongoing history, must be
maintained on each machine
 Dates and frequency of breakdowns

 Descriptions of malfunctions

 Costs of repairs

• Machine specifications/checklists for PM inspection

 Computers generally used to maintain a database

• Also, data can be kept in plastic pocket on a machine


17
Modern Approaches to PM
• PM at the source - workers have the fundamental
responsibility for preventing machine breakdowns
by conducting PM on their own machines
• Workers listen for indications of potential
equipment malfunction
• Maintenance-related records maintained by
workers
• Use of quality circles
18
Decision Analysis in PM

 Three decisions in particular


Determining the number of spare parts to carry
Determining how often to perform PM on a group
of machines
Planning and controlling a large-scale PM project

19
Determining the Number of Spare Parts to Carry
for PM Inspections

Two types of parts demand arise from PM inspection:


1. Parts that we routinely plan to replace at the time of
each inspection (demand that is certain)
– This demand can be satisfied by applying Material
Requirements Planning (MRP) logic

2. Parts, discovered during an inspection, in need of


replacement (demand that is uncertain)
– This inventory problem is similar to the number-of-standby-
machines problem. 20
Determining the Frequency of
Performing PM
• First, compute the expected number of breakdowns
for each PM policy.
• Next, compute the expected breakdown cost,
preventive maintenance cost, and total cost for each
PM policy.
• Finally, identify the policy that minimizes the total
cost per unit of time (say, per week).
21
Expected Number of Breakdowns

where:

Bn = expected number of breakdowns for each of the PM

policies

pn = probability that a breakdown will occur between PM

inspections when PM is performed every n periods


N = number of machines in group 22
Example: PM Frequency

It costs $6,000 to perform PM on a group of four machines.


The cost of down time and repairs, if a machine
malfunctions between PM inspections, is $8,000.

How often should PM be performed to minimize the


expected cost of malfunction and the cost of PM?

(The machines’ breakdown history is on the next slide.)

23
Example: PM Frequency
• Machine Breakdown History

Weeks Probability That a


Between PM Machine Will
Malfunction
1 0.2
2 0.3
3 0.5

24
Example: cont….
n
B n  N( p n )  B(n 1) p1  B(n  2) p 2  ...  B1p (n 1)
1

B1 = 4(0.2) = 0.800
B2 = 4(0.2 + 0.3) + 0.8(0.2) = 2.160
B3 = 4(0.2 + 0.3 + 0.5) + 2.16(0.2) + 0.8(0.3) = 4.672

25
Example: cont….

Exp. Weekly
PM Exp. Number Exp. Weekly Total
Every Number of BDs Cost of Cost Weekly
n Wks. Of BDs per Wk. BDs of PM Cost
1 0.800 0.800 $6,400 $6,000 $12,400
2 2.160 1.080 8,640 3,000 11,640
3 4.672 1.557 12,456 2,000 14,456

The policy that minimizes total weekly cost is: perform


PM every 2 weeks.

26
Large-Scale PM Projects
• Large-scale projects occur commonly in maintenance
departments.
• Banks of machines, whole production departments, and
even entire factories are shut down periodically to
perform PM.
• The number and diversity of the PM tasks that must be
performed can be great.
• CPM (in Chapter 9) is a useful way to plan and control
large-scale maintenance projects. 27
Approaches to Improving
Machine Reliability
 Overdesign - enhancing the machine design to
avoid a particular type of failure
 Design simplification - reducing the number of
interacting parts in a machine
 Redundant components - building backup
components right into the machine so that if one
part fails, it’s automatically substituted
28
Secondary Maintenance Responsibilities

• Housekeeping, grounds keeping, janitorial

• New construction, remodeling

• Painting

• Security, loss prevention

• Pollution control

• Waste recycling

• Safety equipment maintenance

• Public hazard control 29


Trends in Maintenance
• Production machinery is becoming more and more
complex and maintenance personnel must keep pace
• Special training programs to maintain worker skill
level
• Subcontracting service companies
• Production workers maintain own equipment
• Computer assistance in maintenance

30
Computer Assistance in Maintenance

• Scheduling maintenance projects

• Maintenance cost reports by production department,


cost category, and other classifications
• Inventory status reports for maintenance parts and
supplies
• Parts failure data

• Operations analysis studies


31
Maintenance Issues in Service Organizations

• Maintenance issues are not limited to manufacturing

• Transportation firms (airlines, trucking companies, package


delivery services, railroads) must keep their vehicles in top
operating condition
• Highway departments must maintain roadways

• Office personnel are reliant on copiers, printers, computers,


and fax machines working properly
• As services become increasingly automated, service firms
face more and more maintenance issues 32
Wrap-Up: World-Class Practice

• Empower workers so they “own” their machines


• Implement JIT to help reduce inventories and cycle
time
• Invest in factory and service automation projects
• Utilize automated process sensing and control
systems
• Use computers in maintenance management
33