AWP Introduction For MKB

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views7 pages

AWP Introduction For MKB

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 7

AWP Introduction

for MKB
Monday, 21 April 2024
Project Information | Overview
Project Title : EPC for Revamp Ammonia Plant-2 Project
Project Number / Code : TP-9832
Project Owner : PT. Pupuk Kalimantan Timur (PKT)

Kawasan Pabrik Pupuk, Guntung, Kec. Bontang Utara,


Project Location :
Kota Bontang, Kalimantan Timur, Indonesia

Contract Sign = 1 November 2023


Contract Date :
Contract Effective Date = TBA

22 months (Mechanical Completion)


Project Duration :
24 months (Plant Acceptance)

Modifying brownfield plant (several equipment and installing new


Project Objective : sections to the existing PKT-2 plant in Bontang) to reduce energy
consumption by 4 MMBTU/ton

: EPC Lumpsum (schedule driven)


Scope of Work
New equipment & modified equipment layout
According to Appendix J-1 of Contract
Progress Payment = 80%
:
Payment Term Mechanical Completion = 10%
PAC = 10%
Advance Payment = 10% (amortization during progress payment)
Licensor : Casale
Project Location
(inside Kaltim Industrial Estate (KIE))
Project Information | 3D View
AWP involves to dividing a project into manageable work
packages (WPs), which helps to streamline project execution
What is Advance Work Packaging
(AWP)?

AWP is the overall process flow of all


the detailed work packages EWP PWP
(CWP/IWP, EWP and PWP)

Project
EWP EWP PWP CWP

EWP EWP PWP CWP


What target was AWP aiming for?
CWP CWP

1. To monitor Construction progress per CWP/IWP

2. To manage the Constraints per CWP/IWP


Relation of CWP, EWP and PWP :

CWP will be assign to manage Construction work


3. To monitor Construction-related Drawing,
Requisition & PO issuance status + Bulk Material Code

4. To estimate MH and collect the actual MH for each EWP will be assign to manage Engineering work
CWP/IWP to evaluate Construction work productivity
+ Bulk Material Code

PWP will be assign to manage Procurement work

+ Bulk Material Code 4


PEKERJAAN PCWBS - CWP
FIWP

Piling

General Civil –
Building Area
Pile Area 1 Pile Area 4

Foundation Pile Area 2 Pile Area 5

Pile Area 3 Pile Area 6


Mechanical
Installation
Process Implementation

Attach on
FIWP given to Subcon do the FIWP Approved
progress
Subcon work by CM
reporting
FIWP Content FIWP CONTENT

EWP REFERENCE SCHEDULE & PROJECT EXECUTION


SCOPE OF WORK OTHERS
LIST PLANNING REQUIREMENT STRATEGY
Scope of Work EWP List Manpower Requireme Standard Quality Work Constraints Summary Description
nt (pick & choose) Requirement (pick & ch (optional)
oose)

3D Model Shots Material Take Off Equipment (pick & Safety Material Upload Reference
choose) Requirement (pick & ch Handling (pick & choos Document (optional)
oose) e)

Vendor Document List Execution Schedule Waste


(pick & choose) (adjustment from range by Management (pick & ch
CWP date) oose)

Drawing List (pick &


choose)

Value from CWP Menu