271123environmental Management Training Module.

Uploaded by

rokan123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views41 pages

271123environmental Management Training Module.

Uploaded by

rokan123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 41

Reliance Bangladesh LNG & Power Limited

Training on Environmental Management System

© 2022 RBLPL All Rights Reserved.


Overview of the topics

 Environment Policy
 Environmental Regulations governing powerplant
 Understanding powerplant Environmental Aspects & Impacts
 Identification Environmental aspects & impacts
 Determination of significant Environmental impact
 Strategies for minimizing Environmental impact
 Air Emission Management
 Noise Management
 Waste Management
 Waste Water Management
 Chemical Management
 Procurement

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Policy

Environmental policy: Environmental policy is the commitment of RBLPL to the laws, regulations, and other
policy mechanisms concerning environmental issues.
RBLPL is committed to-
• 1. Compliance with Environmental Regulations:
• We will comply with all applicable environmental laws, regulations, and other requirements. Our operations
will adhere to the highest standards to ensure the protection of the environment and the well-being of the
communities in which we operate.
• 2. Pollution Prevention:
• We will implement measures to prevent and minimize air, water, and soil pollution associated with our power
plant operations.
• 3. Resource Conservation:
• We are committed to conserving natural resources and minimizing waste generation.
• 4. Adoption of Clean Technologies:
• We will invest in and adopt clean and sustainable technologies that promote the efficient use of resources and
reduce greenhouse gas emissions.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Policy

 5. Community Engagement:
 We will engage with local communities to foster open communication, address concerns, and contribute
positively to the communities in which we operate.
 6. Employee Training and Involvement:
 Our employees will be provided with the necessary training to understand and implement environmental
policies and procedures. We encourage all employees to actively participate in environmental initiatives and
suggest ideas for improvement.
 7. Monitoring and Reporting:
 We will establish comprehensive monitoring systems to regularly assess our environmental performance. 8.
Emergency Preparedness and Response:
 9. Continuous Improvement:
 We are dedicated to the ongoing improvement of our environmental performance. Regular reviews and
assessments will be conducted to identify opportunities for improvement and the implementation of new
technologies and practices.
 10. Stakeholder Collaboration:
 We will actively collaborate with government agencies, environmental organizations, and other stakeholders to
promote shared environmental goals and contribute to the broader sustainability objectives of society.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Regulations governing powerplant

 Environmental Conservation Act-1995


 Environmental Conservation Rules-2023
 ESIA & Supplementary ESIA Reports of Meghnaghat 718 MW Combined Cycle
Power Plant
 ADB Safeguard Policy Statement-2009
 IFC Performance Standards
 IFC General EHS Guidelines
 IFC EHS Thermal Power Plant Guideline
 Industrial Good Practice
 Applicable Local Act, Rules, Guideline and Policy.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Identification of Environmental Aspects & Impacts

ASPECTS
An environmental aspect is an element of an organization's activities, products, or
services that has or may have an impact on the environment.
IMPACTS
Possible adverse effects caused by a development, industrial, or infrastructural
project or by the release of a substance in the environment.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Methods of Identification of Environmental Aspects & Impacts

Focus on one category at a time to identify aspects.


Start with activities then move to products and finally,
services.
An activity, for instance, might be fueling operation, and
it may include several aspects,such as air emissions,
chemical usage and spills.
Each of these in turn has one or more impacts, from
degradation of air quality to depletion of natural
resources.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Identification of Environmental Aspects & Impacts

To identify Environmental Aspects & Impacts-


RBLPL must look at processes such as the following:
> Power Generation processes;
> environmental performance and procedures of contractors
and suppliers;
> waste processing;
> extraction and distribution of raw materials and natural
resources;

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Potential Environmental Aspects & Impacts of Powerplant Operation

Activi Environ Environme Criteria for Mitigations


ty mental ntal determining
Aspect Impact significance
Power Noise increase in The BNEQS for noise • Low noise
Gener from plant noise require that the sound equipment will be
ation levels in level in industrial area preferred
the should not exceed 75 • Fans for cooling
Communiti dBA at day time and 70 tower will be of low
es dBA at night time, IFC noise type
guidelines for noise also • Silencers will be
require that the sound used for generator &
level in turbine
commercial/industrial • Proper stack height
areas should not exceed to be maintained
70 dB(A) during the with silencer fitted
day and 70 dB(A) • Proper acoustic
during the night design for the power
house building.
• Noise levels will be
monitored regularly
Reliance Bangladesh LNG & Power Limited
within the
© 2022 RBLPL All Rights Reserved.

