ZTE MSOP Weekly Report - WK12 - 2024
ZTE MSOP Weekly Report - WK12 - 2024
ZTE Network
2024, Week 12
Section 1 SLA KPI Trend & Achievements
Half Year
Cell KPI Comparison WK 12
Targets
ZTE KPIs - 2G Group WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 with Last After
(% Cell) Week
Target Exclusion
Y1H1
% of 2G Best Cell Call Setup Success Rate >= 99.5% 78.00 79.15 79.24 84.17 96.20 95.77 81.30 78.47 77.47 76.79 77.61 77.79 77.88 87.89
% of 2G Worst Cell Call Setup Success Rate <97.5% 2.00 2.76 1.93 1.51 0.68 0.75 1.77 2.05 2.08 2.97 2.39 2.15 2.07 0.89
% of 2G Best Cell SDCCH Blocking <=0.1% 99.00 98.28 98.66 98.81 98.89 98.55 98.79 98.84 99.00 97.88 97.93 97.80 98.36 99.77
% of 2G Worst Cell Call SDCCH Blocking >= 1% 0.20 0.73 0.52 0.45 0.42 0.50 0.37 0.41 0.35 0.95 0.74 0.70 0.50 0.04
% of 2G Best Cell TCH Blocking <=0.5% 99.50 99.22 99.69 99.76 99.78 99.72 99.71 99.63 99.65 98.75 99.50 99.77 99.76 99.95
% of 2G Worst Cell Call TCH Blocking >= 1% 0.16 0.60 0.24 0.18 0.16 0.22 0.22 0.29 0.26 1.07 0.42 0.18 0.18 0.03
% of 2G Best Cell Voice Call Drop Rate <= 0.4% 88.50 89.80 90.04 91.28 93.93 94.49 91.32 91.08 90.36 88.77 87.96 89.30 89.44 94.35
% of 2G Worst Cell Voice Call Drop Rate >= 1.5% 0.50 1.26 0.63 0.75 0.92 0.48 0.58 0.60 0.68 1.32 0.73 0.68 0.72 0.19
% of Best Cell HO Success Rate >= 98.5% 85.00 87.86 87.77 87.77 86.79 85.93 86.31 87.42 85.82 86.56 88.10 88.28 88.02 90.76
% of Worst Cell HO Success Rate <= 96% 2.80 2.32 2.48 2.52 2.65 2.85 2.65 2.42 2.61 2.71 2.29 2.29 2.43 1.68
Degradation Comments:
TCH blocking/TCH Drop/HOSR best/worst:
• 18th Mar, Due to poor availability impacting 540 sites and contributing 26.89% of the DCR degradation. Top CPs are T4494, T0228, T4579. Resolved.
• 19th Mar, Due to poor availability/packet loss issue impacting 180 sites and contributing 20.58% of HOSR degradation. Top CPs are T4462, T2337, T4981.
• 20th Mar – Due to poor availability impacting 29 sites causing TCH congestion on 86 neighbor sites and contributing 99.45% of the degradation. Top CPs are T4921, T4912, AK0137.
• 21st Mar - Due to poor availability impacting 506 sites and contributing 23.6% of the DCR degradation. Top CPs are T2442, EN0050, T4949. Worst impacted BSCs are ENZBSC21, PHZBSC13, OWZBSC15 and
OWZBSC20. Also due to construction induced fiber cut 13.9KM from Nipost-Ahoada-YenagoaSBC impacting 152 sites. Resolved.
• 22nd Mar - Due to packet loss impacting 966 sites and contributing 88.24% of the DCR degradation. Top CPs are T4926, T4920, T4921. Worst impacted BSCs are ENZBSC31 and ENZBSC24. Resolved.
• ENZBSC31 link congestion issue is due to 100% utilization of a 1+0 radio link with capacity of 216Mbps between T2577and T2979. Although the link is configured as xpic with one ODU in each ends, FME should
investigate why the second ODU is removed. Not resolved.
Improvement Plan:
CSSR & SDCCH & TCH Congestion: SDCCH congestion optimization & TCH congestion optimization is ongoing to improve the CSSR/SD/TCH Cong KPIs
DCR: Clashing DL frequency checks is in progress to improve the call drop rate.
HOSR: PBGT/Quality HO margins Tuning planned to improve the Inter-Cell outgoing HOSR.
ENZBSC31 LINK CONGESTION
2G Call Setup Success Rate (CS) (Excluding Timeout)_MTN 2G Drop Call Rate (TCH)_MTN • 100% link congestion
between T2577 - T2979
CR0141 CR0142 CR0144 CR0146 CR0405 T2577 CR0141 CR0142 CR0144
CR0146 CR0405 T2577 Degrading Call Setup Success
120
25 Rate of the following sites:
100 CR0141, CR0142, CR0144,
20 CR0146, CR0405,
80 T2577.Although the link is
15 configured as xpic with one
60
ODU in each ends, FME
40
10 should investigate why the
second ODU is removed. Not
5
20 resolved.
0 0
2024-03-11 00:00:00 2024-03-13 23:00:00 2024-03-16 22:00:00 2024-03-19 21:00:00 2024-03-22 20:00:00 2024-03-11 00:00:002024-03-14 02:00:002024-03-17 04:00:002024-03-20 06:00:002024-03-23 08:00:00
1200
80
1000
60
800
40 600
400
20
200
0 0
2024-03-11 00:00:002024-03-14 05:00:002024-03-17 03:00:002024-03-19 23:00:002024-03-22 19:00:00 2024-03-11 00:00:002024-03-14 09:00:002024-03-17 11:00:002024-03-20 11:00:002024-03-23 11:00:00
ZTE – 3G SLA Trend (Weekly)
Half Year
Cell KPI Comparison WK 12
Targets
ZTE - 3G KPIs Group WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 with Last After
(% Cell) Week
Target Exclusion
Y1H1
% of 3G Best Cell Voice Call Setup Success Rate >= 99.5% 82.00 74.14 75.50 75.94 76.61 77.93 78.28 77.61 74.49 75.49 77.38 78.70 78.04 83.93
% of 3G Worst Cell Voice Call Setup Success Rate < 97.5% 1.80 3.32 2.44 2.22 2.16 2.20 2.18 2.03 2.39 2.84 2.49 2.17 2.36 0.97
% of 3G PS Best Cell Call Setup Success Rate >= 99.5% 75.00 70.80 71.46 76.73 83.04 82.89 81.57 82.95 80.38 83.08 84.26 84.28 84.70 90.48
% of 3G PS Worst Cell Call Setup Success Rate < 97% 2.20 3.66 2.67 2.15 1.50 1.59 1.72 1.38 1.30 1.35 1.55 1.38 1.24 0.33
% of 3G Best Cell Voice Call Drop Rate <= 0.3% 96.50 93.27 94.94 95.32 95.03 95.36 95.44 95.86 95.62 95.80 96.60 97.25 97.03 98.78
% of 3G Worst Cell Voice Call Drop Rate >= 1.5% 0.20 0.98 0.27 0.21 0.22 0.19 0.25 0.19 0.25 0.44 0.17 0.15 0.23 0.07
% of 3G Best Cell PS Call Drop Rate <= 0.6% 93.00 90.12 90.73 88.99 88.08 89.00 88.10 88.25 91.17 92.18 91.99 91.52 91.34 96.83
% of 3G Worst Cell PS Call Drop Rate >= 2.5% 0.30 1.28 0.58 0.64 0.81 0.55 0.59 0.58 0.48 0.60 0.52 0.46 0.76 0.16
% of Best Cell Intrafrequency Soft HO Success Rate >= 99.5% 99.50 99.86 99.86 99.84 99.82 99.86 99.84 99.83 99.83 99.84 99.81 99.83 99.78 99.85
% of Worst Cell Intrafrequency Soft HO Success Rate <= 97% 0.10 0.01 0.01 0.02 0.01 0.01 0.01 0.02 0.01 0.01 0.02 0.01 0.01 0.01
% of Best Cell Interfrequency HO Success Rate >= 98.5% 76.00 70.17 70.86 74.62 74.83 74.02 71.88 72.01 72.42 71.08 73.39 74.38 73.01 87.82
% of Worst Cell Interfrequency HO Success Rate <= 95% 15.00 22.31 22.64 21.25 20.91 20.68 22.00 21.96 21.49 22.44 21.04 20.74 21.41 7.24
% of Best Cell IRAT_HO Success Rate >= 98% 93.00 93.17 93.68 93.54 93.64 93.75 93.42 93.40 93.11 92.60 93.06 92.78 93.21 99.55
% of Worst Cell IRAT_HO Success Rate <=95% 6.80 6.50 6.07 6.27 6.17 6.02 6.36 6.39 6.58 6.77 6.62 6.84 6.45 0.15
% of HSDPA Best Cell DL User Throughput 2 Mbps 70.00 79.59 76.28 76.05 76.28 77.56 75.70 76.03 76.83 75.69 75.31 78.76 76.20 80.36
% of HSDPA Worst Cell DL User Throughput
Degradation Comments:
0.75 Mbps 4.00 1.47 1.59 1.83 1.76 1.56 1.83 1.80 1.80 2.20 1.95 1.46 1.72 1.22
CSSR (CS&PS), DCR (CS&PS) Best & worst Cells: 1. High packet loss on 14 Sites connected to CP T4921 . This is due to congestion on Aviat CTR Link T4921<<>>T4920, TAP to review for expansion- Pending
2. High packet loss across 23 Sites connected to CP T4912 leading to degraded Performance. Congestion on 1+1 MW LinkBE0315-T4912, pending for expansion
3. Persistent degraded performance on 10 Sites connected to CP EB0045 as a result of Fiber failure between T4744_Afikpo and Owerri switch : T4744_Afikpo <<>>T4639_SR12_3. Pending
4. Persistent degraded performance on EN0012, EN0071, EN0684 & EN1352 connected to CP T0277 on ENZRNC7 as a result of highly utilized Ericsson ML 1+0 radio-link capacity of 200Mbps between T0277 and EN0012 pending on MTN TAP for
expansion. Pending
5. Recurring TX Link Congestion around CR0141 CR0142 CR0146 and T2577 connected to CP T2340-SDT-20230530-00000409- Pending
6. High Packet loss on 3 Sites (RV0316, T2215 & RV0433) on PHZRNC5 leading to degraded performance. This is due to congesting 1+0 radio link with capacity of 330Mbps on Transmission link T2215<<>>T2291, pending on TAP for expansion.-Pending
Inter-Freq Best & Worst Cells:
Persistent degraded performance on 10 Sites connected to CP EB0045 as a result of Fiber failure between T4744_Afikpo and Owerri switch : T4744_Afikpo <<>>T4639_SR12_3. Pending
Improvement Plan:
CSSR: Concurrent service Optimization, Weak coverage SRB, Max FACh Power tuning & overshooting audit & optimization are ongoing to improve the CSSR
DCR: Weak coverage service strategy optimization & virtual neighbor optimization is in progress to improve the call drop rate
CS IRAT: Mobility Optimization is being implemented to improve the HOSR This will be aggressively pursued after the rehoming activity.
