Quality Notes

Uploaded by

raja trab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views14 pages

Quality Notes

Uploaded by

raja trab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 14

China Communications and Construction . Co . Ltd..

TOPIC IS SITE WORK


AND QC DOCUMENTS
REQUIRED
Quality Control Meeting
Required Documents .

1.Project Quality Plan


Project Quality Plan should be approved
form RC in code 1. All latest form must be
attached with (PQP) in file.
For starting of site we required below item
must be approved from RC.
1.Technical submittal/Material Approval.
2. Shop Drawing.
3.Inspection and test Plan.
Quality Control Meeting
4.Method Statement
5.Request For Inspection
6.Hold Point release.
7.Material receiving Report.
1.Technical submittal/Material Approval.
Before start any activity we need to take approval for all
material which one we will use at site.
2 Shop Drawing.
For all critical and structural work before starting of
construction, prepare shop drawings and get approval
from RC.
3.Inspection and test Plan.
ITPs Detail in-process activities for which inspection &
tests are required indicating.
Quality Control Meeting
1.Method/Activities
2Inspection and test Requirements.
3.Inspection/Test acceptance
(controlling documents/Check List)
4.Responsible parties for witnessing each inspection or
test.
5.Verifying record/documents for each activity can be
found.
4.Method Statement
Prior to commencing every major or lead construction
activity submit method statement for RC approval.
Quality Control Meeting

5.Request For Inspection


After completing any work raise RFI to
RC field engineer for inspection.
6.Hold Point release.
After sign off RFI prepare the HPR and
take sign from RC engineer ASAP.
If possible than make HPR also with RFI
and take signature.
Quality Control Meeting
7.Material receiving Report.
Before raising MRR to RC, make internal
inspection and if any damage material
found then remove from site.
Check all certificate regarding material
testing and delivery note.
Delivery note ant MTC should be match
to each other.
Quality Control Meeting

Site Controlling System.


For Site control we must follow the
below mention points.
1.Every day Qc Engineer will visit the
work location. Morning and evening two
time in a day.
2.If he find any problem than
immediately inform to work related
person/Supervisor or Engineer. And Also
inform to QCM and CM.
Quality Control Meeting

Site Controlling System.


3 if he doesn’t rectify the comment then
Issue internal QAN and inform to QCM
and CM.
4.Hold the inspection up to rectification
of comment.
5.If internal inspection done and every
thing is good then inform to RC for
inspection.
5.Befor starting of any activity must
inform to RC Field engineer.
Quality Control Meeting

Daily Report.
Prepare daily QC report and submit RC
on daily basis.
Weekly Report.
Prepare weekly QC report and submit RC
every week.
Monthly Report.
Starting of next month prepare monthly
report and submit to RC ASAP.
With monthly report should be attach all
relevant documents.
Quality Control Meeting
QCM responsible for all kind of quality
work and he is also responsible for zero
rework policy .
Before submitting any document to RC
QCM should review documents properly
and check according to the RC
requirement .
Make a schedule for QC and take report
everyday regarding inspection and site
work.
Make schedule for code-2 and 3
document closing and give task to
related engineer.
Quality Control Meeting
Check RFI /HPR/MRR log weekly basis.
And send these log to higher
management fore review.
QCM also make schedule with all QC
engineer in a week and visit site with
them.
Arrange quality and construction
meeting regarding quality and progress
work.
Check all files for all work and make sure
all files should be updated.
QCM prepare the monthly internal AUDIT
schedule and report.