0% found this document useful (0 votes)
12 views26 pages

Template - 07 - Progress Presentation

This document outlines a senior design project for developing a business management software solution. It describes the stakeholders, opportunity, proposed solution, progress report including requirements analysis, system design, implementation, and testing. Next steps and the prototype are also mentioned.

Uploaded by

zongwarid72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views26 pages

Template - 07 - Progress Presentation

This document outlines a senior design project for developing a business management software solution. It describes the stakeholders, opportunity, proposed solution, progress report including requirements analysis, system design, implementation, and testing. Next steps and the prototype are also mentioned.

Uploaded by

zongwarid72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Senior Design Project

Pocket Business Solution


Supervised By: Tajwar Mehmood (Lecturer)
Project Team
• Zarghona Zubair(19661)
• Fizza Ayman (19903)
• Afia Ishaq (19653)
Table of Content
• Opportunity & Stakeholders
• Solution
• Progress Report Summary
– Requirements
– Software System (Design + Implementation + Testing)
– Endeavour (Team + Work + Way of Working)
• Next Steps
• Prototype / Report
OPPORTUNITY & STAKEHOLDERS
Stakeholders
• MZ Packages and Productions
• Owners
Opportunity & Stakeholders
• All operation management in owners’ hand.
Our system gives a complete
• Insight to the owner about his business
leading to:
• -Prevention of fraud
• -Better decision making
• -Money saving
• -No Assistant needed
Solution
• Regular reporting and notifications of Real-time
insights to give the owner a complete picture of his
business.
• Both at work and at home the owner can check
various activities like salaries, overtime , order
management , the payments spent on the raw
material as well as the payments being made by
customers of his business throughout the
day/week/month.
• By attendance the owner will monitor his worker’s
presence.
PROGRESS REPORT
SUMMARY
WBS Deliverable Activity # Activity to Complete the Duration Responsible Team
WBS #
Deliverable (# of Days) Member(s) & Role(s)

1 Project Management 1.1 Work Breakdown Structure(WBS) 3 Fizza,Zarghona

1.2 Roles and Responsibility Matrix 1 Afia

1.3 Change Control System 2 Afia,Fizza,Zarghona

2 Reports/Documentation 2.1 Final Documentation Introduction 1 Afia,Fizza,Zarghona

2.2 Literature/ Market Survey 2 Afia,,Zarghona


2.2.1.Interview
2.2.1.1. Questionnaires
2.2.1.2.Find Interviewee
2.2.1.3 Conduct Interview

2.3 Requirement Analysis

2.3.1. Elicitation 14 Afia,Fizza,Zarghona

2.3.2. Document the requirement 1 Afia,

2.3.3. Use Cases 5 Zarghona


2.4 System Design

2.4.1 ER diagram 3 Afia,Fizza,Zarghona

2.4.2.Activity diagram 2 Zarghona

2.4.3.Sequence diagram 2 Afia,Fizza,Zarghona

2.5 Implementation 70 Fizza,zargona,Afia

2.5.1 Prototype 5 Afia,Fizza,Zarghona

2.6 Testing and Performance Evaluation 10 Afia,Fizza,Zarghona

2.6.1 Functional testing

2.6.2 Usability testing


2.6.2.1. Check navigation
2.6.2.2.Ease of use

2.6.3. Performance testing

2.6.4 Security testing

2.6.5.Compatibitlity testing

2.7 Conclusion and Outlook 2 Afia,Fizza,Zarghona

2.8 End User Documentation 3 Afia,Fizza,Zarghona

2.9 Application Administration 3 Fizza,

2.10 System Administration Documentation 15 Afia,,Zarghona


3 System 3.1 Development Environment 30 Afia,Fizza,Zarghona
3.1.1 IDE
3.1.2 Version control
3.13 Server
3.1.4 Database

3.2 Presentation layer 15 Afia,Fizza,Zarghona


3.2.1 Mockups
3.2.2 Story Boarding
3.2.3 Interfaces

2.10 System Administration Documentation 15 Afia,Fizza,Zarghona

3 System 3.1 Development Environment 30 Afia,Fizza,Zarghona


3.1.1 IDE
3.1.2 Version control
3.13 Server
3.1.4 Database
2.10 System Administration Documentation 15 Afia,Fizza,Zarghona

3 System 3.1 Development Environment 30 Afia,Fizza,Zarghona


3.1.1 IDE
3.1.2 Version control
3.13 Server
3.1.4 Database

3.2 Presentation layer 6 Afia,Fizza,Zarghona


3.2.1 Mockups
3.2.2 Story Boarding
3.2.3 Interfaces

3.3 Business layer logic 16 Zarghona


3.3.1 Domain Model
3.3.2 UML Use case diagram
3.3.3 Class Diagram
3.3.4 Deployment diagram
3.3.5 Component diagram
3.3.6 Activity Diagram
3.3.7 Flow Control diagram

3.4 Data Management Layer 10 Afia,Fizza,Zarghona


3.4.1 Database
3.4.2 ER Diagram
Requirements
• Elicitation Techniques / Tools
– Literature Review.
– Interviews.

• Specification / Documentation
– Functional Requirements.
– Non-functional Requirements.
Requirements
• List of Different Users(1)
• Use Cases(7)
• Functional & Non Functional Requirements
Design
• Deployment Diagram Representing
Hardware/Software Components in your
System
Design
• Detailed Design
– UML Diagrams
– ERD (if DB used)
– etc.
Implementation
• List Development Tools & Technologies
• List Best Practices / Coding Standards
• List Libraries / Components / Web Services
Testing
• ???
ENDEAVOUR
Endeavour
• Describe roles of your team members
• Describe your software development process
• Describe your way of working as a team
NEXT STEPS
Work Breakdown Structure
(List of all Deliverables / Strikethrough Completed Deliverables)

• Major Deliverable 1 • Major Deliverable 3


– Sub Deliverable 1 of 1 – Sub Deliverable 1 of 3
– Sub Deliverable 2 of 1 – Sub Deliverable 2 of 3
– Sub Deliverable 3 of 1 – Sub Deliverable 3 of 3
– ... – ...
• Major Deliverable 2 • Major Deliverable 4
– Sub Deliverable 1 of 2 • ...
– Sub Deliverable 2 of 2
– ...
Challenges
PROTOTYPE & REPORT
Prototype
Report
• Chapter 1: Introduction
• Chapter 2: Literature / Market Survey
• Chapter 3: Requirement Analysis
• Chapter 4: System Design
• Chapter 5: Implementation
• Chapter 6: Testing & Evaluations
• Chapter 7: Conclusion & Outlook

You might also like