ZTE – 3G Radio Basic KPIs - (Degradation Supporting Slide)
CP EB0045 :: 8 Sites on ENZRNC8 CP EB0045 :: 8 Sites on ENZRNC8 Persistent high Drop call rate
EB0045 - 3G Call Setup Success Rate (CS)_MTN(%) EB0045 - Mean delay jitter (ms)
& degraded CSSR on 8 Sites
100 EB0045 - Mean delay jitter (ms) 100 EB0045 - Call Setup Success Rate (PS HSDPA)_MTN(%)
90 90
connected to CP EB0045 as a
80 80 result of Fiber failure between
70 70 T4744_Afikpo and Owerri
60 60
50 50
switch : T4744_Afikpo
40 40 <<>>T4639_SR12_3.
30 30
20 20
10 10
0 0
16-Mar 0:00 17-Mar 1:00 18-Mar 2:00 19-Mar 3:00 20-Mar 4:00 21-Mar 5:00 22-Mar 6:00 23-Mar 7:00 24-Mar 8:00 16-Mar 0:00 17-Mar 1:00 18-Mar 2:00 19-Mar 3:00 20-Mar 4:00 21-Mar 5:00 22-Mar 6:00 23-Mar 7:00 24-Mar 8:00
CP T4921 :: 14 Sites on ENZRNC1&4 CP T4912 :: 23 Sites on ENZRNC1 1. High packet loss on 14 Sitess connected to CP T4921 . This is due
to congestion on Aviat CTR Link T4921<<>>T4920, TAP to review for
T4921 - Mean delay jitter (ms) T4912 - Mean delay jitter (ms) expansion- Pending
T4921 - Drop Call Rate (PS)_MTN(%) T4912 - Drop Call Rate (PS)_MTN(%) 2. High packet loss across 23 Sites connected to CP T4912 leading to
degraded Performance. Congestion on 1+1 MW LinkBE0315-T4912,
180 25 80 10 pending for expansion
160 70 9 3. Persistent high Drop call rate on 10 Sites connected to CP EB0045
140 20 8 as a result of Fiber failure between T4744_Afikpo and Owerri
60
120 7 switch : T4744_Afikpo <<>>T4639_SR12_3. Pending
15 50 6
100 4. Persistent high Drop call rate on EN0012, EN0071, EN0684 &
40 5 EN1352 connected to CP T0277 on ENZRNC7 as a result of highly
80 10 30 4 utilized Ericsson ML 1+0 radio-link capacity of 200Mbps between
60 3
20 T0277 and EN0012 pending on MTN TAP for expansion. Pending
40 5 2 5. Recurring TX Link Congestion around CR0141 CR0142 CR0146 and
20 10 1 T2577 connected to CP T2340-SDT-20230530-00000409- Pending
0 0 0 0
16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00 16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00
CP EB0045 :: 8 Sites on ENZRNC8 CP T0277 :: 3 Sites on ENZRNC7 CP T2340 :: CR0141, CR0142, CR0146, T2577 ON
OWZRNC5
EB0045 - Mean delay jitter (ms) T0277 - Drop Call Rate (PS)_MTN(%)
T2340 - Drop Call Rate (PS)_MTN(%)
EB0045 - Drop Call Rate (PS)_MTN(%) T0277 - Mean round-trip delay (ms)
T2340 - Packet loss ratio_%
100 35 20 13
90 18 12 60
30
80 16 11 50
70 25 14 10
60 12 9 40
20
50 10 8 30
40 15 8 7
30 10 6 6 20
20 4 5 10
10 5 2 4
0 0 0 3 0
16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00 16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00 16-Mar 0:00 18-Mar 0:00 20-Mar 0:00 22-Mar 0:00 24-Mar 0:00
ZTE – 3G Radio Basic KPIs - (Degradation Supporting Slide)
CP T4921 :: 14 Sites on ENZRNC1&4 CP T4912 :: 23 Sites on ENZRNC1 CP T2340 :: CR0141, CR0142, CR0146, T2577 ON
OWZRNC5
T4921 - 3G Call Setup Success Rate (CS)_MTN(%) T4912 - 3G Call Setup Success Rate (CS)_MTN(%)
T2340 - 3G Call Setup Success Rate (CS)_MTN(%)
T4921 - Mean round-trip delay (ms) T4912 - Mean round-trip delay (ms) T2340 - Mean round-trip delay (ms)
120 2000 100 300 100 350
1800 98 90
100 1600 96 250 300
80
80 1400 94 200 70 250
1200 92 60 200
60 1000 90 150 50
800 88 40 150
40 600 86 100 30 100
20 400 84 50 20
200 82 10 50
0 0 80 0 0 0
16-Mar 0:00 18-Mar 8:0020-Mar 16:0023-Mar 0:00 16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00 16-Mar 0:00 18-Mar 8:00 20-Mar 16:00 23-Mar 0:00
ZTE – 4G SLA Trend (Weekly)
Cell KPI Half Year Comparison WK 12
ZTE KPIs - 4G Group Targets (% WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 with Last After
Target Cell) Y1H1 Week Exclusion
% of 4G Best Cell Voice Call Setup Success Rate (VoLTE) >= 99.5% 88.00 81.04 82.05 82.56 83.00 82.58 82.90 82.61 81.45 78.39 79.90 77.69 78.68 91.25
% of 4G Worst Cell Voice Call Setup Success Rate (VoLTE) < 97% 3.50 3.49 3.57 3.39 3.50 3.88 3.36 3.34 3.37 3.70 3.46 4.06 3.78 1.15
% of 4G PS Best Cell Call Setup Setup Rate >= 99.5% 80.00 67.53 66.83 67.77 67.43 66.62 66.79 67.99 67.26 64.06 67.77 64.45 67.50 71.22
% of 4G PS Worst Cell Call Setup Setup Rate < 97% 1.50 1.92 2.02 1.88 2.01 2.40 1.83 1.79 1.72 2.14 1.73 2.12 1.92 0.44
% of 4G Best cells CSFB to 3G Success Rate >99.5% 98.00 98.05 98.11 98.26 98.28 98.36 98.34 98.32 98.32 98.13 98.18 98.27 98.18 98.41
% of 4G Worst cells CSFB to 3G Success Rate <97% 0.22 0.21 0.21 0.22 0.19 0.18 0.19 0.18 0.19 0.21 0.19 0.18 0.19 0.11
% of 4G Best Cell ERAB Drop Rate <= 0.25% 35.00 25.68 23.17 24.40 23.87 22.13 19.65 21.20 22.80 22.31 21.46 20.42 21.63 24.37
% of 4G Worst Cell ERAB Drop Rate >= 2% 0.65 0.76 1.10 0.85 1.02 1.50 2.03 1.29 1.00 0.95 1.28 1.00 0.94 0.76
% of 4G Best Cell VoLTE Drop Rate <= 0.3% 60.00 44.88 43.82 44.13 45.41 43.73 45.17 44.88 45.09 42.49 41.32 37.93 36.97 42.87
% of 4G Worst Cell VoLTE Drop Rate >= 1.5% 22.00 32.26 32.70 33.18 32.02 34.72 31.34 30.72 30.84 34.97 34.74 40.16 39.00 32.35
% of Best Cell Intra Frequency Handover SR >= 99.5% 88.50 85.49 84.39 84.38 84.21 85.40 85.41 85.77 85.69 85.23 85.29 85.79 85.68 88.76
% of Worst Cell Intra Frequency Handover SR <= 95% 1.10 1.51 1.45 1.50 1.60 1.52 1.46 1.33 1.37 1.50 1.48 1.42 1.37 0.21
% of Best Cell Inter Frequency HO Success Rate >= 98.5% 95.50 94.18 94.20 94.03 93.81 93.73 93.75 94.43 94.22 93.90 94.15 94.02 94.08 96.74
% of Worst Cell Inter Frequency HO Success Rate <= 97% 2.10 3.03 2.87 2.93 3.15 3.09 3.11 2.69 2.88 3.06 2.85 2.94 2.84 0.86
% of Best Cell Inter-RAT HHO SR >= 98% 93.00 90.63 90.16 90.30 90.48 89.99 90.95 90.94 90.91 90.11 89.79 89.21 90.67 95.24
% of Worst Cell Inter-RAT HHO SR <= 95% 5.00 6.93 7.44 7.32 7.29 7.89 6.91 6.87 6.90 7.59 7.74 8.38 7.05 2.47
% Of 4G best cell SRVCC Handover SR (LTE -> 3G) >=98% 93.00 90.60 89.95 90.62 90.34 90.48 91.64 92.44 92.75 90.98 92.32 92.56 92.92 99.31
% Of 4G Worst cell SRVCC Handover SR (LTE -> 3G) <=95% 7.00 9.40 10.05 9.33 9.66 9.52 8.36 7.56 7.25 9.00 7.66 7.44 7.07 0.68
% of 4G Best Cell UE DL Throughput-20Mhz 12 Mbps 80.00 72.97 69.50 69.10 68.23 68.69 65.94 67.58 68.34 68.40 67.99 72.00 67.75 79.76
% of 4G Worst Cell UE DL Throughput-20MHz 2Mbps 1.50 1.97 1.93 2.13 2.46 2.42 2.87 2.58 2.62 3.01 2.72 2.06 2.68 0.08
% of 4G Best Cell UE DL Throughput-15Mhz 9 Mbps 75.00 84.67 83.11 81.90 80.95 81.07 78.23 78.79 78.40 77.66 79.06 82.62 79.69 88.30
% of 4G Worst Cell UE DL Throughput-15MHz 2 Mbps 6.00 0.86 0.84 0.93 1.16 1.17 1.56 1.52 1.70 2.50 1.24 1.00 1.26 0.07
% of 4G Best Cell UE DL Throughput-10Mhz 6 Mbps 85.00 84.11 79.13 78.07 77.16 78.09 74.71 75.41 76.23 76.34 75.37 79.51 75.84 87.49
% of 4G Worst Cell UE DL Throughput-10MHz 1 Mbps 0.40 0.21 0.24 0.35 0.46 0.38 0.52 0.54 0.52 0.56 0.57 0.39 0.50 0.02
% of 4G Best Cell UE DL Throughput-5Mhz 3 Mbps 90.00 85.81 81.98 80.88 80.00 81.20 77.43 79.43 79.14 79.30 81.73 84.71 81.27 95.38
% of 4G Worst Cell UE DL Throughput-5MHz 0.75 Mbps 0.40 0.07 0.29 0.43 0.36 0.21 0.43 0.07 0.36 0.57 0.14 0.07 0.00 0.00
% of 4G Best Cell UE UL Throughput 3 Mbps 65.00 60.39 55.13 54.77 54.21 54.16 52.41 54.43 54.08 55.07 55.42 53.26 53.91 59.94
% of 4G Worst Cell UE UL Throughput 1 Mbps 0.20 0.06 0.06 0.08 0.07 0.08 0.07 0.08 0.07 0.07 0.07 0.07 0.06 0.06
Comments:
CSFB: Week 12: 19th Mar: Fibre Cut between T4639_4 and T4907 ad about 94 sites impacted Resolved, 21st Mar: Fibre Cut between NIPOST Ahaoda to Yenegoa ad about 152 sites impacted Resolved
VoLTE Drop: Week 12: 18st Mar: Steady and continuous MME related drops suspecting to be related to CN activity. ZTE and other vendors impacted. MTN Is checking with CN Team - Open
Intra freq HOSR: Week 12: 19th Mar: Fibre Cut between T4639_4 and T4907 ad about 94 sites impacted Resolved, 21st Mar: Fibre Cut between NIPOST Ahaoda to Yenegoa ad about 152 sites impacted Resolved
Throughput DL/UL: There is Under Sea Cable damage has impacted internet data services across some African countries, Throughput initially improved due to Traffic Loss but Traffic is back to increasing trend-
Planned and ongoing improvement actions:
- Load balancing (MLB Feature tuning and RET tuning),Overshooting optimization, Diversity Issues resolution,External Definitions and mobility alignments,Worst Cells Optimization, Intra LTE mobility strategy trial, User Inactive Timer for VoLTE, DRX Functionality Optimization, Big Ticket Feature Trials
