Store RFID Tag Storage & GRDC Process

Uploaded by

viiicky04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views16 pages

Store RFID Tag Storage & GRDC Process

Uploaded by

viiicky04
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 16

RFID Tag/Pin Storage &

GRDC process
RFID hard Tag & Pin storage at the cash till

The storage bucket at the cash till to be labele’d,tag & pin to be keep separately in each bucket
RFID hard Tag & Pin storage at the BOH

The storage bins/box at the BOH to be labele’d,Tags & pins to be stored separately in Aluminium/Steel Box
RFID HARD TAGS & PIN-RECONCILATION & GRDC PROCESS:

 Tags & pins need to be kept separately in the cash till bucket.
 At EOD each cashier has to bring his cash tills accumulate Tags & Pins to the BOH.
 Next day morning BOH CSA/RFID champ has to check those tags decoded by using RFID or if not decoded than decoding needs to be done & same need to be
kept at the BOH bins separately after decoding. For decoding follow the defined encoding/decoding process.
 Store manager has to generate sale report for the last week to get no of qty sold for the week. Follow the existing process for generating sales report.
 Accumulate all the RFID tag which qty was sold last week(Tag accumulation need to be done once in every week- (Wednesday)
 Decoding is must before packing of the tags & pins.
 Need to make 100 pcs of each packet of RFID tag by using store merchandise plastic poly bag
 After packing RFID hard tag,100 pcs pin need to be packed in separate poly bag & keep inside the Tag’s packet
 All packet need to be kept inside the carton. And labelling needs to be done outside the box mentioning total qty
 If store has not received RFID tag with invoice for GRN’d & RFID tag received attached with merchandise from DC
-Than store has to do stock correction as per stock correction SOP(Article-491642488)
 After stock correction done, store has to create STO(store need to enter purchase group ”XC4” to get auto release of STO). Follow existing process for STO creation.
 TCN must need to be raised after creating Delivery & dispatch the material. Follow existing process for TCS raising and dispatch.
Step by step SAP process for creating STO & Delivery

 Log on SAP, put T-code Zstorehht and do positive stock correction of RFID hard tag article as much store want to do GRDC
 After that use me21n for creating STO
 double click stock trasp order
 supplying site = supplying store
 purchase org RP00
 purchase group XC4
 company code 9008
 click on default value
 change the delivery date upto next 28 days from creating STO
 site should be the receiving DC or store code
 Presss the save button
 put supplying plant( Whichever store creating STO)
 put RFID hard tag article 491642488
 put PO qty(number of tag need to be GRDC)
 Scroll the mouse wheel so that article description appear in the screen
 Recheck the site code and delivery date.
 Click the save button
 Save the STO number
 Then proceed for delivery creation
 Go To SAP and put T-code VL10b
 put supplying store code in shipping point
 Click purchase order and put STO number in purchasing document
 Wipe out both the date in delivery creation date and then execute
 Select the whole row and click background
 select any of the cell from the table and then click document to get the delivery number
 Use T-code ME21n for creating STO and then double click Stock Transp Order
 Supplying site = supplying store. purchase org RP00. purchase group XC4. company code 9008. Then click on Default
Value.
 Change the delivery date upto next 28 days from creating STO
 site should be the receiving DC or store code
 Press the save button
 Put supplying plant( Whichever store creating STO)
 put RFID hard tag article 491642488
 Put PO qty(number of tag need to be GRDC)
 Scroll the mouse wheel so that article description appear in the screen
 Recheck the site code and delivery date. Click the save button
 Click the save button
 Note down the STO number
 Then proceed for delivery creation
 Go To SAP and put T-code VL10b
 put supplying store code in shipping point
 Click purchase order and put STO number in purchasing document
 Wipe out both the date in delivery creation date and then execute
 Select the whole row and click background
 select any of the cell from the table and then click document to get the delivery number
 Note down the Delivery number
 On the Pickup day Do PGI an SAP with T-code VL02N
 Then use T-code VF01 for STN creation with the help of delivery
number
 Note down the STN number
 Then use T-code VF02 and put the STN number
 Print the required document like Invoice, LR copy, Trip sheet
Thank You