communities in
Potential Environmental Aspects & Impacts

Activity Environmen Environment Criteria for determining Mitigations


tal Aspect al Impact significance

Power Plant River Water No discharge of untreated The power plant water
Generati Effluent Pollution effluent to the environment or treatment system will be
on The power the river. designed to ensure that the
plant is wastewater meets ECR-2023
expected to before it is drained into the
generate drainage channels
liquid
effluents in
the
form of oily
water,
plant cooling
water,
washing
water, blow
down water,
treatment
system
effluent and
sanitary
wastewater

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Potential Environmental Aspects & Impacts

Activity Environmental Environme Criteria for determining Mitigations


Aspect ntal significance
Impact
Power Emission from the Air Air Pollution Control Rules- • Low NOx burner should be selected
Generatio plant can potentially Pollution 2022 and the IFC Thermal for turbine selection
n affect air quality Power Plants • Proper stack height to be
Emission Limits maintained.
Maintena Hazardous and Water • Separation of recyclable materials
nce Non Hazardous Pollution & • Regular audits of waste management
Waste Soil system
Various types of Pollution • Maintenance of a Waste Tracking
wastes such as Register and all records will be kept
packing waste, metal • Separation of hazardous waste from
scrap, and excess Nonhazardous waste.
materials, air • On-site segregation and initial
filtersoily rags, will storage of hazardous waste
be • Off-site disposal of hazardous waste
generated during the in approved hazardous waste
operation phase. The disposal facility.
waste can be a • Recyclable waste to be disposed via
health hazard and licensed waste contractors
pollute waterways, if • Audits of the waste disposal
disposed improperly contractors and waste disposal
facilities
• Develop an emergency response
plan for the hazardous substances
Reliance Bangladesh LNG & Power Limited • © Training of personnel
2022 RBLPL All Rights Reserved. in
Potential Environmental Aspects & Impacts

Activity Environmental Environme Criteria for determining Mitigations


Aspect ntal Impact significance
HRSG Use of Chemical Water Environmental Conservation • Treatment of chemical waste water
chemical pollution, Rules-2023 before discharging to the Environment
dosing, Soil • Storage of Chemical with Secondary
waste Pollution containment
water • MSDS will be maintained at the
treatment, chemical storage area.
pre
treatment,
Deminerali
zation of
water
Procureme Purchasing of non Impact on • taking a whole of life approach to
nt environmentally natural assessing the extent of environmental
friendly products or resources, impacts
services Air, Water • building environmental considerations
Pollution, into the value for money assessment of
GHG a procurement activity
Emission. • where appropriate, engaging with
suppliers who are committed to better
environmental performance

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Determination of Significant Environmental Aspect

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Significance Evaluation of
Environmental Aspects
Evaluation criteria Conditions Score

Legal requirement The aspect is legally and contract regulated. 1

The aspect is not legally regulated. 0

The environmental aspects shall be Environmental Expected release of pollutants of severe environmental 1

evaluated for their significance according consequence consequence


to the four criteria listed in Table 1 one Unexpected situation such as emergency may cause 1

by one. A score of “1” or “0” will be uncontrolled release of pollutants, or serious damage to flora,
assigned. If an environmental aspect fauna or historical heritage.
scores “1” for a criterion, it is considered The aspect does not have potential environmental impacts of 0

as a significant environmental aspect severe consequence.


(SEA) and evaluation against the Use of materials Large consumption of materials with significant potential to 1

reduce, reuse and recycle.


remaining criteria is not necessary
Consumption of materials that are hazardous in nature and can 1
(denoted by “-“ in the Register of
be replaced by more environmentally benign alternatives.
Environmental Aspects). If an
environmental aspect scores “0” for a Consumption of materials that originate from environmentally 1
criterion, it shall be evaluated by the sensitive sources.
remaining criteria one by one. If an Consumption of materials that have little or no potential for 0
environmental aspect scores “0” for all 4 reduce, reuse, recycling, replacement, and are not from
criteria, it is regarded as insignificant. environmentally sensitive sources.
Significant Environmental Aspects shall Corporate concerns RBLPL has received valid, justifiable complaints for similar 1

be taken into account in establishing, situations previously.