ZTE – 2G/3G/4G/5G SLA KPIs with Obvious Improvement
% of Best Cell HO Success Rate % of 3G Best Cell Voice Call Setup Success Rate % of 3G PS Best Cell Call Setup Success Rate % of 3G Best Cell Voice Call Drop Rate % of 3G Best Cell PS Call Drop Rate
98.00
92.00 80 98 97.00
79 90
91.00 97 96.00
90.00 78 85
77 96 95.00
89.00 80
76 95 94.00
88.00 75 75
87.00 94 93.00
74 70
86.00 73 93 92.00
85.00 72 65 92 91.00
84.00 71 60 91 90.00
WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
% of Best Cell Intra Frequency Handover SR % of 4G Best Cell UE DL Throughput-20Mhz % of 5G Best Cell EN-DC SCG Drop Rate (gNB) % of 5G Best Cell EN-DC Inter-
% Of 4G best cell SRVCC Handover SR (LTE -> 3G) SgNB PSCell Change Success Rate (gNB)
30
86 94 84.00 45
82.00 25 40
85.5 93 80.00
20 35
85 92 78.00 30
76.00 15 25
84.5 91
74.00 20
84 90 72.00 10 15
70.00 5 10
83.5 89
68.00 5
83 88 66.00 0 0
WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK WK
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
2G HOSR KPI Optimization: 3G Drop Rate KPI Optimization: 3G PS CSSR KPI Optimization: 4G CSFB SSR KPI Optimization: 4G Intra freq HOSR KPI 4G SRVCC HOSR KPI Optimization: 5G ENDC SCG DCR KPI 5G ENDC Inter HOSR Optimization:
• PBGT & Quality HO margin • Concurrent services flow • Adaptive narrowband int • U2100 CSFB prioritization on top Optimization: • L2U Neighbour Relations Optimization: • In-depth trace to identify
Optimization Optimization erference suppression cells with high interference on • Neighbor audit optimization and alignment of • SN Addition Strategy Based failure causes
• Neighbr audit • Hard handover channel hold • CFN Offset Feature U900. optimization External Definitions on Scenarios • Neighbhour Relations
• Parameter alignment • Call Rebuild align Globalization • Audit and alignment of CSFB • CIO Tuning on top cells • In-depth trace analysis and • Neighbhour Relations optimization
• Top Cell RF Optimization parameter discrepancies. • PCI conflict audit identication of Core related issues. optimization • Top Cell RF Optimization
ZTE – 5G SLA Trend (Weekly)
Half Year
Cell KPI Comparison WK 12
Targets
ZTE KPIs - 5G Group WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 with Last After
(% Cell)
Target Week Exclusion
Y1H1
% of 5G Best Cell EN-DC Setup Success Rate (gNB) >=99.5 96.00 95.52 94.63 93.32 92.75 94.64 95.30 95.59 94.20 94.69 94.50 95.46 94.88 95.18
% of 5G worst Cell EN-DC Setup Success Rate (gNB) <=97.5% 0.35 0.67 1.04 1.47 2.28 1.23 0.96 0.93 1.41 1.13 1.11 0.81 1.11 0.85
% of 5G Best Cell EN-DC SCG Drop Rate (gNB) < 1.0% 15.00 6.96 4.08 5.59 5.88 18.36 22.08 22.57 21.69 22.89 21.34 18.92 23.82 23.97
% of 5G worst Cell EN-DC SCG Drop Rate (gNB) >2% 28.00 83.16 85.79 80.81 80.77 48.79 42.85 38.59 41.55 39.43 40.64 44.95 39.62 39.38
% of 5G Best Cell EN-DC Intra-SgNB PSCell Change Success Rate (gNB) >99% 78.00 81.96 81.44 77.47 77.95 84.68 85.90 83.78 83.86 85.78 84.58 84.46 83.79 84.63
% of 5G worst Cell EN-DC Intra-SgNB PSCell Change Success Rate (gNB) <95% 10.00 1.67 1.47 2.02 2.09 1.01 1.07 1.49 1.66 1.11 1.47 1.45 1.50 0.54
% of 5G Best Cell EN-DC Inter-SgNB PSCell Change Success Rate (gNB) >99% 40.00 23.73 22.75 22.32 24.67 33.48 36.92 38.85 36.24 38.58 38.36 40.52 42.51 43.17
% of 5G worst Cell EN-DC Inter-SgNB PSCell Change Success Rate (gNB) <95% 25.00 38.44 36.20 36.99 33.67 26.05 21.33 20.75 21.78 20.07 19.48 17.66 14.70 13.43
% of 5G Best Cell NR RAN UE Throughput DL -100 MHz 250 Mbps 60.00 52.36 51.16 46.72 44.55 45.27 40.39 41.27 42.69 42.40 43.14 43.03 42.31 42.38
% of 5G worst Cell NR RAN UE Throughput DL-100 MHz 70 Mbps 5.00 3.83 4.16 4.68 5.54 4.86 4.58 5.07 5.75 5.06 5.32 4.69 6.06 5.99
% of 5G Best Cell NR RAN UE Throughput UL-100 MHz 15 Mbps 20.00 15.99 17.22 16.57 14.82 16.79 14.28 15.27 13.43 12.26 13.18 14.92 13.57 13.58
% of 5G worst Cell NR RAN UE Throughput UL-100 MHz 5 Mbps 45.00 42.51 37.67 38.83 42.07 40.65 42.86 44.07 43.75 42.04 43.61 43.06 43.73 43.73
Degradation Comments:
5G SETUP SUCCESS RATE: : S1 Link broken on anchor EN0109 due to outage affecting setup success rate on 5G co-site NEN0109Endc SCTP link issues affecting 5G sites
N2102,N2906,N2276- Resolved
INTRA SGNB PSCELL SUCCESS RATE: Low attempts cells responsible for degraded SLA N2181,N2131,N6329,NRV1711,NEN0687
DL Throughput Best Cell:
Packet loss on anchor site EN0441 causing increased transmission time on NEN0448 which impacted on DL throughput.
Increase in transmission time due to packet loss on 4g anchor sites EN5118 impacted DL throughput of NEN0374, NEN5117 - Resolved
Improvement Plan:
DL Throughput: SR intelligent authorization and UE MCS allocation optimization in the case of truncated RBs feature trial is ongoing to improve the DL throughput
ZTE 2G – TS REDIMENSIONING
Background:
CELL ZONE:: TCH AVAILABILITY (%) CELL ZONE:: CSSR (%)
Ts redimensioning carried out on 77 cells for cells not
meeting SLA. 101.00% 99.80%
100.00% 99.60%
Action:
99.00%
Ts redimensioning for 77 cells 99.40%
98.00%
Results: 97.00% 99.20%
SDCCH congestion improved from 0.13% to 96.00% 99.00%
0.02%.Spike in SD Congestion on the 19/03/2024 was 95.00%
due to availability issue on t4596_ENZBSC24 which 98.80%
94.00%
degraded KPIs on site and NBR. 98.60%
CSSR improved from average of 99.48% to 99.70% 93.00%
TCH Congestion is stable 92.00% 98.40%
4 4 4 4 4 4 4 4 4 4 4 4 4 4 24 24 24 24 24 24 24 24
CS and PS Traffic is stable. 2 2 2 2 2 2 2 2 2 2 2 02 02 02 20 20 20 20 20 20 20 20
/ 20 / 20 / 20 / 20 / 20 / 20 / 20 / 20 / 20 / 20 / 20 4 /2 6 /2 8 /2 / / / / / / / /
All other KPIs following normal trends. /4 /6 /8 10 12 14 16 18 20 22 24 3/ 3/ 3/ 10 12 14 16 18 20 22 24
3 3 3 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/
Cell ZONE: CS TRAFFIC (Erl) CELL ZONE:: SDCCH CONGESTION (%) CELL ZONE:: TCH CONGESTION (%)
11000 0.50 0.60%
0.45
10500 0.40 0.50%
0.35
10000 0.40%
0.30
9500 0.25
0.30%
0.20
9000 0.15 0.20%
8500 0.10
0.05 0.10%
8000 0.00
4 4 4 4 4 4 4 4 4 4 4 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 0.00%
02 02 02 02 02 02 02 02 02 02 02 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
4 /2 6 /2 8 /2 0 /2 2 /2 4 /2 6 /2 8 /2 0 /2 2 /2 4 /2 4/ / 5/ / 6/ / 7/ / 8/ / 9/ 10/ 11/ 12/ 13/ 14/ 15/ 16/ 17/ 18/ 19/ 20/ 21/ 22/ 23/ 24/ 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
3/ 3/ 3/ /1 /1 /1 /1 /1 /2 /2 /2 /
3 3 3 3 3 3 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 0/ 1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 0/ 1/ 2/ 3/ 4/
3 3 3 3 3 3 3 3 3/ 3/ 3/ 3/ 3/ 3/ 3/1 3/1 3/1 3/1 3/1 3/1 3/1 3/1 3/1 3/1 3/2 3/2 3/2 3/2 3/2
ZTE 2G – HOSR Optimization (SLA
WCL)
Background: HOSR HO Faillure Number
HOSR Soft parameter optimization 105 5000
carried out on 16 Cells for Cells not 4500
meeting SLA 100 4000
3500
Action: 95 3000
2500
Soft parameter optimization on 16- 90 2000
neighbor Relation 1500
85 1000
500
Results: 80
2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024-
0
2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024- 2024-
HOSR improved from an average of 03-15 03-16 03-17 03-18 03-19 03-20 03-21 03-22 03-23 03-24 03-15 03-16 03-17 03-18 03-19 03-20 03-21 03-22 03-23 03-24
85.20% to 99.45% (16.73%
improvement in HOSR) Drop Call Rate (%) Drop Call Number
HO Failure count improved from 2.5 60
4000 to 92 (97.70% improvement)
Call Drop Rate improved from 0,59% 2
50
to 0.12% (79.66% improvement in
40
drop rate while TCH Drop count 1.5
improved from 32 to 4 (87.50% 30
improvement) 1
CSSR improved from 99.60% to 20
98.50%
Trx expansion for 14 cells 20
98.00%
15
Results: 97.50%
Traffic (both voice and data) 97.00% 10
following normal trend. 96.50%
5
TCH congestion improved from an 96.00%
TCH Congestion
TCH Congestion number improved Cell Zone:: TCH Cong Rate Vs TCH Cong No. Cell Zone:: CSSR (%)
from 265 to 13 which is a 95.1% 0.16% 300 100.00%
improvement in TCH congestion
0.14% 99.50%
number 250
CSSR improved from 99.62% to 0.12%
99.00%
99.75% which is 0.13% 0.10%
200
98.50%
improvement in CSSR 0.08% 150 Dip in CSSR on the 21st
All other KPIs following normal trend 98.00% was due to spike in
0.06%
100 packet loss on EB0128.
