The document discusses the stages and process of architectural design. It covers initial contact, preliminary design, working drawings, final design considerations, construction, and as-built plans. It then describes the design process including planning, generation, and evaluation phases. Various design diagrams and considerations are explained.

Uploaded by

df
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

Lecture 3

The document discusses the stages and process of architectural design. It covers initial contact, preliminary design, working drawings, final design considerations, construction, and as-built plans. It then describes the design process including planning, generation, and evaluation phases. Various design diagrams and considerations are explained.

Uploaded by

df
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Lecture 3

Architectural Design
contents

 Stages of design
 Specification and requirement
 Methods of making line and detailed drawing
STAGES OF DESIGN

 1. Initial contact with the client


 2. Preliminary Design Study
 3. Initial Working Drawings
 4. Final Design Considerations
 5. Completion of Architectural and Engineering Drawings
 6. Building Permit Procedure
 7. Construction and Job Supervision
 8. As- Built Plans
 9. Occupancy
2. Architectural Design Process
• Design is a creative process to solve a problem.

• Design involves a lot of decisions

• It is composed of phases and steps

Phases

• Planning Phase: Research & Data gathering

• Generation Phase: Solution creation

• Evaluation Phase: Testing solution


Architectural Design Process (cont…)
Client Brief

Research
Planning
Design Program Phase
Site Analysis
Zone Diagram

Bubble Diagram
Generation
Schematic Diagram Phase`

Volumetric Study

Preliminary Design
Evaluation
Phase Final Design
Architectural Design Process (cont…)

Client Brief

• The client has its own needs, testes and objectives

• Your task is to conceptualize and realize the client’s needs

• Client Brief includes


- Size - Religion - Aesthetical

- Age - Profession preference

-Gender - Functional

- Culture preference
Architectural Design Process (cont…)

Research (Literature Review)

• information gathering about the project

• Sources: books, case study, visit, internet

• Project Research includes


- Function - Spatial Relationship

- Standard Size - Special Requirements

- Furniture - Light, View ,Noise

- Fixture
Architectural Design Process (cont…)

Design Program

• a table consisting of space (room) types & their area

• based on Design Brief and Research

• E.g.

- Living + Dining Rm. …………..30m2

- Kitchen…………………………12m2

-Master Bed Rm. ……….……….20m2

• consult & check weather you attained the client’s need


Design Process: Zone Diagram

• spaces which have similar & related function form zone


• Zone 1( Living Zone) Lobby, Living Rm, Garage, Veranda etc

• Zone 2( Meal Zone) Kitchen, Dining Rm, Breakfast Rm etc

• Zone 3( Sleeping Zone) Master Bed, Ch. Bed, Bath Rm. Etc

• Zone 4( Utility Zone) Store, Laundry, Traditional kitchen etc

• Zoning helps to decide


-Location - Orientation -Privacy

-Level - Circulation
Design Process: Zone Diagram
Design Process: Bubble Diagram
• zone diagram provides rough layout & arrangement zones
• but it is bubble diagram that provides rooms/ spaces
- Relationship - Orientation

- Location - Circulation

• bubbles represent rooms/spaces

• arrows represent circulation

• bubble diagrams are floor plans in terms of bubbles

• try to develop as many bubble diagram as possible till you


meet different design requirements
Design Process: Bubble Diagram
Design Process: Schematic Diagram

• from the bubble diagram the schematic diagram develops


• schematic diagram is a one line drawing

• at this point, think also about the appearance of the bldg


• spaces start to get exact shape, size and location

• consider also the impact of design factors

• you try a number of schematic diagram untill you attain the


clients needs and tests
Design Process: Schematic Diagram
Design Process: Volumetric Study