implementing and maintaining the EMS, The aspect concerns suppliers’ or contractors’ activities and can 1

they shall be managed by operational potentially be influenced by RBLPL.


control procedures or by establishing The aspect is about selection of suppliers or contractors 1

improvement objectives and targets. The aspect is a corporate concern reflected in the corporate 1

policy
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
None of above 0
Strategies for minimizing Environmental Impact-
Air Emission Management

Air Emission Management


• Built-in Low-NOx burner in gas turbine will reduce the NOx emission.
• Continuous monitoring will be conducted at the stack, testing stack emission and ambient
air quality sampling.
• Moreover, third party monitoring and auditing will be conducted to identify the changes in
ambient air quality and its impact during operation.
• The project will emit more than 1 million tons of GHG hence, require a number of GHG
emission reduction technologies and related policies. In addition, green building concept
will be introduced in order to reduce energy consumption and sustainable energy use.
• Further to that, energy efficient lighting system, rain water harvesting system, roof top solar
panel system, biogas system from sewage materials and also green belt shall be adopted as
an offset technology for reduction of GHG in the local environment.
• The project will emit more than 1 million tons of GHG hence, require a number of GHG
emission reduction technologies and related policies. In addition, green belt shall be
adopted as an offset technology for reduction of GHG in the local environment.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Air Emission Management
Air Emission Monitoring
Action Monitoring Protocol Responsibilities Monitoring Records

Stack emissions (- Sampling Location and • Operation team Environmental Monitoring


CO Monitoring frequency: for CEMS (annually, stack Report
- CO2 • At the top side emission by DoE enlisted
- O2 of stack through emission environmental consultant).
- NOx monitoring port.
- Temperature) • Continuous
Emission Monitoring
System (CEMS) will
monitor emission
characteristics during
normal operation. And
annually third party (DoE
enlisted environmental
consultant) will do the stack
emission test.

Air Quality Monitoring(- • Air Quality  DoE enlisted  Environmental monitoring


CO will be Monitored monthly environmental consultant report
- CO2
- NOx
- NO2
- PM10
- PM2.5
-Reliance Bangladesh
SO2, LNG & Power Limited © 2022 RBLPL All Rights Reserved.
- O3,
Air Emisssion Management

Air Emission Monitoring Locations

SL Monitoring Location GPS

Station Code Coordinate

1 Pachani Bazar, Mongoler Gaon, Sonargaon, AQ-1 23°36'33'' N 90°34'42'' E


Narayanganj

2 Nayagao Jame Mosjid AQ-2 23°37'25.21"N,

90°36'6.98"E

3 Inside the Project Boundary AQ-3 23°36'28'' N 90°35'42'' E

4 Jamaldi, Hossaindi, Gazaria, Munshiganj AQ-4 23°35'45'' N 90°36'55'' E

5 Gowalgaon, Gazaria, Munshiganj AQ-5 23°34'30'' N 90°35'37'' E

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management

Engineering control
Engineering controls for noise management involve implementing physical changes to reduce
or control the generation, transmission, and reception of noise in a workplace or environment
• The power station will be designed and constructed to minimize generation of excessive
noise from the balance of plant and turbine operation as follows:
• The turbine and generator will be housed in soundproof building;
• Diffuser and bottom half of stack will be insulated;
• Additional baffles will be added inside the stack to reduce stack emission noise;
• Noise insulation surrounding turbine casings, and use of rigid foundations
• Insulated and sealing access doors to the turbine building.
• The rotating machinery, such as turbines, pumps, fans etc. should be covered with noise
proof hood to limit the spread of noise.
• Silencer should be used wherever possible.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management

Noise Management

Administrative control
Administrative controls for noise management involve implementing policies, procedures, and
practices to minimize or control exposure to noise in the workplace.
• Restriction of worker’s prolonged exposure to noise by rotating exposure every 2 hours
• The machineries should be maintained properly according to the provided instructions as
proper maintenance can decrease the level of noise significantly.