0.04%
97.50% Resolved.
0.02%
50 97.00%
0.00% 0 96.50%
13- 14- 15- 16- 17- 18- 19- 20- 21- 22- 23- 13- 14- 15- 16- 17- 18- 19- 20- 21- 22- 23-
03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24 03-24
ZTE 3G - Handover Optimization in Weak Coverage – ENZRNC7 Globalization
n:Action: 9700.00%
12 24
13 24
14 24
15 24
16 24
17 24
18 24
19 24
20 24
21 24
22 24
23 24
24 24
4
MaxFach Power Tuning on 74 cells.
02
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
3 / /2 0
/2
11
Results: 3/
Results:
3G Call Setup Success Rate (CS)_MTN PRE POST 3G Erlang (CS)_MTN (Erl) PRE POST
• 3G Call Setup Success Rate (CS)_MTN
99.50% 140
improved from 98.60% to 98.77%.
120
99.00%
100
• RRC Establishment Success Rate_MTN 98.50% 80
improved from 98.25% to 98.82%. 98.00% 60
40
97.50%
20
• All other major KPIs maintained stable trend. 97.00% 0
4 4 4 4 4 4 4 4 4 4 4 4 4 4
02 02 02 02 02 02 02 02 02 02 02 02 02 02 24 24 24 24 24 24 24 24 24 24 24 24 24 24
/2 2 /2 3 /2 4 /2 5 /2 6 /2 7 /2 8 /2 9 /2 0 /2 1 /2 2 /2 3 /2 4 /2 / 2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0 /2 0
1
1 1 1 1 1 1 1 1 1 2 2 2 2 2 11 12 13 14 15 16 17 18 19 20 21 22 23 24
3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/
ZTE 4G – Mobility Improvement
Coverage Enhancement
Background: % of RSRP Report times in the Range of (-95 to -Max) Handover Success Rate (Intra-Freq)
• Sites having high Handover failure count due to poor coverage. 52.5 99.80%
• Sites that are targets to other sources but have poor coverage and result in high failure 52
99.75%
counts. 51.5
51 99.70%
Activity:
50.5
Site visit in a bid to improve coverage and quality 99.65%
50
14000 2200
2000
% of RSRP Report times in the Range HOSR (Intra-Freq) 13000
1800
of (-95 to -Max)
99.7
1600
5 0 .5 12000
1400
11000 1200
99.63 1000
49 10000
4 4 4 4 4 4 4 4 4 4 4 4 24 24 24 24 24 24 24 24 24 24 24 24
2 02 2 02 2 02 2 02 2 02 2 02 2 02 2 02 2 02 2 02 2 02 2 02 20 20 20 20 20 20 20 20 20 20 20 20
0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/ 0 3/
0 1/ 0 3/ 0 5/ 0 7/ 0 9/ 1 1/ 1 3/ 1 5/ 1 7/ 1 9/ 2 1/ 2 3/ 0 1/ 0 3/ 0 5/ 0 7/ 0 9/ 1 1/ 1 3/ 1 5/ 1 7/ 1 9/ 2 1/ 2 3/
PRE POST PRE POST
ZTE 4G – Mobility Improvement
CIO Tuning
99.70%
99.50%
20
99.30%
99.10%
10
99.00% 5
98.90%
Scope: 98.80%
0 24 0 24 0 24 0 24 0 24 0 24 0 24 0 24 0 24 0 24 0 24 0 24
0
24 24 24 24 24 24 24 24 24 24 24 24
/2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2 /2 20 20 20 20 20 20 20 20 20 20 20 20
1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 1 2/ 1 3/ 1 4/ 1 5/ 1 6/ 1 7/ 1 8/ 1 9/ 2 0/ 2 1/ 2 2/ 2 3/
Activity was done on top 32 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/
Results: 600
PRE POST
400
remain stable 20
24
20
24
20
24
20
24
20
24
20
24
20
24
20
24
20
24
20
24
20
24
20
24
1 2/ 1 3/ 1 4/ 1 5/ 1 6/ 1 7/ 1 8/ 1 9/ 2 0/ 2 1/ 2 2/ 2 3/
3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/
Activities Progress
Tech Activities Target KPI Status Time Line
HR retuning and TRX expansion TCH Cong Ongoing WK13
GU Mobility Stategy Optmization SD & TCH Cong Ongoing WK13
TRX power balance DCR Ongoing WK13
Neighbor Relation and Parameter aduit and Optimization DCR Ongoing WK13
2G
Parameter Alignment DCR Closed WK11
Overshooting aduit and Optimization DCR Ongoing WK13
SDCCH Timeslot Re-dimensioning SD Cong Ongoing WK13
Isolated Island Site related parameters Optimization DCR Ongoing WK14
CFN Offset Feature globalization CSSR Closed WK11
Concurrent service Optimization CSSR Closed WK11
Weak Coverage SRB Optimization CSSR Ongoing WK13
Max Fach Power Tuning CSSR Closed WK12
Service optimization for multi RAB CSSR Ongoing WK13
Overshooting aduit and optimization CSSR/PS DCR Ongoing WK13
3G
Isolated Island Site related parameters Optimization CSSR/PS DCR Ongoing WK14
Load Balance Statery Optimization CSSR Ongoing WK14
Parameter Alignment PS DCR Ongoing WK13
Common channel power optimization CSSR Ongoing WK14
Weak Coverage Service Statery Optimization PS DCR Closed WK12
Virtual Neighbour Optimization PS DCR Ongoing WK13
Overshooting Optimization for Cell edge User CSSR/DCR/HOSR/Throughput Ongoing WK13
RRC license and eNB Admission Failures Optimization CSSR Closed WK12
E-RAB setup failure by other subject study CSSR Closed WK12
DRX Configuration Optimization DCR Closed WK12
E-RAB release by MME study DCR Closed WK12
4G
Physical Optimization to improve Coverage for Cases with Poor RSRP CSSR/DCR Closed WK12
Load balancing (MLB Feature tuning and RET tuning) Throughput Ongoing WK14
Optimization of Relations where Target Cells have Poor Availability HOSR Closed WK11
CIO Tunning for Illogicall Neighbors HOSR Closed WK12
External Definitions and Alignment HOSR Ongoing WK13
SCTP/X2 LINK (Transmission) ENDC SR Ongoing WK14
ENDC X2 DSCP Mapping ENDC SR Ongoing WK14
Anchor cell Audit/Optimization SCG Drop Ongoing WK13
5G Optimization of punishment threshold for unstable anchor cells SCG Drop Ongoing WK14
Neighbor cell routine checks Intra/Inter PCell Change SR Ongoing WK14
Missing neighbor optimization Intra/Inter PCell Change SR Ongoing WK13
RET optimization to improve SINR levels Throughput Ongoing WK13
Section 1 SLA KPI Trend & Achievements
4G Erlang (MErl)
6000000 300000
6000000000
46.3% 100000000
4000000 200000
4000000000
16.2%
50000000
2000000 100000 2000000000
0 0 0 0
'24-Wk-1
'24-Wk-2
'24-Wk-3
'24-Wk-4
'24-Wk-5
'24-Wk-6
'24-Wk-7
'24-Wk-8
'24-Wk-9
'23-Wk-37
'23-Wk-38
'23-Wk-39
'23-Wk-40
'23-Wk-41
'23-Wk-42
'23-Wk-43
'23-Wk-44
'23-Wk-45
'23-Wk-46
'23-Wk-47
'23-Wk-48
'23-Wk-49
'23-Wk-50
'23-Wk-51
'23-Wk-52
'24-Wk-10
'24-Wk-11
'24-Wk-12
'24-Wk-1
'24-Wk-2
'24-Wk-3
'24-Wk-4
'24-Wk-5
'24-Wk-6
'24-Wk-7
'24-Wk-8
'24-Wk-9
'23-Wk-37
'23-Wk-38
'23-Wk-39
'23-Wk-40
'23-Wk-41
'23-Wk-42
'23-Wk-43
'23-Wk-44
'23-Wk-45
'23-Wk-46
'23-Wk-47
'23-Wk-48
'23-Wk-49
'23-Wk-50
'23-Wk-51
'23-Wk-52
'24-Wk-10
'24-Wk-11
'24-Wk-12
2023 2024 2023 2024
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2023 2024 2019 2020 2021 2022 2023 2024
4G VoLTE Erlang (MErl) || PHC Total Voice Traffic (CS) (MErl) || PHC
350000 12000000
300000 10000000
250000
8000000
200000
6000000
150000
4000000
100000
50000 2000000
0 0
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2023 2024 2019 2020 2021 2022 2023 2024
PHC YoY Voice traffic increased in 2024 Wk-12 as compared to 2023 Wk-12 from 9.5MErl to 10.3MErl (+7.7%).
ENG Regional – YoY Voice Traffic
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2023 2024 2019 2020 2021 2022 2023 2024
4G VoLTE Erlang (MErl) || ENG Total Voice Traffic (CS) (MErl) || ENG
200000 12000000
180000
160000 10000000
140000 8000000
120000
100000 6000000
80000
60000 4000000
40000 2000000
20000
0 0
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2023 2024 2019 2020 2021 2022 2023 2024
ENG YoY Voice traffic increased in 2024 Wk-12 as compared to 2023 Wk-12 from 8.2MErl to 9.1MErl (+10.8%).
