Environment Policy
Environmental Regulations governing powerplant
Understanding powerplant Environmental Aspects & Impacts
Identification Environmental aspects & impacts
Determination of significant Environmental impact
Strategies for minimizing Environmental impact
Air Emission Management
Noise Management
Waste Management
Waste Water Management
Chemical Management
Procurement
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Policy
Environmental policy: Environmental policy is the commitment of RBLPL to the laws, regulations, and other
policy mechanisms concerning environmental issues.
RBLPL is committed to-
• 1. Compliance with Environmental Regulations:
• We will comply with all applicable environmental laws, regulations, and other requirements. Our operations
will adhere to the highest standards to ensure the protection of the environment and the well-being of the
communities in which we operate.
• 2. Pollution Prevention:
• We will implement measures to prevent and minimize air, water, and soil pollution associated with our power
plant operations.
• 3. Resource Conservation:
• We are committed to conserving natural resources and minimizing waste generation.
• 4. Adoption of Clean Technologies:
• We will invest in and adopt clean and sustainable technologies that promote the efficient use of resources and
reduce greenhouse gas emissions.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Policy
5. Community Engagement:
We will engage with local communities to foster open communication, address concerns, and contribute
positively to the communities in which we operate.
6. Employee Training and Involvement:
Our employees will be provided with the necessary training to understand and implement environmental
policies and procedures. We encourage all employees to actively participate in environmental initiatives and
suggest ideas for improvement.
7. Monitoring and Reporting:
We will establish comprehensive monitoring systems to regularly assess our environmental performance. 8.
Emergency Preparedness and Response:
9. Continuous Improvement:
We are dedicated to the ongoing improvement of our environmental performance. Regular reviews and
assessments will be conducted to identify opportunities for improvement and the implementation of new
technologies and practices.
10. Stakeholder Collaboration:
We will actively collaborate with government agencies, environmental organizations, and other stakeholders to
promote shared environmental goals and contribute to the broader sustainability objectives of society.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Environmental Regulations governing powerplant
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Identification of Environmental Aspects & Impacts
ASPECTS
An environmental aspect is an element of an organization's activities, products, or
services that has or may have an impact on the environment.
IMPACTS
Possible adverse effects caused by a development, industrial, or infrastructural
project or by the release of a substance in the environment.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Methods of Identification of Environmental Aspects & Impacts
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Identification of Environmental Aspects & Impacts
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Potential Environmental Aspects & Impacts of Powerplant Operation
communities in
Potential Environmental Aspects & Impacts
Power Plant River Water No discharge of untreated The power plant water
Generati Effluent Pollution effluent to the environment or treatment system will be
on The power the river. designed to ensure that the
plant is wastewater meets ECR-2023
expected to before it is drained into the
generate drainage channels
liquid
effluents in
the
form of oily
water,
plant cooling
water,
washing
water, blow
down water,
treatment
system
effluent and
sanitary
wastewater
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Potential Environmental Aspects & Impacts
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Determination of Significant Environmental Aspect
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Significance Evaluation of
Environmental Aspects
Evaluation criteria Conditions Score
The environmental aspects shall be Environmental Expected release of pollutants of severe environmental 1
by one. A score of “1” or “0” will be uncontrolled release of pollutants, or serious damage to flora,
assigned. If an environmental aspect fauna or historical heritage.
scores “1” for a criterion, it is considered The aspect does not have potential environmental impacts of 0
improvement objectives and targets. The aspect is a corporate concern reflected in the corporate 1
policy
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
None of above 0
Strategies for minimizing Environmental Impact-
Air Emission Management
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Air Emission Management
Air Emission Monitoring
Action Monitoring Protocol Responsibilities Monitoring Records
90°36'6.98"E
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management
Engineering control
Engineering controls for noise management involve implementing physical changes to reduce
or control the generation, transmission, and reception of noise in a workplace or environment
• The power station will be designed and constructed to minimize generation of excessive
noise from the balance of plant and turbine operation as follows:
• The turbine and generator will be housed in soundproof building;
• Diffuser and bottom half of stack will be insulated;
• Additional baffles will be added inside the stack to reduce stack emission noise;
• Noise insulation surrounding turbine casings, and use of rigid foundations
• Insulated and sealing access doors to the turbine building.