• A green belt consisting of trees of different heights and canopy coverage should be
developed along the boundary wall of the power plant area.
• Provide regular breaks in quieter areas to allow employees to recover from noise exposure
and reduce the cumulative effects on hearing.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management

Noise Management

Personal Protective Equipment

Personal Protective Equipment (PPE) is an essential component of a comprehensive noise


management program, especially when engineering and administrative controls alone cannot
reduce noise exposure to acceptable levels.
Hearing Protection Devices (HPDs):
Earplugs: These are inserted into the ear canal to reduce the entry of sound. They come in
disposable, reusable, and custom-molded forms.
Earmuffs: These cover the entire outer ear and create a seal with the head, providing a
physical barrier against noise.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management

Noise Level Monitoring


Action Monitoring Protocol Responsibilities Monitoring Records

Noise Level Monitoring Sampling location •DoE enlisted Environmental


and Monitoring environmental consultant Monitoring Report
frequency:
• NL1, NL2,
NL3, NL4, NL5, NL6 &
NL7
• Monthly
and 24 hours.

Noise generation from Sampling Location • Operation team Internal Noise


plant equipment and Monitoring Monitoring records
frequency:
• 1 m from
the noise generation
equipment’s (for all noise
sources greater than 70
dB (A) noise level)
• Frequency -
Bi-annually.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management

Noise Level Monitoring Locations

Monitoring Location GPS


SL.
Station Code Coordinate
1 Pachani Bazar, Mongoler Gaon, Sonargaon, Narayanganj NL-1 23°36'33'' N 90°34'43'' E

2 Nayagao Jame Masjid NL-2 23°37'25.21"N, 90°36'6.98"E

3 Hossaindi, Gazaria, Munshiganj NL-3 23°35'45'' N 90°36'55'' E

4 Gowalgaon, Gazaria, Munshiganj NL-4 23°34'30'' N 90°35'37'' E

5 Adjacent to the Settlement Area, Meghnaghat Plant Road NL-5 23°36'48''N 90°36'6'' E

6 Middle of the Project Site, Meghnaghat, Sonargaon, NL-6 23°36'31''N 90°35'45 '' E
Narayanganj

7 Adjacent to the jetty area, besides Orion power plant NL-7 23°36'45'' N 90°35'28 '' E

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Sources

Type of Waste Anticipated Waste Potential generation


areas/activities
Domestic solid waste Food, packaging, paper, stationery Activities at dormitory, office,
etc. canteen, guard room etc.

Non-hazardous industrial Paper, packaging, metal, plastic, Maintenance activities inside


Waste electrical wiring, e-waste etc. power plant, dormitory, canteen,
guard room etc.

Hazardous waste Discarded/spilled oil and grease, Maintenance activities inside


sludge, chemicals; waste fuel; power plant.
contaminated rags; discarded waste/chemical storage
hazardous material containers; areas etc.
fluorescent lamp; battery;
medical waste such as mask,
bandage, needle, gloves from first
aid room

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Management
Waste sources-

Type of Waste Anticipated Waste Potential generation


areas/activities
Domestic solid waste Food, packaging, paper, stationery Activities at dormitory, office,
etc. canteen, guard room etc.

Non-hazardous industrial Paper, packaging, metal, plastic, Maintenance activities inside


Waste electrical wiring, e-waste etc. power plant, dormitory, canteen,
guard room etc.

Hazardous waste Discarded/spilled oil and grease, Maintenance activities inside


sludge, chemicals; waste fuel; power plant.
contaminated rags; discarded waste/chemical storage
hazardous material containers; areas etc.
fluorescent lamp; battery;
medical waste such as mask,
bandage, needle, gloves from first
aid room

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Management

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Strategies for minimizing
Environmental Impact
Waste Storage & Identification

Three containers/bins at each station shall be in for domestic waste (green),


nonhazardous, industrial waste (yellow), and hazardous waste (red)

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste transportation

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Storage Area

 be located away from water resources


 avoid impacts from rain or have proper cover and roof to avoid rain water and wind
 There is a foundation level to ensure no flooding; ensure the floor is tight, not cracked,
non-permeable, and durable enough to withstand the load of the transport vehicle and
the stored waste.
 Provide a designated hazardous waste storage area inside the power Plant. The size of
the area shall be based on the quantity of hazardous waste to be generated from
operation and maintenance activities.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Signage for Hazardous Waste storage area

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Source of Waste Water
Chemical Waste Water
• Drain water from chemical storage and handling area
• Waste water from fume scrubber and eye shower at chemical handling area
• GT evaporative cooler blow-down water
• Treated Oily Waste Water
• Floor washing water
Oily Waste Water
• Oily waste water from GT Building oily sump
• Oily waste water from ST Building oily sump
• Oily waste water from HRSG area oily sump
• Oily waste water from Workshop & Warehouse oily sump
• Oily waste water from Emergency Diesel Generator oily sump
• Oily waste water from Fire Fighting pump area