PHC Regional – YoY Data Volume
2G Data Volume (TB) || PHC 3G Data Volume (TB) || PHC 4G Data Volume (TB) || PHC
35000000 1800000000 8000000000
30000000 1600000000 7000000000
1400000000 6000000000
25000000 1200000000
20000000 5000000000
1000000000
4000000000
15000000 800000000
600000000 3000000000
10000000 2000000000
400000000
5000000 200000000 1000000000
0 0 0
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2019 2020 2021 2022 2019 2020 2021 2022
2023 2024 2023 2024 2023 2024
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2019 2020 2021 2022
2023 2024 2023 2024
PHC YoY Data traffic increased from 6.3PB in 2023 Wk-12 to 9.1PB (+44.0%) in 2024 Wk-12; Major increase seen in 4G & 5G Data volume
ENG Regional – YoY Data Volume
2G Data Volume (TB) || ENG 3G Data Volume (TB) || ENG 4G Data Volume (TB) || ENG
35000000 1400000000 6000000000
30000000 1200000000 5000000000
25000000 1000000000 4000000000
20000000 800000000
3000000000
15000000 600000000
10000000 400000000 2000000000
5000000 200000000 1000000000
0 0 0
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-1
Wk-3
Wk-5
Wk-7
Wk-9
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
Wk-11
Wk-13
Wk-15
Wk-17
Wk-19
Wk-21
Wk-23
Wk-25
Wk-27
Wk-29
Wk-31
Wk-33
Wk-35
Wk-37
Wk-39
Wk-41
Wk-43
Wk-45
Wk-47
Wk-49
Wk-51
Wk-53
2019 2020 2021 2022 2019 2020 2021 2022 2019 2020 2021 2022
2023 2024 2023 2024 2023 2024
ENG YoY Data traffic increased from 4.9PB in 2023 Wk-12 to 6.4PB (+32.1%) in 2024 Wk-12; Major increase seen in 4G & 5G Data volume.
ZTE 3G - IuB Interface Port utilization
Exceptions
All KPI passed the NCC Compliance Criteria except availability which impatced due to diesel crises problem.
ZTE – 3G State Level NCC KPIs – March MTD
RIVERS 1 East 99.73 99.68 99.92 0.06 99.99 99.76 0.21 0.00 0.00
ABIA 2 East 99.44 99.60 99.88 0.08 99.99 99.73 0.21 0.00 0.00
AKWA IBOM 2 East 99.78 99.69 99.91 0.04 100.00 99.77 0.17 0.00 0.00
BENUE 2 East 99.86 99.54 99.79 0.06 99.99 99.49 0.30 0.00 0.00
ENUGU 2 East 99.61 99.62 99.92 0.07 99.98 99.73 0.23 0.00 0.00
BAYELSA 3 East 99.92 99.64 99.90 0.03 99.99 99.74 0.21 0.00 0.00
CROSS
3 East 99.26 99.64 99.90 0.06 99.99 99.65 0.31 0.00 0.00
RIVER
EBONYI 3 East 96.29 99.32 99.80 0.13 99.99 99.42 0.36 0.00 0.00
All KPI passed the NCC Compliance Criteria except availability which impatced due to diesel crises problem.
ZTE – 4G State Level NCC KPIs – March MTD
Initial E-
Active E-
Availabilit RAB RRC CSFB Inter-Freq Intra-Freq
Active E- RAB Drop
y Rate Establish Setup Initiation Handover Handover
NCC State ENodeB RAB Drop Rate
STATE (Cell)_MT ment Success Success Success Success
Priority Count Rate (Excl.
N Success Rate Rate Rate Rate
(<2%) MME)
(>=99%) Rate (98.50%) (>98%) (>95%) (>95%)
(2%)
(>98%)
RIVERS 1 1109 99.94 99.48 0.59 0.05 99.95 99.97 99.39 99.51
ABIA 2 593 99.90 99.41 0.67 0.07 99.94 99.97 98.89 99.34
AKWA
2 539 99.96 99.52 0.78 0.10 99.96 99.98 98.98 99.65
IBOM
BENUE 2 446 99.92 99.26 0.72 0.11 99.96 99.98 99.21 99.65
ENUGU 2 609 99.91 99.39 0.55 0.04 99.94 99.96 99.37 99.56
BAYELSA 3 173 99.96 99.43 0.55 0.07 99.95 99.97 99.45 99.62
CROSS
3 403 99.93 99.14 0.61 0.04 99.92 99.97 99.38 99.29
RIVER
EBONYI 3 184 99.75 99.09 0.80 0.12 99.91 99.96 98.98 99.49
Section 1 SLA KPI Trend & Achievements
Section 4
Customer Complaints and Cluster Drive Test
Progress
Open
Technology Closed
HW Issue HW Ops
2G - 1 5
3G 2 4 13
4G - 1 9
5G - - -
PHC PHZBSC6 RV3031E 2G CS/PS 8 Due to suspected frozen software. Reset request has been sent to huawei SDT-20240318-00000130 Open
PHC OWZRNC7 AK0532U 3G CS/PS 34 Faulty RRU on site AK0532 U and X_FME assigned to replace S1 3G RSU having SDT-20231124-00000456 Open
sleeping cell RSU Type: RSU-U2112 Serial No: 219024528355
3G CS/PS Faulty RRU on site AK0532 U and X_FME assigned to replace S1 3G RSU having
PHC OWZRNC7 AK0532X 34 SDT-20231124-00000456 Open
sleeping cell RSU Type: RSU-U2112 Serial No: 219024528355
ENG ENZRNC5 4621GD 3G CS/PS 2 Suspected Frozen PA, escalated to Huawei for reset SDT-20240322-00000639 Open
ENG OWZRNC3 AB0086G 3G CS/PS 2 Board hardware fault, escalated to Huawei Open
SDT-20240322-00000286
ENG OWZRNC3 AB0086H 3G CS/PS 2 Board hardware fault, escalated to Huawei Open
SDT-20240322-00000286
ENG OWZRNC3 AB0086I 3G CS/PS 2 Board hardware fault, escalated to Huawei Open
SDT-20240322-00000286
ENG LEN0404 LEN0404D 4G 60 Intermittent power outage lingers due to Access issue SDT-20240202-00000412 Open
Customer Complaints Overview
No Network Network
17% Fluctuations
23%
Cluster Drive Test Progress
Section 1 SLA KPI Trend & Achievements
Analysis Completed
IUB and IUPS Interface Checks
(Rehoming to New RNC ongoing to further distribute load)
Capacity 2G 100% Half Rate Enabling (Top Sites) Based on last year traffic study
3G 2ms TTI Disabling (Top Sites) Based on last year traffic study
4G Load Balancing (Top Sites) Routine Activity
3G TCP Power Expansion (Top Sites) Based on last year traffic study
Daily and Hourly KPI Dashboard sharing Daily Activity
2G Top Degraded Cells Optimization Daily Activity
3G Top Degraded Cells Optimization Daily Activity
4G Top Degraded Cells Optimization Daily Activity
KPI Monitoring and 5G Top Degraded Cells Optimization / VIP Daily Activity
Optimization
VIP Sites Performance monitoring and assurance Daily Activity
Zero Traffic Cells Tracking Daily Activity
Cell Availability Issues Tracking Daily Activity
Packet Loss Issues Tracking Daily Activity
Customer Complaints handling and resolution Ongoing on daily basis. Team is also prepared to swiftly handle any potential increase in number of Complaints
Emergency Issue Festive Event Areas Assurance Assurance activities are ongoing in Areas identified by MTN SPOCs as hotspot areas for the Festive season
Handling
Close Contact and Communication with MTN SPOCs Daily interaction with MTN SPOCs is established with communication channels also created for Emergency response
Escalation Matrix
Festive TX
Bottlenecks
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
traffic to neighbor sites and degraded KPIs.
Callout: E,
19th Mar - Due to packet loss impacting 222 sites and contributing 31.67% of
the SDCCH congestion degradation. Top CPs are T4730, T4435, T4981.
20th Mar - Due to packet loss impacting 314 sites and contributing 34.75% of
the SDCCH congestion degradation. Top CPs are T0227, T4432, T4925.
21st Mar - Due to packet loss impacting 748 sites and contributing 99.18% of
2G Congestion Rate (SDCCH)(%) 2G Congestion Rate (TCH Sub Perceived)(%) the SDCCH degradation. Top CPs are T2415, EN0050, T4714. Worst impacted
BSCs are OWZBSC15, OWZBSC20, ENZBSC21 and ENZBSC25. Resolved.
22nd Mar - Due to packet loss impacting 966 sites and contributing 88.24% of
0.90 ENG PHC ENG PHC the BSC degradation. Top CPs are T4926, T4920, T4921. Worst impacted BSCs
are ENZBSC31 and ENZBSC24. Resolved
0.80 2.00 Callout: F,
0.70 1.80 6th Feb: Due to roll back of the BSC timer alignment CR of Jan. 19 th.
Callout: H,
0.60 1.60 17th Feb: Due to packet loss on CP T4423 in ENZBSC3 impacting 28 sites also
1.40 due to packet loss on CP T2228 in PHZBSC13 impacting 47 sites.
0.50 1.20 Callout: A,
0.40 B
1.00 B High packet losses due to TX congestion on below Top CPs. KPIs impacted –
A 2G CSSR & SDCCH Congestion (ENG)
0.30 0.80
C
0.20 H C D E 0.60 H
Region Count of Top
0.40 CP
Sites
RCA
0.10 0.20 Congestion On Aviat CTR Link En0165-En0050,
ENG EN0050 28
0.00 0.00 TAP To Review For Expansion
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
on OWZBSC19.
Callout: E,
• 28th Feb – Multiple fiber cut that affected whole network CS/PS traffic
and other Radio KPIs.
Callout: F,
2G Erlang (TCH)_MTN(Erl) 2G Data Volume (PS)_MTN(MB) • 17th Feb: Due to packet loss on CP T4423 in ENZBSC3 impacting 28 sites.
• 17th Feb: Due to packet loss on CP T2228 in PHZBSC13 impacting 47 sites.
400,000.00 1,500,000.00 E
J
• 20th Mar - Due to packet loss impacting 314 sites and contributing 34.75%
of the SDCCH congestion degradation. Top CPs are T0227, T4432, T4925.
E 1,000,000.00
200,000.00 Callout: I,
500,000.00 • 11th Mar - Due to fiber failure affecting OWZBSC11, OWZBSC19,
0.00 0.00 OWZBSC12, OWZBSC9, OWZBSC22 impacting over 254 sites.
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
• 13th Mar – (Fiber failure between Beta glass - Yenogoa PD POF detected
49.2km from Beta glass, COF: Construction induced) impacting 147 sites
ENZBSC24 and ENZBSC31.
• 16th Mar – Due to poor availability on 4 sites in PHZBSC13 which pushed
traffic to neighbor sites and degraded KPIs.
Callout: J,
14th Mar - Due to subsea fiber fault incidence severely impacting whole
network PS traffic.