• The rotating machinery, such as turbines, pumps, fans etc. should be covered with noise
proof hood to limit the spread of noise.
• Silencer should be used wherever possible.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management
Administrative control
Administrative controls for noise management involve implementing policies, procedures, and
practices to minimize or control exposure to noise in the workplace.
• Restriction of worker’s prolonged exposure to noise by rotating exposure every 2 hours
• The machineries should be maintained properly according to the provided instructions as
proper maintenance can decrease the level of noise significantly.
• A green belt consisting of trees of different heights and canopy coverage should be
developed along the boundary wall of the power plant area.
• Provide regular breaks in quieter areas to allow employees to recover from noise exposure
and reduce the cumulative effects on hearing.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Noise Management
Noise Management
5 Adjacent to the Settlement Area, Meghnaghat Plant Road NL-5 23°36'48''N 90°36'6'' E
6 Middle of the Project Site, Meghnaghat, Sonargaon, NL-6 23°36'31''N 90°35'45 '' E
Narayanganj
7 Adjacent to the jetty area, besides Orion power plant NL-7 23°36'45'' N 90°35'28 '' E
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Sources
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Management
Waste sources-
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Management
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Strategies for minimizing
Environmental Impact
Waste Storage & Identification
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste transportation
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Waste Storage Area
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Management
Signage for Hazardous Waste storage area
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Source of Waste Water
Chemical Waste Water
• Drain water from chemical storage and handling area
• Waste water from fume scrubber and eye shower at chemical handling area
• GT evaporative cooler blow-down water
• Treated Oily Waste Water
• Floor washing water
Oily Waste Water
• Oily waste water from GT Building oily sump
• Oily waste water from ST Building oily sump
• Oily waste water from HRSG area oily sump
• Oily waste water from Workshop & Warehouse oily sump
• Oily waste water from Emergency Diesel Generator oily sump
• Oily waste water from Fire Fighting pump area
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Source of Waste Water
Sewage water
Sewage water generated from Plant area are summarized as below.
• Sanitary water from administration & control building.
• Sanitary water from Guard house.
• Sanitary water from Workshop and Switchyard control building.
• Sanitary water from Demi-Treatment Electrical building.
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
All waste water generated during the operational phase of the project will be
collected, treated and discharged by complying with the standard value of
parameters set by the regulatory body.
Chemical waste waters will be drained and directly routed to the Chemical
waste water holding Pond and pumped to the pH regulation tank,
Coagulation tank, Flocculation tank and the Clarifier. From Clarifier it
flows to Treated waste water holding Pond
The normal Oily Water will be directly drained to the Oily Waste water
holding pond and then pumped to the CPI oil separator for further
treatment. Then the treated Oily Waste Water flows to Chemical Waste
Water Holding Pond.
Sewage treatment includes the pretreatment of sewage, biological treatments
(equalization, aerobic treatment) and chemical dosing(chlorination).
Each type waste water after treatment will be collected to the central
monitoring basin.
Waste water parameters will be checked before disposing to the central
monitoring basin.
Only after ensuring the parameters within the standard range treated waste
Reliancewater
Bangladesh
will LNG & Power Limited
be discharged or used for gardening purpose.
© 2022 RBLPL All Rights Reserved.
Waste Water Management
Performance Monitoring
Action Indicators Monitoring Protocol Responsibilities Records
Sludge Quality - Pb (Lead) Sampling Location and Monitoring Frequency DoE enlisted Environmental
Monitoring environmental monitoring report
- Cd (Cadmium) Sewage Sludge holding tank before disposing consultant
it for agricultural use.
- Cr (Chromium)
- Cu (Copper)
- Ni (Nickel)
- Hg (Mercury)
- Zn (Zinc)
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Waste Water Management
Waste Water Treatment process
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Chemical Management
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Storage of Chemical
Before storing of any chemical it is important to ensure
that-
the label on the container to determine the hazard
class & precautions to be taken
Separation of incompatible materials
Always segregation of chemicals will be done by
hazard class
There will be restriction on access to toxic storage
areas whenever possible.
There will be adequate means of dealing with
spillage and fire situations and that PPE is available
adequate ventilation will be ensured.
MSDS should be clearly visible
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Handling of Chemical
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Handling of Chemical
Reliance Bangladesh LNG & Power Limited © 2022 RBLPL All Rights Reserved.
Procurement