• when the plan gets shape, start to visualize the form


• perspective or isometric drawings

• volumetric model

• apply elements of design


• elements of design

• principles of design

• make as many volumetric study as possible to come up with

aesthetical pleasing form


Design Process: Preliminary Design

Develop the schematic diagram to preliminary design


• widening walls

• including openings

• structural elements

• adding furniture

• selecting interior and exterior finishing materials

• type of roof

• includes plans, section, elevations, site plan, 3Ds


Design Process: Final Design

• you show the preliminary design to your client

• after getting confirmation from client start preparation of

final design
• Final Design includes rendered, dimensioned and labled:

• Floor Plans
• Sections
• Elevations
• Site Plan
• 3D: Perspective or Model
Minimum requirements

 Room height :- 2.70m


 Any room side width should not be less than 2 meter
 A minimum width a corridor is 1.2meter
 5m*3m is enough for small car parking
 A room should have a minimum of 1.5m set back from
side building and 1m if it is blind wall.
 Fire exit stair should not be far from 15m.
 Ramp for humans -6%(max)
 Ramp for cars – 12%-15%(max).
Thumb Rules for Residential Building
• Living Room
-Minimum Area = 12m2
- Minimum Width = 3m
- Minimum Door Size = 90cm
- Minimum Window Area = 1/10th floor area
- Maximum Window Sill Height = 0.90 cm
- Require View and South Side Exposure
- Should be at the front of a house and accessible from the front door
• Dining Room
- Minimum Area = 12m2
- Minimum Width = 3m
- Minimum Door Size = 90cm
- Minimum Window Area = 1/10th floor area
- Maximum Window Sill Height = 0.90 cm
- Require View and South or East Side Exposure
Thumb Rules for Residential Building (cont…)
• Car Port/ Garage
-Minimum Area = 15m2
- Minimum Width = 3m
- Minimum Length = 5cm
- Should be at the front of a house and accessible from the main gate
• Bed Room
- Minimum Area = 12m2
- Minimum Width = 2.7m
- Minimum Door Size = 90cm
- Minimum Window Area = 1/10th floor area
- Maximum Window Sill Height = 0.90 cm
- Require View and East Side ( morning sun) Exposure
- Should be at the quiet part of the site preferably on upper floors
Thumb Rules for Residential Building (cont…)
• Kitchen
-Minimum Area = 6m2
- Minimum Width = 1.8m
- Minimum Door Size = 90cm
- Should be at the back of a house adjacent to dining room
- Orient to north side ( cooler side) & kitchen yard
- Minimum Window area should be 15% of floor area
- Perimeter of work triangle should be between 3.6m to 6m
• Bath Room
- Minimum Area= 4m2
- Minimum Width = 1.5m
- Minimum Door Size = 70cm
- Bath Rooms should be adjacent to bed rooms
- Minimum Window height is 1.5m
Thumb Rules for Residential Building (cont…)
• Half Bath Room
- For visitors and contain WC and HWB
- Minimum Area = 2.5m2
- Minimum Width = 1.5m
- Minimum Door Size = 70cm
- Should be near living & dining room
- Minimum Window height is 1.5m
- Up to 1.5m height interior walls should be covered with ceramic tile
• Study Room
-Minimum Width = 1.5m
Thumb Rules for Residential Building (cont…)

• Important Points
 Traffic circulation should follow day today activities
 Avoid traffic circulation through rooms
 If a traffic must pass through a room, arrange doors in such a way
that circulation
 affects one side or corner of the room
 The route from Garage to Kitchen be defined and short
 Circulation Area should not exceed 15% of total floor area
 Main Entrance near the center of a house decreases corridor length
Thumb Rules for Residential Building (cont…)
 Main Entrance to a house should be emphasized, inviting and accessible
 In front of Main Entrance there should be a transitional space like:
Veranda, Canopy
 In side a house next to Main Entrance there should be a transitional
space:
Foyer, Lobby, Entrance Hall
 Make the Foyer or Entrance Hall the continuation of the exterior
 Rooms located on west side need sheding
 Locate rooms ( non- sensitive to harsh sun) like WCs, Bath Rms, Store
or Garage on west and south west side