2G Planned & Ongoing Activities
Implementation
SN Tech Activity Target KPI Scope Status Activity Results Summary
Date
1 2G ConnFailRel Trial TCH DCR 1 BSC Closed 04/03/2024 -All KPIs are stable.
3 2G SDCCH congestion optimization SDCCH Cong 16 Cells Closed 04/03/2024 -SD Congestion rate improve by 45.64% from 50.25% to 27.31%.
Call Out C
ENG PHC ENG PHC • 26th Feb till 3rd Mar: Degraded availability leading to poor
performance as a result of the diesel crisis impacting multiple
105.00 100.00 RNCs across ZTE Region, OWZRNC6 & ENZRNC6 as worst
99.80 impacted. This was aggravated by the multiple fiber failures
100.00 99.60 across the network on the 28th of Feb.- Resolved
95.00 99.40 Call Out D ENG Region 5th Mar to date
99.20 E
• 5th Mar: Degraded performance due to spike in packet loss due
B to link congestion on 8 Sites connected to CP EB0045 on
90.00 99.00 D
C ENZRNC8 (Resolved) and Packet loss spike across 97 Sites
98.80 F
85.00 98.60 connected to CPS T4900, T4912, T4921 & T4949 on ENZRNC1
C
due to multiple fiber failures. This is resolved.
80.00 98.40 Call Out E
98.20 • Sudden Increase in Drops on 3 Sites (EN1352, EN0071 & EN0684)
75.00 98.00 connected to CP T0277 on ENZRNC7 as a result of suspected TX
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
issue –Pending
• Fibre failure impacting over 200 Sites on OWZRNC5. POF
detected 49.2km from Betaglass, COF: Construction induced.
Resolved
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
• Sudden Increase in Drops on 3 Sites (EN1352, EN0071
& EN0684) connected to CP T0277 on ENZRNC7 as a
result of suspected TX issue –Pending
• Fibre failure impacting over 200 Sites on OWZRNC5.
POF detected 49.2km from Betaglass, COF:
3G Handover Success Rate (CS Inter-Freq)(%) 3G Handover Success Rate (CS IRAT U2G)(%) Construction induced. Resolved
Call Out F: ENG Region 17th to Date
ENG PHC ENG PHC 1. High packet loss on 14 Sitess connected to CP T4921 .
This is due to congestion on Aviat CTR Link
97.00 100.00
T4921<<>>T4920, TAP to review for expansion- Pending
95.00 99.00 2. High packet loss across 23 Sites connected to CP T4912
98.00 leading to degraded Performance. Congestion on 1+1 MW
93.00
F 97.00 Link BE0315-T4912, pending for expansion
91.00 C 3. Persistent high Drop call rate on 10 Sites connected to
96.00 F CP EB0045 as a result of Fiber failure between
89.00
95.00 T4744_Afikpo and Owerri switch : T4744_Afikpo
87.00 94.00 <<>>T4639_SR12_3. Pending
4. Persistent high Drop call rate on EN0012, EN0071,
85.00 93.00
EN0684 & EN1352 connected to CP T0277 on ENZRNC7 as
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
a result of highly utilized Ericsson ML 1+0 radio-link
capacity of 200Mbps between T0277 and EN0012 pending
on MTN TAP for expansion. Pending
5. Recurring TX Link Congestion around CR0141 CR0142
CR0146 and T2577 connected to CP T2340-SDT-20230530-
00000409- Pending
3,600.00
3,700.00
3,800.00
3,900.00
4,000.00
4,100.00
4,200.00
4,300.00
4,400.00
4,500.00
4,600.00
01-12-23
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
0.00
05-12-23
01-12-23 09-12-23
05-12-23 13-12-23
09-12-23 17-12-23
13-12-23
17-12-23 21-12-23
21-12-23 25-12-23
25-12-23 29-12-23
29-12-23 02-01-24
02-01-24 06-01-24
06-01-24 10-01-24
10-01-24 14-01-24
ENG
ENG
14-01-24 18-01-24
18-01-24 22-01-24
22-01-24 26-01-24
26-01-24 30-01-24
30-01-24 03-02-24
03-02-24 07-02-24
PHC
PHC
07-02-24 11-02-24
3G Erlang (CS)_MTN(Erl)
11-02-24 15-02-24
15-02-24 19-02-24
19-02-24
23-02-24 23-02-24
27-02-24 27-02-24
B
02-03-24 02-03-24
06-03-24 06-03-24
10-03-24 10-03-24
3G Throughput User (PS HSDPA MAC-HS)_MTN(Kbps)
14-03-24 14-03-24
18-03-24 18-03-24
22-03-24 22-03-24
26-03-24 26-03-24
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
01-12-23
05-12-23
09-12-23
50,000,000.00
100,000,000.00
150,000,000.00
200,000,000.00
250,000,000.00
0.00
13-12-23
17-12-23 01-12-23
05-12-23
ZTE – 3G Radio Basic KPIs III
21-12-23 09-12-23
25-12-23 13-12-23
29-12-23 17-12-23
02-01-24 21-12-23
06-01-24 25-12-23
10-01-24 29-12-23
14-01-24 02-01-24
06-01-24
18-01-24 10-01-24
ENG
ENG
22-01-24 14-01-24
26-01-24 18-01-24
30-01-24 22-01-24
03-02-24 26-01-24
07-02-24 30-01-24
TCP Utilization(%)
03-02-24
PHC
PHC
11-02-24
A
07-02-24
15-02-24 11-02-24
19-02-24 15-02-24
3G Data Volume (PS)_MTN(MB)
23-02-24 19-02-24
27-02-24 23-02-24
02-03-24 27-02-24
06-03-24 02-03-24
10-03-24 06-03-24
10-03-24
14-03-24 14-03-24
18-03-24
c
18-03-24
22-03-24 22-03-24
26-03-24 26-03-24
•
Callout: A
Callout C:
Callout: B,
29th January, 2024
Data Volume dip is due to the ongoing Submarine Fiber Cable Failure.
28th Feb – Multiple fiber cut that affected whole network CS/PS
Multiple fibre failure between; ELELE – OWERRI, PSS Fiber cut AHOADA
3G Planned & Ongoing Activities
Implementat
SN Tech Activity Target KPI Scope Status Activity Results Summary
ion Date
•CS Drop Call Rate improved from 0.09% to 0.05% Week on Week.
•PS Drop Call Rate improved from 0.23% to 0.15%
Globalization
1 3G PS DRBC Prohibition Parameter Trial DCR Closed 1/3/2024 •Avg. CS Drop number reduced from 21647 to 11589
(Batch 2 & 3)
•Avg. PS Drop number reduced from 1082032 to 762370.
•Traffic and other major KPIs are on normal trend.
2 3G Handover Optimization in Weak Coverage DRIOP 1 RNC Implemented 13/03/2024 Globalized in ENG Region, monitoring ongoing
5 3G RNC Release Flow Optimization DROP 1 RNC Closed 14/03/2024 Initial BM Shared, Degraded and Rolled back
•
•
•
•
Status
99.89%
99.90%
99.91%
99.92%
99.93%
99.94%
99.95%
99.96%
99.97%
99.98%
99.99%
100.00%
98.00%
98.50%
99.00%
99.50%
100.00%
100.50%
00:00:00 00:00:00
01:00:00 01:00:00
02:00:00 02:00:00
03:00:00 03:00:00
04:00:00 04:00:00
05:00:00
Recovered
06:00:00 05:00:00
07:00:00 06:00:00
08:00:00 07:00:00
C: Aliade
09:00:00 08:00:00
B: Otukpo
10:00:00 09:00:00
11:00:00 10:00:00
D: Markurdi
12:00:00 11:00:00
13:00:00 12:00:00
14:00:00
13:00:00
18/03/2024
15:00:00
A: Enugu-Ezike
16:00:00 14:00:00
18/03/2024
17:00:00 15:00:00
18:00:00 16:00:00
19:00:00 17:00:00
20:00:00 18:00:00
21:00:00 19:00:00
22:00:00 20:00:00
23:00:00
00:00:00 21:00:00
01:00:00 22:00:00
02:00:00 23:00:00
03:00:00 00:00:00
Impacted Clusters in ZTE Region
04:00:00 01:00:00
05:00:00 02:00:00
06:00:00 03:00:00
07:00:00
Impacted Radio KPIs in ZTE Region
08:00:00 04:00:00
09:00:00 05:00:00
10:00:00 06:00:00
11:00:00 07:00:00
12:00:00 08:00:00
HOSR (Inter/Intra/Inter-RAT/SRVCC)
13:00:00
Active Drop Rate & VoLTE Drop Rate
14:00:00 09:00:00
10:00:00
19/03/2024
15:00:00
16:00:00 11:00:00
17:00:00 12:00:00
18:00:00 13:00:00
19:00:00 14:00:00
20:00:00
19/03/2024
21:00:00 15:00:00
22:00:00 16:00:00
ENG-S1 Conn Success Rate & Initial ERAB Setup SR
23:00:00 17:00:00
18:00:00
19:00:00
Initial ERAB Setup Success Rate & VoLTE CSSR
20:00:00
1
21:00:00
22:00:00
0.94
0.95
0.96
0.97
0.98
0.99
23:00:00
Issue: There was a massive network outage in ENG Rgion.
