1 Production of Refined Rice Bran Wax (Final)
1 Production of Refined Rice Bran Wax (Final)
1 Production of Refined Rice Bran Wax (Final)
BACHELOR OF TECHNOLOGY
IN
OIL TECHNOLOGY
Extraction of de-oiled wax-sludge with non-polar solvent of the kind such as herein described in a ratio of
about 1:2 under stirring for a period of about 30 minutes at room temperature ranging from 25-35°C
Collection of wax layer and solvent removal from the said wax layer under 15 inch vacuum to obtain the
purified wax.
In an embodiment of the present invention, the pressure applied is in the range 5-50 psi.
In another embodiment of the present invention, the non-polar aliphatic hydrocarbon solvent is selected
from hexane, n-hexane, and any of the C5-C8 carbon chain length aliphatic hydrocarbon solvents viz.,
petroleum ether, pentane hexane, heptane and octane..
9 kg of wax-sludge was pressed using a low pressure press at 30 psi to get 6.3 kg of partially
de-oiled wax and 2.2 kg of the oil fraction. Later, 500g of the partially de-oiled wax was
treated with 2000ml X 4 of the C6 aliphatic hydrocarbon solvent and after
30 minutes, the wax layer and the oil layer were separated at
Reference:
Handbook of Industrial Crystallization
Crystallizer Designing
1) Retention time Parameters
2) Minimum Active Volume
3) Sizing
4) Height of Cylinder
5) Height of Cone
Equipment Sizing:
Calculation Flow Diagram
Retention time
r = L 50
3.67G
Equipment Sizing:
Calculation Flow Diagram
Retention time
Minimum Active Volume
r = L 50 VR = rV 14
3.67G
Equipment Sizing
Calculation Flow Diagram
Retention time
Minimum Active Volume
r = L 50 VR = rV 14
3.67G
Sizing
VR = Vcone + V cylinder
π
VR = 0.1868D +
3
D 2 (1.5D)
4
Equipment Sizing:
Calculation Flow Diagram
Retention time
Minimum Active Volume
r = L 50 VR = rV 14
3.67G
Height of Cone
ℎ = t an 55 ( 0 −D 0.1D
)
2 2 Sizing
VR = Vcone + V cylinder
π
VR = 0.1868D +
3
D 2 (1.5D)
Height of Cylinder 4
ℎ = 1.5D
Mechanical Engineering Design
The selected material for the crystallizer is (stainless steel 316) due to its high
corrosion resistance.
•
Shell Thickness 3
t
Pc = K c E
Do
•
Tori spherical Head Thickness
Pe
e = 4R s
E
Mechanical Engineering Design
•
Cone Thickness
3
Pc = K c E t cone
L
D
•
Corrosion Allowance: 2 m m
Mechanical Engineering Design
•
Leg Support, Angle Type
Wt −K 1 + 6K2 + H ( −R
K + 6K )
S 1t = [cosα R 3 4
t2
t
Wt −K 1 − 6K2 + H ( − KR − 6K
S 1c = [cosα R 3 4
t2
t
Mechanical Engineering Design
LOCATION: Kanpur
Total 1,24,50,000
Entities Cost
2.BUILDING:
Construction 20,00,000
RCC 5,00,000
Electrification 3,00,000
Other expenses 50,000
Total 28,50,000
Total 1,40,00,000
4. Miscellaneous Fixed Assets = 1,00,000
5.Escalation and Contingencies = 10%of (total cost of Building, Machinery & Equipments
and Miscellaneous Fixed Assets)
= 10% of (28,50,000 + 1,40,00,000 + 1,00,000)
= 10% of (1,69,50,000)
= 16,95,000
Total 4,97,000
Per day salary 16,566
Name Amount Cost Net
2.Raw material (per day) -:
Total 4,00,000
Other 6,000
Total 81,000
5.Other contingent expenses (per day) -:
Transportation 5,000
Insurance 500
Total 9700
Depreciation (yearly) -:
Total 22,02,500
7.Miscellaneous expenses (yearly) = (0.5% of daily expenses)
= 17,702.5
10.Total cost of production = (Sum of all the above entities in viability report)
(yearly) = 15,81,58,484.5
11.Sales Realization(annual) -:
Total 1,86,24,000
Hence, it would take 2.079 YEAR to recover our original investment i.e. Payback
Period is 2.079 YEAR
Break Even Point