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Source of Waste Water

Sewage water
Sewage water generated from Plant area are summarized as below.
• Sanitary water from administration & control building.
• Sanitary water from Guard house.
• Sanitary water from Workshop and Switchyard control building.
• Sanitary water from Demi-Treatment Electrical building.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management

 All waste water generated during the operational phase of the project will be
collected, treated and discharged by complying with the standard value of
parameters set by the regulatory body.
 Chemical waste waters will be drained and directly routed to the Chemical
waste water holding Pond and pumped to the pH regulation tank,
Coagulation tank, Flocculation tank and the Clarifier. From Clarifier it
flows to Treated waste water holding Pond
 The normal Oily Water will be directly drained to the Oily Waste water
holding pond and then pumped to the CPI oil separator for further
treatment. Then the treated Oily Waste Water flows to Chemical Waste
Water Holding Pond.
 Sewage treatment includes the pretreatment of sewage, biological treatments
(equalization, aerobic treatment) and chemical dosing(chlorination).
 Each type waste water after treatment will be collected to the central
monitoring basin.
 Waste water parameters will be checked before disposing to the central
monitoring basin.
 Only after ensuring the parameters within the standard range treated waste
Reliancewater
Bangladesh
will LNG & Power Limited
be discharged or used for gardening purpose.
© 2022 RBLPL All Rights Reserved.
Waste Water Management
Performance Monitoring
Action Indicators Monitoring Protocol Responsibilities Records

- Parameters Sampling Location and Monitoring Frequency:  DoE enlisted  Environmental


mentioned in environmental monitoring report
Waste Water Quality  At the discharge point of Power Plant CMB.
ECR’23, Schedule consultant
at the Discharge
-4, (discharge  Quarterly.
Central Monitoring
Basin location inland
surface water).
Sewage Water Quality - Parameters Sampling Location and Monitoring Frequency:  DoE enlisted  Environmental
after treatment mentioned in environmental monitoring report
 At the STP discharge point after treatment.
ECR’23, Schedule consultant
-3  Quarterly.

Sludge Quality - Pb (Lead) Sampling Location and Monitoring Frequency  DoE enlisted  Environmental
Monitoring environmental monitoring report
- Cd (Cadmium)  Sewage Sludge holding tank before disposing consultant
it for agricultural use.
- Cr (Chromium)

- Cu (Copper)

- Ni (Nickel)

- Hg (Mercury)

- Zn (Zinc)

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Waste Water Treatment process

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Chemical Management

The chemical management plan addresses the sound management of chemicals


for prevention and minimizing the risks for the occupational exposure of the
chemical and release to the environment.

• Chemical inventory will be maintained during operational phase of


the Project.
• Each chemical will be stored in a designated area.
• All chemical container will be properly labelled.
• MSDS instruction will be incorporate with the standard operating
procedure for each chemical handling.
• Only authorized person will handle the chemical.
• Chemical storage area will be maintained properly sealed condition to
avoid any leakage to environment.

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Storage of Chemical
Before storing of any chemical it is important to ensure
that-
 the label on the container to determine the hazard
class & precautions to be taken
 Separation of incompatible materials
 Always segregation of chemicals will be done by
hazard class
 There will be restriction on access to toxic storage
areas whenever possible.
 There will be adequate means of dealing with
spillage and fire situations and that PPE is available
 adequate ventilation will be ensured.
 MSDS should be clearly visible

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Handling of Chemical

Before handling of any chemical-


 Label information and MSDS will be checked and to obey the warnings
and precautions given.
 Use appropriate PPE
 lay out the workspace appropriately to avoid knocking over containers
 In case of spills, immediately clean Carefully (without raising clouds of
dust / vapors

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Handling of Chemical

Before handling of any chemical-


 Label information and MSDS will be checked and to obey the warnings
and precautions given.
 Use appropriate PPE
 lay out the workspace appropriately to avoid knocking over containers
 In case of spills, immediately clean Carefully (without raising clouds of
dust / vapors

Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Procurement

 Purchasing department will include a list of the Environmental


responsibility criteria required of the organizations suppliers.

 Meeting such criteria would be a part of purchasing negotiations between


the organization and the supplier.

 The objective would be to stipulate grades of material that have low


environmental impacts in production, use, and disposal.