0.00%
0.05%
0.10%
0.15%
0.20%
0.25%
0.30%
0.35%
99.00%
99.10%
99.20%
99.30%
99.40%
99.50%
99.60%
99.70%
99.80%
99.90%
00:00:00 00:00:00
01:00:00 01:00:00
02:00:00 02:00:00
03:00:00 03:00:00
04:00:00
04:00:00 05:00:00
05:00:00 06:00:00
06:00:00 07:00:00
07:00:00 08:00:00
08:00:00 09:00:00
10:00:00
09:00:00 11:00:00
10:00:00 12:00:00
11:00:00 13:00:00
12:00:00 14:00:00
15:00:00
18/03/2024
13:00:00 16:00:00
14:00:00 17:00:00
18/03/2024
15:00:00 18:00:00
19:00:00
19th Mar: Fibre Cut between T4639_4 and T4907 ad about 94 4G sites impacted
16:00:00 20:00:00
17:00:00 21:00:00
18:00:00 22:00:00
19:00:00 23:00:00
20:00:00 00:00:00
21:00:00 01:00:00
22:00:00 02:00:00
23:00:00 03:00:00
04:00:00
00:00:00 05:00:00
01:00:00 06:00:00
02:00:00 07:00:00
03:00:00 08:00:00
04:00:00 09:00:00
10:00:00
05:00:00 11:00:00
06:00:00 12:00:00
07:00:00 13:00:00
14:00:00
ENG-HOSR (Inter/Intra Freq)
08:00:00 15:00:00
19/03/2024
09:00:00 16:00:00
10:00:00 17:00:00
11:00:00 18:00:00
12:00:00 19:00:00
13:00:00 20:00:00
21:00:00
ENG- ERAB Drop Rate & S1 Link Failures
14:00:00 22:00:00
19/03/2024
15:00:00 23:00:00
16:00:00
17:00:00
18:00:00
0
19:00:00
20:00:00
21:00:00
22:00:00
100000
200000
300000
400000
500000
600000
700000
23:00:00
ZTE – 4G Radio Basic KPIs_Availability and Affected KPIs
21-03-2024
PHC-S1 Conn Success Rate & Initial ERAB Setup SR PHC- ERAB Drop Rate & S1 Link Failures
100.20% 100.00% 600000 0.20%
100.00% 0.18%
500000 0.16%
99.50%
99.80% 0.14%
400000
99.60% 99.00% 0.12%
300000 0.10%
99.40%
0.08%
99.20% 98.50% 200000 0.06%
99.00% 100000 0.04%
98.00% 0.02%
98.80%
0 0.00%
98.60% 97.50%
00:00:00
01:00:00
02:00:00
03:00:00
04:00:00
05:00:00
06:00:00
07:00:00
08:00:00
09:00:00
10:00:00
11:00:00
12:00:00
13:00:00
14:00:00
15:00:00
16:00:00
17:00:00
18:00:00
19:00:00
20:00:00
21:00:00
22:00:00
23:00:00
00:00:00
01:00:00
02:00:00
03:00:00
04:00:00
05:00:00
06:00:00
07:00:00
08:00:00
09:00:00
10:00:00
11:00:00
12:00:00
13:00:00
14:00:00
15:00:00
16:00:00
17:00:00
18:00:00
19:00:00
20:00:00
21:00:00
22:00:00
23:00:00
21/03/2024 21/03/2024
00:00:00
01:00:00
02:00:00
03:00:00
04:00:00
05:00:00
06:00:00
07:00:00
08:00:00
09:00:00
10:00:00
11:00:00
12:00:00
13:00:00
14:00:00
15:00:00
16:00:00
17:00:00
18:00:00
19:00:00
20:00:00
21:00:00
22:00:00
23:00:00
00:00:00
01:00:00
02:00:00
03:00:00
04:00:00
05:00:00
06:00:00
07:00:00
08:00:00
09:00:00
10:00:00
11:00:00
12:00:00
13:00:00
14:00:00
15:00:00
16:00:00
17:00:00
18:00:00
19:00:00
20:00:00
21:00:00
22:00:00
23:00:00
21/03/2024 21/03/2024
ZTE – 4G Radio Basic KPIs
Callout: A, H,
4G Cell Availability(%) 4G Initial E-RAB Establishment Success Rate_MTN(%) • ENG & PHC Region Initial ERAB Setup Success Rate and CSFB SR
is degraded due to multiple occurrence of S1 failures in ENG Region.
• Correlation also seen with availability degradation for the top
ENG PHC ENG PHC impacted sites.
• Top sites exceed 400 on daily basis and have been highlighted and
shared with Huawei for resolution and RCA
100.00 100.00 J • Support required to fast track resolution from Huawei Team
99.50 99.50 Callout: B,
• PHC & ENG Initial ERAB Success Rate impacted due to Multiple
99.00 Fiber Failures from Elele<<<>>>Ahaoda route due to
99.00 98.50 G K cable vandalization.
H
B E Callout: C,
98.50 98.00 A • 9th Feb – Active DCR impacted by Suspected CN activity (Change in
MME attached Subscribers observed – Both ZTE and Huawei Regions
98.00 97.50 were impacted). Raised to MTN on mail for support.
97.00 Trends currently returning to Normal
97.50 96.50
Callout: D,
• 23rd Feb – Degradation of Active Drop Rate was majorly due
97.00 96.00 Abnormal Release triggered by MME-Closed
• 25th Feb –Degradation of eNB Drop Rate in ENG is majorly due E-
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
RAB Release by ENB Through E-RAB Release Procedure due to S1
Link Error- Escalated to Huawei Ops Team- Closed
Callout: E,
• 25th Feb: Diesel Crisis & Massive Site outages in the both ENG &
PHC Regions impacting Radio KPIs
Callout: F,
• Degradation of Active Drop Rate was due Abnormal Release triggered
4G Active E-RAB Drop Rate (%) 4G CSFB Initiation Success Rate (%) by MME- Recovered
Callout: G,
• 13th Mar: Fibre Cut induced by road construction along Enugu-Okigwe
ENG PHC ENG PHC Road affecting 632 4G Sites-Recovered
Callout: I,
1.10 100.00 • 14th Increased MME triggered drops observed in line with the Active
ERAB drop rate after the Sub-Sea Cable damage-Recovered
1.00 Callout: J,
0.90 99.95 • 19th Mar: Fibre Cut between T4639_4 and T4907 ad about 94 4G sites
impacted
0.80 C G J
•
99.90 A
Impacted Clusters in ZTE Region-Recovered
0.70 D Callout: K,
0.60 E • 21st Mar: Fibre Cut between NIPOST Ahaoda to Yenegoa ad about 154
99.85 4G sites impacted-Recovered
0.50 Callout: L,
0.40 99.80 • 18st Mar: Steady and continuous MME related drops suspecting to be
F I L related to CN activity. ZTE and other vendors impacted. MTN Is
0.30 checking with CN Team-Ongoing
0.20 99.75
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
ZTE – 4G Radio Basic KPIs II
Callout A
4G Intra-Freq Handover Success Rate_MTN(%) Inter-Freq Handover Success Rate (%) • Intra-Freq & Inter-Freq Handover Success Rate degraded from Dec
20 after IBvMME02 integration. (HO Prep Failures for Handovers
involving the new vMME).
• Impact cuts across ENG-PHC regions
ENG PHC ENG PHC • Resolution is being tracked with the Core Team and MTN RF
Optimization Team
99.80 99.80 Callout: B,
99.70 99.70 A • PHC & ENG HOSR (Inter-Freq/Intra-Freq/IRAT) impacted due to
Multiple Fiber Failures from Elele<<<>>>Ahaoda route due to
99.60 99.60 cable vandalization.
99.50 D
E H 99.50 H
• Intermittent drop in Gi/Gn traffic (L/R) on ABMPG01/2,
B ASMPG01/02, IKMPG01, IKvMPG01 and OJMPG01/2, highest on
99.40 B
F
99.40 E OJMPG02 at 28%
A C Callout: C,
99.30 99.30 • Improvement observed due to AScPCG02 Full Traffic Migration
99.20 99.20 Callout: D,
• 25th Feb Feb: Diesel Crisis & Massive Site outages in the both
99.10 99.10 ENG & PHC Regions impacting Radio KPIs
99.00 99.00 Callout: E,
• 13th Mar: Fibre Cut induced by road construction along Enugu-
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
Okigwe Road affecting 632 4G Sites. STATUS: Recovered
Callout: F,
• 15th Mar: LTE attach failure across all MMEs, this failure start 1am
during MW This is coming from TAC ¬13068 which is not defined
on the core
• STATUS: Recovered
4G Inter-RAT Handover Success Rate (L2U) (%) E-UTRAN IP Throughput UE UL (Kbps) • STATUS: Recovered
Callout: H,
• 21st Mar: Fibre Cut between NIPOST Ahaoda to Yenegoa ad about
154 4G sites impacted-Recovered
ENG PHC ENG PHC
100.00 5,000.00
95.00 4,500.00
90.00 4,000.00
85.00 F H 3,500.00
80.00 B 3,000.00
75.00 2,500.00
70.00 2,000.00
65.00 1,500.00
60.00 E 1,000.00
55.00 500.00
50.00 0.00
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
ZTE – 4G LTE Radio Basic KPIs III
Callout A
E-UTRAN IP Throughput UE DL (Kbps) PRB Utilisation DL(%)
• Users and Traffic increase is sustained in ENG & PHC region
when compared to Pre-Festive trend
ENG PHC ENG PHC
• Top Sites impacting throughput have been identified and
14,000.00 35.00 shared.
12,000.00 1. Scope for Load balancing have been successfully
30.00 implemented with Improvement seen in DL throughput for
10,000.00 implemented scope (This is a routine activity)
25.00 2. Majority of the scope pending on capacity expansions which
8,000.00 have been shared with MTN for Planning evaluation
6,000.00 20.00 Callout: B,
4,000.00 C C • 28th Feb – Multiple fiber cut that affected whole network
15.00 CS/PS traffic and other Radio KPIs.
2,000.00
0.00 10.00 Callout: C,
• 14th Mar: Impact of Under-sea cable damage
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
• Increased Data Retransmission rate can is seen mapped with
degradation in Active Drop Rate
• STATUS: Recovered
01-12-23
06-12-23
11-12-23
16-12-23
21-12-23
26-12-23
31-12-23
05-01-24
10-01-24
15-01-24
20-01-24
25-01-24
30-01-24
04-02-24
09-02-24
14-02-24
19-02-24
24-02-24
29-02-24
05-03-24
10-03-24
15-03-24
20-03-24
25-03-24
ZTE – 4G VoLTE Basic KPIs Callout A
• ENG Region VoLTE CSSR is degraded due to multiple occurrence of S1 failures in ENG Region.
Resolution is tracked daily with Huawei Team
Callout B
• Recurring spikes of ERAB Drop on different sites, on different days due to TNL Drops (ERAB Release
due to S1 link error) - Top sites tracked daily with Huawei Team
Callout C
•
Speech Erlang (VoLTE)(Erl) Call Setup Success Rate (VoLTE)_MTN SRVCC Handover Success Rate degraded from Dec 19 after IBvMME02 integration.
Callout: D,
• PHC & ENG CSSR Volte impacted due to Multiple Fiber Failures from Elele<<<>>>Ahaoda route due to
cable vandalization.
ENG PHC ENG PHC • Intermittent drop in Gi/Gn traffic (L/R) on ABMPG01/2, ASMPG01/02, IKMPG01, IKvMPG01 and
OJMPG01/2, highest on OJMPG02 at 28%
50,000.00 100.00 Callout: E,
45,000.00 99.50 • SRVCC Improved due to CN actions on resolving missing new MME config
40,000.00 99.00 Callout: F,
• 25th Feb Feb: Diesel Crisis & Massive Site outages in the both ENG & PHC Regions impacting Radio
35,000.00 98.50 KPIs
D L
30,000.00 98.00 A Callout: G,
A A F
25,000.00 97.50 VoLTE DCR correlates with the time of configuration of ZTE sites to the newly integrated MME (AScMM01)-
This is tracked with the Core team
20,000.00 97.00 Callout: I,
15,000.00 96.50 • 13th Mar: Fibre Cut induced by road construction along Enugu-Okigwe Road affecting 632 4G Sites.
10,000.00 96.00 STATUS: Recovered
5,000.00 95.50 Callout: J,
• 10th Mar: Suspected CN activity-Engaged MTN to support to check with CN Team-
0.00 95.00 Callout: K,
01-12-23
06-12-23
11-12-23
16-12-23
21-12-23
26-12-23
31-12-23
05-01-24
10-01-24
15-01-24
20-01-24
25-01-24
30-01-24
04-02-24
09-02-24
14-02-24
19-02-24
24-02-24
29-02-24
05-03-24
10-03-24
15-03-24
20-03-24
25-03-24
01-12-23
06-12-23
11-12-23
16-12-23
21-12-23
26-12-23
31-12-23
05-01-24
10-01-24
15-01-24
20-01-24
25-01-24
30-01-24
04-02-24
09-02-24
14-02-24
19-02-24
24-02-24
29-02-24
05-03-24
10-03-24
15-03-24
20-03-24
25-03-24
• 18st Mar: Steady and continuous MME related drops suspecting to be related to CN activity. ZTE and
other vendors impacted. MTN Is checking with CN Team-Ongoing
Callout: L,
• 19th Mar: Fibre Cut between T4639_4 and T4907 ad about 94 4G sites impacted
• Impacted Clusters in ZTE Region-Recovered
• 21st Mar: Fibre Cut between NIPOST Ahaoda to Yenegoa ad about 154 4G sites impacted- Recovered
ENB VOLTE DROP MME VOLTE DROP SRVCC Handover Success Rate(%)
L
ENG PHC ENG PHC ENG PHC
0.50 4.00 100.00
0.45 3.50 90.00 E
0.40 80.00
0.35 3.00
I I K 70.00
0.30 2.50 60.00 F
G D J
0.25 K
2.00 G
50.00 C
0.20 F
1.50 40.00
0.15 30.00 D
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
06-12-23
11-12-23
16-12-23
21-12-23
26-12-23
31-12-23
05-01-24
10-01-24
15-01-24
20-01-24
25-01-24
30-01-24
04-02-24
09-02-24
14-02-24
19-02-24
24-02-24
29-02-24
05-03-24
10-03-24
15-03-24
20-03-24
25-03-24
4G Planned & Ongoing Activities
SN Tech Activity Target KPI Scope Status Implementation Date Activity Results Summary
1 4G CIO Tuning for HOSR Intra/Inter Freq HOSR 32 Cells Closed 01/03/2024 Intra Frequency Handover shows improvement from 98.83% to 99.04%
2 4G SRVCC Analysis and Optimization Recommendation SRVCC HOSR 100 Sites Ongoing 02/03/2024 Implemented, Further Evaluation Ongoing
Network Improvement
3 4G DL Padding Rate 20 Sites Closed 01/03/2024 DL Padding Rate decreases from 5.73% to 4.92%
type1RBAllocEnableSwchDl
Network Improvement UL Padding Rate decreases from 42.12% to 40.99%
4 4G UL padding/UL PRB utilization 20 Sites Closed 01/03/2024
oneRBAllocateSwch Awaiting Approval to implement on DL PRB >80%
Network Improvement
5 4G DL Data Retransmission Rate 20 Sites Closed 01/03/2024 No Obvious gains. To be Rolled back and trialed in the future
dLRetrRBOptSwtch
Network Improvement
6 4G Average NI 50 Sites Closed 01/03/2024 No Obvious gains. To be Rolled back and trialed in the future
maxRbOffsetOfUlPrbRand
Network Improvement Improvement in proportion of CQI>= 7 from 67% to 69%
7 4G cQIFalseDetcSwch LTE CQI≥7 Rate 20 Sites Closed 01/03/2024 Improvement in proportion of CQI<7 from 39% to 36%
Approval Gotten for State Trials
Network Improvement
8 4G E-RAB Drop Rate 20 Sites Closed 01/03/2024 No Obvious gains. To be Rolled back and trialed in the future
interEnbReestabSwch/interEnbReestRetrvSwch
DL Throughput improved by 16.92% from 5.39 Mbps to 6.31 Mbps
9 4G Overshooting P0 Scope Downtilt (Week9) Active Drop Rate 30 Cells Closed 04/03/2024
Active Drop Rate show 7.84% Improvement from 0.51% to 0.47%
RRC Admission Failures due to license prohibit reduced to zero
10 4G RRC License Upgrade RRC Setup Success Rate 7 Sites Closed 04/03/2024
RRC success rate maintains a stable trend
POLQA Improved from 4.16 to 4.29
11 4G VoLTE HARQ Retransmission Optimization (Globalisation) DL/UL MOS Network Closed 05/03/2024
DL MOS Improved from 3.18 to 3.22
RRC Establishment failures due to ENB admission is reduced to Zero (0)
12 4G permitRRCNum_06032024 RRC Setup Success Rate 29 Sites Closed 06/03/2024 RRC Establishment Success Rate improved from 99.76% to 99.96%
Total Number of failed RRC Connection Establishment improved from >50,000
to <15,000 daily
13 4G WCL CSSR-LTE_Po Nominal Value RRC Setup Success Rate 59 Sites Closed 07/03/2024 RRC Establishment Success Rate improved from 99.93% to 99.94%
Inter-Freq HOSR shows improvement from 97.57% to 98.69%
14 4G WCL HOSR EUTRAN Neighbour Relations Intra/Inter Freq HOSR 82 Sites Closed 13/03/2024
All other KPIs maintain normal trend.
Overall DL E-UTRAN IP Throughput improved from 4.04Mbps to 4.57Mbps
15 4G 4G Multi-Layer Load Balance_(Week 11) DL Throughput 52 Sectors Closed 12/03/2024
Number of Cells with DL PRB Utilization >70% reduced 12 to 6
L1800 and L700 DL Throughput improved from 6 to 8Mbps & 12 Mbps
16 4G LTE MOBILITY STRATEGY TRIALS Intra/Inter Freq HOSR 53 Sites Closed 17/03/2024
respectively
17 4G SRVCC HO External Neighbour Relations SRVCC HOSR 217 Relations Closed 18/03/2024 SRVCC HOSR improved from 93.66 to 94.99
18 4G 4G Multi-Layer Load Balance_(Enugu) DL Throughput 134 Sectors Ongoing 18/03/2024 Implemented, Further Evaluation Ongoing
19 4G Baseline Alignment-VoLTE DRX cycle VoLTE Drop 393 Sites Closed 16/03/2024 All KPIs remain stable
ZTE – 5G Radio Basic KPIs
Callout K,
5G Cell Availability 5G EN-DC Setup Success Rate (gNB) S1 link broken on cosite anchor EN0109 affecting 5G site
NEN0109.
Callout F,
ENG PHC ENG PHC Transmission issue on anchor sites T4687,EN0383,EN0386,EN0389
caused to degrade the Intra-SgNB PsCell change success rate -
100.00 100.50 Resolved
99.50 100.00 Callout J,
99.00 Decrease in attaempts in denominator showing degradation in call
99.50
98.50 K
drop due to cable failures undersea - Resolved
98.00 99.00 E
Callout E,
97.50 98.50 X2 link broen issue on top worst 4 sites
97.00 A EN0262,T0345,EN0538,T6322 which impacted EN-DC SSR on
98.00 2nd March- Resolved
96.50 Callout D,
96.00 97.50 Intra SgNB PCell success rate is being impacted with top sites on
95.50 15th & 16th due to SCTP link broken & X2 link issues on RV0743,
97.00 RV0704, BY0023.
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
Top site N2252, the related anchors T2864,RV1329,RV0021 having
alarms (SCTP association interrupted/S1 link is broken), which
affected KPIs of intra pscell change.
The anchor sites escalated to Huawei for resolution of them.
Callout A,
Low availability issue on N6312 which impacted the performance of
5G EN-DC SCG Drop Rate (gNB) 5G EN-DC Intra-SgNB PSCell Change Success Rate (gNB) region on 21st Feb due to outage issue with different time of
intervals
Callout B,
ENG PHC ENG PHC
Recommendations:
5.00 99.80 1) DSS700 Activation with 2 Parameters Change.
2) ANR Activation for all 5G and 4G (5km radius) increase
4.50 99.60 F
the far 4g-5g NBRs.
4.00 99.40
C
3) add the 1.5KM missing anchors neighbors for all 5G sites, and al
3.50 99.20
so align the anchor parameters use new OSE script
- Closed
3.00 J 99.00 D
2.50 Callout C,
B 98.80
2.00
1.50 98.60 Recommendations:
1.00 98.40 Missing anchor neighbors & parameters alignment is ongoing based
on top worst cells
0.50 98.20 X2 missing link audit done
0.00 98.00 Black list sites neighbor removal done.
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
CR approved - Closed
ZTE – 5G Radio Basic KPIs
Callout A,
5G EN-DC Inter-SgNB PSCell Change Success Rate 5G NR RAN UE Throughput DL(Kbps)
(gNB) 5G Traffic increase
Jan 3: Addition of over1.5KM missing anchors neighbors for all 5G
ENG PHC sites, and alignment of anchor baseline parameters.
ENG PHC
250,000.00 Callout B,Inter SgNB Pcell change success rate
100.00
200,000.00 • X2 link broken issues on Site T0321 impacted the neighbor
96.00 sites which lead to the Inter-Sgnb Pscell change degradation
Callout C:
150,000.00 •
92.00 Data Volume dip is due to the ongoing Submarine Fiber Cable
B Failure
100,000.00 Callout D:
88.00
D • Increase in transmission time due to packet loss
84.00 50,000.00 on 4g anchor sites EN0687, EN0374, T5947, N4649, T4651
impacted throughput of ENG region
80.00 0.00
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
5G NR RAN UE Throughput UL(Kbps) 5G Data Volume(MB)
6,000.00 25,000,000.00
5,000.00
4,000.00 20,000,000.00
3,000.00 15,000,000.00
2,000.00 10,000,000.00
1,000.00 5,000,000.00
0.00 0.00
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
01-12-23
05-12-23
09-12-23
13-12-23
17-12-23
21-12-23
25-12-23
29-12-23
02-01-24
06-01-24
10-01-24
14-01-24
18-01-24
22-01-24
26-01-24
30-01-24
03-02-24
07-02-24
11-02-24
15-02-24
19-02-24
23-02-24
27-02-24
02-03-24
06-03-24
10-03-24
14-03-24
18-03-24
22-03-24
26-03-24
5G Planned & Ongoing Activities
2G KPIs PRE POST Comparison PRE POST Comparison PRE POST Comparison PRE POST Comparison
3G KPIs PRE POST Comparison PRE POST Comparison PRE POST Comparison PRE POST Comparison
4G KPIs PRE POST Comparison PRE POST Comparison PRE POST Comparison PRE POST Comparison
Coverage >-105dBm (%) 98.44% 98.53% 84.27% 93.01% 99.14% 100.00% 79.79% 91.51%
Quality (SINR)>= 5dB (%) 54.48% 59.88% 55.07% 79.12% 36.81% 63.15% 71.33% 83.60%
PDCP DL Data Throughput > 5Mbps (
59.77% 73.09% 61.44% 79.13% 37.00% 92.27% 62.99% 76.81%
%)